Loading...
HomeMy WebLinkAboutCS-27-93THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report CS -27 -93 be received for information. 1.0 BACKGROUND: 1.1 Council approved the 1993 budget of $232,700 for projects under the Facilities/Building Services Division in the Community Services Department. This report is presented to reflect the status of the twenty -four (24) projects approved in 1993 and the eleven (11) projects carried over from previous years. 1.2 The purpose of the projects approved were to identify and rectify building and fire code irregularities, energy efficiency and structural integrity. 1.3 The recommendations identified in the Building Profiles dated 1988 and 1989 have been addressed and Municipal buildings comply to all the necessary guidelines as set out by Municipal, Provincial and Federal authorities with the exception of the Orono Community Hall and Newcastle Community Hall. The retrofits for the Orono Town Hall and the Newcastle Community Hall have been delayed until a Life Safety Study has been completed. A Life Safety Study is a proposal to the Chief Fire Official, with a detailed assessment of life safety performance requirements, clearly identifying items not in compliance with the code; how a life safety level can be achieved and a detailed time schedule for implementation. �)U3 ../2 REPORT CS -27 -93 .2. NOVEMBER 1, 1993 1.4 The volunteers at the various Municipally owned facilitiesibuildings must be commended for their ongoing dedication to the daily operational needs of their building as well as their support of municipal projects to improve the overall safety of the building and their functions. 2.6 BUDGET NOTES: 2.1 The header replacement at the Darlington Sports Centre has been delayed until the Spring due to drainage problems in the trench, ice scheduling concerns and the changeover of our mechanical contractor at the Centre. 2.2 The air conditioning units at the Fire /Court Building were not replaced due to sizing and technical specifications. We were able to overhaul the existing units to satisfy staff and tenants' comfort levels submitted, jo p P. Caruana, Director Dr `partment of Community Services JPC:FH:sa 904 Recommended for presentation to the Committee, arie Marano, Acting Chief Administrative Officer ATTACHMENT 1 TO REPORT NO. CS -27 -93 Page 1 of 2 CU% PROJECTS BUDGET I STATUS ACTUAL EXPENDITURES A Municipal Administrative Centre 1. Safety Glass Installation $ 2,000.00 Complete $ 1,242.27 2. Nixalite $ 6,000.00 Complete $ 2,739.20 3. Metal Storage Cabinet $ 1,200.00 Complete $ 803.00 4. Fire Sprinkler System $10,000.00 Complete $ 4,778.17 B Fire Court Building 5. Air Conditioning Unit $25,000.00 Complete $ 2,953.20 6. Exhaust System $35,000.00 Complete $27,000.00 C Bowmanville Library 7. Entrance Doors $24,000.00 Ordered $18,379.30 D Brownsdale Community Hall 8. Floor Area (Repair Tiles) $ 2,000.00 Complete $ 995.00 9. Panic Hardware $ 2,400.00 Complete $ 1,900.00 E Newcastle Memorial Arena 10. Sprinkler System $15,000.00 Complete $ 2,962.56 F Newcastle Fire Department #2 11. Roof Replacement $12,000.00 In Progress G Newcastle Community Hall 12. Roof Repair $10,000.00 In Progress H Orono Arena 13. Structural Adequacy Test $ 3,000.00 Complete $ 782.00 I Darlington Sports Centre 14. Header Trench $12,000.00 Deferred 15. Metal Storage Cabinet $ 1,200.00 Complete $ 803.00 16. Structural Adequacy Test $ 3,000.00 Complete $ 882.00 J Bowmanville Recreation Complex 17. Cabinet $ 1,200.00 Complete $ 803.00 18. Sprinkler System $18,000.00 Complete $ 4,376.92 K Orono Park Pool 19. Pool Cover $ 3,000.00 In Progress 20. Sealant $ 4,000.00 Complete $ 4,255.00 L Newcastle Lions Pool 21. Heater $17,500.00 Complete $12,279.97 M Fitness Centre 22. Metal Cabinet $ 1,200.00 $ 803.85 23. Sprinkler System $ 6,000.00 $ 2,034.69 24. Washroom Partitions $ 6,000.00 In Progress CU% ATTACHMENT 1 TO REPORT NO. CS -27 -93 Page 2 of 2 CAPITAL CARRY -OVER BUDGET STATUS ACTUAL PROJECTS EXPENDITURE S A Darlington Sports Centre 1. Dehumidifier $22,000.00 Complete $14,500.00 B Bowmanville Recreation Complex 2. Acoustical Baffle $36,000.00 In Progress C Orono Town Hall Delay pend. 3. Balcony Renovations $21,000.00 Life Safety Study D Newcastle Community Centre Delay pend. 4. Fire Code Renovations $24,000.00 Life Safety Study E Memorial Park Clubhouse 5. Fire Suppression System $ 6,000.00 Complete $ 1,064.65 F Bowmanville Parks Yard 6. Air Monitoring System $ 3,400.00 Complete $ 2,789.90 G Hampton Works Yard 7. Air Monitoring System $ 4,400.00 In Progress $ 3,468.40 H Municipal Administrative Centre 8. Painting $10,000.00 Complete $15,793.20 9. Security Key System $ 4,300.00 In Progress I Orono Arena 10. Chemical Treatment System $ 8,000.00 In Progress 11. Fire Separation Wall $ 3,000.00 In Progress