HomeMy WebLinkAboutCS-26-87TOWN OF NEWCASTLE REPORT MEETING: Newcastle Community Services Advisory Board (N.C.S.A.B.) DATE: JULY 8, 1987 REPORT #: 26 4 FILE #: SUB.ECT. STATUS OF NEW ARENA PROJECT RECOMMENDATIONS: Fi le # Res. # By -Law # It is respectfully recommended to the Newcastle Community Services Advisory Board: 1. That Report CS -26 -87 be received for information. BACKGROUND AND COMMENTS: As requested by resolution of Council and subsequently by the Advisory Board, I offer the following information to serve as an update on the status of the new arena. Site: The site of the new arena has been selected and approved by council. The town has purchased a parcel of land (approx. 22 acres) on the North -West corner of H.wy. ##2 and Regional Road 57 to serve as the location-of the new arena. Consultant: A call for proposals related to the design and construction of the new arena was issued in September of 1986. After lengthy discussions and an interview process, it was decided to engage the firm of Phillips Barratt and Kaiser as the Town's Consultants for the new arena. tl...2 NCSAB CS -26 -87 PAGE 2 Conceptual Design : In January of this year, our consultants submitted four seperate designs of arena facilities for selection. Council approved in principle a design which incorporated a 1400 seat arena, an outdoor skating rink (artificial ice), a Multi Purpose Facility which would have a capacity of 350 people (seated at tables), and four softball diamonds to be located on the westerly portion of the property. Preliminary Design: At this point, our consultants were directed to prepare the preliminary design of the facility. This design, was presented to council at the March 16th. meeting of the General Purpose and Administration Committee and approved in principle. The consultants were then requested to prepare a preliminary budget prior to council's authorization of the preparation of the detailed design drawings. Preliminary Budget: A cost estimate summary (attachment #1) was prepared and submitted to the General Purpose and Administration Committee for approval. The cost estimates were approved in principle and authorization was given for preparation of the Detailed Design Drawings. At present, the detailed design stage is in progress. I have also enclosed a schedule of target dates (attachment #2) which leads to the contractor award in early September of this year. I trust this brief recap of events will serve for purposes of information as requested. Respectfully Submitted: Joseph P. Caruana Acting Director of Community Services JPC /dm Attachments Phillips 6arra(( Kaiser - - -- - - -- i NEWCASTLE PLACE COST ESTIMATE SUMMARY Arena Community Centre Outdoor skating rink Site Works Septic System Sooreboard TOTAL Furnishings ishings (1988 Budget Items) Folding partitions for Community Centre Tables (45) and Chairs (500) Concession /Kitchen equipment Individual seats Options: Bleacher seating Second ice sheet Lighted ball diamond (1) Unlighted ball diamonds 3 x $35,000 ATTACHMENT41 Project No. 87006 16 April 1987 Schedule'A' Current Budget Estimate $ 2,500,000 $ 2,642,000 600,000 722,000 120,000 818,900 440,000 75,000 50,000 I ,s , ycxl J 3,982,000 $ 75,000 ` 25,000 35,000 30,000 $ 165,000. $ 4,147,000 60,000 1,585,000 90,000 105,000 r ATTACHMENT #2 TARGET DATES (REVISION 1) APRIL 27 - Council ratification of next stage. MAY 4 - Commence detailed design. MAY 25 - Submit septic design to M.O.E. for approval. JULY 6 - Building permit submission. JULY 27 - Council approval of tender documents. AUGUST 3' - Issue general tender. AUGUST 24 - Close general tender. AUGUST 31 - Award recommendation. SEPTEMBER 7 - Council ratifies contractor award. SEPTEMBER 14 - Contractor on site.