HomeMy WebLinkAboutCS-33-86TOWN OF NEWCASTLE REPORT File # p� Res_ # -- �� By -Law # NESTING: General Purpose and Administration Committee DATE: JUNE 2, 1986 REPORT #: FILE #: SUB.ECT: STRUCTURAL REPORT: BOWMANVILLE ARENA - MAY 1986 RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: - 1. That Report CS -33 -86 be received; and 2. That Totten Sims Hubicki Associates be authorized to draw up tenders for the remedial repairs required to the old Bowmanville Arena; and 3. That Totten Sims Hubicki Associates be retained to supervise said repairs; and 4. That the costs associated with the technical consultant (approx. $2,000.00) be drawn from the contingency account; and 5. That staff be authorized to proceed with the tendering process. BACKGROUND AND COMMENTS: At the May 12, 1986 Council meeting Council authorized staff to proceed with the structural analysis of the Bowmanville Arena and report back at the earliest opportunity. The report from Totten Sims Hubicki Associates is attached. Approximately $40,000.00 worth of remedial repairs are required for the building to be operational for the 1986 -87 season. ../2 GENERAL PURPOSE & ADMINISTRATION COMMITTEE REPORT NO. CS -33 -86 Page 2. The building is very quickly deteriorating and demonstrates our desperate need for the new arena. It is respectfully recommended that Council authorize staff to proceed immediately to have this work done. Respect lly sub itted, Jan Devantier, R.D.M. ., Director Department of Community Services JD:sa 3 ` F'" CONSULTANTS totten sims hubicki associates Corporation of the Town of Newcastle 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attention: Mr. J. Devantier, R.D.M.R. Director of Community Services Re: Structural Report - Bowmanville Arena Town of Newcastle Dear Sir: G.L. TOTTEN B.Sr,,,, P.Eng. R.E. SIMS B.A.Sc., P.Eng, J.M. HUBICKI 8 A.Sc., OAA. P Enq. R L. WINDOVER M.Sc., P Eng, P.C. EBERLEE B,A.Sc., P.Eng. TOTTEN SIMS HIJBICKI ASSOCIATES (1961) LIMITED 1500 HOPKINS STREET, WHITBY, ONTARIO CANADA LIN 2C3 (416) 666.9363 May 26th, 1986 We are pleased to submit our "Structural Report - Bowmanville Arena" which summarizes the results of our inspection of the major structural components of the arena. This Report is a follow -up-of previous inspections of the Bowmanville Arena completed by Totten Sims Hubicki Associates and Rethink Incorporated since 1976. During our recent inspection, previous reinforcement details were reviewed, and the remainder of the arena structure was checked to determine if any further deterioration of members had occurred. Recommendations for further remedial actions are also presented in this Report. It is recommended that follow -up inspections of the arena be carried out semi - annually and prior to reopening of the arena for the winter season to ensure that the structural integrity of the building is maintained. Should you have any questions with regard to information and recommendations outlined in this Report, please do not hesitate to contact our office. Yours very truly, G. L. Aleong, P. Eng. Director Designated Structural Specialist GLA /dh SUMMARY An inspection of the Bowmanville Arena was conducted in May, 1986, which included a visual inspection of the entire arena and a structural evaluation of the major structural components of the arena. With the following structural improvements, the arena's structural system will be generally adequate to support the Ontario Building Code's current loading requirements: Some members of the timber 'Bowstring' trusses require reinforcement due to checking and splitting of the members. Roof leaks should be repaired to prevent deterioration of the structural members due to exposure to high moisture content. The concrete block chimney on the front building section should be repaired. The perimeter non -load bearing concrete block walls of the main arena are in poor condition and the following action should be implemented to retard the rate of deterioration and /or ensure the stability of the concrete block walls: 1• Install eavestrough along the north and south sides of the main arena roof and direct the water from the roof away from the building. 2. Repair and /or replace the badly deteriorated concrete blocks. 3. Clean out the loose and deteriorated mortar joints, and repoint the joints between the concrete blocks. 4. Rout vertical cracks and caulk. 5. Install steel straps across larger cracks in the concrete block walls and install restraining brackets around the corners of the main arena building. 6. Remove the top courses of blocks from the roof parapets around the east and west end bays of the main arena, and install new flashing. 7. Remove the concrete caps on the concrete block walls around the front building section, and install new flashing. The total preliminary estimated cost to carry out the recommended structural repair- reinforcement work is $40,000.00.