HomeMy WebLinkAboutFSD-003-23Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Joint Committees Date of Meeting: February 6, 2023 Report Number: FSD-003-23 Submitted By: Trevor Pinn, Deputy CAO/Treasurer Reviewed By: Mary-Anne Dempster, CAO Resolution#:JC-010-23 File Number: CL2022-32 By-law Number: Report Subject: Newcastle Memorial Arena Refurbishment Recommendations: 1.That Report FSD-003-23, be received; 2.That Gerr Construction Limited with a total bid amount of $3,332,640.00 (Net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of tender CL2022-32 be awarded the contract for the Newcastle Memorial Arena Rink Replacement and Renovations, as required by the Community Services Department; 3.That the total funds for this project is $3,974,236.80 (Net HST Rebate), which includes construction costs of $3,332,640.00 (Net HST Rebate) and other related costs such as design, inspection, testing, contract administration and contingencies of $641,596.80 (Net HST Rebate) is in the approved budget allocation as provided and be funded from the following account: Description Account Number Amount Newcastle/Orono Arena Improvements 110-42-421-84233-7401 $3,974,237 4.That all interested parties listed in Report FSD-003-23 and any delegations be advised of Council’s decision. Municipality of Clarington Page 2 Report FSD-006-23 Report Overview To request authorization from Council to award CL2022-32 for the rink replacement and renovations required at the Newcastle Memorial Arena. 1. Background 1.1 Tender specifications and drawings were prepared by Barry Bryan Associates and provided by the Community Services Department to the Purchasing Services Division. The scope of work included the full rink slab replacement, refrigeration system replacement, renovations of existing changerooms, washrooms, lobby, accessibility upgrades and the addition of accessible changerooms and washrooms at the Newcastle Memorial Arena. 1.2 Tender CL2022-32 was issued by the Purchasing Services Division and advertised electronically on the Municipality’s website. Notification of the availability of the document was also posted on the Ontario Buyers Association’s website. 1.3 Thirty-nine companies registered as official plan takers. The tender document included a mandatory site visit. Only those plan takers in attendance at the site visit were eligible to submit a bid. Twenty-nine companies attended the mandatory site visit. 2. Analysis 2.1 The tender closed on December 8, 2022 2.2 Eight submissions were received in response to the tender call. The bids were reviewed and tabulated by the Purchasing Services Division (see attachment 1). Seven submissions were deemed compliant and forwarded to the Community Services Department for review and consideration. 2.3 The Community Services Department requested that the Purchasing Services Division complete reference checks and a further review of the low bid. After further review and unsatisfactory reference checks, the low bid was removed from consideration and deemed non-compliant. 2.4 The Purchasing Services Division completed reference checks for the second low bidder, Gerr Construction Limited. References were deemed satisfactory and provided to the Community Services Department for consideration. Municipality of Clarington Page 3 Report FSD-006-23 2.5 After review and analysis of the bids by the Purchasing Services Division and the Community Services Department, it was mutually agreed that the second low bidder Gerr Construction Limited be recommended for the award of CL2022-32. 3. Financial Considerations 3.1 As part of the 2022 budget deliberations, $6,402,000 (Net HST Rebate) was approved, in Report CSD-002-22, for renovation work at both the Newcastle Memorial Arena (Phase I) and the Orono Arena & Community Centre (Phase II). The Phase I work, as discussed in this report, is scheduled for spring 2023 with the Phase II work scheduled for spring 2024. Based on approval of the cost for Phase I at $3,974,236.80 (Net HST Rebate), a balance of $2,427,763 (Net HST Rebate) will remain for the completion of the Phase II work. This will be considered when staff complete the Phase II scope of work, scheduled for tendering in Fall 2023. 3.2 The total funds required for Phase I of this project is $3,974,236.80 (Net HST Rebate), which includes the construction costs of $3,332,640.00 (Net HST Rebate) and other related costs such as design, inspection, testing, contract administration and contingencies of $641,596.80 (Net HST Rebate), be drawn from the following account: Description Account Number Amount Newcastle/Orono Arena Improvements 110-42-421-84233-7401 $3,974,237 3.3 Queries with respect to the department’s needs, specifications, etc. should be referred to the Director of Community Services. 4. Concurrence This report has been reviewed by the Director of Community Services who concurs with the recommendations. 5. Conclusion It is respectfully recommended that Gerr Construction Limited with a total bid price of $3,332,640.00 (Net HST Rebate) being the low compliant bidder be awarded the contract for the Newcastle Memorial Arena Rink Replacement and Renovation in accordance with the terms, conditions and specifications of Tender CL2022-32. Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext 2209 or dferguson@clarington.net. Municipality of Clarington Page 4 Report FSD-006-23 Attachments: Attachment 1 – Summary of Bid Results Interested Parties: List of Interested Parties available from Department. Municipality of Clarington Page 5 Report FSD-006-23 Attachment #1 Municipality of Clarington CL2022-32 Newcastle Memorial Arena Refurbishment Bid Summary Bidder Total Bid Price (Including HST) Total Bid Price (Net HST Rebate) Gerr Construction Limited $3,700,750.00 $3,332,640.00 Ball Construction Inc. 3,911,407.99 3,522,344.04 Schilthuis Construction Inc. 4,036,360.00 3,634,867.20 Gay Contracting Limited 4,058,970.81 3,655,228.94 JJ McGuire General Contractors Inc. 4,253,094.00 3,830,042.88 Van Horne Construction Limited 5,605,177.42 5,047,635.88 Anacond Contracting Inc. Non-Compliant Non-Compliant