Loading...
HomeMy WebLinkAboutCOD-009-12 Clarftwn REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: April 23, 2012 Resolution#: By-law#: Report#: COD-009-12 File#: Subject: TENDER CL2012-3 FLETT STREET RECONSTRUCTION RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-009-12 be received; 2. THAT Eagleson Construction, Millbrook, ON with a total bid in the amount of $432,463.67 (Net of HST Rebate), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2012-3, be awarded the contract for Flett Street Reconstruction as required by the Engineering Department; 3. THAT the funds for Clarington's portion of the project, required in the amount of $341,982.27 which includes $432,463.67 for Tender, design, contract administration, material testing, contingencies and net HST less Regional of Durham costs, be drawn from the following account; Flett Street Reconstruction Account # 110-32-330-83357-7401 Road Works & Storm Sewer $341,982.27 4. That the tender award be subject to the approval of the Regional Municipality of Durham for Regional Infrastructure; and 5. THAT the Mayor and the Clerk be authorized to execute the necessary agreement. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: COD - 009 -12 Submitted by: Reviewed by: L rie Marano, H.B.Sc., Franklin Wu, 11 11 B :.1 C.M.O., Chief Administrative Officer Director of Corporate Services Nancy Ta lor, Br,'B.A., C.A., Director o Finance/Treasurer CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905 - 623 -3379 REPORT NO.: COD - 009 -12 PAGE 3 1. BACKGROUND 1.1 Tender specifications were provided by AECOM Canada Ltd. for the Flett Street Reconstruction as required by the Engineering Department. 1.2 Tenders were advertised in the Daily Commercial News, as well as electronically on the Municipality's website and the Ontario Public Buyer's Association website. Subsequently, tenders were received and tabulated as per the letter from AECOM Canada Ltd., Schedule "A" attached. 2. ANALYSIS 2.1 A total of ten (10) submissions were received in response to the tender call. 2.2 After further review and analysis by the Engineering Department, AECOM Canada Ltd. and Purchasing, it was mutually agreed that the low bidder, Eagleson Construction, Millbrook, ON, be recommended for the contract for the Flett Street Reconstruction. A copy of the recommending memos from the Department of Engineering and the consultant AECOM are attached as Schedule "A ". 2.3 Eagleson Construction has completed projects for the Municipality of Clarington in the past and the service has been satisfactory. In addition, references were checked and all references indicated satisfaction with the work completed by Eagleson Construction and would recommend them for similar projects. 2.4 Queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering. 3. FINANCIAL 31 The total project cost, including tender price of $432,463.68, design contract administration, contingencies and utilities amounts to $581,741.67 (Net of HST REPORT NO.: COD - 009 -12 PAGE 4 Rebate). The detailed funding required for the project is outlined in the memo from Engineering Services and the letter from AECOM Canada Ltd., marked Attachment 1 and summarized below. 3.2 Funding for this project will be paid by the following: Department and Account Number Engineering Department — Capital Budget Flett Street Reconstruction Account # 110 -32- 330 - 83357 -7401 $380,000.00 Total Clarington Cost $341,982.27 Region of Durham Costs Flett Street Reconstruction Total Region of Durham Cost $239,759.39 Combined Total Project Costs $581,741.67 4. CONCURRENCE 4.1 This report has been reviewed for recommendation by the Purchasing Manager and the Director of Engineering. 5. CONCLUSION 5.1 That the proposed contract award be approved. CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Marie Marano, Director of Corporate Services Attachments: Attachment 1 - Memo from Engineering Services & Letter from AECOM Canada Ltd. Attachment 2 - Project Location — Key Map Attachment 1 Leading the Way TO: Jerry Barber, Purchasing Manager FROM: Ron Albright, Manager, Infrastructure and Capital Works DATE: April 16, 2012 RE: Flett Street Reconstruction, Bowmanville CL2012 -03 The Engineering Services Department has reviewed the recommendation provided by AECOM Canada Ltd. ( "AECOM ") and offers the following comments. Prior to completing the design and tendering work for Flett Street, a Public Information Centre was held on December 14, 2011 to review the project with the public and to get their input regarding the proposed works. For more detailed information on the PIC, please refer to Report EGD- 006 -12. Flett Street is currently constructed to a semi -urban cross section with asphalt gutters and storm sewers. Upon completion of the works, the street will be reconstructed to an urban standard with concrete curb and gutter, new storm sewers and new road structure. The surface asphalt will be placed in 2015 under a separate contract. The Municipality of Clarington is working in cooperation with the Region of Durham on this project and they will be replacing their sanitary servicing on Flett Street. We concur with AECOM's recommendation to award the contract to Eagleson Construction in the amount of $424,983.95, exclusive of HST, or $432,463.67 net HST, for the reconstruction of Flett Street. A detailed breakdown of the Clarington's and the Region of Durham's funding is provided on the Cost Apportionment provided with AECOM's tender review letter. Due to past experiences on similar projects, a contingency amount of approximately 10% is carried forward. Therefore, including design and tender fees as well as contract administration fees, the Engineering Department advises the following breakdown for the above referenced project: Attachment 1 Flett StiocF t R(�GOiTstrUGtior'I, (:- 2012.03 2 April 10, 2012 Total Project Value $341,982.27 Budget Amount Flett Street 110 -32- 330 - 83357 -7401 (2011&2012) $380,000.00 Estimated Unexpended Budget $38,017.73 Additional Funding Required $0 We recommend the report to Council move forward based on the above apportionments. Attached for your files is the recommendation provided by AECOM which includes a more detailed breakdown of estimated project costs. Should you have any further questions, please feel free to contact the undersigned. RA /ra Attachment Cc: Will McCrae, P. Eng., Manager, Cobourg Office, AECOM Nancy Taylor, Director of Finance A.S. Cannella, Director of Engineering Services Attachment 1 AZCOM AECOM 905 372 2121 tel. 513 Division Street 905 372 3621 fax COBOURG, Ontario K9A 5G6 www,aecom.com April 16, 2012 Mr. A. S. Cannella, C.E,T. Director, Engineering Services. The Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario L1C 3A6 Dear Sir: Project No: 60215457 Regarding: Flett Street Reconstruction, Bowmanville Contract No. CL2012 -03 (the "Contract ") Municipality of Clarington Tenders for the above project were opened at the Municipal Offices on Thursday, April 5, 2012 at 2:15p.m. A list of the bids received is provided in the table below. *Calculation Error(s) - Values noted above are corrected by Clarington Purchasing Department to correct Calculation Error(s), CL2012.03 Tender Award LeneGpoo TOTAL i3 I D, TOTAL BI[ T.QTAL, BID (EXCI HST) {Intl 13 % HSTj (Intl, Net HST Rebate Eagleson Construction MILLBROOK, ON $ 424,983.95 $ 480,231.86 $ 432,463.67 Macklin Bros. Construction Ltd. GRAFTON, ON $ 435,219.54 $ 491,798.08 $ 442,879.40 Kawartha Capital Construction PETERBOROUGH, ON $ 449,236.20 $ 507,636.91 $ 457,142.76 Hard -Co Construction Ltd. WHITBY, Ontario $ 566,170.00 $ 639,772.10 $ 576,134.59 Coco Paving BOWMANVILLE, ON $ 567,175.50 $ 640,908.32 $ , 577,157.79 Cobourg Development Services COBOURG, ON $ 575,557.36 $ 650,379.82 $ 585,687.17 Calder Hill Contracting Ltd. THORNHILL, Ontario $ 656,888.70 $ 742,284.23 $ 668,449.94 North Key Construction NAPANEE, ON $ 699,938.39 $ 790,930.38 $ 712,257.31 Bar -quip Construction RICHMOND HILL, ON $ 781,737.13 $ 883,362.96 $ 795,495.70 Royel Paving Ltd. LINDSAY, ON $ 816,924.91 $ 923,125.15 $ 831,302.79 *Calculation Error(s) - Values noted above are corrected by Clarington Purchasing Department to correct Calculation Error(s), CL2012.03 Tender Award LeneGpoo F Attachment 1 Page 2 April 16, 2012 The Municipality of Clarington's Purchasing Department (the "Purchasing Department ") reviewed all bids to confirm compliance with the Clarington Purchasing By -Law. All bids were deemed compliant by the Purchasing Department. AECOM Canada Ltd. ( "AECOM ") has reviewed the two lowest bids and confirmed the bid values noted above. Eagleson Construction ( "Eagleson ") is the lowest bidder. Its submitted tender has been reviewed and had a calculation error in the amount of $757.55 (exclusive of HST) resulting from not revising the tender quantity of 4 ea. to 5 ea, as identified in Addendum No. 1. Eagleson did however, acknowledge and submit receipt of Addendum No. 1 with their bid package. This error was corrected by the Purchasing Department. This does not affect the bid order. As requested by the Purchasing Department, references were checked only for the lowest bidder. Eagleson has completed projects of similar scope and value. References stated that Eagleson has completed work to specification and to their satisfaction. With the low bid from Eagleson, and other associated project costs noted on the attached cost apportionment, the project is within budget, Should funding be available and based on the input provided by the references contacted regarding performance on previous projects, we are not aware of any reason why the Municipality would not be entitled, in its sole discretion, to accept Eagleson's bid in the amount of $424,983.95 (exclusive of HST) and award the contract to it, subject to all provisions of the Clarington Purchasing Bylaw being met. Bid Cheques or Bid Bonds shall be retained for Eagleson Construction and Macklin Bros. Construction Ltd., the second low bidder, until the Contract has been executed. Should you have any questions regarding this matter, please contact the undersigned. Sincerely, AECO Canada Ltd. rcve_ Will McCrae, P.Eng. Associate Vice - President, East District, Water will.mccrae @aecom.com WM:pc Encl. cc: Mr. Ron Albright, P.Eng., Manager of Infrastructure and Capital Works, Municipality of Clarington CL2012 -03 Tender Award LetlecDOc Attachment I 0o it Cn 0 00 15L CL I Co V) C) fl 0 < LO w (D (D aria I o - (D 0 1 0 o 0 �j a LO io q) 0 E >ro C) LO V) (D E I m¢ 0 69 4C) 0 C) (U 0 o U) > C) C: :3 o -'j i� (D 0 '0 C2: E5 > 0 O w > C) 0, 0 U) w < 0 w a) a - I I - w < 6 Z, I I w U) ¢ E 0 (o (o 'T — C� 0 c! 0 c-I 0 CD 0 c�j Co .6 a) Cl) to LO - 0) (0 n 0 LO (D 1 0 0 0 0 (D 0 c; trp Co (X) a) LO C) V) M I C� (C� rl- r-- Co (Y) 0 - Lf) W) co r-- a� t- cr� U) 00 oo Cr) N N M Cl) 0 69 6q tp, (f) C14 N i 0 U) (0 i o w 0) 0� .0 1 P 0 q L,) IR w 0) r-- 0 M 0 (\i C) 04 - (0 0 Co 10 0 0 0 (0 ce) ( (0 0 0 0 0 0 CN 00 CD C) r- — C to 9 L() Cl) o 5 c5 o V' — (.) w cQ m t(j a) cD co O 13 , 7 't 0 0 Oa Co M 4- 0 N V) N (ft t-- LO w 1 tO 69 ?1,) w Cl) M trIl 0 16 0 U) C\l C) C" - 41 CL 0 M 0 0 C 0 (D (D i N Cl) LO .0 to O 0 O CY) Lq W Lf) lV, M Iq 0 (7i M O 0 O O ti n O 0 O C) O 0 (q LQ U 4Z r M Co I O O a1 O C, 0 0) 46 V) (Q (C� cl� (0 a� Lq (D j 'T C:) O CD I 0 N LO GQ w Co N ;; a 6A, w ko E2 0. (o < a 0 Q) C: Q) 0 0 VI 0 0 Q inI 2 2 !,Op U) (D M < C: 0 (n E 0 0 T 0 -Fu -i� 0 = C: W C: 0 0 C? 0 C*4 0 0. E C) > CD 0 CL 0 0 C) r 0 QT O! (1) N r_ 0 0 :3 o 00 0 0 E 0 > < 0 F- L) 0 0 (o 0 0 0 0 D . 0 F- w < 0 to O REPORT NO.: COD - 009 -12 PROJECT LOCATION — KEY MAP P��y�eS o� 0 Par 3t, F] Pine , n ED�e�s aLJi St. E Attachment #2 I\\ 11 -][-IF- KEY MAP