HomeMy WebLinkAboutCSD-009-22Staff Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: General Government Committee
Date of Meeting: April 11, 2022 Report Number: CSD-009-22
Submitted By:
Reviewed By:
File Number:
Report Subject:
George Acorn, Director of Community Services
Mary-Anne Dempster, CAO By-law Number:
Resolution#:
Future Use of the Tourism Information Centre
Recommendation:
1.That Report CSD-009-22 be received for information.
Municipality of Clarington Page 2
Report CSD-009-22
Report Overview
The Tourism Information Centre (TIC) has been closed since March 2020, due to the
COVID-19 pandemic, and a new Tourism Delivery Model which provides Tourism
information and assistance within Clarington’s major indoor recreation facilities.
Staff were requested through ratification of Report CSD-004-21 Future of the Tourism
Information Centre to investigate future options for the building, which are presented in this
report. We have identified an opportunity to make minor modifications to the space to
effectively offer additional programming for our residents.
1. Background
1.1 In March 2020, the COVID-19 pandemic caused the closure of the Tourism Information
Centre (TIC) at 181 Liberty Street South in Bowmanville. Other than operating as a flu
vaccination clinic for Durham Region for a couple of months, the TIC has been closed to
the public since that time. In September 2020, as recommended in the Organizational
Structure Review, the responsibility for municipal tourism operations moved to
Community Services from the CAO’s Office.
1.2 In May of 2021, Report CSD-004-21 Future of the Tourism Information Centre was
received by Council, and ratified with Resolution GG-371-21, C-207-21 which states:
“That Report CSD-004-21 be received; That Council approve the permanent closure of
the Tourism Information Centre at 181 Liberty Street, Bowmanville; That Council
support the revised Tourism Delivery Model, as presented in this report; and That Staff
continue to investigate future options for the building, that could include upgrading and
repurposing, relocation or demolition, and to provide all necessary funds in the 2022
budget, for consideration.”
1.3 Community Services staff implemented the new Tourism Delivery Model throughout
2021, with Tourism information and assistance now being provided at the major indoor
recreation facilities throughout Clarington. This model provides a broader reach with
residents and visitors, due to the volume of visits to these facilities, expanded hours and
larger number of Customer Service staff available to assist. The closure of the TIC, and
a $50,000 reduction of the 2021 Tourism Operating Budget, enhanced the opportunity
to embrace this new direction.
2. Need for Recreation Programming Space
2.1 Bowmanville is the largest urban centre within Clarington and is severely lacking in
programmable space. There is a large demand for recreation programming within
Bowmanville, and the Tourism Information Centre provides an opportunity for
recreational opportunities both indoors and using the adjacent outdoor space.
Municipality of Clarington Page 3
Report CSD-009-22
2.2 Recreation staff have visited the building and surrounding lands and are excited about
the potential for a variety of recreational programming opportunities.
2.3 The outdoor space will lend itself to outdoor fitness activities, starting in June as a tie in
with June is Recreation and Parks Month. This location will also be a great addition to
the Mobile Playground summer camp program and provide the opportunity for
gardening programs.
2.4 Other programs also being planned within the building include:
Preschool programming
Babysitting/Home alone
Youth Arts Nights
Yoga classes
Nutrition Workshop
Intergenerational Programming
55+ Activities such as euchre and socials
3. Modifications to the Building
3.1 To make the space flexible to offer a range of activities, staff have removed the interior
partial partition walls, replaced some flooring and doors. Additionally, accessibility
improvements have been made including power operated entrance doors. By removi ng
the interior partition walls, the space is fully opened and functional for the variety of
activities that staff are planning.
3.2 Most of this work has been completed in-house by staff and this has kept the costs
down to a minimum, in most cases for supplies only. The costs incurred can be
accommodated in the Department’s operating budget, with no impact on forecasted
year end results.
4. Concurrence
4.1 Not Applicable.
5. Conclusion
5.1 Staff are looking forward to programming this building for both indoor and outdoor
activities. Although adding this space will not satisfy the current need for programming
space in Bowmanville, it will provide new opportunities for our residents to access
services that we were not previously able to offer in Bowmanville.
Municipality of Clarington Page 4
Report CSD-009-22
Staff Contact: George Acorn, Director of Community Services, 905-623-3379 ext. 2502 or
gacorn@clarington.net .
Attachments:
Not Applicable
Interested Parties:
There are no interested parties to be notified of Council's decision.