HomeMy WebLinkAboutCS-10-95Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend
to Council the following:
1. THAT Report CS -10 -95 be received;
2. THAT the preliminary floor plan (Attachment #2) be approved;
3. THAT the revised project budget be established at $589,955.00;
4. THAT the additional funds in the amount of $239,550.00 be accessed from the Public Works
Lot Levy Account #5100- 00036 -0000;
5. THAT staff be authorized to proceed with the project and issue a tender call for the
renovations to the former Fire /Court building; and
6. THAT the Clarington Older Adult Association be advised of Council's decision.
1.0 BACKGROUND:
1.1 At the October 24, 1994 meeting, Council approved report CS -44 -94 authorized staff to
proceed with preliminary design of the Fire /Court building for the purpose of renovating the
interior for use as an Older Adult Centre.
1.2 Since that time a number of meetings have taken place among staff, representatives of the
Older Adults and the architects (Greer Galloway Architects and Engineers) with the intent
of providing a list of building components, and a floor plan for the proposed Centre.
1.3 As a result of that process, a recommended list of components (Attachment #1) was reached
and a preliminary floor plan (Attachment #2) was designed utilizing the area formerly
occupied by the Fire Department.
R 1- CLI
-6 6 PRIMED - RECYCLED GA IER
./2
REPORT CS -10 -95 - 2" APRIL 3, 1995
1.4 Included as part of the consultants responsibilities was a requirement to perform a structural
and mechanical examination of the building making recommendations as to the feasibility
of renovating the former fire hall to provide a new Older Adult facility for the Municipality
of Clarington.
2.0 STRUCTURAL/MECHANICAL EXAMINATION:
2.1 Numerous points were raised during this phase of the study and several recommendations
related to this undertaking are summarized as follows:
2.1.1 There is an existing ground water problem which is contributing to the deterioration of the
base of the foundation walls and should be rectified as part of the renovation work.
2.1.2 It is recommended that due to the age of the existing boiler, a new back -up boiler for the
existing ground floor offices and second floor court facilities be installed.
2.1.3 The existing electrical service will have to be upgraded to an 800 amp. service and the
existing transformer will have to be replaced with an exterior pad mounted transformer.
2.1.4 The existing fire alarm service must be upgraded and it is proposed that the Older Adult
component have new heating, ventilation and air conditioning systems which are independent
from the existing building systems.
2.2 Notwithstanding the various requirements to upgrade, the structure is sound and with careful
planning should be able to accommodate the proposed renovations. (A complete copy of the
consultant's report is on file in the Community Services Department and can be made
available to Council upon request.)
3.0 BUDGET:
3.1 The original budget for this project, was estimated at $350,000.00 which was the amount
used, when the Municipality made application for the Canada /Ontario Infrastructure
program.
3.2 The results of the building evaluation and review of the building component requirements,
dictates that we revisit our original budget submission and make necessary revisions.
../3
REPORT CS -10 -95 - 3, APRIL 3, 1995
3.3 The revised estimated project budget is as follows:
Construction Costs (including contingency) $525,000
Preliminary Studies
- Soils Investigation $1,500
- Legal Survey $1,225
- Hazardous Substance $1,330
Hydro $9,350
Architectural/Engineering Fees $47,300
G.S.T. 11M
TOTAL $589,995
ORIGINAL BUDGET ESTIMATE $350,000
ADDITIONAL FUNDING REQUIREMENTS $239,955
3.4 Through discussions with the Chief Administrative Officer, a number of funding scenarios
were examined. Subsequently, it is recommended that the additional funds required in the
amount of $239,955.00 be accessed from the Public Works Lot Levy Account. The Director
of Public Works took part in those discussions and is in agreement with the recommendation.
4.0 COMMENTS:
4.1 With Council approval of this report, the architect will proceed with the detailed design
component anticipating a tender closing on June 29, 1995 and subsequent tender award at
the July 10 Council Meeting, anticipating a project completion towards the end of January
1996.
4.2 A revised project scheduled is detailed as follows:
April 3
Presentation to Council
April 4
Public Meeting (Seniors General Meeting)
April 10
Council Ratification
May 1
Completion of Detail Design
May 27
Complete Bid Documents
June 8
Tender Issue
June 29
Tender Closing
July 10
Tender Award
January 26, 1996
Construction Complete
Respectfully Submitted,
Jose . 'P . Caruana, Director
Department of Community Services
JPC:sa
Attachments
Recommended for presentation
to the Committee,
William H. Stockwell,
Chief Administrative Officer
I 3
Feasibility Study
Proposed Seniors Activity Centre
and Firehall Conversion
Municipality of Clarington
TABLE 1
ATTACHMENT NO. 1
TO REPORT NO. CS -10 -95
Page 17
RECOMMENDED COMPONENTS OF PROPOSED SENIORS' CENTRE
Item
Room Size and Capacity
Activities/Comments
Multi- purpose room (apparatus bay)
1981 sq.ft.;
• line dancing
• 194 persons 1)
• bowling
• Subdividable
• aerobics
Kitchen
258 sq.ft.
• refrigerator, stove, microwave
(catering type)
• dishwasher
• large enough for 3-4 people to
work in
Library /lounge
• 463 sq.ft.+
• should have comfortable
• 13 -15 persons
furniture, bookshelves around
perimeter
Crafts Room
• 452 sq.ft.+
• should be equipped for ceramics,
• 10-12 persons
pottery- making, quilting, etc.
Meeting Room
• 376 sq.ft.+
• conference table
(small groups)
• 10-15 persons
• kitchenette
Offices
- one 150 sq.ft. office for full time
• also includes ancillary areas for
administrator
photocopier, office supplies,
- one 120 sq.ft.
storage, etc.
office for volunteer administrator
Foyer /Reception Room
• 300 sq.ft.+
• should be bright, airy, large
enough to promote social
interaction and serve as a
waiting area /lounge
• should be accessible to connecting
link to Durham Non - Profit
Housing projects
Coatroom
• 180 sq.ft.+
• on all levels
• 1 person
Washrooms
• 130 -150 sq.ft. /sex
• fully accessible
Elevator lobby
• 2500 lbs. capacity passenger
elevator serving 3 floors
ma
111) Based on O.B.C. classification table 3.1.16A, space with non -fixed seats and tables (10.2 sq.ft. /person)
\C.
CRAFTS
118
MALE
ROOM
51R
LOBBY II
II
II
NEW AND EXISTING
HVAC STORAGE
4]1P
+6Im
=-A SUMP PUMP
PROPOSED BASEMENT FLOOR
PASS
KITCHENETTE THROUGH
IW 256FU
Fr Fl
'
FOLDING
IPARTITION WINDOWS
C/W EXT DOOR
LANDSCAPED
TERRACE
(OPTIONAL)
Gt
F
DISPLAY WALL/
UL -PURP
ROOM
i (OPTIONAL)
NEW PARTITIONS
CURRENT EVENTS
ts1V
iIsmm
A
—
BASEMENT ................'m m2
— AEROBICS
— BOWLING
DRAWN BY PROJECT TITLE
PTA No. 94 —C -0861
CLARINC3TON SENIORS CENTRE
GROUND FLOOR..........554 m2 (IN DES 2nd STOREY
APPARATUS BAY)
C= =O WALLS TO BE REMOVED GRAPHIC SCALE
_—
UP
— CRAFTS
—LINE DANCING
:LINE
CHECKEO BY RM DATE JAN 1995
EAT
f
STUDY
DOOR
—SHUFFLE BOARD —
FP,
000a --
7
MECHANICAL
STORAGE/
MECHANICAL/
BALER
�
AIY41F
COATS
ELECTRICAL
-
-CHAIRS
-
O
— EXERCISE EOLP.
— BOWING EQUIP.
—E�
SUMP PUMPSOO
B
D
J ` J
�
Om
F
0--q
I
"0
PROPOSED BASEMENT FLOOR
N
(0
LEGEND
Gt
SHAFT WALLS AND
NEW PARTITIONS
FIGURE No.
QUINNG GROSS FLOOR AREA SUMMARY
O EMSTING WALLS
—
BASEMENT ................'m m2
® EXISTING LOAD BEARING WALLS
DRAWN BY PROJECT TITLE
PTA No. 94 —C -0861
CLARINC3TON SENIORS CENTRE
GROUND FLOOR..........554 m2 (IN DES 2nd STOREY
APPARATUS BAY)
C= =O WALLS TO BE REMOVED GRAPHIC SCALE
SECOND FLOOR 606 m2 (BUILDNO FOOTPRINT)
j T T }
T 0 EXIT LIGHTS
(�
CHECKEO BY RM DATE JAN 1995
f
STUDY
alloway
[* =FEASIBILITY
s •Engineers
An �Am r t
NEW MECHANICAL
F-1 EOUIPMENT
NEW WINDOW
NEW EXT DOOR OFFICE OFFICE
AND RETAINING
WALL BOOK E VES/ tiW 7218
MAG DISPLA 118FF "c
ADYNS ATDR VOLUNTEER i ; EJ
COORDINATOR
LOUNGE/ ^ u S
LIBRARY 20
131P ffi} n
t M u� i
UP ❑ a
II
A NE VAN ws E VAT i i LOBBY MEETING
AIP
OUTDOOR a H /C I SDFR
PATIO/ WC
LANDSCAPED �i
AREA UP
I �� .. ...
r- _
FOYER II i
---a Lk
K
UPr - --
CONNECTING LINK TO DURHAM
NON -PROFIT HOUSING DEVELOPMENT
PROPOSED GROUND FLOOR
NEW WINDOW
FOLDING
PARTITION
C/W 00T DOOR
>TOMUL7]- (OPTIONAL)
OSE ROOM BELOW)
LANDSCAPING
EMSTINC SIDEWALK
NEW WINDOW
F.D.
r
UP
NEW
LINE OF BLDG
OVERHANG
i
I-
W
LLJ
G!
F-
in
U
Of
2
U
FIGURE No. 13
GRAPHIC SCALE WN BY PTA " SECT 94 -C -0881 TITLE CLARINGTON SENIORS CENTRE
} 0 1 J CHECKED BY RM °'I JAN 1995
- - - -
S FEASIBILITY STUDY