SUBJECT: "STREAM BANK IMPROVEMENTS" (ORONO PARK)
RECOMMENDATIONS: It is respectfully recommended that the General Purpose
and Administration Committee recommend to Council the
following:
1. That this report be received; and
2. That Council authorize the Orono Park Stream Bank
Improvements Project; and
3. That Council authorize payment for materials from the
Reserve Account #1100 -X -166 -6 to an upset limit of
$2,500.00
BACKGROUND & COMMENT:
During this past spring, the Orono Park stream experienced excessive
erosion along portions of its banks, making it unsafe for public use in
some areas.
The Department of Community Services in conjunction with Ganaraska Region
Conservation Authority have assessed the improvements necessary and
Ganaraska has provided plans for upgrading the stream banks (please find
attached).
As in the past, labour for the project will be provided by the Community
Services Department and can be accommodated through our current operating
budget. However, material costs for this project were not included in our
budget preparations as the problem did not exist until Spring of this year.
../2
f
t
tl j .5(a>
REPORT NO. CS -07 -84
Page 2..
This project deserves immediate attention to ensure the safety of patrons
using the park and to defer the continual deterioration of the Orono Park
stream banks.
Respectfully submitted,
a-", 6(' --- � 'r- '
Thomas A. Fanning, R.D.H.R.(F)
Director of Community Services
Joseph P. Caruana, D /Director
Department of Community Services
'• 1• i
REGION CONSERVATION AUTHORITY
Oano_Talko'
Mr. Thomas A. Fanning, Director
Department of Community Services
Town of Newcastle
40 Termperance Street
BOWMANVILLE, Ontario
L1C 3A 6
Dear Mr. Fanning:
416 -885 -8173
P.O. BOX 328,
PORT HOPE, ONTARIO
LIA 3W4
Enclosed are plans for the further upgrading of the streambanks in
Centennial Park, Orono. Please call our office at 885 -8173 and speak
to Bill Newell if you have any questions regarding these plans.
A site meeting between your staff and our prior to commencement of
operations may be beneficial for final clarification of the plans.
Yours truly,
ya414
D.H. Palmer
Secretary-Manager
DHP /B. Newell /jml
Encl.
�v
d
STREAM IMPROVEMENTS - aRONO PARK - 1984
Site A - Remove 2 lower gabions. Put in 2 foundation gabions.
Reinstall original gabions.
Site B.- From tree, 35 yds. downstream to bridge remove concrete
slabs and replace with Rip -Rap.
Site C.- Remove bridge. 9 (1'x3'x6') gabions on each side of
creek. Position as per diagram.
Site D.- 20 ft. Rip -Rap
Site E_- 40 ft. Rip -Rap
Material
22 1'x3'x6' gabions
65 tons 4" - 8" stone
50' of 10' wide filter mat
Phone: Maccaferri (416)429-3380 for current municipal rates