Loading...
HomeMy WebLinkAboutCS-06-84col . •! • • •fl • �� DEPARTMENT OF COMMUNITY SERVICES OFFICE TELEPHONE 623 -3114 TOLL FREE 987 -5039 40 TEMPERANCE STREET BOWMANVILLE, ONTARIO L1C 3A6 REPORT TO GENERAL PURPOSE & ADMINISTRATION COMMITTEE MEETING OF JUNE 4, 1984 REPORT NO. CS -06 -84 SUBJECT: "BOWMANVILLE MEMORIAL ARENA IMPROVEMFNTS" RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. That this report be received; and 2. That approval be given to the repairs shown on Priority List Number One as they relate to the Bowmanville Memorial Arena; and 3. That consideration be given to the repairs shown on Priority List Number Two as they relate to the Bowmanville Memorial Arena. BACKGROUND AND COMMENTS: According to the Town of Newcastle Five Year Forecast, the construction of a new arena in Bowmanville is proposed for commencement in the year 1987. If this is the case, then I would like to advise Council that the various maintenance items shown on the attached Priority List Number One should be carried out as soon as possible for the welfare and safety of the patrons using the premises. If we do not continue to perform preventive maintenance in the Bowmanville Arena at the present time, we will face further deterioration in the arena, making it unsafe for people to use. 6(4 REPORT NO. CS -06 -84 Page 2. Council should give some consideration to Priority List Number Two in Budget Discussions in 1985 or earlier if funds are available. Each budget year, until such time as the Bowmanville Arena is replaced, Council should set aside funds for such necessary maintenance items. Each amount is likely to increase with each year of the buildings operation. TAF:sda,. Bowmanville Memorial Arena Priority Repairs for 1984 Labour 1. Public Washrooms: a) Paint both rooms 14 x $10.= 140.00 b) Replace floor tiles in Ladies Washrooms 6 x $10.= 60.00 c) Repair Ceiling (Mens) 4 x $10.= 40.00 d) Repair Door (Mens) 1 x $10.= 10.00 250.00 2. Dressing Rooms: a) Replace frame and door on room #2. 8 x $10.= 80.00 b) Repair frames and doors, room # 1,3 & 4 8 x $10.= 80.00 c) Repair holes in interior doors and walls 2 x $10.= 20.00 180.00 3. Arena Ice Surface Area: a) Fix west sliding fire door 2 x $10.= 40.00 b) Replace both south exit doors including panic bars and hardware 7 x $20.= 140.00 c) Repair seats 6 x $10.= 60.00 d) Replace broken and cracked ice surface PRIORITY LIST TV NUMBER ONE Materials 80.00 110.00 75.00 25.00 • 1 11� Total 220.00 170.00 115.00 35.00 540.00 350.00 430.00 400.00 480.00 50.00 70.00 800.00 980.00 50.00 90.00 1,000.00 1,140.00 90.00 150.00 5. Compressor Room: a) Repair Condensor leak & bearings b) Repair Ketch Basin GRAND TOTALS 8 x $30.= 240.00 1,000.00 1,240.00 16 x $10.= 160.00 125.00 285.00 400.00 1,125.00 1,525.00 1,710.00 4,195.00 5,905.00 boards 32 x $10.= 320.00 200.00 520.00 e) Weld and replace board screening 15 x $10.= 150.00 150.00 710.00 1,340.00 2,050.00 4. Arena Exterior: a) Repair Compressor Room exit steps 4 x $10.= 40.00 150.00 190.00 b) Replace Main Front Door 3 x $10.= 30.00 220.00 250.00 c) Repair Main Door Cement sill 6 x $10.= 60.00 200.00 260.00 d) Repair Roof - Mens Washroom 4 x $10.= 40.00 70.00 110.00 170.00 640.00 810.00 5. Compressor Room: a) Repair Condensor leak & bearings b) Repair Ketch Basin GRAND TOTALS 8 x $30.= 240.00 1,000.00 1,240.00 16 x $10.= 160.00 125.00 285.00 400.00 1,125.00 1,525.00 1,710.00 4,195.00 5,905.00 Bowmanville Memorial Arena Second Priority Repairs for 1984 Labour 1. Canteen & Office: a) Sand and varathane, tongue and groove, outer counter wall b) Paint interior of canteen c) Paint lower half of warm room 2. Arena Ice Surface Area: l PRIORITY LIST U -�((') NUMBER TIVIO Material Total 8 x $10.= 80.00 75.00 155.00 45 x $10.= 450.00 95.00 545.00 30 x $10.= 130.00 80.00 210.00 660.00 250.00 910.00 a) Replace kick boards 48 x $10.= 480.00 b) Replace ice surface zamboni room doors 48 x $10.= 480.00 including hardward & wire c) Paint bleacher seats 160 x $10.= 1600.00 d) Build players box seats 16 x $10.= 160.00 3. Arena Exterior: a) Repair fence 4. Compressor Room: a) Paint compressor room 2,720.00 4 x $10.= 40.00 80 x $10.= 800.00 GRAND TOTALS 4,220.00 300.00 780.00 1,300.00 1,780.00 800.00 2,400.00 300.00 460.00 2,700.00 5,420.00 130.00 170.00 150.00 1/ 3,230.00 • !/