Loading...
HomeMy WebLinkAboutCOD-011-12 Clarington REPORT CORPORATE SERVICES A► Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: May 7, 2012 Resolution#: 1 - By-law#: Report#: COD-011-12 File#: Subject: TENDER CL2012-9 SIDEWALK REPLACEMENT —VARIOUS LOCATIONS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Aloia Bros, Concrete Contractors Ltd., Toronto, Ontario with a total bid in the amount of$388,927.79 (Net of HST), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2012-9, be awarded the contract for the 2012 Sidewalk Replacement - Various locations as required by the Engineering Department; and 2. THAT funds required in the amount of$439,000.00 which includes.$388,927.79 for tendering plus contingencies, be drawn from the following accounts: Account # Description Amount 110-32-331-83215-7401 2012 Sidewalk Replacement— $183,000.00 Various Locations 110-32-331-83375-7401 Scugog St. (Jackman Rd. To $77,000.00 Longworth Ave.) (2012) 110-32-331-83374-7401 Scugog St. ( Bons Ave. to Hockley $33,000.00 Ave.) (2012) 100-42-421-10129-7540 2012 Courtice Complex & Community $7,000.00 Centre 110-32-331-83364-7401 Green Rd. Pedestrian Link (2011) $25,000.00 Region of Durham Traffic $70,000.00 Durham Region Transit $44,000.00 Total Funds Required $439,000.00 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 Clarington REPORT CORPORATE SERVICES DEPARTMENT Submitted by: Reviewed by: J-1 Marie Marano, H.B.Sc., Franklin Wu, C.M.O., Chief Administrative Officer Director of Corporate Services ;/M Nancy aylor, B.A., C.A., Director of Finance/Treasurer MM\JDB\km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: COD-011-12 PAGE 3 1.0 BACKGROUND: 1.1 Tender specifications were provided by the Engineering Department for the 2012 Sidewalk Replacement requirements. 1.2 Tenders were advertised in Daily Commercial News and electronically on the Clarington and OPBA Websites. Subsequently, tenders were received and tabulated as per the memo from the Engineering Department, Schedule "A". 2.0 ANALYSIS: 2.1 A total of five (5) submissions were received in response to the tender call. All submissions were deemed compliant. 2.2 After further review and analysis of the bids by the Engineering Department and Purchasing, it was mutually agreed that the low bidder, Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario be recommended for the contract for 2012 Sidewalk Replacement program. A copy of the recommendation memo from the Engineering Department is appended as Attachment#1. 2.3 The low bidder has provided similar services to the Municipality of Clarington in the past and the level of service has been acceptable. 2.4 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Engineering. 3.0 FINANCIAL: 3.1 The total project cost, including costing allocation is detailed in the memo from Engineering Services marked Schedule "A" with the required funds being be provided from the following accounts. REPORT NO.: COD-011-12 PAGE 4 Account # Description Amount 110-32-331-83215-7401 2012 Sidewalk Replacement— $183,000.00 Various Locations 110-32-331-83375-7401 Scugog St. (Jackman Rd. To $77,000.00 Longworth Ave.) (2012) 110-32-331-83374-7401 Scugog St. ( Bons Ave. to Hockley $33,000.00 Ave.) (2012) 100-42-421-10129-7540 2012 Courtice Complex & Community $7,000.00 Centre 110-32-331-83364-7401 Green Rd. Pedestrian Link (2011) $25,000.00 Region of Durham Traffic $70,000.00 Durham Region Transit $44,000.00 Total Funds Required $439,000.00 4.0 CONCURRENCE: This report has been reviewed by Tony Cannella, Director of Engineering who concur(s) with the recommendations. 5.0 CONCLUSION: 5.1 Bid Submissions were invited from qualified contractors. A total of 5 compliant submissions were received and evaluated by staff and in accordance with standard procedures and policies the low compliant bid received from Aloia Bros. Concrete Contractors Ltd., Toronto, is recommended REPORT NO.: COD-011-12 PAGE 5 CONFORMITY WITH STRATEGIC PLAN The recommendations contained in this report conform to the general intent of the following priorities of the Strategic Plan: Promoting economic development Maintaining financial stability Connecting Clarington Promoting green initiatives X Investing in infrastructure Showcasing our community Not in conformity with Strategic Plan Staff Contact: Marie Marano, Director of Corporate Services Attachments: Attachment 1 - Recommendation Memo — Engineering Services ATTACHMENT"1" I eading tlae Way MEMO TO: Jerry Barber, Purchasing Manager FROM: Ron Albright, Manager, Infrastructure and Capital Works DATE: May 1, 2012 RE: Sidewalk Rehabilitation and New Construction, Various Locations CL2012-09 Tenders for the above project were opened at the Municipal Offices on Friday, April 20, 2012 at 2:15 p.m. A summary of the bids as received from Purchasing is provided in the table below. BIDDER TOTAL TENDER TOTAL BID AMOUNT (including HST) (including net HST) Aloia Bros. Concrete Contractors Ltd. $ 431,887.19 $ 388,927.79 Etobicoke, ON Barra Con Construction Ltd $ 446,909.35 $ 402,455.71 Mt Albert, ON Miwel Construction Limited $ 453,562.55 $ 408,447.13 Richmond Hill, ON Bennington Construction Ltd. $ 466,767.86 $ 420,338.91 Stouffville, ON 002274084 Ontario Ltd. o/a GMP Contracting $ 555,200.08 $ 499,974.86 Toronto, ON The scope of the project deals with replacing sections of deficient sidewalk at various locations within the Municipality as well as constructing new sidewalk at various locations. Two sections of new sidewalk on Scugog St will be funded by development charges. The work also includes improvements to three intersections, as requested by the Region of Durham Traffic department and construction of concrete sidewalk at various bus stops, as requested by Durham Region Transit. A detailed breakdown of Clarington's and the Region of Durham's funding is provided on the attached Cost Apportionment. The total project costs based on Aloia Bros.'s low bid are shown in the table below. Due to past experiences on similar projects, a contingency amount of approximately 10% is carried forward. ATTACHMENT"I" Sidewalk Rehabilitation and New Construction, Various Locations, CL20-12-09 3 May 1, 2012 It should be noted that the contract preparation, tendering and contract administration for this project will all be completed with Municipal Staff. Project Breakdown Total Project Value $439,000.00 Budget Amount Sidewalk Replacement $200,000.00 110-32-331-83215-7401 Scugog St (Jackman Rd to Longworth Ave) $80,000.00 110-32-331-83375-7401 Scugog St (Bons Ave to Hockley Ave) $45,000.00 110-32-331-83374-7401 Courtice Community Complex $7,000.00 100-42-421-10129-7540 Green Rd Pedestrian Link $25,000.00 110-32-331-83364-7401 (2011) Region of Durham Traffic $70,000.00 Durham Region Transit $44,000.00 Total Budget Amount $471,000.00 Estimated Unexpended Budget $32,000.00 Additional Funding Required $0 This total project cost is lower than the capital budget allocation for the various accounts approved by Council. Region of Durham Traffic and Durham Region Transit have confirmed that they have adequate budget and wish to move forward with award of the contract. The Engineering Services Department recommend that Purchasing move forward with awarding Contract CL2012-09 to Aloia Bros, Concrete Contractors Ltd. in the amount of$382,201.05 (exclusive of H.S.T.) which amounts to $388,927.79 including our net HST commitment, Should you have any further questions, please feel free to contact the undersigned. ATTACHMENT Sidewalk Rehabilitation and New Constrriction, Various Locations, CI_2012-09 3 May 1; 2012 Regards, , Ron Albright, P. Eng. Manager, Infrastructure and Capital Works RA/ra Attachment Cc: Nancy Taylor, Director of Finance A.S. Cannella, Director of Engineering Services ATTACHMENT"1" c W - D v v nn n m D o w o o 0 3 0 0 o 0 o o D �. o rn a o w > > an N d v d r a m o K n m ti G) -1 m O o m D O ° ° I I m l I I 1 I I a N 3 c °m 2 c O N N p O. p O o N N OZl ,O-n O d N 'N- C C 3 H s 3 '�° ,°°. .°°.. Q G r d w Q c -1 co q o > > p d ? D m o m y 3 A �- w O C d n O. b ^ ° V � N z y D 0 N N n p O p O = rNi C (A A A di � W lfi EA EA Vf 69 EA � C W .J.� W W fii to EA 00 W W O 69 Efl N m W O � p Oo O W t�0 0 0 0 0 � .OA f•°O N t�OO o -w+ N UOi � � C M N to N O V G O n o m O O O f0 OI N Ot O O f)t O O U1 O O O Of O O O v N O O O O fh w O N U �c c J W O d(O O O O A O N (T J O O C ° 'O w 0 =W O d Efl 4i fA J W w O(w `0 N N W N EA to Vi O tN0 J N T_. y p 01 JJ W W f� 0 0 o W W J J J o O y V O o o fwlt Ul O o e o O � O O� p b3 fA ER d `jJj� Z•3 O O O (°O O O o O W N O O o 0 0 69 Ni EA J W to O o p (WO W W N O O p W O'er, O O O W Q) N (T !+ A O o O O J O O O J J O O O O O O O o O O o O o J (on J J T w O O O O O W J O O e O O p C N A N A 0 3 E9 A o O (O J m T O A ?. VJi O O O (O (T O O) O W N ° °.O ., °• N ° U)U)3 N9 ° c 0 W m m m m m o o d m m°' 3 n O a £ m 3 0 S O d O7 T� d (D O N j•-I O � -• � N C 6 A N O y a N