Loading...
HomeMy WebLinkAboutCS-18-83DEPARTMENT OF COMMUNITY SERVICES REPORT TO GENERAL PURPOSE AND ADMINISTRATION COMMITTEE REPORT NO. CS -18 -83 I U _ 3 OFF ICE TELEPHONE 623 -3114 TOLL FREE 987 -5039 40 TEMPERANCE STREET BOWMANVILLE, ONTARIO L1C 3A6 MEETING OF NOVEMBER 7, 1983 SUBJECT: EMPLOYMENT DEVELOPMENT PROGRAM RENOVATIONS TO PUBLIC BUILDINGS AND.PROPERTY RECOMMENDATION: 1. That this report be received for information. BACKGROUND & C014MENTS: Through the co- operation of the Provincial and Federal Governments, the Town of Newcastle received grant funds through the Employment Development Program. As a result, the Community Services Department received a portion of these funds to perform work related to renovations of public buildings and property. Through referrals from the Canada Manpower Office, a foreman and four (4) labourers were hired for the duration of the project. The following is a recap of jobs completed through this program. (a) ABANDONED CEMETERIES (April 18 - May G) - general clean up, trim trees, shrubs etc. - relocation of headstones - erect fences - remove tree stumps - landscaping and land leveling (b) BOWMANVILLE LIBRARY (May 9 - Play 13) - painted lower level of building (hallway, foyer, auditorium and offices) ../2 \\ t} REPORT NO. CS -18 -83 IV (a) Page 2. (c) DARLINGTON SPORTS CENTRE (May 16 - June 10) - painted interior of building (washrooms, hallways, seating area) (d) NEWCASTLE COMMUNITY HALL (June 13 - June 23) - painted lower level of hall, including bowling alley, a number of rooms and downstairs kitchen - sanded and re- varnished woodwork on stage and walls of main hall (e) BOWMANVILLE MEMORIAL PARK POOL (former) (June 29 - June 30) - the former pool was filled in, levelled and landscaped (sodded) (f) BELL BUILDING (July 4 - July 15) - painted interior of building (complete) - sanded and finished all wood doors. (g) ORONO TOWN HALL (July 18 - July 29) - main hall, stage and floor was stripped of old varnish, sanded and finished - lower floor, hallways and offices were painted (h) ORONO ARIIORIES BUILDING (Aug. 1 - Aug. 19) - general clean up of entire building (excluding insurance office) - hardwood floors all stripped, sanded and finished - removed portion of walls to open three (3) small offices into one large room. - construction of reception area - painted complete interior of hall and offices (i) HAYDON HALL (Aug. 22 - Aug. 26) - general clean up around building - painted kitchen and fire escape - installed new facia board - installed new eavestroughs (j) HAPIPTON HALL (Aug. 29 - Sept. 9) - strip main hall of paint - install new tile floor - painted walls in kitchen, hall and entrance way ../3 REPORT N0. CS -18 -83 Page 3. (k) NEWCASTLE VILLAGE ARENA (Sept. 12 - Sept. 20) - painted interior of arena seating including floors - installed and painted plywood sheeting on boards (arena) - painted exterior block work on east,south and west sides of arena (1) NEWCASTLE VILLAGE FIRE .WALL (Sept. 21 - Sept. 23) - painted interior of hall including kitchen and hose room - painted exterior doors (m) BROWNSDALE C01"1MUNITY CENTRE (Sept. 26 - Sent. 29) - installed drainage tile - repaired inside wall - painted interior of building (n) BOVIMANVILLE MEMORIAL ARENA (Sept. 28 - Sept. 30) - installed cold mix pad at rear of arena to accommodate ice re- surfacer (o) ANIMAL CONTROL SWELTER (Oct. 3 - Oct. 7) - painted interior office and kennels - constructed reception counter in staff office (p) HAMPTON MUNICIPAL BUILDING (Oct. 5) - repaired parking lot Generally, this program accomplished a great deal of work throughout the municipality. I was especially pleased with our work crew who displayed a conscientious effort in performing their duties during the summer. As a result, many favourable comments were received throughout the program period.