HomeMy WebLinkAboutWD-72-83CORPORATION OF THE TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT R. DUPUIS, P. ENG., DIRECTOR HAMPTON, ONTARIO TEL. (416) 263 -2231 LOB 1JO 987.5039 REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE MEETING OF SEPTEMBER 6, 1983. REPORT NO.: WD-72-83 SUBJECT: SCHEDULING OF RECONSTRUCTION OF HOLT ROAD BETWEEN HIGHWAY 401 AND BASELINE ROAD. RECOMMENDATION: It is respectfully recommended: 1. That reconstruction of Holt Road between Highway 401 and Baseline Road be deferred in response to a request by the Hydro Liaison Committee; and, 2. That the condition of the road and amount of traffic using Holt Road be monitored to allow appropriate scheduling of reconstruction; but, that said reconstruction be deferred no more than five years; and, 3. That safety improvements to the intersection of Holt Road and Baseline Road be scheduled for 1984; and, 4. That directional and safety signs be installed immediately at the intersection of Holt Road and Baseline Road; and, 5. That a copy of this report be forwarded to Ontario Hydro with a request that they confirm their agreement with the above recommendations., /lC/ Page 2 REPORT WD -72 -83 BACKGROUND: The Town has, in its 1983 Budget, scheduled reconstruction of Holt Road between Highway 401 and Baseline Road with project costs of approximately $300,000 to be recovered from the Ontario Hydro Station "A" Account® More recently, Ontario Hydro has reviewed the need for reconstruction and feels that traffic demands have not substantially materialized; nor, is the traffic causing damage to Holt Road. Accordingly, they are requesting that the reconstruction project be deferred. As a result of the above, a report was presented to the Hydro Liaison Committee with the following recommendations: 1. That the Hydro Liaison Committee request the Town of Newcastle to defer reconstruction of Holt Road between Highway 401 and Baseline Road a further year; and, 2. That in the meantime, discussions take place between Hydro and Town Staff with respect to timing of interim improvements and ultimate construction requirements; and, 3. That a recommendation be made to Hydro Liaison Committee and the Council of the Town of Newcastle as a result of such discussions. Council considered and adopted the recommendations and, subsequently, a meeting was held between Hydro and Town staff. After some discussion it was mutually agreed that the requirement for reconstruction of the subject section of Holt Road was not urgent and that the situation should be monitored to determine when construction should occur. -)� �V-- / (c ) Page 3 REPORT WD -72 -83 The need for interim improvements was also discussed and it was felt that safety considerations dictate that improvements to the intersection of Holt and Baseline Roads should proceed as quickly as possible. There are just too many potential conflicts between Hydro construction traffic and local traffic, which includes school buses. Therefore, consideration should be given to improving the intersection in 1984. During the discussions it was also felt that traffic signs ( warning of the intersection and perhaps oversized stop signs would be of immediate benefit. Also, signs providing direction to the Darlington site would eliminate much inconvenience to local residents created by visitors who lose their way to the site. Prior to the Town proceeding with any of the above, it would be worthwhile to secure Hydro's concurrence, since the required funding would be drawn from the Station "A" Account. Following the recommendations of this report should deal with the issue of Hydro generated traffic and Hold Road in a very acceptable manner. Accordingly, it is recommended that the Town endorse this approach. Respectfully submitted, t R.G. Dupuis, P. Eng., Director of Public Works. RGD : j co August 17, 1983.