DEPARTMENT OF COMMUNITY SERVICES
REPORT TO THE GENERAL PURPOISE AND ADMINISTRATION COMMITTEE
MEETING OF MAY 21, 1985
REPORT NO. CS -11 -85
E,
.. C. HAND -OUT I, ''
OFFICE TELEPHONE 623.3114
TOLL F RE E 987.5039
SUBJECT: BOWMANUILLE ARENA FEASIBILITY STUDY UPDATE
RECOMMENDATIONS:
It is respectfully recommended to Council:
1. That CS -11 -85 be received for information.
BACKGROUND AND C0',RIENT:
40TEMPERANCESTREET
BOWMANVILLE, ONTARIO
L 1 C 3A6
This report is intended to update Council on the progress of the Bowmanville Arena
Feasibility Study.
Our Consultant, Rethink Inc., has provided a progress report attached for information.
It essentially outlines the tasks which have been accomplished to date and future
tasks still to be undertaken to complete the study.
As part of the study team meeting May 16, 1985, Claudius Carnegie of A.J. Graham
Engineering Consultants Ltd. presented a document entitled "Investigation and
Evaluation of the Bowmanville Arena for the Corporation of the Town of Newcastle''.
The report gives a detailed evaluation of our current facility from a structural
and technical point of view. Attached please also find a copy of the "Executive
Summary" of this report. This report is available from the consultant or the study
team.
../2
REPORT NO. CS -11 -85
Page 2.
The study process chart indicating the stage of the planning process is also
attached.
It is important to note that the figure of $2,300,000—for a new arena reflects
the cost of a modern facility comparable in size and functional use to tale
existing arena structure. No land costs or ancillary facilities such as meeting
halls, paved parking, landscaping etc. are included in the $2.3 million figure.
Respectfully submitted,
Jan Devantier, R.D.M.R.
Director of Community Services
JD /sa
Encl.
OVdo
ink
IINCORPORATED
BOWMANVILLE ARENA FEASIBILITY STUDY - TOWN OF NEWCASTLE
PROGRESS REPORT - MAY 16, 1985
1. Initial meetings with Community Services Department staff and the
Feasibility Study Committee.
2. Completed an overview of the Community, including a site visit to
most relevant facilities, and discussions about the way leisure
services are provided in Newcastle.
3. Evaluated and analyzed most of the existing data base that has
been made available to us.
4. Held a press conference (March 12, 1985) - newspaper articles.
5. Sent questionnaires to many community recreation groups, service
clubs and major facility operators (private and volunteer).
6. Examined much of the demographic and other community profile and
trends data supplied by the Planning Department and contained in
the Master Plan and other documents.
7. Completed the investigation and evaluation of the Bowmanville
Arena (except for user group perceptions).
8. Have begun to examine the facility base in the Newcastle area
(relevant to the types of facilities under study).
i
9. Collected a good deal of the available data on facility use and
related program participation.
10. Preparation is almost complete for a series of resident workshops
to be completed on May 22 and 23, 1985.
11. Conducted a session with Newcastle Town Council (March 29, 1985).
12. Conducted a session with the Newcastle Comunity services Planning
Board (April 25, 1985).
13. Conducted a session with key staff from the Board of Education
and Newcastle High School (March 27, 1985).
....cont'd
1206 Goviriaught Drive, VIR #1, Ennisrnore, Ontario KOL I TO 706 - 292 -5331
- 2 -
14. Interviewed Sue Stickley (March 27, 1985).
15. Interviewed Gail Willoughby and Janice Griffith from the "Y"
(March 27, 1985).
16. Begun the preliminary investigation of potential sites.
NEXT STEPS
1. Tour of potential sites (May 16, 1985).
2. Workshop.;with seniors (May 22, 1985).
3. General Interest Workshop (May 22, 1985).
4. Workshop with arena users (May 23, 1985).
5. Analyze returned questionnaires.
6. Notify Town Council of the upcoming workshops and our
recommendations re: the Bowmanville Arena (May 16, 1985).
7. Complete the visits to major facilities and developments.
8. Once all of the data is in and workshops completed, the
assessment of the facility adequacy and facility requirements
(market) can be completed.
9. We can then determine all feasible facility and site options to
meet known facility requirements.
10. At that point, Stages 1 and 2 will be complete.
:�
1.0 EXECUTIVE SUMMARY
As part of the Bowmanville* Arena Feasibility Study process, this facility
has been inspected, analysed, evaluated and the following conclusions
and recommendations are provided.
The entire complex is currently in a state of dis- repair. This current
state threatens the medium to long term durability and serviceability
of the complex. In order to ensure adequate long term durability and
serviceability, a capital expenditure of about $301,500.00 must be made
within the next nine months for appropriate repairs, and after that, an
annualized maintenance cost of about $23,000.00 would be required to
maintain a reasonable level of service. Should these repairs be undertaken,
then another detailed inspection /evaluation of the entire complex would
be required in about five years time. At that time, further major
renovations may be required, notwithstanding functional obsolescence.
To put this into perspective then, a five year life cycle cost of about
$420,000.00 is a minimum to maintain this complex in a serviceable state
and with no guarantee of functional adequacy.
A modern facility, that is functionally adequate can be built with 1985
dollars, for about $2,300,000.0o:** Year-round optimum use can be made
of this facility, with substantial increase in revenue to the Town, and
a service life of the building of 50 years minimum with nominal annualized
maintenance cost. Using salvageable components of the existing facility
will lower this cost.
It is recommended that use of this complex be phased out over a period
of less than two years and that a new facility be constructed within that
time, to meet current and forecasted needs. It is further recommended
that while the complex is in service, that at least two inspections per
year be carried out by a registered Professional Structural Engineer from
the Province of Ontario, until the recommended repairs are undertaken.
However, stop -gap repairs with an estimated cost of $65000.00 can be
undertaken in the next two years, only if the Town can decide to phase
out use of the existing facility in that time frame, and if these prescribed
inspections are carried out.
It is advised that the Town shall be cognizant of their duties, pursuant
to the Occupational Health and Safety Act (1978) and Regulations for
Industrial Establishments Section 14 - (1); (a) to (e) inclusive.
* *Cost of comparable arena excluding land purchase or ancillary
facilities not part of the existinn arena.
PROGRESS TO DATE (.'1AY 16, 1985)
SUMMARY OF PLANNING PROCESS -- BOWMANVILLE ARENA FEASIBILITY STUDY -- TOWN OF NEWCASTLE
f nmpi PTFF1 *PART _ /C.nmP1 FTFn
W
O
R
K
P
R
O
G
R
A
M
FIGURE 1
STAGE I
PRELIMINARY WORK
hh�
STAGE 2
RESEARCH &
ANALYSIS
• PRESS RELEASE
STAGE 3
EVALUATE & SELECT
PREFERRED FACILITY
OPTION
• OTHER AN40UNCERE4TS
F 4
LED
4.ENDAT I ONS
• CALL FOR SUBMISSIONS
STAGE 5
DOCUI.ENTAT I ON &
PRESENTATION
• INITIAL MEETING
• NEEDS ASSESSMENT
• ASSESS WHICH ALTERNA-
pp'
• FACILITY CONCEPT • PREPARE DRAFT REPORT
WITH STUDY TEAM
* - COMMUNITY BACK-
FST
TIVE MOST MEETS RE-
& SPECIFICATIONS • REVIEW DRAFT REPORT
• EVALUATE EXISTING
GROUND
QUIREMENTS OF EACH OF
• USES & PROGRAMS WITH STUDY TEAM, MiR,
DATA BASE
- PRESENT & FUTURE
THE PRIMARY USER
• CAPITAL CONSTRUCTION COUNCIL
• OVERVIEW OF
DEMAND & EXPECTA-
GROUPS
COSTS • PREPARE FINAL REPORT
COMMUNITY
TIONS
• EVALUATE OPTIONS/
• CAPITAL FINANCING • PRSENT FINAL REPORT
- UPDATE INVENTORY
CONCEPTS
COSTS
- STUDY SOCIAL IMPACT
- EXAMINE IMPACT ON
• CAPITAL FINANCING
• DETERMINE FACILITY
OTHER FACILITIES
• OPERATING PL/NI
REQUIREMENTS /OPTIONS/
- PRELIMINARY FINAN-
• IMPLEMENTATION
CONCEPTS /SOLUTIONS
CIAL ASSESSMENT
SCHEDULE
- DETERMINE FACILITY
- EXAMINE IMPACT ON
• ONTARIO HYDRO IMPACT
REQUI REMEMS
EXISTING & PLAZ04ED
*- EVALUATE ADEQUACY
MUNICIPAL SERVICES
OF EXISTING &
• SELECT & REFINE PRE-
PLANNED FACILITIES
FERRED FACILITY CON-
& PROGRAMS
CEPT /SOLUTION
*- PRELIMINARY EXAMINA-
- FURTHER EVALUATE
TION OF OTHER SITES-
PREFERRED SOLUTION
*. DETERMINE ALL FEASIBLE
- REVISE AS REQUIRED
FACILITY & SITE OPTIONS
• GEOTECHNICAL INVESTIGA-
TION
I,UF "II'LLI LU F'IHY GG & -Ij /00
R
E 1
• PRESS RELEASE
s N
• OTHER AN40UNCERE4TS
I P
• CALL FOR SUBMISSIONS
D U
AND BRIEFS
E T
N
T
FST
I SESSION
• INTERVIEWS WITH KEY
INDIVIDUALS & GROUPS
• GENERAL INTEREST GROUP
WORKSHOP
• FOCUS GROUP WORKSHOPS
2 SESSIONS
• COMMUNITY FORUM
I SESSION
I SESSION
T
1
M MARCH APRIL -JUNE JUNE -JULY AUGUST
I
N
• PUBLIC PRESENTATION
I SESSION
AUGUST- SEPTEMBER