Loading...
HomeMy WebLinkAboutWD-21-84�� M A _ 0 PUBLIC WORKS DEPARTMENT HAMPTON, ONTARIO LOB 1JO R. DUPUIS, P. ENG., DIRECTOR TEL. (416) 263.2231 987.5039 REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE MEETING OF FEBRUARY 6, 1984. REPORT NO.: WD -21 -84 SUBJECT: RILLS OF LIBERTY NORTH PART LOT 11, CONCESSION 3, FORMER DARLINGTON REQUEST FOR COMPLETION CERTIFICATE RECOMMENDATION: It is respectfully recommended: 1. That this report be received; and, 2. That the Director of Public Works be authorized to issue a Completion Certificate for those works installed and completed in accordance with Stage 1 of the subdivision agreement between the Town of Newcastle and East Woodbridge Developments Ltd., as amended; and, 3. That the maintenance period for the completed works commence February 14, 1984. NWA 4 t�, Page 2 REPORT NO.: WD -21 -84 BACKGROUND & REPORT: On July 13, 1981, the Town of Newcastle entered into a subdivision agreement with East Woodbridge Developments and Mutt Enterprises for the construction of a residential rural estate subdivision known as the Rills of Liberty, Lot 11, Concession 3, former Darlington. A staging plan was approved and Conro Construction Ltd., of Weston, Ontario, was contracted by the developer to construct Regional and Town services in Stage 1 of the subdivision. In September of 1982, Regional Works Staff conducted a final inspection of Regional services and found the work performed to be complete, in accordance with approved plans and construction documents. Regional services were placed on a two year maintenance period commencing September 15, 1982. At that time, works required to be constructed in accordance with Schedule G of the Town's agreement were not complete. On review of Schedule "G ", it became apparent that certain works required to be constructed would be better left unfinished until a future date. An example of such works would be Section "G" 2, Roadways, which states that the owner agrees to the grading and paving of all driveways to the property line, in accordance with the Town of Newcastle's Design Criteria and Standard Drawings. Page 3 REPORT NO.: WD -21 -84 The Rills of Liberty is a rural estate subdivision with individually custom built homes, therefore, it is difficult to locate driveways before the house locations are established. In order to accommodate incomplete works such as this, the Town entered into an amending agreement dated June 13, 1983, which allows those works not completed to be excluded from the Completion Certificate. East Woodbridge have now requested that a Completion Certificate be issued for the works constructed, to -date. Public Works Staff have inspected the work and concur with the request. The final course of asphalt installed late last fall has some minor deficiencies which are to be repaired by the contractor in the Spring of 1984. When these deficiencies are repaired, a Completion Certificate will be issued for the final course of asphalt. The Town presently holds a letter of credit in the amount of $303,530.00 as financial security for completion and maintenance of the works. It is, therefore, recommended that the request of East Woodbridge for a Completion Certificate for works satisfactorily completed, be granted as of February 14, 1984. Respectfully submitted, R.G. Dupuis, P. Eng., Director of Public Works. DTG:jco January 31, 1984. 3 2 15 13 E 12 19 17 18 9 10 WA=W 23 2,1 22 28 tR 30 25 27 21 31 26 32 33 17- 37 36 35 'N 3,1 39 '10 13 15 16 t 42 ILO(I 47 f I, f I A 20^i- 19 ()(TAIL 'S' SURVEYOR'S CERW OWNER'S CER11FICAT • Z;;; F 7.. 17 1-- NolEs �aA � � RECEIVE 2­4m� JAN 1 7 1984 TELEPHONE (416) 669 -4432 7501 KEELE STREET a}1{(eQCial¢e SUITE 200 P.O. BOX 5000 CONCORD, ONTARIO L4K 166 January 17, 1984 Town of Newcastle Public Works Department Scugog Street Hampton, Ontario LOB 1J0 ATTENTION: MR. R. DUPUIS, P. ENG. RE: RILLS OF LIBERTY SUBDIVISION Dear Sir: Further to our meeting of January 16th, you are requested to grant Completion Approval on the subject subdivision for those sections of the works which are complete. It is understood that Completion Approval for the top course of asphalt is subject to completion of any remedial work required as a result of an inspection to be carried out in the spring. However, you indicated that provided this work was carried out expeditously the top course completion date would be set to coincide with the current Completion Approval (anticipated as February 13, 1984) I have also requested that "as built drawings" be forwarded to you.. from Anton Kikas Limited this week. A statutory declaration regarding payments in enclosed herewith. 1 Yours truly, EAST WOODBRIDGE DEVELOPMENTS LIMITED Per: Maurice Stevens, P. Eng. MS:pp Encl. C.C. - Anton Kikas Limited Attention: J. Stewart