DEPARTMENT OF COMMUNITY SERVICES
OFFICE TELEPHONE 623 -3114
TOLL FREE 987 -5039
40 TEMPERANCE STREET
BOWMANVILLE, ONTARIO
L1C 3A6
REPORT TO GENERAL PURPOSE &
ADMINISTRATION COMMITTEE MEETING OF JUNE 4, 1984
REPORT NO. CS -06 -84
SUBJECT: "BOWMANVILLE MEMORIAL ARENA IMPROVEMFNTS"
RECOMMENDATIONS: It is respectfully recommended that the General Purpose
and Administration Committee recommend to Council the
following:
1. That this report be received; and
2. That approval be given to the repairs shown on Priority
List Number One as they relate to the Bowmanville Memorial
Arena; and
3. That consideration be given to the repairs shown on
Priority List Number Two as they relate to the Bowmanville
Memorial Arena.
BACKGROUND AND COMMENTS:
According to the Town of Newcastle Five Year Forecast, the construction of a
new arena in Bowmanville is proposed for commencement in the year 1987. If
this is the case, then I would like to advise Council that the various
maintenance items shown on the attached Priority List Number One should be
carried out as soon as possible for the welfare and safety of the patrons using
the premises.
If we do not continue to perform preventive maintenance in the Bowmanville Arena
at the present time, we will face further deterioration in the arena, making it
unsafe for people to use.
6(4
REPORT NO. CS -06 -84
Page 2.
Council should give some consideration to Priority List Number Two in Budget
Discussions in 1985 or earlier if funds are available.
Each budget year, until such time as the Bowmanville Arena is replaced, Council
should set aside funds for such necessary maintenance items. Each amount is
likely to increase with each year of the buildings operation.
TAF:sda,.
Bowmanville Memorial Arena
Priority Repairs for 1984
Labour
1. Public Washrooms:
a)
Paint both rooms
14 x
$10.=
140.00
b)
Replace floor tiles in
Ladies Washrooms 6 x
$10.=
60.00
c)
Repair Ceiling (Mens)
4 x
$10.=
40.00
d)
Repair Door (Mens)
1 x
$10.=
10.00
250.00
2. Dressing Rooms:
a) Replace frame and door on room #2. 8 x $10.= 80.00
b) Repair frames and doors, room # 1,3 & 4 8 x $10.= 80.00
c) Repair holes in interior doors and
walls 2 x $10.= 20.00
180.00
3. Arena Ice Surface Area:
a) Fix west sliding fire door 2 x $10.= 40.00
b) Replace both south exit doors including
panic bars and hardware 7 x $20.= 140.00
c) Repair seats 6 x $10.= 60.00
d) Replace broken and cracked ice surface
PRIORITY LIST TV
NUMBER ONE
Materials
80.00
110.00
75.00
25.00
• 1 11�
Total
220.00
170.00
115.00
35.00
540.00
350.00 430.00
400.00 480.00
50.00 70.00
800.00 980.00
50.00 90.00
1,000.00 1,140.00
90.00 150.00
5. Compressor Room:
a) Repair Condensor leak & bearings
b) Repair Ketch Basin
GRAND TOTALS
8 x $30.= 240.00 1,000.00 1,240.00
16 x $10.= 160.00 125.00 285.00
400.00 1,125.00 1,525.00
1,710.00 4,195.00 5,905.00
boards
32
x
$10.=
320.00
200.00
520.00
e)
Weld and replace board screening
15
x
$10.=
150.00
150.00
710.00
1,340.00
2,050.00
4. Arena Exterior:
a)
Repair Compressor Room exit steps
4
x
$10.=
40.00
150.00
190.00
b)
Replace Main Front Door
3
x
$10.=
30.00
220.00
250.00
c)
Repair Main Door Cement sill
6
x
$10.=
60.00
200.00
260.00
d)
Repair Roof - Mens Washroom
4
x
$10.=
40.00
70.00
110.00
170.00
640.00
810.00
5. Compressor Room:
a) Repair Condensor leak & bearings
b) Repair Ketch Basin
GRAND TOTALS
8 x $30.= 240.00 1,000.00 1,240.00
16 x $10.= 160.00 125.00 285.00
400.00 1,125.00 1,525.00
1,710.00 4,195.00 5,905.00
Bowmanville Memorial Arena
Second Priority Repairs for 1984
Labour
1. Canteen & Office:
a) Sand and varathane, tongue and groove,
outer counter wall
b) Paint interior of canteen
c) Paint lower half of warm room
2. Arena Ice Surface Area:
l PRIORITY LIST
U -�((')
NUMBER TIVIO
Material Total
8 x $10.=
80.00
75.00
155.00
45 x $10.=
450.00
95.00
545.00
30 x $10.=
130.00
80.00
210.00
660.00
250.00
910.00
a)
Replace kick boards
48 x
$10.=
480.00
b)
Replace ice surface zamboni
room doors 48 x
$10.=
480.00
including hardward & wire
c)
Paint bleacher seats
160 x
$10.=
1600.00
d)
Build players box seats
16 x
$10.=
160.00
3. Arena Exterior:
a) Repair fence
4. Compressor Room:
a) Paint compressor room
2,720.00
4 x $10.= 40.00
80 x $10.= 800.00
GRAND TOTALS 4,220.00
300.00 780.00
1,300.00 1,780.00
800.00 2,400.00
300.00 460.00
2,700.00 5,420.00
130.00 170.00
150.00 1/
3,230.00 • !/