Loading...
HomeMy WebLinkAboutFSD-026-23Clarftwn Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: May 29, 2023 Report Number: FSD-026-23 Submitted By: Trevor Pinn, Deputy CAO/Treasurer Reviewed By: Mary -Anne Dempster, CAO Resolution: GG-113-23 File Number: CL2023-4 By-law Number: Report Subject: Hill Street Rehabilitation Recommendations: 1. That Report FSD-026-23 be received; 2. That Green Infrastructure Partners Inc. with a total bid amount of $912,372.68 (Net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of tender CL2023-4 be awarded the contract for the Hill Street Rehabilitation as required by the Planning and Infrastructure Services Department; 3. That the total funds required for this project in the amount of $1,094,400.00 (Net HST Rebate) which includes construction costs of $912,372.68 (Net HST Rebate) and other related costs such as topographic survey, tree removals, utility relocations (Bell and Hydro One), third -party consultant services to complete material testing, inspection, and contract administration, and contingencies of $182,027.32 (Net HST Rebate) is included in the approved 2022/2023 Capital Budget; and 4. That all interested parties listed in Report FSD-026-23, and any delegations be advised of Council's decision. Municipality of Clarington Report FSD-026-23 Report Overview Page 2 To request authorization from Council to award CL2023-4 for the rehabilitation of Hill Street from Reid Road to Newtonville Road (Regional Road 18). 1. Background 1.1 Tender specifications and drawings were prepared by the Planning and Infrastructure Services Department's Infrastructure Division. The scope of work includes the rehabilitation of Hill Street from Reid Road to Newtownville Road (Regional Road 18). The scope of works includes: • Site grading and earthworks. • Storm sewer replacement / installation. • Road rehabilitation and widening. • Installation of driveway and road culverts. • Local sidewalk replacement. • Permanent erosion control. • Area restoration works. 1.2 Tender CL2023-4 was issued by the Purchasing Services Division and advertised electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyers Association's website. 1.3 Thirty-four (34) companies downloaded the tender document. 2. Analysis 2.1 The tender closed May 5, 2023. 2.2 Seven submissions were received. One submission received did not contain the required bid bond and therefore, has been deemed non -compliant. Six submissions were deemed compliant and forwarded to the Planning and Infrastructure Services Department for review and consideration. 2.3 References were not checked for the low -compliant bidder Green Infrastructure Partners Inc. as the Municipality has worked with this company and the past and their work was satisfactory. Municipality of Clarington Report FSD-026-23 Page 3 2.4 Based on the review by Planning and Infrastructure Services and Purchasing, it was mutually agreed that confirmed that Green Infrastructure Partners Inc. be recommended for award for this project. 3. Financial Considerations 3.1 The total funds required for this project in the amount in the amount of $1,094,400.00 (Net HST Rebate) which includes construction costs of $912,372.68 (Net HST Rebate) and other related costs such as topographic survey, tree removals, utility relocations (Bell and Hydro One), third -party consultant services to complete material testing, inspection, and contract administration, and contingencies of $182,027.32 (Net HST Rebate) is included in the approved Capital Budget and will be funded from the following accounts: Description Account Number Amount Pavement Rehabilitation 110-50-330-83212-7401 $1,041,800 Structures Rehabilitation 110-50-330-83275-7401 52,600 3.2 Queries with respect to the department's needs, specifications, etc., should be referred to the Director of Planning and Infrastructure Services. 4. Concurrence This report has been reviewed by the Director of Planning and Infrastructure Services who concurs with the recommendations. 5. Conclusion It is respectfully recommended that Green Infrastructure Partners Inc. with a total bid amount of $912,372.68 (Net HST Rebate), being the low compliant bidder, be awarded the contract for Hill Street Rehabilitation in accordance with the terms, conditions, and specifications of Tender CL2023-4. Staff Contact: Sandra McKee, Assistant Purchasing Manager, 905-623-3379 Ext. 2210 or smckee@clarington.net. Attachments: Attachment 1 — Bid Summary Interested Parties: List of Interested Parties available from Department. Municipality of Clarington Report FSD-026-23 Page 4 Attachment 1 to Report FSD-026-23 — Bid Summary Municipality of Clarington CL2023-4 Hill Street Rehabilitation Bidder Total Bid (Including HST) Total Bid (Net HST Rebate) Green Infrastructure Partners Inc. $1,013,149.69 $9121372.68 Broz Excavating Inc. 1,088,426.30 980,161.60 Montgomery MacEwen Contracting 1,220,842.54 1,099,406.52 Dig -Con International Ltd. 1,430,015.00 1,287,772.80 Dufferin Construction Company 1,522,704.38 1,371,242.46 Fidelity Engineering & Construction 1,533,870.57 1,381,297.96 Elirpa Construction & Materials Ltd. 1,562,058.66 1,406,682.20 Dig -Con International Ltd.* Note: The asterisk denotes a non -compliant bidder.