Loading...
HomeMy WebLinkAboutCOD-031-11 SERVICES Clarington REPORT CORPORATE Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: October 17, 2011 Resolution#: - -11 By-law#: N/A Report#: COD-031-11 File#: Subject: CL2011-28, BOWMANVILLE VALLEY PEDESTRIAN BRIDGE & TRAIL RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-031-11 be received; 2. THAT Taylor Wakefield General Contractors Limited, Toronto, Ontario, with a total bid in the amount of $212,090.17 (net of H.S.T. Rebate), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2011-28, be awarded the contract for the Bowmanville Valley Pedestrian Bridge and Trail, as required by the Engineering Department; 3. THAT the funds required in the amount of$ 263,539, which includes $212,090.17 for tendering plus contingency amount, engineering and materials testing and the Municipality's Net HST amount) be drawn from the following Engineering Department Capital Budget Accounts: 2011 — Bowmanville Valley Bridge & Trail 110-32-325-83257-7401 ...................................................................$ 238,000.00 2011 — Nelson Parkette (unexpended funds) 110-32-325-83340-7401 .......................................................................$25,539.00 $263,539.00 REPORT NO.: COD-031-11 PAGE 2 4. THAT the Mayor and the Clerk be authorized to execute the necessary agreement. Submitted by. Reviewed by: M'gfh-e`Marano, H.B.Sc., C.M.O., Franklin Wu, Dire r of Corpo to S rvices Chief Administrative Officer ancy T yl r, B ., C.A., Director of Finance/Treasurer MM/JDB/km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: COD-031-11 PAGE 3 BACKGROUND 1.1 Tender specifications were provided by the AECOM for the Bowmanville Valley Pedestrian Bridge and Trail. 1.2 Tender CL2011-28 - Bowmanville Valley Pedestrian Bridge and Trail was advertised in the Daily Commercial News and electronically on the Municipality's website and the Ontario Public Buyer's Association website. Subsequently, tenders were received, reviewed and tabulated as per the memo from the Engineering Department (Attachment 1). 1.3 Attached for information is a copy of the Key Maps (Attachment 2) indicating locations of the project. 2.0 ANALYSIS 2.1 A total of twelve (12) submissions were received in response to the tender call. All submissions were deemed compliant. 2.2 Based on the bids submitted, the project cost is in excess of the budget amount. In order to bring the cost to within an acceptable limit and allow for a contingency a portion of the trail has been deleted from the schedule of work. This change was applied consistently to the three low bids submitted, and the bid submitted by Taylor Wakefield Contractors Limited remains the low compliant bid. 2.3 After further review and analysis of the compliant bids by AECOM, the Engineering Department and Purchasing, it was mutually agreed that the low bidder, Taylor Wakefield General Contractors Limited, Toronto, Ontario be recommended for the contract for the Bowmanville Valley Pedestrian Bridge and Trail. A copy of the recommendation memo from the Department of Engineering is appended as Attachment 1. 2.4 Taylor Wakefield Contractors Limited has not provided similar services to the Municipality of Clarington in the past although they were recently awarded a project for parkette construction. A review of their references, Oakville, Ajax and Georgina indicate that the level of service has been satisfactory. 2.5 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Engineering. 3.0 FINANCIAL 3.1 The total project cost is $ 263,539.00 (i.e., which includes $212,090.17 for tendering, engineering, administration and a ten percent contingency amount and materials testing and the Municipality's net HST). REPORT NO.: COD-031-11 PAGE 4 3.2 The total revised project costs for the Bowmanville Valley Pedestrian Bridge and Trail project exceed the budgeted amount. The additional funds in the amount of $25,539.00 are available as unexpended funds in the Nelson Street Parkette project account 10-32-325-83340-7401. 4.0 COMMENT 4.1 Public tenders were invited resulting in the submission of complaint bids with the low revised bid being acceptable. Therefore it is recommended that the contract be awarded to the low compliant bidder, Taylor Wakefield General Contractors Limited, Toronto. 5.0 CONCURRENCE 5.1 This report has been reviewed by A.S. Cannella, Director of Engineering Services, who concurs with the recommendations. 5.2 Queries with respect department needs, specifications, etc., should be referred to the Director of Engineering. 6.0 CONCLUSION 6.1 To award the contract to Taylor Wakefield General Contractors Limited, Toronto, Ontario for Contract CL2011-28 Bowmanville Valley Pedestrian Bridge and Trail. CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Jerry D. Barber, C.P.P.O., Purchasing Manager Attachments: Attachment 1 - Memo from Engineering Services Attachment 2 - Key Maps List of interested parties to be advised of Council's decision: Not-Applicable ATTACHMENT 1 Leading the Way MEMO TO: Jerry'Barber, Purchasing Manager FROM: Peter Windolf, Park Development Manager DATE: October 14, 2011 SUBJECT: Bowmanville Valley Bridge and Trail Construction Tender CL2011-28 The Engineering Services Department has reviewed the low bid by Taylor Wakefield General Contractors Limited and offers the following comments: In 2011 Council approved $238,000 for the construction of Bowmanville Valley Bridge and Trail. We recommend award of the contract in the amount of$212,090(net of H.S.T. rebate) for the project. Taylor Wakefield was recently awarded the contract for the construction of Nelson Street Parkette. Their references were checked as part of that award and I am satisfied they will be able to complete this project to our satisfaction. In order for the project to be awarded some items have been deleted from the contract. Those items include trail construction on the west side of the bridge and the asphalt surface for the trail on the east side. Those items will be included in our Capital Budget submission for 2012. A contingency allowance of 10% is carried forward. The Engineering Services Department advises the following breakdown for the above referenced project: Project Breakdown Total Project Costs: Construction $ 212,090 Engineering $ 30,240 Contingency $ 21,209 Total Project $ 263,539 Cost Project Funding: 2011 Budget—Bowmanville Valley 110-32-325-83257-7401 $ 238,000 Bridge&Trail 2011 Budget—Unexpended funds for 110-32-325-83340-7401 $ 25,539 Nelson Parkette Estimated Budget $ 0 Surplus/(Deficit) Bowmanville Valley Bridge and Trail CL2011-28 2 ATTACHMENT 1 Should you have any questions, please feel free to contact me. Regards, Peter Windolf, OALA, CSLA Manager Park Development Attachment Cc Nancy Taylor, Director of Finance Tony Cannella, Director of Engineering CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO 1-1C 3A6 T(905)623-3379 ATTACHMENT 2 MAE m SIT KEY MAP - Q e Y � _ SPRY AVE J N r w Q � � 41 J Baseline Rd. J W SITE 0 EA 401