Loading...
HomeMy WebLinkAbout01-17-2022 Agenda Planning and Development Committee Agenda Date:January 17, 2022 Time:6:30 p.m. Location:Council Members (in Chambers or MS Teams) | Members of the Public (MS Teams) Inquiries and Accommodations: For inquiries about this agenda, or to make arrangements for accessibility accommodations for persons attending, please contact: Lindsey Patenaude, Committee Coordinator, at 905-623-3379, ext. 2106 or by email at lpatenaude@clarington.net. Alternate Format: If this information is required in an alternate format, please contact the Accessibility Coordinator, at 905-623-3379 ext. 2131. Audio/Video Record: The Municipality of Clarington makes an audio and/or video record of General Government Committee meetings. If you make a delegation or presentation at a General Government Committee meeting, the Municipality will be recording you and will make the recording public by on the Municipality’s website, www.clarington.net/calendar Cell Phones: Please ensure all cell phones, mobile and other electronic devices are turned off or placed on non-audible mode during the meeting. Copies of Reports are available at www.clarington.net/archive *Late Item added or a change to an existing item after the Agenda was published. Pages 1.Call to Order 2.Land Acknowledgment Statement 3.Declaration of Interest 4.Announcements 5.Public Meetings 6.Presentations/Delegations 6.1.Delegation of Eric Bowman, Chair, Agricultural Advisory Committee, Regarding the Agricultural Advisory Committee 2021 Accomplishments 4 (Correspondence Attached) 6.2.Delegation of Elizabeth Campbell, Monde Development Group Inc., Regarding Report PDS-003-22 Courtice Community Improvement Plan Grant; 1607 Highway 2, Courtice 7.Reports/Correspondence Related to Presentations/Delegations 7.1.PDS-003-22 Courtice Community Improvement Plan Grant; 1607 Highway 2, Courtice 8 8.Communications 9.Staff Reports and Staff Memos 9.1.PDS-001-22 5-year Corporate Electric Vehicle Action Plan 14 9.2.PDS-002-22 Downtown Community Improvement Plan Programs 2021 - Annual Report 89 9.3.PDS-004-21 A Draft Approved Plan of Subdivision and Rezoning, West of Green Road North of Durham Highway 2, in Bowmanville 95 10.New Business - Consideration 11.Unfinished Business Planning and Development Committee January 17, 2022 Page 2 12.Questions to Department Heads/Request for Staff Report(s) 13.Confidential Items 14.Adjournment Planning and Development Committee January 17, 2022 Page 3 Agricultural Advisory Committee of Clarington 2021 Accomplishments 2021 Members: Eric Bowman (Chair) John Cartwright (Vice-Ch) Tom Barrie Ryan Cullen Ben Eastman Jennifer Knox Jordan McKay Brenda Metcalf Richard Rekker Don Rickard Henry Zekveld Councillor Zwart Staff Liaisons: Amy Burke COVID-19 Due to COVID-19 restrictions and to ensure social distancing, participation in all 2021 meetings was done electronically and by conference call. A lack of reliable, high quality internet connection across many areas of Durham Region, and in particular rural areas, is making it challenging for agricultural organizations and other networks to stay connected. The COVID-19 pandemic has forced association meetings and networking opportunities to transition to a virtual format. Connection issues hinder the ability for many to fully participate in these events. Presentations to the Committee COVID-19 Community Improvement Grant Program: Sarah Allin, Planning & Development Services, presented an overview of the COVID-19 Community Improvement Plan, approved by Council in October 2020. The CIP seeks to support Clarington’s local businesses with physical improvements necessary to implement COVID-19-related health and safety requirements. Rural Capital Projects Annual Update: Sean Bagshaw, Public Works Department, presented an overview of the rural area capital infrastructure projects planned for 2021. A range of planned projects, including road resurfacing, road rehabilitation, culvert replacement, roadside protection, roadside stabilization and road shoulder widening and paving, were highlighted. In addition, desktop level projects planned for 2021 were introduced. Page 4 Clarington Corporate Climate Change Action Plan: Doran Hoge, Planning and Development Services, presented the Clarington Corporate Climate Action Plan, approved by Council in March 2021. Doran described the process used to develop the actions and the main goals of the plan. He provided the adaption and mitigation framework guiding the implementation of the plan, as well as an overview the monitoring and evaluation process and the next steps of implementation. Committee members asked how the effects of the plan are going to be measured and brought up on-farm carbon sequestration opportunities. Emerald Ash Borer - Tree Removal Rural Area Plan: Brett Novak, Public Works Department, provided an update on the ongoing Emerald Ash Borer and Rural Tree Removal Program. He advised the tree removal in the urban areas is complete and rural areas are now being prioritized. He noted that increased 2021 budget allocation for the program has supported the advance of the program in the rural area. The Committee inquired about what happens to the removed trees and if there was a publicly available list of roads where trees are to be removed and the timeframe. Regional Roads Capital Program: Ron Trewin and Andrew Janes, Transportation Design, Region of Durham, presented an overview of rural projects proposed in Clarington. Nine key road projects will occur along or near Taunton Road between Townline Road and Liberty Street over the next three to four years. Ron noted that the Region continues to update Regional Road Standards, considering new approaches to road safety, concerns received from rural residents, and the impacts of climate change. The Committee commented on the importance of ensuring that farm vehicles can easily move between their farming locations and requested notification of pending road projects as far in advance as possible. Envision Durham: Kiersten Allore-Engel, Planning and Economic Development, Region of Durham, updated the Committee on Envision Durham – the Municipal Comprehensive Review of the Regional Official Plan, and provided an overview of the proposed policy directions relating to the Strategic Direction of a Thriving Rural System. She reviewed the policy framework, review approach, and timelines. Margaret Walton, Planscape, provided an overview of the Agricultural System update study. Margaret demonstrated how the system relates to the policy framework in Ontario, reviewed how the system was identified and refined, and then explained the implementation process and project timelines. Questions and comments relating to land severance policies, agricultural system fragmentation and the mapping of prime agricultural lands were discussed. Future project updates and requests for comments will be made of the Committee in 2022. Wilmot/Graham Creek Flood Plain Mapping Update Study: Cory Harris of the Ganaraska Region Conservation Authority provided an overview of the floodplain mapping update study being done for the Wilmot and Graham Creeks, in collaboration with the Municipality. Cory outlined the technical requirements of the study and how the floodplain mapping is delineated. The project timelines were reviewed and the relationship of the mapping updates to land use planning was discussed. Page 5 Golden Horseshoe Food and Farming Alliance – Event Barn Position Paper (Draft): Janet Horner, Executive Director, Golden Horseshoe Food and Farming Alliance (GHFFA), provided an overview of the GHFFA’s Draft Event Barn Position Paper. Ms. Horner informed the Committee that the position paper has been written with input from the GHFFA, OMAFRA and municipal staff, and has used three existing event barns in the Greater Golden Horseshoe as case studies for the basis of the review. The basis for the position set out in the paper, which states that “event barns should only be permitted if they can meet all the current government requirements and follow the OMAFRA Guidelines on Permitted Uses in Ontario's Prime Agricultural Areas,” was provided and recommendations and next steps were highlighted. The paper was referred to the On- farm Diversified Use Sub-Committee for commenting in early 2022. Consultation Feedback Clarington Tourism Advisory Committee – 2021 Focus on Local Agriculture: The Committee met with representatives of Clarington’s Tourism Advisory Committee to discuss the CTAC’s 2021 focus on local agriculture and to share ideas on how Clarington Tourism can further support and showcase local farms as destinations. Farm education and raising awareness of what Clarington has to offer was seen as a critical component, and several ideas were suggested. Clarington Official Plan Amendment, Special Study Area 2: Planning and Development Services Staff consulted with the Committee regarding Draft Official Plan Amendment COPA 2021-001. The Committee also heard several delegations on the matter. The Committee provided comments, and recommended that Council focus its protective effort on the lands between Bowmanville and Newcastle, by ensuring: 1. That growth be provided through intensification and redevelopment, and within the existing urban boundaries; 2. That impacts from settlement areas on agricultural operations be mitigated; 3. That all types, sizes and intensities of agricultural uses and normal farm practices be promoted and protected in accordance with Provincial Standards; and 4. That stringent tests for the consideration of urban boundary expansions into Prime Agricultural Areas be established, including soil capability (e.g. avoid Classes 1, 2 and 3 soils, in this order of priority) and other key factors, such as those considered by the LEAR evaluation system model. And further, that additional incentives to promote long term agricultural use of these lands be considered. [Motion 021-013] Page 6 Committee Correspondence Temporary Foreign Worker Program: An acknowledgment letter expressing appreciation for the program was submitted on behalf of the Committee to Employment and Social Development Canada. Other Highlights On-Farm Diversified Uses: In response to Councils direction in Resolution #PD-207- 21 referring the topic of On-Farm Diversified Uses and guidelines for such uses to the Committee for their input, an On-Farm Diversified Uses Sub-Committee was formed. The Committee will commence meetings in 2022. The input of the Sub-Committee will also inform the Comprehensive Zoning By-law Review Project - Zone Clarington. Zone Clarington: The Committee received regular updates on the Comprehensive Zoning By-law Review Project. Additional consultation with the Committee on agricultural aspects of the Second Draft Zoning By-law, released November 2021, will occur in 2022. Page 7 Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: January 17, 2022 Report Number: PDS-003-22 Submitted By: Ryan Windle, Director of Planning and Development Services Reviewed By: Andrew C. Allison, CAO Resolution#: File Number: PLN 37.4; CIPC2021-001 By-law Number: N/A Report Subject: Courtice Community Improvement Plan Grant; 1607 Highway 2, Courtice Recommendations: 1. That Report PDS-003-22 and any related communication items, be received; 2. That Council provide direction regarding a maximum funding commitment of up to $1, 000,000 in response to the application for a Development Charge Grant under the Courtice Main Street Community Improvement Plan submitted by Monde Development Group for 1607 Highway 2 in Courtice; 3. That any funding committed by Council to Monde Development Group for 1607 Highway 2, Courtice for a DC Grant be conditional upon the completion of the project in accordance with site plan approval and the fulfilment of the requirem ents of the CIP Agreement to the satisfaction of the Municipality; 4. That $1,000,000 from the General Capital Reserve, allocated for the Courtice CIP, be committed for this project; 5. That, if there are insufficient funds in the General Capital reserve, the Treasurer be authorized to withdraw from another reserve or reserve fund that the Treasurer deems appropriate; 6. That any funds withdrawn from an alternate reserve or reserve fund, be repaid on an annual basis using 50 per cent of the incremental property ta x for the property, with the remaining 50 per cent available for general budgetary use; 7. That all interested parties listed in Report PDS-003-22 and any delegations be advised of Council’s decision. Page 8 Municipality of Clarington Page 2 Report PDS-003-22 Report Overview The purpose of this report is to obtain a funding commitment and direction regarding an application submitted by Monde Development Group for a Development Charge (DC) Grant under the Courtice Main Street Community Improvement Plan (CIP). In accordance with the Courtice Main Street CIP, applications for qualifying development projects are brought forward to Council for consideration of grant funding. The applicant would be required to enter into an agreement with the Municipality once CIP grant funding is conditionally allocated to the project. Additional information about the Courtice Main Street CIP is provided in the Community Improvement Plan Programs Annual Report 2021 (PDS-002-22), also on the agenda for the Planning and Development Committee meeting. 1. Background Courtice Main Street Community Improvement Plan 1.1 The Courtice Main Street Community Improvement Plan (CIP) was approved in 2016 to support the vision established by the Courtice Main Street Secondary Plan to develop the area as a mixed-use, transit-supportive, and pedestrian-friendly environment that preserves valuable natural heritage, built form and community character. The CIP provides incentives to higher density residential and mixed-use development projects that generate new or increased property assessment. 1.2 The Courtice Main Street CIP incorporates two financial incentive programs including the Development Charge (DC) Grant Program, and the Tax Increment Grant Program. 1.3 To be eligible for the Courtice Main Street CIP Grant Programs, projects must first meet minimum intensification targets (e.g. density, floor space index). Once it is determined the project achieves the minimum eligibility criteria, the application is evaluated against a performance evaluation framework to determine how well the project addresses key community improvement needs identified by the CIP. The grant value for a project is based on the number of performance criteria achieved by the as-built project, and is expressed as a proportion of the applicable development charges, in the case of the DC Grant, or a proportion of the increased tax assessment generated by the development for the Tax Increment Grant. 1.4 All applicable development charges are required to be paid as per the Development Charges By-law, typically at the time a building permit is issued. Grant approvals and funding commitments are conditional upon the development being completed in accordance with the site plan approved plans/drawings, and the terms and conditions outlined in the required CIP Agreement. Grants would be issued once construction of the development is complete, and the applicant has demonstrated the terms and conditions of the Agreement have been fulfilled to the satisfaction of the Municipality. Page 9 Municipality of Clarington Page 3 Report PDS-003-22 1.5 DC grants are budgeted for annually and held in a reserve fund in order to meet anticipated demand in future years. Tax Increment grants are tied to the increased assessment value of a property resulting from development, which the Municipality would forgo (on a sliding scale) for a specified period of time (e.g.10 years). Additional details about the Courtice Main Street CIP fund are outlined in PDS-002-22. 2. CIP Grant Application and Discussion Development Charge Grant Application for 1607 Highway 2, Courtice 2.1 An application for a DC Grant has been submitted by Monde Development Group for its project at 1607 Highway 2 in Courtice. The project consists of a six-storey residential apartment building containing 89 dwelling units and 95 underground parking spaces (File SPA2019-034). A location map is included for information as Attachment 1. This is the first grant application under the Courtice Main Street CIP. 2.2 The property is designated Regional Corridor by the Clarington Official Plan and is within the Low-Rise High-Density Residential designation of the Courtice Main Street Secondary Plan. The property is zoned “Residential Mixed Use - Holding ((H)MU2(S:4/6))” and “Special Purpose Commercial Exception (C5-1)” by Zoning By-law 84-63. The site plan application for the proposed development (File SPA2019 -0034) was approved in February 2021. The applicant is working with Planning and Development Services staff to finalize the site plan agreement. It is now appropriate to consider a funding commitment for the requested DC Grant. Eligibility and Performance Criteria 2.3 The Courtice Main Street CIP encourages intensification along the Regional Corridor in the form of higher density residential, commercial, and mixed-use development. To be eligible for a DC Grant, properties within the Low-Rise High Density Residential designation outside of the Town Centre of the Courtice Main Street Secondary Plan area must achieve minimum intensification targets of 75 residential units per gross hectare, a floor space index (FSI) of 1.2, and minimum height of five storeys. The development approved for this property under Site Plan File SPA2019 -0034 meets the Minimum Intensification Targets and qualifies for the Program. 2.4 The DC Grant Program requirements are designed to encourage development that is of high quality, sustainable urban design and construction, and contributes towards a range of housing affordability. 2.5 DG Grant applications are evaluated against five categories of Project Performance Criteria, including: Building Design and Construction, Pedestrian Environment and Active Transportation, Green/Open Spaces and Trail Access, Housing Choice, Accessibility and Affordability, and Sustainable Development. Full details of the Performance Criteria and requirements are included in Appendix F of the Courtice Main Street CIP. Page 10 Municipality of Clarington Page 4 Report PDS-003-22 2.6 An additional incentive is provided for projects required to pay the Region the cost of full municipal services. Developments that are not responsible for their share of the cost of full municipal services may be eligible to receive a grant equal to between 25 per cent and 37.5 per cent of the applicable development charges. DC grants for developments required to cover the cost of municipal services may range from 50 per cent to 75 per cent of applicable development costs, depending on the number of Project Performance Criteria achieved by the as-built project. 2.7 Based upon the information provided in support of the CIP application and the site plan approved drawings, the residential development proposed at 1607 Highway 2, Courtice meets 5 out of 5 Project Performance Criteria. The developer will be required to pay the Region for their share of the cost of municipal services. The project would qualify for a grant of up to 75 per cent of the applicable development charges, resulting in an estimated maximum grant value between $800,000 and $1 million. Commitment of Funding 2.8 This report seeks direction from Council regarding a funding commitment in the range of $800,000 to $1 million in response to the DC Grant application made by Monde Development Group to facilitate its six-storey residential apartment development located at 1607 Highway 2, Courtice. 2.9 Subsequent to Council’s direction, staff will complete the processing of the Grant application to the satisfaction of the Director of Planning and Development Services, including the execution of a CIP Agreement. 2.10 As outlined in Report PDS-002-22, funding has been included in the Planning and Development Services 2022 budget to continue to build the CIP reserve in anticipation of this and other applications which may be received. The timing of payout of the grant is after completion of the construction and once the performance criteria can be verified which could be anywhere from 2-5 years. Finance Considerations 2.11 The Municipality allocates unspent budgeted CIP funds to the General Capital Reserve, this reserve is a working capital reserve that includes a variety of items that are carried over from year to year for specific projects. At December 31, 2020 there was approximately $119,800; in 2021, there was a budgeted contribution of $210,000 which would make the December 31, 2021 balance approximately $329,800. 2.12 It is proposed that Council authorizes the Treasurer to draw on the Tax Rate Stabilization Reserve Fund for any shortfall in the grant funding between now and when the payment is to be issued. This provides the developer with a funding commitment providing the grant conditions are met, the developer will be relying upon this commitment for their financial decision making. Page 11 Municipality of Clarington Page 5 Report PDS-003-22 2.13 Once the development is complete, the Municipality will realize increased property tax revenue, which over time will offset the up-front cost of the DC Grant for the project. Therefore, any grant funding shortfall made up by the Tax Rate Stabilization Reserve Fund, or other reserve as the Treasurer determines, shall be repaid on an annual basis using 50 per cent of the incremental property tax for the property. 3. Concurrence This report has been reviewed by the Director of Financial Services and Director of Legislative Services who concur with the recommendations. 4. Conclusion 4.1 The purpose of this report is to obtain direction from Council regarding an application submitted by Monde Development Group for a DC Grant under the Courtice Main Street CIP for the development for SPA2019-0034 at 1607 Highway 2. 4.2 Staff have reviewed the subject CIP application and ha ve determined that the site plan approved development meets the eligibility criteria for the Program and qualifies for a DC Grant. 4.3 Should Council provide direction to commit the necessary funding, staff will proceed with the conditional approval of a DC grant and execution of a CIP Agreement. The grant would be paid out once (i) the development is complete and occupied, and (ii) all Site Plan and CIP Grant agreement requirements have been fulfilled to the satisfaction of the Municipality. Staff Contact: Sarah Allin, Planner, 905-623-3379 ext. 2419 or sallin@clarington.net. Attachments: Attachment 1 – Location Map and Aerial; 1607 Highway 2, Courtice Interested Parties: The following interested parties will be notified of Council's decision: Monde Development Group Page 12 6 35 79 79 2 86428 2 1 75 9 1 5 9 1 5 9 8 2 81630 3412 3011 4442403836343230282624223432 3722261721252933 11 43454749 19 17 15 21 15172123252729313335373941434547462826242220181412103129 27 33 28 26 22 16 12 31 504815171923 25 29 54 50 46 42 343 2 28 262422 2018165421 25 2931 35 39 43 47 51 58 19 67 63 13 17 89 85 8179 75 71 13 1719 30 26 22 18 14494541 3729272523211917151311252933137139 121123 127 131 128126122 118 1141321604160616071603159716171620162216261630163415751577159015801586158415921600159815961595159115891587160216156 3 3 7 2 3 7 14 131924 20 14 10 461113 21 27 5252 48 44 56 23 27 33 37 41 45 49 53 65 61 11 15 69 87 83 77 73 11 15 21 28 24 20 16 12104743 352731141 135 125 129 133 124 120 1161301616160116281588161360 Regional Highway 2 Stirling Avenue Kennedy DriveStrathallan Drive Mcmann CrescentStrathallan Drive Strathallan Drive Strathallan Drive Mcmann CrescentMcmann Crescentµ 1607 Regional Highway 2Courtice Subject Property Subject Property Newcastle401401 40135&115Newtonville RdLiberty StBowmanville Avenue407 Courtice RdRegion a l Rd 2 Regional Rd 235&115L a k e O n t a r i o King St Courtice Bowmanville Orono Solina Newtonville Enniskillen Hampton Burketon Tyrone Leskard Mitchell Corners Kendal Haydon MapleGrove Kirby Brownsville Enfield Subject Area Page 13 Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: January 17, 2022 Report Number: PDS-001-22 Submitted By: Ryan Windle, Director of Planning and Development Services Reviewed By: Andrew C. Allison, CAO By-law Number: File Number: PLN 23.29 Resolution#: Report Subject: 5-year Corporate Electric Vehicle Action Plan Recommendations: 1. That Report PDS-001-22 be received for information; 2. That Council endorse the Electric Vehicle Action Plan (EVAP) to guide the electrification of the Municipal fleet and the installation of public EV charge stations on Municipal properties (Attachment 1); 3. That Municipal staff consult the EVAP to inform annual budget recommendations related to the electrification of the municipal fleet and the installation of public electric vehicle (EV) charge stations on municipal properties; 4. That Council authorize staff to apply for funding opportunities to support the implementation of the EVAP, where/when identified; and 5. That all interested parties listed in Report PDS-001-22 and any delegations be advised of Council’s decision. Page 14 Municipality of Clarington Page 2 Report PDS-001-22 Report Overview This report provides an overview of the Clarington Electric Vehicle Action Plan (EVAP). The EVAP is a guide to transition the municipal fleet to zero-emissions electric vehicles (EV) and install fleet and public EV charging stations at municipal facilities between 2022 and 2026. The EVAP sets out the Municipality’s annual EV purchases and infrastructure needs and makes recommendations for the timing and location of public EV charging stations to be included in the annual budget cycle. By following the steps outlined by the EVAP the Municipality will transition 25 fleet vehicles to electric and install at least 60 EV charge points on municipal properties for public and fleet charging. Fleet vehicles are responsible for 13.8 per cent of Municipal greenhouse gas (GHG) emissions. Transportation is responsible for approximately 47 percent of region-wide emissions. By implementing the EVAP, the Municipality will take significant steps to respond to climate change by directly reducing GHG emissions associated with corporate transportation; provide infrastructure to meet the community’s need for public EV charging; and improve community wellbeing by promoting transportation options that reduce air and noise pollution. 1. Background 1.1 The Municipality’s 2018 corporate GHG emissions inventory shows that municipal fleet vehicles are responsible for 13.8 per cent of Clarington’s corporate GHG emissions. The 2019 Durham Community Energy Plan (DCEP) shows that the transportation sector is responsible for 47 per cent of region wide GHG emissions. 1.2 In November 2019, Clarington Council endorsed the DCEP though resolution #GG-551-19, which establishes a community energy reduction target of 80% by 2050 and the Low Carbon Pathway scenario as the preferred energy scenario for implementation, which includes a community-wide transition to electric vehicles (EVs). 1.3 In March 2020, the Municipality set targets to reduce corporate GHG emissions 35 per cent by 2030 from 2018 levels and achieve net-zero emissions by 2050. 1.4 On March 2, 2020, Council passed resolution #C-066-20: “That it be policy for all future car and SUV purchases be electric vehicles or similar vehicles without tailpipe emissions where practicable.” 1.5 In December 2020, Trent University completed a report as part of Communications and Critical Thinking Capstone course, which identifies best practices for the Municipality to reduce corporate GHG emissions thought the adoption of EVs. Page 15 Municipality of Clarington Page 3 Report PDS-001-22 1.6 Action 1.30 of the Clarington Corporate Climate Action Plan (CCCAP), which was approved by Council in March 2021, recommends updating the Municipal Fleet Strategy and establishing a five-year plan to electrify the Municipal fleet, where practicable. 1.7 Based on direction from Council outlined above, the EVAP was created to guide the Municipality’s transition to EVs over the next five years (2022 to 2026). The EVAP is provided in Attachment 1. 1.8 The EVAP sets out the Municipality’s annual EV purchases and infrastructure needs and makes recommendations for the timing and location of public EV charging stations. 1.9 By transitioning the municipal fleet from internal combustion engine vehicles (ICEs) to EVs and by helping the public to also make the switch to EVs, the Municipality is taking important steps to reduce both corporate and community GHG emissions and respond to climate change. 2. Rationale for Switching to Electric Vehicles Environmental Benefits 2.1 GHG emissions from vehicles (tailpipe emissions) are some of the easiest emissions to pinpoint and eliminate, as they come from a single source and can be easily quantified. 2.2 Unlike internal combustion engines (ICEs), which burn fossil fuels and emit GHGs during operation, EVs rely on the electricity grid for their energy. EVs are as ‘clean’ as the electricity grid used to power them. Most of Ontario’s electricity is produced from low or no carbon sources, including nuclear, hydro, and renewable energy sources, with some backup power coming from natural gas ‘peaker plants’, which compensate for spikes in energy demand. 2.3 A transition to EVs will result in reduced GHG emissions and air pollutants, and significantly contribute to achieving the Municipality’s net-zero emissions target. Community Benefits 2.4 The EVAP includes options for installing public EV charge stations in strategic locations on Municipal properties to support the public to transition to EVs. 2.5 By installing publicly accessible chargers, the Municipality is providing the community with needed EV charging infrastructure and actively promoting the reduction of community GHG emissions that contribute to climate change. 2.6 A community-wide transition to EVs will benefit the community in several ways:  Reduced noise pollution in urban neighbourhoods.  Improved air quality (EVs do not emit carbon monoxide, sulfur oxides or volatile organic compounds). Page 16 Municipality of Clarington Page 4 Report PDS-001-22  Reduced GHG emissions (most notably carbon dioxide and methane).  The simplicity of an electric motor and the reduced number of moving parts in an electric car means that EVs have been found to be more reliable and require less regular maintenance than ICEs.  Lower maintenance costs are coupled with cheaper fuel prices to bring a lower total cost of ownership.  EV fueling costs from municipal charging stations will remain predictable and relatively unchanging over the coming years.  Gasoline and diesel prices are anticipated to rise with the federal carbon tax, EV drivers can expect to benefit from low fuel costs relative to petroleum-based alternatives. Current Trends 2.7 The switch to EVs is already underway. In June 2021, the Federal government set a target for all passenger vehicles sold in Canada to be electric by 2035. 2.8 All major auto manufactures have publicly committed to continuing the transition to EVs , and now have models of EVs available, many of which are less expensive to operate and maintain than ICE vehicles. Alignment with the Region of Durham 2.9 Clarington’s direction to switch its fleet to EVs and develop EV charging infrastructure is supported by the Durham Community Energy Plan (DCEP), which was endorsed by Clarington Council on November 25, 2019, through Resolution #GG-551-19.The DCEP sets a goal to support the transition of the transportation sector in Durham to electric. 2.10 Clarington has already collaborated with the Region of Durham, Ajax, Whitby, and Oshawa on two applications to the federal Zero Emissions Vehicle Infrastructure Program (ZEVIP) for funding to install EV charging infrastructure across the region. Both applications have been funded. (More information in Sections 3.6 to 3.9 below). EV Support in Ontario 2.11 As referenced in the Made-in-Ontario Environment Plan, the Provincial Government has signaled its support for an EV transition by investing $295 million into the Ford Oakville Assembly Complex. The investment will transform the automobile manufacturing facility into a battery electric vehicle production facility. 2.12 On November 17, 2021, the provincial government announced that it will work with the auto industry to prioritize EVs in Ontario by: 1) supporting vehicle and parts production for EVs; 2) establishing and supporting an electric battery supply chain ecosystem; 3) innovating on EV development; and 4) investing in auto workers. Page 17 Municipality of Clarington Page 5 Report PDS-001-22 2.13 Investment in domestic EV production is a positive indicator that the provincial government has confidence in the growing EV market. Direction of the Federal government 2.14 On June 29, 2021, the Federal government announced a plan to ban the sale of new ICEs by 2035, accelerating their previously released timeline of 100 percent EV sales by 2040 by five years. 2.15 This mandatory target is part of the federal government’s plan for nationwide carbon neutrality by 2050 and is supported by a series of policies and incentives to help consumers, manufacturers and governments prepare for the transition. 2.16 To spur demand from consumers, the federal government has committed $587 million to the popular federal EV rebate program, which offers those who buy zero-emissions vehicles up to $5,000 in purchasing rebates. 2.17 The Federal government has committed $460 million to build EV charging infrastructure across the country. The ZEVIP will distribute $240 million of the total committed funds to subsidizing EV charge station purchase and installation costs. 3. Cost Considerations Shifting Vehicle Lifecycle Costs 3.1 Transitioning to an EV fleet requires a reconceptualization of municipal vehicle budgets. Currently, electric vehicles have higher Manufacturer Suggested Retail Prices (MSRP) than similar ICE models. Despite their higher MSRPs, EVs offer lower fuel and maintenance costs over the lifespan of the vehicle. 3.2 While maintenance costs between ICEs and EVs vary significantly depending on vehicle make, model, drive cycle and other factors, research shows that EVs have substantially lower maintenance and fuel costs. EVs contain fewer moving parts and have fewer fluids to change than ICE vehicles. 3.3 The Ontario Ministry of Transportation estimates that, for a car driven 20,000 km/year, the average yearly fueling cost for EVs is approximately $530; a similar size ICE would cost $2,500. The estimates assume overnight (off-peak) charging and a gasoline price of $1.20/L (2020). 3.4 Most municipal vehicles in Clarington are replaced within 7 years, before they require serious or ongoing repairs. EVs offer savings on routine maintenance costs as the electric motor and drive train do not need regular servicing (such as the oil changes and engine maintenance required by ICEs). The relative simplicity of EVs compared to ICE vehicles reduce the risk of unexpected malfunctions. 3.5 A 2021 report by the Clean Air Partnership that compares EV and ICE vehicles in fleet applications in London, Ontario and the Fraser Valley Regional District found that Page 18 Municipality of Clarington Page 6 Report PDS-001-22 switching fleet vehicles to EVs saved more than $3,000 per vehicle in fuel and maintenance costs (based on average 13,000km/year and service life of 7 years). 3.6 A 2018 report from the 2 Degree Institute estimates that combined fuel and maintenance costs are 66 per cent less per year for EVs than similar ICE vehicles in Ontario. Taking into consideration upfront purchase cost, fuel, and maintenance, EVs cost on average $27,000 less than ICEs over a 15-year life of life of the vehicle (250,000km) 3.7 With current government incentives, carbon taxes, declining EVs prices, and increasing petroleum fuel prices it is likely that EVs will continue to outperform ICEs on total cost of ownership as fleet vehicles in Clarington. 3.8 As such, departmental budgets will need to account for a higher upfront purchase price for EVs with the understanding the Municipality will likely save money over the 7-year replacement life of the vehicle. Please see Appendix C of the EVAP (Attachment 1) for more information about these figures. EV and Charge Station Purchasing Incentives 3.9 To encourage electric vehicle purchases, the Government of Canada has launched the Incentives for Zero Emissions Vehicles Program (iZEV), which offers rebates of up to $5,000 on the purchase of new electric vehicles. 3.10 The federal government has also made funding available to assist with the proliferation of EV charging infrastructure through the Zero Emission Vehicle Infrastructure Program (ZEVIP). The ZEVIP program has committed $280 million in funding until 2024 to subsidize up to 50 per cent of the costs associated with installing charging infrastructure. 3.11 Clarington has already benefited from federal ZEVIP funding. 3.11.1. In Fall 2019, Clarington received approximately $21,400 from NRCan, subsidizing the cost of five public charge points in downtown Bowmanville . 3.11.2. In the Spring of 2020, Clarington received approval for $82,000 from NRCan to subsidize the installation of 18 charge points across the Municipality ($4,554 per charge point). 3.12 Guided by the EVAP, staff will continue to take advantage of external funding opportunities for EVs and EV charging stations. 4. Other Considerations Emergency Vehicle Exemptions 4.1 Emergency and Fire Services staff expressed concerns regarding EV performance during emergency situations. Specifically, staff brought forward concerns regarding Page 19 Municipality of Clarington Page 7 Report PDS-001-22 towing capacity, battery life and vehicle range during prolonged vehicle use in cold weather. 4.2 Electric pickup trucks have only recently come to market. As such, there has not been a significant amount of time to assess their performance in real-world emergency situations. 4.3 To ensure the proven reliability of vehicles during extended emergency situations, Emergency and Fire Services vehicles designated as an emergency vehicle by the Fire Chief are exempted from the EVAP. Fire prevention vehicles must comply with Council’s EV policy. 4.4 The EVAP recommends that Emergency and Fire Services prioritize vehicles with high energy efficiency and low carbon emissions when selecting vehicles moving forward. 4.5 The use of EVs in Emergency and Fire operations will be revisited as more information about the use of EVs in emergency situations becomes available. Expanding EV Options and Technology 4.6 The EVAP includes only light-duty cars, vans, and pickup trucks up to one half-ton (equivalent to a Ford F-150). The EV options coming to market in 2022 and beyond are expanding, providing more options for the Municipality when purchasing vehicles. This is especially relevant for truck and van replacements. 4.7 The EVAP will be reviewed annually to evaluate expanding EV availability to assess potential EV options for light, medium, and heavy-duty vehicles as they become available. 4.8 Moving forward, staff will consider the practicality of less conventional EVs such as ice resurfacers, fire trucks, e-mobility scooters, e-bikes, and other ZEV options as they become available. 4.9 Currently the average range of EVs is already around 400 kilometres per charge, the range will continue to increase as battery technology continues to improve. This will provide more flexibility, some vehicles could likely go several days without charging if the need arose. 4.10 Staff will monitor the real-word performance and repair costs of EV fleet vehicles and municipally owned EV charge stations on an ongoing basis to inform ongoing decisions related to the municipality’s transition to EVs. 5. EVAP Methodology EV Inventory 5.1 The EVAP is a plan to transition the Municipality’s existing fleet from ICEs and EVs as vehicles reach the end their service life. Page 20 Municipality of Clarington Page 8 Report PDS-001-22 5.2 To create the EVAP the Municipal Interdepartmental Climate Change Working Group (ICCWG) convened to set the objectives of the plan and establish milestone dat es. The ICCWG has been updated monthly throughout the creation of the plan to guide the development of the plan and review its content. 5.3 To begin, staff created a list of key stakeholders from all departments with direct knowledge of future vehicle acquisitions. Identified stakeholders submitted a list of all anticipated new and replacement vehicle purchases between 2021 – 2026. 5.4 This list was analyzed, and all light-duty vehicles with suitable EV replacement options (cars, SUVs, transport vans, and light-duty trucks) were counted to create an anticipated 5-year EV inventory. 5.5 Once the number of EVs expected to be purchased over the next five years was established, it was used to determine how many charge points would need to be installed each year to ensure sufficient charging capacity to accommodate yearly EV purchases. 5.6 As a precautionary measure, and to leverage available federal funding, the installation of EV charge stations over the next five years was prioritized for installation early in the 2022-2026 period, with most of the fleet charging locations scheduled to be installed in the next three years. 5.7 Once the EVAP was drafted and reviewed by the ICCWG, it was circulated more broadly to department heads for internal feedback. Several one -on-one meetings were held with key representatives from Community Services, Emergency and Fire Services and Public Works to address the specific challenges or circumstances and these were incorporated into the plan. EV Charger Site Selection 5.8 The EVAP focuses on retrofitting existing buildings and parking lots to install the charging capacity needed by fleet and public vehicles. It is expected that all new municipal buildings will integrate public and fleet EV charging into their designs, taking into consideration the site selection criteria outlined below 5.9 A list of potential sites was compiled from all municipal properties, including buildings and parking lots. This list was assessed and refined by Community Services facilities staff and Public Works staff to eliminate locations that were deemed unsuitable for infrastructure installation. 5.10 Five criteria were used to measure the suitability of locations for fleet EV charger installation. Suitability criteria include:  Near municipal offices or depots  Near where staff are working  There are enough parking spaces for staff personal vehicles and fleet vehicles  There is enough space for an adequate grouping of EV chargers (4-8 stations) Page 21 Municipality of Clarington Page 9 Report PDS-001-22  There is a transformer or electrical panel with sufficient capacity to accommodate the EV chargers 5.11 Five criteria were used to measure the suitability of locations for public EV charger installation. Suitability criteria include:  Significant traffic at the site  Potential to attract users  The area is currently underserved by charging stations  There is enough space for an adequate grouping of EV chargers (4-8 stations)  There is a transformer or electrical panel with sufficient capacity to accommodate the EV chargers 5.12 For each list, locations scoring a ‘Medium’ or ‘High’ were prioritized for charge station installation within the next five years. Eight public charging locations and nine fleet charging locations were identified for development between 2021 – 2026. 5.13 Locations that can accommodate large banks of stations and locations where many fleet EVs can conveniently be parked and charged have been prioritized for early installations. Figure 1 – Proposed Fleet EV Charge Stations Page 22 Municipality of Clarington Page 10 Report PDS-001-22 Figure 2 – Proposed Public EV Charge Stations 6. Yearly EV and EV Charge Station Breakdown 6.1 The EVAP contains a yearly breakdown of the costs associated with the purchase of new fleet EVs and the purchase and installation of fleet and public EV charge stations. 6.2 The EV and EV charge station cost summaries outlined below are subject to change, as departments and Council may shift priorities regarding the purchases or as external funding opportunities become available. 6.3 Vehicle purchasing years are subject to change, as departments may opt to delay or expedite new vehicle purchases as approved during budget review by Council. Page 23 Municipality of Clarington Page 11 Report PDS-001-22 EV Purchases by Year 6.4 As the Municipality’s fleet vehicles reach the end of their service life, they will be replaced with zero emission EVs between 2022 and 2026. Year New EVs/Hybrids purchased Estimates upfront EV costs by year. Potential Savings to the Municipality over the lifespan (7 years or 91,000 km) 2021 7 $315,000 $21,000 2022 3 $155,000 $9,000 2023 9 $543,000 $27,000 2024 1 $73,000 $3,000 2025 2 $167,000 $6,000 2026 3 $165,000 $9,000 Total 25 1,418,000 $75,000 Table 1 – Fleet EV Purchases by Year and Saving on Fuel and Maintenance over the lifespan of EVs 6.5 Please see Appendix B of the EVAP for a detailed breakdown of the EV purchasing costs. 6.6 Staff will seek all available subsidies at the time that vehicles are purchased. Municipal Fleet EV Charge Station installations by Year 6.7 EV charge stations for fleet vehicles will be installed ahead of vehicle purchases. Year Charge Points Installed Total Estimated Cost Potential ZEVIP Contributions Estimated Cost to Clarington 2021 9 $95,525.00 $40,724.44 $54,800.56 2022 8 $93,550.00 $40,000.00 $53,550.00 2023 6 $66,162.50 $30,000.00 $36,162.50 2024 0 $0.00 $0.00 $0.00 2025 2 $24,137.50 $10,000.00 $14,137.50 2026 0 $0.00 $0.00 $0.00 Total 27 $279,375.00 $120,724.44 $158,650.56 Table 2 – Fleet EV Charge Station Installations by Year Page 24 Municipality of Clarington Page 12 Report PDS-001-22 6.8 Please see Appendix A of the EVAP (Attachment 1) for a detailed breakdown of the Fleet EV charge station purchase and installation cost by year. Public EV Charge Points Installed Year Charge Points Installed Total Estimated Cost Potential ZEVIP Grant Contribution Estimated Cost to Clarington 2021 4 $52,025.00 $17,120.00 $34,905.00 2022 6 $89,912.50 $10,000.00 $79,912.50 2023 8 $120,222.50 $40,000.00 $80,222.50 2024 8 $104,050.00 $40,000.00 $64,050.00 2025 2 $24,137.50 $10,000.00 $14,137.50 2026 10 $118,187.50 $50,000.00 $68,187.50 Total 38 $508,535.00 $167,120.00 $341,415.00 Table 3 – Public EV Charge Station Installations by Year 6.9 Please see Appendix A of the EVAP for a detailed breakdown of the public EV charge station purchase and installation cost by year. 7. Conclusion 7.1 To achieve the Municipality’s GHG emissions reduction targets, the Municipality must transition its fleet to low carbon options. 7.2 With broader community adoption of EVs already underway, the Municipality should also act to ensure community EV charging infrastructure is available. 7.3 The EVAP is a guide for the Municipality to electrify its fleet and provide much -needed public EV charging infrastructure at Municipal facilities between 2022 and 2026. 7.4 Under this plan, the Municipality over the next 5 years is proposing to acquire over 25 electric vehicles to replace ICE vehicles and install more than 60 EV charging spaces, to meet fleet and community EV charging needs at municipal facilities. 7.5 By implementing this plan, the Municipality is taking significant steps to respond to climate change by directly reducing GHG emissions associated with transportation, providing needed infrastructure to meet the community’s needs for EV charging, promoting community wellbeing and transportation options that reduce air and noise pollution. Page 25 Municipality of Clarington Page 13 Report PDS-001-22 7.6 Municipal staff will consult the EVAP during its annual budget cycle to guide the electrification of the municipal fleet and the installation of public EV charge stations on municipal properties. 8. Concurrence 8.1 This report has been reviewed by the Director of Community Services, the Director of Financial Services, the Director of Public Works and the Director of Emergency and Fire Services, who concur with the recommendations of this report. 9. Recommendations 9.1 The Electric Vehicle Action Plan (EVAP) be endorsed to guide the electrification of the Municipal fleet and the installation of public EV charge stations on municipal properties (Attachment 1); 9.2 The EVAP will be used by Staff to inform annual budget recommendations related to the electrification of the municipal fleet and the installation of public electric vehicle (EV) charge stations on municipal properties; 9.3 Staff will continue to seek out and apply for funding to support the implementation of the EVAP. Staff Contact: Doran Hoge, Energy and Climate Change Response Coordinator, 905-623-3379 ext. 2429 or dhoge@clarington.net. Attachments: Attachment 1 – Clarington Electric Vehicle Action Plan Interested Parties: List of Interested Parties available from Department. Page 26 Clarington’s Five-Year Electric Vehicle Action Plan (EVAP) Introduction .................................................................................................................. 4 Objectives .................................................................................................................... 4 About EVs and EV Charging ........................................................................................ 5 Electric Vehicle Basics .............................................................................................. 5 EV Charging Stations ............................................................................................... 6 Level 1 AC Chargers (120V)................................................................................. 6 Level 2 AC Chargers (240V)................................................................................. 6 DC Fast Chargers (480V) ..................................................................................... 7 Networked vs. Non-Networked Stations ............................................................... 7 Rationale for Switching to Electric ................................................................................ 7 Direction from Council .............................................................................................. 7 Alignment with the Region of Durham ...................................................................... 8 EV Support in Ontario ............................................................................................... 8 Direction from the Federal Government .................................................................... 8 Environmental Benefits ............................................................................................. 9 Community Benefits .................................................................................................. 9 Cost Considerations ................................................................................................... 10 Shifting Vehicle Lifecycle Costs .............................................................................. 10 Purchasing Incentives ........................................................................................ 11 Charger Installation Costs ...................................................................................... 12 Fleet Charging Stations ...................................................................................... 12 Public Charging Stations .................................................................................... 12 EV Charge Station Incentives ............................................................................. 12 Other Considerations ................................................................................................. 13 Emergency Vehicle Exemptions ......................................................................... 13 Expanding Vehicle Options and Technology ...................................................... 13 Plan Development Process ........................................................................................ 14 Assumptions ........................................................................................................... 14 Fleet Charging Infrastructure Assumptions ........................................................ 14 Public Charging Infrastructure Assumptions ....................................................... 15 Plan Creation Methodology .................................................................................... 16 Electric Vehicle Inventory Methodology .............................................................. 16 EV Charger Site Selection .................................................................................. 17 Page 27 Page 2 EVAP Adaptability................................................................................................... 18 Yearly EV and Charge Station Breakdown ................................................................ 18 Yearly Overview...................................................................................................... 19 EV Charge Station Locations .................................................................................. 20 2021 ........................................................................................................................ 21 Vehicle Costs ...................................................................................................... 21 Charger Costs .................................................................................................... 21 Garnet B Rickard Recreation Complex - Fleet Chargers .................................... 22 Church and Division St Parking Lot - Public Chargers ....................................... 23 2022 ........................................................................................................................ 24 Vehicle Costs ...................................................................................................... 24 Charger Costs .................................................................................................... 24 Community Resource Centre (Firehouse Youth Centre) - Fleet Chargers ......... 25 Fire Station #1- Fleet Chargers .......................................................................... 26 Courtice Community Complex - Public Chargers ............................................... 26 Orono Public Library - Public Chargers .............................................................. 27 2023 ........................................................................................................................ 27 Vehicle Costs ...................................................................................................... 28 Charger Costs .................................................................................................... 28 Yard 42 - Fleet Chargers .................................................................................... 29 Bowmanville Indoor Soccer Centre - Public Chargers ........................................ 30 Shaw Building - Public Chargers ........................................................................ 32 2024 ........................................................................................................................ 33 Vehicle Costs ...................................................................................................... 33 Charger Costs .................................................................................................... 33 Alan Strike Aquatic and Squash Centre - Public Chargers ................................. 34 South Courtice Arena - Public Chargers ............................................................. 35 2025 ........................................................................................................................ 36 Vehicle Costs ...................................................................................................... 36 Charger Costs .................................................................................................... 36 Yard 42 (Expansion) - Fleet Chargers ................................................................ 37 Garnet B Rickard - Public Chargers ................................................................... 38 2026 ........................................................................................................................ 39 Vehicle Costs ...................................................................................................... 39 Charger Costs .................................................................................................... 39 Darlington Sport Centre - Public Chargers ......................................................... 40 Municipal Administrative Centre (MAC) - Public Chargers ................................. 41 Page 28 Page 3 Conclusion ................................................................................................................. 42 Bibliography ............................................................................................................... 43 Appendix A – EV Charger Installation Costs .............................................................. 46 Summary of EV Charger Installation by Year ......................................................... 46 2021 ................................................................................................................... 47 2022 ................................................................................................................... 49 2023 ................................................................................................................... 51 2024 ................................................................................................................... 53 2025 ................................................................................................................... 54 2026 ................................................................................................................... 56 Appendix B – Projected EV purchases by Year ......................................................... 57 Summary EV Purchases by Year ........................................................................... 57 2021 ................................................................................................................... 57 2022 ................................................................................................................... 57 2023 ................................................................................................................... 58 2024 ................................................................................................................... 58 2025 ................................................................................................................... 58 2026 ................................................................................................................... 58 Appendix C – EV Ownership Costs ........................................................................... 59 Page 29 Page 4 Introduction In March 2020, the Municipality of Clarington set targets to reduce corporate greenhouse gas (GHG) emissions 35 per cent by 2030 from 2018 levels and achieve net-zero emissions by 2050. The 2018 corporate GHG emissions inventory shows that municipal fleet vehicles are responsible for 13.8 per cent of municipal GHG emissions. Similarly, the 2015 Durham Community Energy Plan shows that the transportation sector is responsible for 47 per cent of region-wide emissions. By transitioning Municipality’s fleet from internal combustion engine vehicles (ICEs) to electric vehicles (EV)s and by helping the public to also make the switch, the Municipality is taking an important step to reduce carbon emissions and respond to climate change. The switch to EVs is already underway. In June 2021, the Federal government set a target for all passenger vehicles sold in Canada to be electric by 2035. All major auto manufactures now have models of EVs available, many of which are less expensive to operate and maintain than ICE vehicles. More models of EVs, including transport vans and pickup trucks are coming online in 2022. This Electric Vehicle Action Plan (EVAP) was created to guide the Municipality’s corporate transition to EVs over the next five years (2022 to 2026). The EVAP maps out the Municipality’s annual EV purchases and infrastructure needs and makes recommendations for the timing and ideal locations for EV charging stations. EVs offer Clarington an opportunity to significantly reduce GHG emissions and fuel costs from the municipal fleet while simultaneously encouraging community-wide uptake of EVs by demonstrated leadership in adoption and investment in charging infrastructure. The implementation of this plan will require interdepartmental coordination as the Municipality adapts to a new vehicle type and fueling system. The public charging aspect of this plan is intended to serve the long-term needs of the community on Municipal properties. There is a gap in public EV charging in Clarington that needs to be filled. Objectives On March 2, 2020, Council passed resolution #C-066-20: “That it be policy for all future car and SUV purchases be electric vehicles or similar vehicles without tailpipe emissions where practicable.” This plan puts Clarington on a path to fulfill this resolution. The objectives of this plan are: 1) to transition Clarington’s municipal fleet to EVs; 2) provide public EV charging on municipal properties to fill the current public EV charge station service gap, and 3) reduce corporate GHG emissions as part of the Municipality’s efforts to achieve net-zero carbon emissions by 2050. This plan will also satisfy action 1.30 of the Clarington Corporate Climate Action Plan, to update the Municipal Green Fleet Strategy and establish a five-year plan to electrify municipal fleet vehicles where practicable. This plan is intended to guide the transition of the municipal fleet to include at least 25 low carbon electric hybrid vehicles (hybrids), Page 30 Page 5 plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) over the next five years. In addition to transitioning the municipal fleet to electric, the installation of public EV charging stations will demonstrate Clarington’s commitment to serving the public. The EVAP proposes 60 charging points to be installed across the Municipality by the end of 2026 to meet the needs of municipal fleet and public vehicles. The installation of public EV stations will bridge the current service gap in Clarington and contribute to Ontario’s much-needed network of public EV charging stations. Figure 1 illustrates the current gap in charging infrastructure in Clarington. Figure 1 - EV charging stations in Southern Durham Region, illustrating the service gap in Clarington About EVs and EV Charging Electric Vehicle Basics Unlike traditional internal combustion engine (ICE) vehicles, which rely on gasoline or diesel fuel to power an engine to move, electric vehicles use an internal battery and electric motor to operate. Because of this, there are no tailpipe emissions from electric vehicles. By switching to EVs, electricity providers can reduce overall transportation emissions by integrating renewable, low carbon energy sources into electrical grid, such as wind, solar, hydroelectric, and nuclear. The below chart describes the main types of light-duty zero and low emissions vehicles currently available. Type of Vehicle Description Hybrid Vehicle A vehicle with a gasoline engine and electric motor, both of which are used to power the car. These models cannot be plugged in to charge and typically rely on regenerative braking to charge the battery. Plug-In Hybrid Electric Vehicle (PHEV) Like hybrids, PHEVs employ both a gasoline engine and an electric motor. The main difference is PHEVs use a wall plug to charge, have a larger battery, and (therefore) can go further using only battery power, using the gasoline engine as a backup. Page 31 Page 6 Zero Emissions Vehicle (ZEV) A zero emissions vehicle is any vehicle that does not directly produce emissions from operating (what would be considered ‘tailpipe emissions’ from the above vehicle types). Most ZEVs use an electric battery and motor, but hydrogen fuel cell vehicles also fall into this category (given the lack of options and available infrastructure, hydrogen vehicles have not been considered as part of this plan). Electric Vehicle (EV) An electric vehicle is powered solely by a large internal battery and electric motor. They can use wall plugs to charge or use fast charging infrastructure to replenish the battery faster. The motors are much less complex than ICE’s and a fully electric car has a substantially farther range than a PHEV does using solely it’s battery. These are also referred to as battery electric vehicles or BEVs. Table 1 - Types of Electric Vehicles EV Charging Stations To fuel Clarington’s electric vehicles, charging stations will need to be installed across the Municipality at convenient locations, with enough grid capacity to accommodate them. There are three kinds of EV chargers which the Municipality could install for fleet and public use. Each has different infrastructure requirements and price points. Level 1 AC Chargers (120V) The slowest of the three charging options. Level 1 charging involves plugging the electric vehicle into a standard 120-volt wall outlet and is a popular choice for overnight charging at home as it does not require any additional infrastructure or electrical capacity. The rate of charge or ‘Range Per Hour’ (RPH) is 8km/h. Level 1 chargers are best suited for vehicles that are driven less than 100 kilometres a day and can be left to charge overnight. This entry-level charger usually operates on a standard 15 or 20-amp circuit. Level 1 chargers do not come at an extra cost as the 120-volt outlet is a household standard, and the charging cable is included with the EV. Level 2 AC Chargers (240V) Level 2 chargers are also common for overnight at-home charging of EVs and are increasingly common in public parking lots where drivers stay for relatively long periods, such as outside a mall or grocery store. Level 2 chargers are the most common type of public or fleet charger. They require dedicated infrastructure and electrical capacity to operate and are most useful for vehicles that will be plugged in for at least an hour. At 240 volts, Level 2 chargers deliver an RPH between 19 to 40 kilometers depending on the model of charger and EV type. These chargers can range from 20 to 80 amps (32 amps being the most common). The installation costs for the infrastructure can range from $2,500 to $15,000. Page 32 Page 7 DC Fast Chargers (480V) Direct current fast chargers (often called Level 3 chargers) can deliver an RPH charge of over 160k/h; some EVs can have their battery charged to 80 per cent in as little as 30 minutes. They are commonly installed along highways or long-distance routes where it is expected an EV will need to recharge and time is a factor. It should be noted that not all EVs are equipped with a DC fast-charging port, and some can only utilize Level 1 and 2 chargers. These chargers have the highest installation price point as they have higher electrical requirements, and more electrical infrastructure is required as they can operate anywhere from 60 to 800 amps. The typical installation price of a Level 3 charger is $75,000 and up. Networked vs. Non-Networked Stations Another consideration when installing EV infrastructure is whether to invest in networked or non-networked chargers. The main benefit to non-networked stations is the purchasing and servicing costs are lower than networked stations. Non-networked stations do not feature an internet connection and therefore do not have the ability to charge a user fee, committing those who install them to provide free charging. By contrast, networked stations give the Municipality the capability to apply user fees (to supplement maintenance and replacement costs) and track fleet fuel consumption by car for accurate departmental billing. Networked stations are slightly more expensive to purchase and require a fee to be paid to a service provider. Networked stations provide powerful use-management tools that give the Municipality the ability to set charge and idling fees, send reminders to users whose batteries are fully charged, restrict public use of fleet chargers during specified periods, and collect data on usage trends. After consideration of the above charge station capabilities and the most likely usage patterns for fleet and public charging, the chargers which will be primarily used in Clarington will be networked, Level 2 chargers. These chargers will allow fleet and public usage to be tracked and billed appropriately while also monitoring wider usage trends, which will inform future installation decisions. As fleet vehicles will sit idle overnight, their battery will have time to fully recharge before they are needed the next day. These chargers will be useful to residents visiting municipal buildings or public parking lots for 30 minutes or more. According to research conducted by Trent University, networked Level 2 chargers balance cost and reliability and are the appropriate choice for Clarington. Rationale for Switching to Electric Direction from Council On March 2, 2020, Council passed Resolution #C-066-20: “That it be policy for all future car and SUV purchases be electric vehicles or similar vehicles without tailpipe emissions where practicable.” Page 33 Page 8 On March 3, 2020, Clarington Council approved Resolution # GG-083-20, declaring a climate emergency, stressing the need to act to respond to the threats that climate change present to the Municipality. On March 2, 2021, Council’s direction to transition the municipal fleet to zero-emission vehicles was further strengthened with the endorsement of the Clarington Corporate Climate Action Plan (CCCAP). The CCCAP sets targets for the Municipality to reduce corporate GHG emissions 35 per cent by 2030 and achieve net-zero emissions by 2050 from 2018 levels – a goal which is only possible with the adoption of EVs across the fleet. Action 1.30 in the CCCAP calls for the creation of a green fleet strategy and a plan to electrify the corporate fleet. More broadly, the CCCAP supports climate actions that reduce corporate energy use and GHG emissions. Alignment with the Region of Durham Clarington’s push to switch its fleet to EVs and develop EV charging infrastructure is supported by the Durham Community Energy Plan (DCEP), which was endorsed by Clarington Council on November 25, 2019, through Resolution #GG-551-19.The DCEP sets a goal to support the transition of the transportation sector in Durham to electric. Clarington has already collaborated with the Region of Durham, Ajax, Whitby, and Oshawa, on two applications to the federal Zero Emissions Vehicle Infrastructure Program (ZEVIP) for funding to install EV charging infrastructure across the region. Both applications have been awarded. EV Support in Ontario As referenced in the Made-in-Ontario Environment Plan, the Provincial Government has signaled its support for an EV transition by investing $295 million into the Ford Oakville Assembly Complex. The investment will transform the automobile manufacturing facility into a battery electric vehicle production facility. On November 17, 2021, the provincial government announced that it will work with the auto industry to prioritize EVs in Ontario by: 1) supporting vehicle and parts production for electric vehicles; 2) establishing and supporting an electric battery supply chain ecosystem; 3) innovating on EV development; and 4) investing in auto workers. Investment in domestic electric vehicle production is a positive indicator that the provincial government has confidence in the growing EV market. Direction from the Federal Government On June 29, 2021, the Federal Government announced a plan to ban the sale of light duty ICEs by 2035, accelerating their previous target to have 100 per cent EV sales in Canada by 2040. New interim targets are currently under development, though it is expected that they will be more ambitious than the previous plan’s goal of converting 10 per cent of all light-duty vehicle sales to ZEVs by 2025 and 30 per cent by 2030. This mandatory target is part of the federal government’s plan for nationwide carbon neutrality by 2050 and is supported by a series of policies and incentives to help consumers, manufacturers and governments prepare for the transition. Page 34 Page 9 To spur demand from consumers, the federal government has committed $587 million to the popular federal EV rebate program, which offers those who buy zero-emissions vehicles up to $5,000 in purchasing rebates. To ease the transition for the automotive industry, tax cuts and strategic partnerships are being rolled out for affected businesses. The Federal Government has also committed $460 million to build EV charging infrastructure across the country. The Zero Emissions Vehicle Infrastructure program (ZEVIP) (from which Clarington has already benefited) will distribute $240 million of the total committed funds to subsidizing EV charge station purchase and installation costs. With this plan in place, Clarington is in an ideal position to access for federal funding to install EV stations for public and fleet use. Environmental Benefits GHG emissions from vehicles (tailpipe emissions) are some of the easiest emissions to pinpoint and eliminate, as they come from a single source and can be easily quantified. Unlike ICEs, which burn fossil fuels and emit GHGs during operation, EVs rely on the electricity grid for their energy. As such, EVs are as ‘clean’ as the electricity grid used to power them. Most of Ontario’s electricity is produced from low or no carbon sources, including nuclear, hydro, and renewable energy sources; with some backup power coming from natural gas ‘peaker plants,’ which compensate for spikes in energy demand. A transition to EVs will realize emissions reductions, reduce air pollutants, and significantly contribute to achieving the Municipality’s net-zero emissions target. The public switch to EVs is already taking place. Current trends in vehicle purchases, coupled with the federal government’s pledge to ban the sale of ICEs by 2035, indicate that public adoption of EVs will increase sharply in the coming years. Auto manufactures are also pushing the switch to EVs. All major auto manufactures are now selling EVs, with over 50 models of EVs for sale in 2022. All major auto manufactures have publicly committed to continuing the transition to EVs. The EVAP includes options for installing public EV charge stations in strategic locations on municipal properties to support the public to transition to EVs. By installing publicly accessible chargers, the Municipality is providing the community with needed EV charging infrastructure and actively promoting the reduction of community GHG emissions that contribute to climate change. Community Benefits Clarington residents face barriers to widespread EV adoption, including a lack of charging infrastructure and a lack of trust in the reliability of EVs. Clarington can address some of these concerns by educating the public about EV technology and providing EV charging stations for the public to use. The visible presence of more charging stations and EVs on Clarington’s roads will also help to normalize the EVs as a trusted option for consumers. In a report completed by Trent University in 2020 for the Municipality of Clarington, range anxiety was identified as one of the principal concerns cited by those considering Page 35 Page 10 an EV purchase, a city-led effort to build out local charging capacity will accelerate the community adoption to EVs. A community-wide transition to EVs will benefit the community in several ways: The electric motors in EVs are much quieter than ICEs. Therefore, reducing the number of ICE vehicles on Clarington roads will reduce noise pollution in urban neighbourhoods; switching to EVs will reduce the number of vehicles emitting tailpipe emissions, improving air quality across the Municipality; Reducing (and eventually eliminating) tailpipe emissions will reduce greenhouse gases (most notably carbon dioxide and methane) and local air pollutants (notably carbon monoxide, sulfur oxides and volatile organic compounds). Beyond air and noise pollution, electric vehicles will bring increased reliability and decreased operating costs to owners. The simplicity of an electric motor and the reduced number of moving parts in an electric car means that EVs have been found to be more reliable and require less regular maintenance than ICEs. Lower maintenance costs are coupled with cheaper fuel prices to bring a lower total cost of ownership after the upfront purchase price is taken into consideration (Appendix C – Vehicle Cost of Ownership). The public EV stations proposed in the EVAP are intended to be revenue-neutral, ensuring fueling costs for residents stay low. As maintenance and replacement costs for the charging stations are well known, EV fueling costs from municipal charging stations will remain predictable and relatively unchanging over the coming years. While gasoline and diesel prices are anticipated to rise with the federal carbon tax, EV drivers can expect to benefit from low fuel costs relative to petroleum-based alternatives. Cost Considerations Shifting Vehicle Lifecycle Costs Transitioning to an EV fleet requires a reconceptualization of municipal vehicle budgets. Currently, electric vehicles have higher Manufacturer Suggested Retail Prices (MSRP) than similar ICE models. Despite their higher MSRPs, EVs offer lower fuel and maintenance costs over the lifespan of the vehicle. While maintenance costs between ICEVs and EVs vary significantly depending on vehicle make, model, drive cycle and other factors, research shows that EVs have substantially lower maintenance and fuel costs. EVs contain fewer moving parts and have fewer fluids to change than ICE vehicles. The Ontario Ministry of Transportation estimates that, for a car driven 20,000 km/year, the average yearly fueling cost for EVs is approximately $530; a similar size ICE would cost $2,500. The estimates assume overnight (off-peak) charging and a gasoline price of $1.20/L (2020). A 2018 report from the 2 Degree Institute estimates that combined fuel and maintenance costs are 66 per cent less per year for EVs than they are for similar ICEs in Ontario. Taking into consideration upfront purchase cost, fuel, and maintenance, EVs Page 36 Page 11 cost on average $27,000 less than ICEs over a 15-year life of life of the vehicle (250,000km) Most municipal vehicles in Clarington are replaced within 7 years, before they require serious or ongoing repairs. However, EVs offer savings on routine maintenance costs as the electric motor and drive train do not need regular servicing (such as the oil changes and engine maintenance required by ICEs). The relative simplicity of EVs compared to ICE vehicles reduce the risk of unexpected malfunctions. A 2001 report by the Clean Air Partnership, which compares EV and ICE vehicles in fleet applications in London Ontario and The Frasier Valley Regional District, all-electric EVs save more than $3,000 from reduced fuel and maintenance costs, compared to ICE vehicles the current fleet vehicles (based on average 13,000km/year and service life of 7 years). With current government incentives, current carbon tax, and reducing EVs prices, and increasing petroleum fuel prices it is probable that EVs would outperform ICEVs on total cost of ownership as fleet vehicles in Clarington. As such, and departmental budgets will need to account for a higher upfront purchasing cost for EVs with the understanding the Municipality will likely save money over the 7- year replacement life of the vehicle. See Appendix C for more information about these figures. Purchasing Incentives To encourage electric vehicle purchases, the Government of Canada has launched the Incentives for Zero Emissions Vehicles Program (iZEV), which offers rebates of up to $5,000 on the purchase of new electric vehicles. The federal government has committed to the iZEV program through the 2022 fiscal year, but at this point, further funding has not been announced. Federal Electric Vehicle Incentives (July 2021) Type of Vehicle Financial Incentive (rebate) Eligibility Definition Battery Electric Vehicle, Hydrogen Fuel Cell Vehicle, or Long-range Plugin Hybrid Electric Vehicle $5,000 All zero-emissions vehicles or Plug-in hybrids with a battery capacity greater than 15kWh, with a base model MSRP of $45,000 or less. Short-range Plugin Hybrid Electric Vehicle $2,500 All Plug-in hybrid vehicles with a battery capacity lower than 15kWh, with a base model MSRP of $45,000 or less. Table 2 - Federal Electric Vehicle Incentives (July 2021) Page 37 Page 12 Charger Installation Costs To fuel the EV fleet and offer charging options to residents, Clarington must invest in EV charging stations in advance of electric vehicle purchases. Many factors must be considered when costing new charging stations, including site design, transformer and panel upgrades, site preparation, EV station hardware, repair, and maintenance. A detailed breakdown of anticipated costs by location can be found in Appendix A – EV Charger Installation Costs. Fleet Charging Stations To provide predictability for staff, each fleet EV will be assigned a centrally located parking/charging spot, where the vehicle will charge each night. The number and location of charging stations has been mapped out as part of the EVAP process to provide predictability and security to departments purchasing EVs. Each department will continue to be responsible for budgeting for the purchase, maintenance, and fuel costs for the vehicles their department uses. Appendix B outlines by year the location and number of fleet stations to be installed, as well as the department(s) which will be using them and therefore responsible for including them in their budgets. Public Charging Stations As a service to the community, public EV chargers will be installed at high-traffic locations across the Municipality. Ideal public EV charge station locations were identified based on a set of criteria based on research conducted for the Municipality Trent University (outlined below). Appendix B identifies the location and number of public charging stations to be installed by year. These stations are primarily intended to be used by the public while they are accessing the nearby facilities, services, and businesses. While these chargers are considered public, they may be utilized by municipal fleet vehicles during the workday if needed. Fleet vehicles will be expected to charge overnight at their designated charging space. As public stations will be located at municipally owned recreation complexes, buildings and parking lots, funding for public stations will be included in the Community Services department yearly budget. Council should consider increases to Community Service annual budget to accommodate the additional expenses associated with the installation and maintenance of community EV charging stations as a service to the community. Public charging stations are considered ancillary services offered to residents as an added benefit to residents accessing municipal facilities. While seed funding will be needed to make the initial purchase for public EV stations, user fees will be applied to offset the maintenance, repair, and replacement costs for public stations. Fees for the use of public stations are intended to be revenue-neutral, encouraging public EV adoption while maintaining a reasonable fee for use. EV Charge Station Incentives The federal government has made funding available to assist with the proliferation of EV charging infrastructure through the Zero Emission Vehicle Infrastructure Program (ZEVIP). Through the ZEVIP program $280 million has been committed until 2024 to Page 38 Page 13 subsidize 50 per cent of the costs associated with installing charging infrastructure up to $5000 per charge point. Clarington has already benefited from federal ZEVIP funding. In Fall 2019, Clarington, in partnership with Durham Region, Ajax, Oshawa, and Whitby, successfully applied to Natural Resources Canada (NRCan) for funding through ZEVIP. This application secured 60 Level 2 charge points for the region, kickstarting a region-wide push for EV adoption. Clarington received approximately $21,400 from NRCan, subsidizing the cost of five public charge points in downtown Bowmanville. In the Spring of 2020, Clarington, Whitby, Scugog and the Region of Durham successfully applied for a second round of ZEVIP funding to install a further 42 stations across the region. Clarington received approval for $82,000 from NRCan to subsidize the installation of 18 charge points across the Municipality ($4,554 per charge point). By the end of 2022, Clarington will have 21 public charge points and fleet charge stations. Clarington staff will continue to take advantage of external funding opportunities for EVs and EV charging stations as it transitions its fleet to electric and develops public EV charging infrastructure on Municipal properties. Other Considerations Emergency Vehicle Exemptions During the development of the EVAP Emergency and Fire Services staff expressed concerns regarding electric vehicle performance during emergency situations. Specifically, staff brought forward concerns regarding towing capacity, battery life and vehicle range during prolonged vehicle use in cold weather. Electric pickup trucks have only recently come to market. As such, there has not been a significant amount of time to assess their performance in real-world emergency situations. To ensure the reliability of vehicles during extended emergency situations, Emergency and Fire Services vehicles have been exempted from the EVAP. The EVAP recommends that Emergency and Fire Services prioritize vehicles with high energy efficiency and low carbon emissions when selecting vehicles moving forward. The use of EVs in Emergency and Fire operations will be revisited as more information about the use of EVs in emergency situations becomes available. Expanding Vehicle Options and Technology The EVAP includes only light-duty cars, vans, and trucks up to half-ton (equivalent to a Ford F-150). The electric vehicle options coming to market in 2022 and beyond are expanding. This is especially relevant for pickup truck and van replacements, which will provide more options for the Municipality when choosing vehicles. The EVAP will be reviewed annually to evaluate expanding EV availability to assess potential EV options for light, medium, and heavy-duty vehicles. Moving forward, staff will also consider less conventional electric vehicle options such as ice resurfaces, fire trucks, e-mobility scooters, e-bikes, and other ZEV options as they become available. The goal of the EVAP is to convert Clarington’s fleet EVs across all municipal operations where practicable to do so. As electric vehicles become more prevalent, Page 39 Page 14 more options and lower MSRPs will give the Municipality an expanded range of lower- cost vehicle replacement options. While the range of EVs is already around 400 kilometers per charge, the range if EVs is projected to increase as battery technology continues to improve. Plan Development Process Assumptions The EVAP has been designed based on a set of assumptions about how EVs and EV charge stations will be used by staff and the public. These assumptions are based on best practices identified by staff through research and consultation with stakeholders. Fleet Charging Infrastructure Assumptions Assumption Rationale Each fleet vehicle will have a designated charge point and parking spot. Designated EV charge points and parking spaces will provide simplicity and consistency to staff. Future municipal buildings will be constructed with the inclusion of fleet charging stations, as appropriate. Clarington will continue to expand its EV fleet beyond the 2026-time horizon of this plan and will require more charging capacity. It is much less expensive to design and build in charging capacity during initial construction than to retrofit buildings at a later date. All EV stations will be located on municipal property. Installing EV stations on municipal property simplifies construction timelines, lowers costs, and provides continuity of parking spot availability to staff. 100 per cent of eligible light-duty vehicles set to be purchased in the next five years will be electric. Direction from Clarington Council requires a transition to EVs wherever practicable. 100 per cent of the municipal fleet will be electric by 2035 where practicable. The federal government has set a target to ban the sale of light duty ICEs by 2035. All EV stations will be networked. Networked stations allow staff to track station use and can be used to charge a fee for public use. Most of the EV stations will be ‘Level 2’ charging stations. Fleet Vehicles will be parked there overnight; Level 2 stations balance cost and charging speed. Level 3 charge stations will be considered for charging fleet and public EVs in urgent situations. Some Emergency and Fire Services vehicles will be exempt. Concessions will be given for Emergency and Fire Services vehicles due to the lack Page 40 Page 15 of sufficient data about the use of EVs in emergency situations and the high need for vehicle reliability in emergency situations. No stations will be located at small community halls. These locations do not get enough use to be prioritized as part of the EV charge station site selection criteria (see site selection criteria below). The number of stations installed is based on projected need and transformer capacity. User needs and grid capacity are limiting factors for the installation of EV charge stations. Station installations are intended to meet imminent need and prepare for future expansions. Preparing sites for further rounds of charger installations will reduce the overall installation costs associated with transitioning the municipal fleet to electric. Some fleet stations may be made available to the public during predetermined hours. Fleet charging capacity may not be needed during the municipal working day; these stations could be utilized by citizens, maximizing charger utility. Table 3 - Fleet Charging Infrastructure Assumptions Public Charging Infrastructure Assumptions Assumption Rationale The Municipality has a role in promoting community EV adoption to reduce GHG emission, noise pollution and air pollution. By declaring a climate emergency, Clarington has taken a leadership role in fighting climate change. Encouraging the adoption of EVs in the community is a significant step in reducing GHG emissions causing climate change. Future municipal buildings will include EV public EV charging stations in their design and construction. Clarington will continue to expand its public charging network beyond 2026. It is much less expensive to design and install EV charging into new buildings than to retrofit existing buildings. Municipally owned parking lot rehabs that meet the site selection criteria for public stations will be prioritized (see site selection criteria below). Coordinating EV station installations with scheduled parking lot resurfacing will save on installation costs. All EV stations will be located on municipal property. Installing EV stations on municipal property simplifies construction, ensures control and ownership of stations stays with the Municipality. Page 41 Page 16 The installation of public stations is based on community trends toward EV adoption. EV sales are expected to increase exponentially over the next 14 years. The federal government has set a target to phase out (until the anticipated complete ICE phase-out by 2035) All Stations are networked. Networked stations allow the Municipality to track EV station use and allow for the application of a fee for service, based on Clarington’s Fee Bylaw and Signage bylaw. EV Charging stations will be revenue neutral. The fee charged for the use of public EV stations will only be applied to cover the cost of operating, maintaining, and replacing the stations. No stations will be located at small community halls These locations do not get enough use to be prioritized as part of the EV charge station site selection criteria (see site selection criteria below). The number of stations installed is based on projected need and transformer capacity. Need and grid capacity are limiting factors for installing community EV stations. Fleet vehicles can use public charging stations. During the day, staff may need to charge their fleet vehicles at locations distant from their designated charging station. As the Municipality’s primary duty is service delivery to residents, fleet vehicles will be permitted to charge at public stations. Table 4 - Public Charging Infrastructure Assumptions Plan Creation Methodology Electric Vehicle Inventory Methodology To create this plan the Municipal Interdepartmental Climate Change Working Group (ICCWG) convened to set the objectives of the plan and establish milestone dates. The ICCWG has been updated monthly throughout the creation of the plan to guide the development of the plan and review its content. To begin, staff created a list of key stakeholders from each department with direct knowledge of future vehicle acquisitions. Identified stakeholders submit a list of all anticipated new and replacement vehicle purchases between 2021 – 2026. This list was analyzed, and all light-duty vehicles with suitable EV replacement options (cars, SUVs, transport vans, and light-duty trucks) were counted to create an anticipated 5-year EV inventory. Once the number of EVs expected to be purchased over the next five years was established, it was used to determine how many charge points would need to be Page 42 Page 17 installed each year to ensure sufficient charging capacity to accommodate yearly EV purchases. As a precautionary measure, and to leverage available federal funding, the installation of EV charge stations for over the next five years was prioritized for installation early in the 2022-2026 period, with most of the fleet charging locations scheduled to be installed in the next three years. Once the EVAP was drafted and reviewed by the ICCWG, it was circulated more broadly to department heads for internal feedback. Several one-on-one meetings were also held with key representatives from Community Services, Emergency and Fire Services and Public Works to address the specific challenges or circumstances and incorporated into the plan. EV Charger Site Selection The EVAP focuses on retrofitting existing buildings and parking lots to install the charging capacity needed by fleet and public vehicles. It is expected that all new municipal buildings will integrate public and fleet EV charging into their designs, taking into consideration the site selection criteria outlined below. A list of potential sites was compiled from all municipal properties, including buildings and parking lots. This list was initially assessed and refined by Community Services facilities staff and Public Works staff to eliminate locations that were deemed unsuitable for infrastructure installation. Locations were eliminated because they were remote, unused, or slated for demolition or sale. Small community halls owned by the Municipality were also excluded, as these locations are typically operated by third-party groups, complicating installation processes. The resulting list contained 38 potential sites to install public and fleet charging stations. The sites were reviewed again and assessed for their suitability for fleet and public charging, creating a list for each. For each list, a set of criteria was developed to guide the site selection process for public and fleet chargers to ensure the optimal placement of EV stations. The site selection criteria were used to rank the remaining options. Sites were scored based on how many of the criteria were met, with grid capacity being a mandatory requirement for consideration. A complete list of sites and assessment criteria can be found in Appendix B - Projected EV purchases by Year. Fleet Charger Suitability Criteria After from the initial suitability assessment, five criteria were used to gauge the suitability of locations for fleet EV charger installation. Suitability criteria include: Near municipal offices or depots Near where staff are working There are enough parking spaces for staff personal vehicles and fleet vehicles There is enough space for an adequate grouping of EV chargers (4-8 stations) There is a transformer or electrical panel with sufficient capacity to accommodate the EV chargers Page 43 Page 18 Public Charger Site Selection Criteria After the initial suitability assessment, five criteria were used to gauge site suitability. Suitability criteria include: Significant traffic at the site Potential to attract users The area underserved by charging stations There is enough space for an adequate grouping of EV chargers (4-8 stations) There is a transformer or electrical panel with sufficient capacity to accommodate the EV chargers For each list, locations scoring a ‘Medium’ or ‘High’ were prioritized for charge station installation within the next five years. Eight public charging locations and nine fleet charging locations were identified for development between 2021 – 2026. A timeline, broken down by year was created, listing the public and fleet charging stations that would be installed each year. Locations that can accommodate large banks of stations and locations where many fleet EVs can conveniently be parked and charged have been prioritized for early installations. Once a list of prioritized locations was identified, it was circulated for feedback to members of the ICCWG and departmental staff whose fleet vehicles will be replaced with an EV during the plan’s five-year time horizon. The finalized timeline of station installations can be found in Appendix B - Projected EV purchases by Year. EVAP Adaptability The EVAP is intended to be a living document, with amendments expected over the course of the five-year plan. Any changes made throughout the life of this plan should be made with the goal of expanding Clarington’s fleet of EV charging infrastructure. Changes to the EVAP will be based on the availability of funding, the expansion of EV model availability, improvements to EV charging infrastructure and increased ambition by Municipal Council. Yearly EV and Charge Station Breakdown The following section summarized the information in Appendices A and B. The information contained herein is subject to change as departments and Council may shift priorities or ambitions regarding the below purchases. Vehicle purchasing years are especially subject to change as departments may opt to delay or expedite new vehicle purchases. Page 44 Page 19 Yearly Overview Year New EVs/Hybrids purchased New public chargers installed New fleet chargers installed 2021 7 5 8 2022 3 6 8 2023 9 8 6 2024 1 8 0 2025 2 2 2 2026 3 10 0 Total 25 39 24 Table 5 - EVs purchased, Public Chargers and New Chargers Installed by Year Note: The higher number of EVs purchased than fleet chargers installed is not a cause for concern, as the Municipality already has several chargers in operation, which pre- date the EVAP. Page 45 Page 20 EV Charge Station Locations Figure 2 - Proposed Fleet EV Charge Stations Figure 3 - Proposed Public EV Charge Stations Page 46 Page 21 2021 In 2021, six EVs and one hybrid vehicle were budgeted by the Municipality. All six EVs were purchased by the Planning and Development Services department and will be charged at the fleet chargers located at Garnet B Rickard. The hybrid vehicle was purchased by the Emergency and Fire Services Department. Vehicle Costs Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Emergency and Fire Services Hybrid $45,000 Total 6 + 1 Hybrid $315,000.00 Table 6 - 2021 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Address Charger Type Number of Charge Points Estimated Cost (Rounded) Garnet B Rickard Recreation Complex 2440 Highway 2, Bowmanville, ON Fleet 8 $81,000 Church and Division Street Parking Lot 26 Division St, Bowmanville, ON Fleet and Public 5 $66,000 Total 13 $147,000 Table 7 - 2021 Charger Costs Page 47 Page 22 Note – budget does not reflect external funding subsidies that are currently available Garnet B Rickard Recreation Complex - Fleet Chargers Garnet B Rickard is slated to receive a group of eight fleet chargers at the East side of the building in late 2021. Six of these chargers are reserved for Planning and Development EVs. The remaining two spots will temporarily be available to the public until the final two Planning and Development Services EVs are purchased in 2022 and 2023, at which time they will become reserved for fleet parking. Garnet B Rickard already has two networked stations to the West of the building and is scheduled to receive more public charging stations in the coming years. This location was prioritized for a large group of stations because its large parking lot can accommodate eight stations without creating a shortage of parking spaces for other drivers. The Recreation Complex is centrally located and near to where the vehicle users will be working. The building also had sufficient electrical capacity to accommodate the charging stations. Partial funding for these chargers has been granted to Clarington through the federal government’s Zero Emissions Vehicle Infrastructure Program (ZEVIP). Page 48 Page 23 Church and Division St Parking Lot - Public Chargers The parking lot on the Southwest corner of the intersection of Church and Division St in Bowmanville is the first location under the EVAP to have chargers installed. The location consists of five charge points. One charge point is dedicated to fleet charging for Legislative Services’. Four charge points are reserves for public charging. The Church and Division Street parking lot was prioritized for EV charge stations because of its central location in downtown Bowmanville. The location allows EV users to charge their vehicles while visiting nearby businesses, municipal buildings, and the library. The parking lot is large enough to allow for vehicle charging while not substantially reducing the total number of available parking spaces. Partial funding for these chargers was provided to the municipality through the federal government’s Zero Emissions Vehicle Infrastructure Program (ZEVIP). Page 49 Page 24 2022 Clarington will add three EVs to their fleet in 2022. Legislative Services will acquire a Plug-in Hybrid EV. The Planning and Development Services and Emergency and Fire Departments will each purchase an additional Chevy Bolts. A bank of six fleet chargers will be installed at the Community Resource Centre to charge the Legislative Services department’s vehicles, which will acquired in 2022 and 2023. Two fleet charge points will also be installed at Fire Station 1. The community is slated to receive six new charge points as well: two at the Orono Branch Public Library, and four at the Courtice Community Complex. Vehicle Costs Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Fire and Emergency Services EV (SUV) EUV $60,000 Legislative Services PHEV (car) $50,000 Total 3 $155,000 Table 8 - 2022 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Address Charger Type Number of Charge Points Estimated Cost (Rounded) Community Resource Centre (Firehouse Youth Centre) 132 Church Street, Bowmanville, ON Fleet 6 $68,000 Fire Station #1 2430 Highway 2, Bowmanville, ON Fleet 2 $26,000 Courtice Community Complex 2950 Courtice Road, Courtice, ON Public 4 $52,000 Orono Library s 127 Church Street, Orono, ON Public 2 $38,000 Total 14 $184,000 Table 9 - 2022 Charger Costs Page 50 Page 25 Note – budget does not reflect external funding subsidies that are currently available Community Resource Centre (Firehouse Youth Centre) - Fleet Chargers The bank of six fleet charge points to be located at the Firehouse Youth Centre will draw power from electrical transformers located on electrical polls at the site. The site will primarily charge vehicles from the Legislative Services Department, specifically the vehicles purchased in 2022 and 2023 and a further two EVs in 2026. Though the bank of stations is intended for fleet charging, the unassigned charge points at this location will be made available for public charging until to allow for excess capacity should the municipality decide to expand its fleet with more EVs. This location was selected because the parking lot allows for the installation of a bank of EV charge stations without significantly impacting the total amount of parking spots available to the public. The Firehouse Youth Centre is centrally located near the Municipal Administrative Centre, which is a convenient and central location near to where staff are working. Page 51 Page 26 Fire Station #1- Fleet Chargers Two additional charge points will be added to Fire Station #1, bringing the total number of chargers at the site to four. They are necessary to meet the needs of the Emergency and Fire Department’s expanding fleet of EVs (the department will have a total of four EVs by the end of 2023). Fire station #1 is situated among the most densely populated areas in Clarington. It has the required electrical capacity to accommodate more chargers and has already undergone electrical work to install the first two charge points in 2020. Courtice Community Complex - Public Chargers The Courtice Community Complex has a parking lot large enough to dedicate four spots to EV charging locations while ensuring there is sufficient parking at the site. Currently, there are no publicly available chargers in Courtice. These four charge points will Page 52 Page 27 address a service gap in the community. The Courtice Community Complex hosts a swimming pool and other activities which will keep patrons on the site for at least an hour (on average), making it a suitable location for level 2 chargers. It is a high-traffic location for the community, and the chargers’ visual presence at the site will serve as a reinforcement of Clarington’s commitment to an EV transition. This location has more than enough panel capacity to accommodate these chargers and future expansions of up to six or more charge points. Orono Public Library - Public Chargers Orono does not currently have any EV charge points. Placing two at the library will begin to fill the public EV charging gap for the community and provide a location for municipal fleet vehicles to recharge at night. These charge points may also serve as an indirect method of increasing tourism for the community. The charge points will be located near Highway 115 and the several restaurants, shops, and green spaces. Locally, the availability of EV charging may encourage residents to consider adopting EVs. 2023 The Planning and Development Department will acquire their eighth Chevy Bolt in 2023, at which point all eight charge points at Garnett B Rickard (installed in 2022) will be dedicated for fleet use. Emergency and Fire Services will acquire two new EVs. All four EMS EVS will be parked at Fire Hall #1 for charging. Legislative Services will acquire an electric van and EUV. Lastly, the Public Works Department is slated to replace four light-duty pickup trucks this year two of which were deferred from 2022. These trucks are anticipated to be Ford F-150 Lightnings. The trucks will be parked and charged at Page 53 Page 28 Yard 42, which will have six EV charge points installed this year (later expanded to eight). 2023 will also see the most significant build-out of public chargers to date, with a total of eight being installed in three different locations across the Municipality. Vehicle Costs Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Emergency and Fire Services EV (EUV) $47,000 Emergency and Fire Services Hybrid (car) $47,000 Legislative Services EV (SUV) $47,000 Legislative Services EV (Cargo Van) $65,000 Public Works EV (pickup truck) $73,000 Public Works EV (pickup truck) $73,000 Public Works EV (pickup truck) $73,000 Public Works EV (pickup truck) $73,000 Total 9 $543,000 Table 10 – 2023 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Address Charger Type Number of Charge Points Estimated Cost (Rounded) Yard 42 178 Clarke Townline, Bowmanville, ON Fleet 6 $66,000 Bowmanville Indoor Soccer Centre 2375 Baseline Road, Bowmanville, ON Public 4 $53,000 Newcastle Branch Library 150 King Avenue East, Newcastle, ON Public 2 $38,000 Shaw Building 156 Church St, Bowmanville, ON Public 2 $33,000 Total 14 $190,000 Table 11 - 2023 Charger Costs Page 54 Page 29 Note – budget does not reflect external funding subsidies that are currently available Yard 42 - Fleet Chargers Yard 42 is one of Clarington’s main service yards. Used primarily by the Public Works Department, it is the location where service trucks and other vehicles are parked by Public Work’s staff. This is an important location for EV chargers, as the municipal EV fleet expands beyond sedans and SUVs. This location will receive a bank of six EV charging points (later expanded to eight) and will be the main charging site for electric trucks. At the time of writing, these are all anticipated to be Ford F-150 Lightnings, though this may change as more electric truck options come onto the market. Electric trucks and the city staff who operate them have different needs than those with Sedans and SUVs. Yard 42 is one of the main Public Works hubs for Clarington. It makes sense, then, to install charging stations for these and future trucks in the location where they are most frequently used and parked. The fleet chargers at this location will not be accessible to the public and will be for the sole use of city staff. The location is central to where affected city staff operate, and the site has enough electrical capacity to accommodate the six (later expanded to eight) chargers that will operate at Yard 42. Page 55 Page 30 Bowmanville Indoor Soccer Centre - Public Chargers The Bowmanville Indoor Soccer Centre will host four EV charge points, all dedicated to public use. The site is also a good candidate for future expansions past the EVAPs 2026 time horizon. The Centre is used year-round for indoor and outdoor soccer and lacrosse games and maintains a steady flow of people, especially on the evenings and weekend. While it has not been decided where the chargers will be located, it is assumed that they will be close to the building and the entrance. Situating the stations close to the structure will lower installation and electrical costs while providing a preferred parking benefit for those who use them. As a large sports centre with continual year-round usage, sufficient electrical capacity and a large parking lot, the Bowmanville Indoor Soccer Centre was deemed to be a highly suitable location for public charging. Page 56 Page 31 Newcastle Branch Library - Public Chargers The Newcastle Branch Library will have two public charge points installed in its parking lot. Though the location of the chargers has not yet been determined, it is likely that they will be located close to the building to reduce installation and electrical costs. There is a deficit of public EV charging infrastructure in Newcastle. There are currently no publicly available EV chargers in the community, with the nearest public chargers to be in Bowmanville and Orono. This is likely a deterrent to residents interested in purchasing an EV. Installing EV charge points at the Newcastle Branch Library is a step to encourage community members to adopt EVs. These chargers may offer the side benefit of increased traffic and tourism to local businesses (especially the restaurants in the area), given the community’s proximity to Highway 401. Page 57 Page 32 Shaw Building - Public Chargers The two charge points to be installed at the Shaw building will be in the parking lot on the left side of the building. This building has enough electrical capacity to accommodate a double head charger. The chargers at this site will be designated as public use charge points but given the building’s proximity to the Municipal Administrative Centre and several fleet charging stations, the charge points at the Shaw Building have been designated as a backup location for municipal EVs and may be used for overnight fleet vehicle charging if the need arises. The Shaw building is centrally located in downtown Bowmanville, providing EV charging for residents while they visit the Municipal Administrative Centre or visit location businesses and recreation locations in downtown Bowmanville. This location also offers a benefit to fleet EVs; the chargers at the Shaw building can be used for overnight charging if charge points at the Community Resource Centre require maintenance, replacement or are otherwise offline. Page 58 Page 33 2024 Public Works is the only department expected to acquire a new EV in 2024. With the replacement of another light-duty truck, they will add another Ford F-150 Lightning to the fleet, which will also be charged at Yard 42. The EVAP’s goal to install most of the required fleet charging in the early years of the plan means that in 2024, all 10 charge points installed will be designated for public charging. Two double-headed chargers will be installed at the Alan Strike Aquatic and Squash Centre (Alan Strike Centre). An additional four charge points will offer community charging to those using the South Courtice Arena. Vehicle Costs Department Vehicle Type and Model Projected MSRP (Rounded) Public Works EV (pickup truck) $73,000 Total 1 $73,000.00 Table 12 - 2024 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Address Charger Type Number of Charge Points Estimated Cost (Rounded) Alan Strike Aquatic and Squash Centre 49 Liberty Street, Bowmanville, ON Public 4 $52,000 South Courtice Arena 1595 Prestonvale Road, Courtice, ON Public 4 $52,000 Total 8 $104,000 Table 13 - 2024 Charger Costs Note – budget does not reflect external funding subsidies that are currently available Page 59 Page 34 Alan Strike Aquatic and Squash Centre - Public Chargers The Alan Strike Centre is located centrally in Bowmanville, hosting both a pool and squash courts. There are several parking lots that can be used when accessing the Centre, and while the exact location for the chargers has not been determined, it is likely that the charging spots will be located on the south side of the west parking lot, as that location is closest to the transformer which the power would be drawn from. The four level-2 two charging points will be primarily accessible to members of the public who are using the Alan Strike facility. The Alan Strike Centre enjoys consistent levels of year-round use, making it a medium- traffic location in Clarington’s largest urban settlement area. Publicly accessible charging installations at this facility are part of Clarington’s plans to extend EV charging infrastructure to every medium and large-sized municipally owned building. This location was deemed to be of medium suitability due to the building itself not having enough panel capacity to accommodate the chargers, necessitating a separate service be run from a nearby transformer. Page 60 Page 35 South Courtice Arena - Public Chargers The South Courtice Arena is a year-round public facility with a skating rink, gymnasium, meeting room, youth centre, and a football field, basketball court and dog park, which are accessible in the summer months. The four charge points to be installed at the site will be placed close to the building to reduce installation costs. The four charging spots will be available exclusively for public use for those using the facility. The South Courtice Arena is a high-traffic location with a steady user base year-round. Its proximity to Oshawa means that it will likely receive more traffic than other locations as the Arena draws in residents from the neighbouring city. The main building offers more than sufficient electrical capacity. The site suitability selection criteria (outlined above) indicate that this site would be a good candidate for future expansions to the charging network. It is likely that Courtice will still be underserved by public chargers in 2024. This central, high-traffic location is an ideal spot for expansion. Page 61 Page 36 2025 At the time of writing, there are only two electric trucks planned for purchase in 2025. Two chargers will be installed at Garnet B Rickard for public use, doubling the number of public chargers currently installed at the site. Yard 42 will receive an expansion of two additional charge points, creating additional charging capacity to accommodate the two new trucks. Vehicle Costs Department Vehicle Type and Model Projected MSRP (Rounded) Public Works EV (pickup truck) $73,000 Public Works EV (pickup truck) $73,000 Total 2 $146,000.00 Table 14 - 2025 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Charger Type Number of Charge Points Estimated Cost (Rounded) Garnet B Rickard Recreation Complex 2440 Highway 2, Bowmanville, ON Public 2 $24,000 Yard 42 (expansion) 178 Clarke Townline, Bowmanville, ON Fleet 2 $24,000 Total 4 $48,000 Table 15 - 2025 Charger Costs Note – budget does not reflect external funding subsidies that are currently available Page 62 Page 37 Yard 42 (Expansion) - Fleet Chargers Yard 42 is one of Clarington’s main service yards, used primarily by the Public Works Department. Yard 42 hosts many of the service trucks used by Public Work’s staff. The expansion of two additional charging points should be a relatively simple task, as the installation in 2022 prepared for this expansion. As trucks continue to be decommissioned and more mid- and heavy-duty electric truck options become available on the market, the Public Works fleet of EVs will continue to expand. This installation prepares for future purchases, setting up Yard 42 as a central charging hub for Clarington’s electric trucks and other heavy-duty EVs. Page 63 Page 38 Garnet B Rickard - Public Chargers By the end of 2023, the Planning and Development Services Department will acquire two more EVs, which will be charged at the stations in the Eastern parking lot. This will leave only two public charge stations at one of the Municipality’s highest traffic public facilities. In 2025, two public EV charge points will be installed at this location, doubling the public charge points currently installed at the site. These charge points will be located next to the existing public chargers on the site in the building’s western parking lot. Note: As data is collected over the coming years on charger usage, there may be a case for expanding this installation from four to six public charge points. Usage statistics of the existing public chargers should be examined in 2024 to determine whether this expansion is warranted. Page 64 Page 39 2026 In 2026 Legislative Services will replace another one of their cars with an EV. While this is the only vehicle being replaced that currently has a suitable EV alternative, the expansion of available EVs models will mean that more heavy-duty fleet EVs will be available in 2026. Public charging capacity will continue to be expanded in 2026, with charge points at the Darlington Sports Centre and six charge points at the Municipal Administrative Centre (MAC). Vehicle Costs Department Vehicle Type and Model Projected MSRP Legislative Services EV (Sedan) $45,000 Legislative Services EV (pickup truck) $73,000 Emergency Services EV (SUV) $47,000 Total 3 $165,000 Table 16 - 2026 Vehicle Costs Note – budget does not reflect external funding subsidies that are currently available Charger Costs Location Address Charger Type Number of Charge Points Estimated Cost Darlington Sport Centre 2276 Taunton Road, Hampton, ON Public 4 $52,000 Municipal Administration Centre (The MAC) 40 Temperance Street, Bowmanville, ON Public 6 $66,000 Total 10 $118,000 Table 17 - 2026 Charger Costs Note – budget does not reflect external funding subsidies that are currently available Page 65 Page 40 Darlington Sport Centre - Public Chargers The Darlington Sports Centre is one of the only large, publicly owned buildings in Darlington. The Centre hosts an ice pad, soccer field and skate park, meaning there is a level of usage at the centre year-round. Power for the EV chargers will not come from the centre, as it does not have the necessary capacity. Instead, the power will be drawn from a transformer on the eastern end of the parking lot. Four charging spots will be located as close to the transformer as possible. Darlington does not currently have any EV charging stations in the area, leaving residents without convenient access to community charging. By installing four charge stations at the Darlington Sports Centre, Clarington will address this service gap. Page 66 Page 41 Municipal Administrative Centre (MAC) - Public Chargers The MAC offers two small parking lots, each with a hydro meter nearby, which could be used to power chargers at the site. A bank of six chargers at either location would take up many of the parking spots in the lot. Care will need to be taken to balance the Parking needs of ICE and EV drivers. Further study will be needed to ascertain the best location for chargers on this site. The MAC is the central hub of Clarington’s municipal government, providing in-person municipal services to citizens and is in the heart of downtown Bowmanville, close by to shops, restaurants and green spaces. The main branch of the Clarington library is also located at this site. The MAC is a highly suitable location for a bank of six public charge points. Public chargers at this site have been pushed to 2026, as there will already be EV chargers in the area (at the Church and Division Street Parking Lot, the Shaw building, and the Community Resource Centre). The building has sufficient electrical capacity to support EV chargers. Page 67 Page 42 Conclusion To achieve the Municipality’s GHG emissions reduction targets, the municipality must act the transition is fleet to electric. With a boarder community adoption of EVs already underway, the Municipality must also act to ensure community EV charging infrastructure is available. This Electric Vehicle Action Plan is a guide for the Municipality to electrify its fleet and provide much-needed public EV charging at municipal facilities between 2022 and 2026. Under this plan, the Municipality is set to acquire at least 25 electric vehicles, install more than 60 EV charging spaces, and become a regional leader in EV charging stations. This plan aims to fulfil direction by Council to implement an electric vehicle transition strategy through resolution #C-066-20 which this plan fulfills. By implementing this plan, the Municipality is taking significant steps to respond to climate change by directly reducing GHG emissions associated with transportation, providing needed infrastructure to meet the community’s needs for EV charging, promoting the community wellbeing promoting transportation options that reduce air and sound pollution. Page 68 Page 43 Bibliography Accelerating the Deployment of Plug-In Electric Vehicles in Canada and Ontario, Bruce Power L.P., Plug’N Drive, Pollution Probe and University of Waterloo, 2016. Are Electric Cars Worse for the Environment: Myth Busted, Engineering Explained, 2018. Atmospheric Fund, A Clearer View on Ontario’s Emissions: Electricity emissions factors and guidelines, Toronto, Canada, 2019. Axsen et al., Electrifying Vehicles: Insights from the Canadian Plug-in Electric Vehicle Study, 2015. BC Hydro Power Smart, EV Consideration and Range Comparison, BC. 2020. Bruitparif, Impact Sanitaires Du Bruit Des Transport Dans La Zone Dense De La Region ile-de-France, Paris, France, 2019 Calgary’s Electric and Low-Emission Vehicles Strategy, City of Calgary, 2018. Canada Energy Regulator, Provincial and Territorial Energy Profiles – Ontario, 2019. Canada’s Changing Climate Report, Ministry of Environment and Climate Change, 2019. Canadians Charged Up about Electric Vehicle Incentives, Angus Reid, 2018. Charlotte Argue, to what degree does temperature impact EV range? GEOTAB Electric Vehicles, Oakville, Ontario, 2020. City of London, 7th Meeting of City Council Agenda, April 07, 2020, Request for Proposal (RFP) 20-04 Award - Supply and Delivery of Electric Ice Resurfacers, City of London, ON, Canada, 2020. City of Toronto Electric Mobility Strategy: Assessment Phase, City of Toronto, 2018. Clarington Transportation Master Plan, Municipality of Clarington, 2016. Clean Air Partnership, Green Fleets business Case Series, 2001. Crothers, This Is A Big Reason Electric Cars Still Aren’t Popular With Americans: Study, 2020. Durham Community Energy Plan: Baseline Study, Region of Durham, 2017. Edmonton’s Electric Vehicle Strategy, City of Edmonton, 2018. Electric Cars and Global Warming Emissions, Union of Concerned Scientists, 2015. Page 69 Page 44 Electric Power Research Institute, Total Cost of Ownership Model for Plug-in Electric Vehicle, Palo Alto, CA, 2013. “Electric Vehicle Sales in Canada – Q1 2020,” Electric Mobility Canada, 2020. Electric Vehicle Strategy, City of North Vancouver, 2018. Electrifying Montreal, City of Montreal, 2016. Entirely appropriate' for Feds to Weigh Climate Impacts of Oilsands Project: Minister, The House on CBC Radio, 14 December 2019. Environmental Defence, Ontario Public Health Association, CLEARING THE AIR: How Electric Vehicles and Cleaner Trucks Can Help Reduce Pollution, Improve Health and Save Lives in the Greater Toronto and Hamilton Area, Toronto, 2020. Ferguson, Mark, Sean Sears, Quinn Hachey, Moataz Mohamed. The Evolution of Canadian Consumer Attitudes on Electric Vehicles: 2015-2018, 2018. FleetCarma, Electric Vehicle Sales in Canada: 2015 Final Numbers, 2016. Framework for Municipal Zero Emission Vehicle Deployment, Pollution Probe and Delphi Group, 2019. Fraser Valley Regional District, FVRD Electric Vehicle Business Case, BC, Canada, 2015. Hänninen et al., Environmental Burden of Disease in Europe: Assessing Nine Risk Factors in Six Countries, 2014. Holland and Na Jiao, Li-ion Battery Recycling: 2020-2040, IDTechEX, UK, 2020. Jean-François Venne, Municipal electric champions show how it’s done, Electric Autonomy, 2019. Laboratory for Alternative Energy Conversion, Plug-in BC, Environmental Life Cycle Assessment of Electric Vehicles in Canada, BC, 2018. Lee, Hoesung. Opening Statement of COP 25, 2 December 2019. Li Bai et al., 2020, Exposure to Road Traffic Noise and Incidence of Acute Myocardial Infarction and Congestive Heart Failure: A Population-Based Cohort Study in Toronto, Environmental Health Perspective, 2020. Peter Gorrie (April 18, 2019), Think you can’t afford that EV? In a faceoff against gas cars, the numbers say otherwise. Corporate Knights, 2019. Plug’n Drive, Electric Vehicles Available in Canada, Toronto, 2020. Propfe et al., Cost analysis of Plug-in Hybrid Electric Vehicles including Maintenance & Repair Costs and Resale Values, LA, CA, USA, 2013. Page 70 Page 45 R. Logtenberg and B. Saxifrage, Comparing Global Warming Impacts of Electric and Gas Powered Vehicles by Electrical Region, 2 Degree Institute, 2017. Richardson, Mark. The Trouble with Electric Vehicles – Winter, Globe and Mail, 4 February 2019. Rowley, S. & Phillips, R. “Introduction to” In From Hot Air to Happy Endings: How to Inspire Public Support for a Low Carbon Society, 2010. Stephanie Wallcraft, So you think electric vehicles cost more? A 10-year comparison shows they’re actually cheaper, The Star, 2020. Towards Resilience: Durham Community Climate Adaptation Plan, Region of Durham, 2016. Townsend, S. “Talk the Walk,” In from Hot Air to Happy Endings: How to Inspire Public Support for a Low Carbon Society, 2010. Valdes-Dapena, Peter. By 2040, More Than Half of New Cars Will Be Electric, CNN Business, September 6, 2019. Vincentric, Canadian Total Cost of Ownership, Canada, 2011. Wallcraft, Stephanie. So You Think Electric Vehicles Cost More? A 10-Year Comparison Shows They’re Actually Cheaper, Toronto Star, 23 June 2020. Wolinetz, Michael and John Axsen. How Policy Can Build the Plug-In Electric Vehicle Market: Insights from the REspondent-based Preference and Constraints (REPAC) Model, Technological Forecasting and Social Change, 2017. World Health Organization, Ambient air pollution: Health impacts, Geneva, Switzerland, 2016. World Health Organization, Burden of disease from environmental noise, WHO Regional Office for Europe & JRC, 2011. Page 71 Page 46 Appendix A – EV Charger Installation Costs Summary of EV Charger Installation by Year Fleet Charge Points Installed Year Charge Points Installed Total Estimated Cost Potential Grant Contribution Estimated Cost to Clarington Pre 2011 2 N/A N/A N/A 2021 9 $95,525.00 $40,724.44 $54,800.56 2022 8 $93,550.00 $40,000.00 $53,550.00 2023 6 $66,162.50 $30,000.00 $36,162.50 2024 0 $0.00 $0.00 $0.00 2025 2 $24,137.50 $10,000.00 $14,137.50 2026 0 $0.00 $0.00 $0.00 Total 27 $279,375.00 $120,724.44 $158,650.56 Table 18 - Fleet EV Charger Installation by Year Public Charge Points Installed Year Charge Points Installed Total Estimated Cost Potential Grant Contribution Estimated Cost to Clarington Pre-2021 2 N/A N/A N/A 2021 4 $52,025.00 $17,120.00 $34,905.00 2022 6 $89,912.50 $10,000.00 $79,912.50 2023 8 $120,222.50 $40,000.00 $80,222.50 2024 8 $104,050.00 $40,000.00 $64,050.00 2025 2 $24,137.50 $10,000.00 $14,137.50 2026 10 $118,187.50 $50,000.00 $68,187.50 Total 40 $508,535.00 $167,120.00 $341,415.00 Table 19 - Public EV Charger Installation by Year Page 72 Page 47 2021 Fleet Garnet B Rickard Church & Division Lot Unit Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 4 $36,000 0 $0 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 1 $7,000 Insurance and Maintenance (per station) $350 4 $1,400 1 $350 Shipping (per station) $150 4 $600 1 $150 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 0 $0 Hardscaping Excavation Work / m2 $100 26 $2,600 26 $2,600 'EV Charging Only' Signage (per charge point) $400 8 $3,200 1 $400 'Municipal Vehicles Only' Signage (per charge point) $200 8 $1,600 1 $200 Stencil $500 1 $500 0 $0 Painting (per charge point) $110 8 $880 1 $110 Bollards (per charge point) $120 8 $960 1 $120 Site Remediation (road, curb and softscaping) (per station) $550 4 $2,200 1 $550 Contingency (12% of total costs) 12% 1 $7,793 1 $1,378 HST (13% of Total) 13% 1 $8,442 1 $1,492 Total $81,175 $14,350 Table 20 - 2021 Detailed Fleet Charger Costs Garnet B. Rickard Church & Division Lot Total Municipal Contribution $44,731 $10,070 $54,801 Grant Contribution $36,444 $4,280 $40,724 Total $81,175 $14,350 $95,525 Table 21 - 2021 Fleet Charger Cost Contributions Page 73 Page 48 Public Church & Division Lot Unit Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 2 $18,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 Insurance and Maintenance (per station) $350 2 $700 Shipping (per station) $150 2 $300 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 Signage (per charge point) $400 4 $1,600 Stencil $500 1 $500 Painting (per charge point) $110 4 $440 Bollards (per charge point) $120 4 $480 Site Remediation (road, curb and softscaping) (per station) $550 2 $1,100 Contingency (12% of total costs) 12% 1 $4,994 HST (13% of Total) 13% 1 $5,411 Total $52,025 Table 22 - 2021 Detailed Public Charger Costs Church & Division Lot Total Municipal Contribution $34,905 $34,905 Grant Contribution $17,120 $17,120 Total $52,025 $52,025 Table 23 - 2021 Public Charger Cost Contributions Page 74 Page 49 2022 Fleet Community Resource Center (Firehouse Youth Center) Fire Station 1 Unit Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 3 $27,000 1 $9,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 0 $0 Insurance and Maintenance (per station) $350 3 $1,050 1 $350 Shipping (per station) $150 3 $450 1 $150 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 1 $5,000 Hardscaping Excavation Work / m2 $100 35 $3,500 35 $3,500 'EV Charging Only' Signage (per charge point) $400 6 $2,400 2 $800 'Municipal Vehicles Only' Signage (per charge point) $200 6 $1,200 2 $400 Stencil $500 1 $500 1 $500 Painting (per charge point) $110 6 $660 2 $220 Bollards (per charge point) $120 6 $720 2 $240 Site Remediation (road, curb and softscaping) (per station) $550 3 $1,650 1 $550 Contingency (12% of total costs) 12% 1 $6,496 1 $2,485 HST (13% of Total) 13% 1 $7,037 1 $2,692 Total $67,663 $25,888 Table 24 - 2022 Detailed Fleet Charger Costs Community Resource Center (Firehouse Youth Center) Fire Station 1 Total Municipal Contribution $37,663 $15,888 $53,550 Potential Grant Contribution $30,000 $10,000 $40,000 Total $67,663 $25,888 $93,550 Table 25 - 2022 Fleet Charger Cost Contributions Page 75 Page 50 Public Courtice Community Complex Orono Library Unit Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 2 $18,000 1 $9,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 0 $0 Insurance and Maintenance (per station) $350 2 $700 1 $350 Shipping (per station) $150 2 $300 1 $150 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 35 $3,500 'EV Charging Only' Signage (per charge point) $400 4 $1,600 2 $800 Stencil $500 1 $500 1 $500 Painting (per charge point) $110 4 $440 2 $220 Bollards (per charge point) $120 4 $480 2 $240 Site Remediation (road, curb and softscaping) (per station) $550 2 $1,100 1 $550 Contingency (12% of total costs) 12% 1 $4,994 1 $3,637 HST (13% of Total) 13% 1 $5,411 1 $3,940 Total $52,025 $37,888 Table 26 – 2022 Detailed Public Charger Costs Courtice Community Complex Orono Library Total Municipal Contribution $32,025 $27,888 $79,913 Potential Grant Contribution $20,000 $10,000 $10,000 Total $52,025 $37,888 $89,913 Table 27 - 2022 Public Charger Cost Contributions Page 76 Page 51 2023 Fleet Yard 42 Depot Unit Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 3 $27,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 Insurance and Maintenance (per station) $350 3 $1,050 Shipping (per station) $150 3 $450 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 'EV Charging Only' Signage (per charge point) $400 6 $2,400 'Municipal Vehicles Only' Signage (per charge point) $200 0 $0 Stencil $500 1 $500 Painting (per charge point) $110 6 $660 Bollards (per charge point) $120 6 $720 Site Remediation (road, curb and softscaping) (per station) $550 3 $1,650 Contingency (12% of total costs) 12% 1 $6,352 HST (13% of Total) 13% 1 $6,881 Total $66,163 Table 28 - 2023 Detailed Fleet Charger Costs Yard 42 Depot Total Municipal Contribution $36,163 $36,163 Potential Grant Contribution $30,000 $30,000 Total $66,163 $66,163 Table 29 - 2023 Fleet Charger Cost Contributions Page 77 Page 52 Public Bowmanville Indoor Soccer Center Newcastle Library Branch Shaw Building Unit Cost No. of Units Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 2 $18,000 1 $9,000 1 $9,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 0 $0 0 $0 Insurance and Maintenance (per station) $350 2 $700 1 $350 1 $350 Shipping (per station) $150 2 $300 1 $150 1 $150 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 1 $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 35 $3,500 35 $3,500 'EV Charging Only' Signage (per charge point) $400 4 $1,600 2 $800 2 $800 Stencil $500 1 $500 1 $500 1 $500 Painting (per charge point) $110 4 $440 2 $220 2 $220 Bollards (per charge point) $120 4 $480 2 $240 2 $240 Site Remediation (road, curb and softscaping) (per station) $550 2 $1,100 1 $550 1 $550 Contingency (12% of total costs) 12% 1 $4,994 1 $3,637 1 $3,637 HST (13% of Total) 13% 1 $5,411 1 $3,940 1 $3,940 Total $52,025 $37,888 $30,310 Table 30 - 2023 Detailed Public Charger Costs Bowmanville Indoor Soccer Center Newcastle Library Branch Shaw Building Total Municipal Contribution $32,025 $27,888 $20,310 $80,223 Potential Grant Contribution $20,000 $10,000 $10,000 $40,000 Total $52,025 $37,888 $30,310 $120,223 Table 31 - 2023 Detailed Public Charger Contributions Page 78 Page 53 2024 No EV stations for fleet are planned for installation in 2024 Public Alan Strike Aquatic and Squash Center South Courtice Arena Unit Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 2 $18,000 2 $18,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 0 $0 Insurance and Maintenance (per station) $350 2 $700 2 $700 Shipping (per station) $150 2 $300 2 $300 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 35 $3,500 'EV Charging Only' Signage (per charge point) $400 4 $1,600 4 $1,600 Stencil $500 1 $500 1 $500 Painting (per charge point) $110 4 $440 4 $440 Bollards (per charge point) $120 4 $480 4 $480 Site Remediation (road, curb and softscaping) (per station) $550 2 $1,100 2 $1,100 Contingency (12% of total costs) 12% 1 $4,994 1 $4,994 HST (13% of Total) 13% 1 $5,411 1 $5,411 Total $52,025 $52,025 Table 32 - 2024 Detailed Public Charger Costs Alan Strike Aquatic and Squash Center South Courtice Arena Total Municipal Contribution $32,025 $32,025 $64,050 Potential Grant Contribution $20,000 $20,000 $40,000 Total $52,025 $52,025 $104,050 Table 33 – 2024 Public Charger Contributions Page 79 Page 54 2025 Fleet Yard 42 Unit Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 1 $9,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 Insurance and Maintenance (per station) $350 1 $350 Shipping (per station) $150 1 $150 Installation Panel Upgrades and Electrical Work $15,000 0 $0 Hardscaping Excavation Work / m2 $100 0 $0 'EV Charging Only' Signage (per charge point) $400 2 $800 'Municipal Vehicles Only' Signage (per charge point) $200 0 $0 Stencil $500 1 $500 Painting (per charge point) $110 2 $220 Bollards (per charge point) $120 2 $240 Site Remediation (road, curb and softscaping) (per station) $550 1 $550 Contingency (12% of total costs) 12% 1 $1,417 HST (13% of Total) 13% 1 $1,535 Total $14,763 Table 34 - 2025 Detailed Fleet Charger Costs Yard 42 Total Municipal Contribution $4,763 $4,763 Potential Grant Contribution $10,000 $10,000 Total $14,763 $14,763 Table 35 - 2025 Fleet Charger Contributions Page 80 Page 55 Public Garnet B. Rickard Unit Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 1 $9,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 Insurance and Maintenance (per station) $350 1 $350 Shipping (per station) $150 1 $150 Installation Panel Upgrades and Electrical Work $15,000 0.5 $7,500 Hardscaping Excavation Work / m2 $100 0 $0 'EV Charging Only' Signage (per charge point) $400 2 $800 Stencil $500 0 $0 Painting (per charge point) $110 2 $220 Bollards (per charge point) $120 2 $240 Site Remediation (road, curb and softscaping) (per station) $550 1 $550 Contingency (12% of total costs) 12% 1 $2,257 HST (13% of Total) 13% 1 $2,445 Total $23,513 Table 36 - 2025 Detailed Public Charger Costs Garnet B. Rickard Total Municipal Contribution $13,513 $13,513 Potential Grant Contribution $10,000 $10,000 Total $23,513 $23,513 Table 37 - 2025 Detailed Public Charger Contributions Page 81 Page 56 2026 No EV stations for fleet are planned for installation in 2026 Public Darlington Sport Center Municipal Administrative Center Unit Cost No. of Units Cost No. of Units Cost EV Charger Equipment Double-Charge Point Stations - Pedestal Unit (level 2) $9,000 2 $18,000 3 $27,000 Single-Charge Point Station - Pedestal Unit (level 2) $7,000 0 $0 0 $0 Insurance and Maintenance (per station) $350 2 $700 3 $1,050 Shipping (per station) $150 2 $300 3 $450 Installation Panel Upgrades and Electrical Work $15,000 1 $15,000 1 $15,000 Hardscaping Excavation Work / m2 $100 35 $3,500 35 $3,500 'EV Charging Only' Signage (per charge point) $400 4 $1,600 6 $2,400 Stencil $500 1 $500 1 $500 Painting (per charge point) $110 4 $440 6 $660 Bollards (per charge point) $120 4 $480 6 $720 Site Remediation (road, curb and softscaping) (per station) $550 2 $1,100 3 $1,650 Contingency (12% of total costs) 12% 1 $4,994 1 $6,352 HST (13% of Total) 13% 1 $5,411 1 $6,881 Total $52,025 $66,163 Table 38 - 2026 Detailed Public Charger Costs Darlington Sport Center Municipal Administrative Center Total Municipal Contribution $32,025 $36,163 $68,188 Potential Grant Contribution $20,000 $30,000 $50,000 Total $52,025 $66,163 $118,188 Table 39 - 2026 Public Charger Contributions Page 82 Page 57 Appendix B – Projected EV purchases by Year Summary EV Purchases by Year Year New EVs/Hybrids purchased 2021 7 2022 3 2023 9 2024 1 2025 2 2026 3 Total 25 Table 40 - Summary EV Purchases by Year 2021 Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Planning and Development Services EV (car) $45,000 Emergency and Fire Services Hybrid $45,000 Total 6 + 1 Hybrid $315,000.00 Table 41 - 2021 EV Purchases 2022 Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Fire and Emergency Services EV (SUV) $60,000 Legislative Services PHEV (car) $50,000 Total 3 $155,000 Table 42 - 2022 EV Purchases Page 83 Page 58 2023 Department Vehicle Type and Model Projected MSRP (Rounded) Planning and Development Services EV (car) $45,000 Emergency and Fire Services EV (SUV) $47,000 Emergency and Fire Services Hybrid (car) $47,000 Legislative Services EV (SUV) $47,000 Legislative Services EV (Cargo Van) $65,000 Public Works EV (truck) $73,000 Public Works EV (truck) $73,000 Public Works EV (truck) $73,000 Public Works EV (truck) $73,000 Total 9 $543,000 Table 43 - 2023 EV Purchases 2024 Department Vehicle Type and Model Projected MSRP (Rounded) Public Works EV (truck) $73,000 Total 1 $73,000.00 Table 44 - 2024 EV Purchases 2025 Department Vehicle Type and Model Projected MSRP (Rounded) Public Works EV (truck) $73,000 Public Works EV (truck) $73,000 Total 2 $146,000.00 Table 45 - 2025 EV Purchases 2026 Department Vehicle Type and Model Projected MSRP Legislative Services EV (Sedan) $45,000 Legislative Services EV (truck) $73,000 Emergency Services EV (SUV) $47,000 Total 3 $165,000 Table 46 - 2026 EV Purchases Page 84 Page 59 Appendix C – EV Ownership Costs Source: Clean Air Partnership, Green Fleets business Case Series, 2001. Table 47 - TOTAL COST OF OWNERSHIP OF FORD ESCAPE S (2015) Table 48 - TOTAL COST OF OWNERSHIP OF TOYOTA PRIUS (2015) Page 85 Page 60 Table 49 - TOTAL COST OF OWNERSHIP OF FORD FOCUS SE (2014) Page 86 Page 61 Table 50 - TOTAL COST OF OWNERSHIP OF TOYOTA COROLLA (2015) Table 51 - TOTAL COST OF OWNERSHIP OF NISSAN LEAF SEV (2015) Page 87 Page 62 Table 52 - TOTAL COST OF OWNERSHIP OF FORD FOCUS EV (2015) Page 88 Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: January 17, 2022 Report Number: PDS-002-22 Submitted By: Ryan Windle, Director of Planning and Development Services Reviewed By: Andrew C. Allison, CAO By-law Number: File Number: PLN 37 Resolution#: Report Subject: Downtown Community Improvement Plan Programs 2021 - Annual Report Recommendations: 1. That Report PDS-002-22 be received; and 2. That all interested parties listed in Report PDS-002-22 and any delegations be advised of this report. Page 89 Municipality of Clarington Page 2 Report PDS-002-22 1. Background 1.1. A Community Improvement Plans (CIP) is a tool available under the Planning Act that allows municipalities to provide incentives to business and property owners within an identified geographic area. Council adopted the CIPs for Bowmanville and Orono in 2005, and Newcastle in 2008. These three CIPs were refreshed and renewed in 2018 with an expanded suite of grant programs. The Bowmanville, Newcastle, and Orono CIPs primarily focus on grants for improving existing buildings and enhancing the historic downtown streetscapes. The Courtice Main Street CIP, adopted in 2016, includes programs that encourage major redevelopment and intensification within the Highway 2 Regional Corridor. 1.2. Information about the CIP programs is available to business and property owners within the CIP areas on Clarington’s website, is distributed using Clarington’s social media platforms, and is provided by staff during pre-consultation meetings and as part of responses to property inquiries. ‘Word-of-mouth’ within the community has also been effective in creating awareness of CIP grant opportunities. 1.3. Liaison Groups were established for the three historic downtown CIPs for Bowmanville, Newcastle, and Orono. The CIP Liaison Groups meet with Planning and Development Services staff on a quarterly basis. Liaison Group members are apprised of CIP- related matters, assist staff with informing business/property owners about CIP programs, and provide feedback on the effectiveness of the various grant opportunities based upon the experiences of those who participate in the programs. 1.4. In 2018, a portion of the CIP grant funds for Bowmanville and Newcastle was allocated to support the Sidewalk Patio pilot project. The initiative was expanded to include Orono Report Overview The grant programs available under the Bowmanville, Newcastle, and Orono downtown Community Improvement Plans (CIP) continue to be an effective tool for encouraging investment and renewal in Clarington’s historic downtowns. These CIPs are intended to support improvements to the appearance and function of buildings in the downtowns. The Courtice Main Street CIP was adopted by Council in 2016 and functions in a different manner. Its purpose is to promote land consolidation, redevelopment, and intensification in support of the vision for a sustainable, quality-designed, and complete community established by the Courtice Main Street Secondary Plan. This annual report provides an update and overview of downtown CIP program activities and grants in 2021. Page 90 Municipality of Clarington Page 3 Report PDS-002-22 in 2019 and was made available again to all three communities in 2020 and 2021. This component of the CIP funding was not expended during the 2021 sid ewalk patio season and will be carried over and made available in 2022 to support new sidewalk patios in accordance with PDS-060-21. 2. CIP Grant Program Activity Overview of CIP Grant Applications 2.1. Two CIP signage grant applications associated with two Bowmanville properties were received in 2021. No new applications were received for properties within the Newcastle or Orono CIP areas. Participation of property and business owners in each of the downtown areas was considerably lower in 2020 and 2021 than in previous years, likely due to the COVID-19 pandemic. 2.2. Although new grant activity was slow in 2021, grants that were conditionally approved in previous years were paid out as the work was completed, suggesting property owners and businesses are beginning to resume planned improvement works. Bowmanville, Orono, Newcastle Community Improvement Funding 2.3. To date, the Municipality has provided funding of over $1 million for grants in support of the CIP programs in the Bowmanville, Newcastle, and Orono downtown areas. CIP grants represent an investment and partnership whereby the grant value is matched by property or business owners at a ratio of 3:1 or 2:1, based upon eli gible costs for the specific type of grant in each community. It is noted that many projects exceed this ratio, resulting in the grant comprising a much smaller proportion of the overall cost of the project. 2.4. The implementation of the CIPs through grant programs has translated into direct public benefit. Investment in building code and accessibility upgrades, façade improvements to historic and aging buildings, and upgraded signage all contribute to the vibrancy of Clarington’s central business areas as viable and attractive places to shop and access local services. It is estimated that the grant contributions have resulted in over $3.7 million in investments in the downtowns. Figure 1 illustrates the total applications received by grant type since the CIP grant programs began. Page 91 Municipality of Clarington Page 4 Report PDS-002-22 Figure 1: Summary of Total Applications by Grant Type 2.5. Funds not committed to grant applications are carried over into subsequent years. Each CIP has carry-over funding from prior years available for projects when applications are received. The grant funding request appears as part of the Planning and Development Services budget each year. Table 1 below summarizes the funding status for each CIP identifying the total funding (i) provided to the programs to date (ii) expended through grants issued (iii) committed to conditionally approved projects, and (iv) remaining for new applications in each community. Table 1: Summary of Funding Status; Bowmanville, Newcastle, Orono and Courtice CIPs Funding Category Bowmanville Newcastle Orono Courtice (DC Grant) Provided $716,000 $348,000 $172,000 $456,000 Expended $551,842 $221,269 $135,517 $126,179* Committed $12,719 $26,169 $13,970 $0 Remaining $151,439 $100,561 $22,513 $329,821 *Includes $90,000 that was reallocated from the Courtice CIP towards the local parks/trail system as noted in subsection 2.9, below. 0 10 20 30 40 50 60 70 80 90 Façade Improvement Building Code Upgrades Signage Building Permit Fee Site Plan Fee Infill/Reconstruction Accessiblity Summary of Total Number of Grants by Type Page 92 Municipality of Clarington Page 5 Report PDS-002-22 Courtice Main Street CIP Funding 2.6. The Courtice Main Street CIP was approved in 2016 and incorporates two programs including the development charge grant program, and the tax increment grant program. Grants issued under the Courtice Main Street CIP will result in much higher grant values due to its focus on incenting significant development/redevelopment projects that would generate new and/or increased property assessment. 2.7. Development charge grants are budgeted for annually and held in a reserve fund in order to meet anticipated demand in future years. Tax increment grants are tied to the increased assessment value of a property resulting from development or redevelopment, which the Municipality would forgo for a specified period of time (e.g.10 years). 2.8. To date, two developers are interested in pursuing development charge grants under the Courtice Main Street CIP. Based upon the eligibility and project performance criteria, possible DC Grant values for these projects could be in the range of $800,000 to $1 million for each project. Applications for qualifying development projects would be brought forward to Council for consideration and commitment of funding. Applicants would be required to enter into an Agreement outlining the terms and conditions associated with the grant funding. A separate report, PDS-003-22 on one of these applications is on the same meeting agenda. 2.9. As per Table 1 above, the non-capital funding to date for the Courtice CIP is $456,000. In 2019, previously approved funds from 2018 and $100,000 budgeted in 2019 for the Courtice CIP were reallocated to support works within the local parks and trails system. In 2020, $100,000 and 2021, $210,000 was allocated to the Courtice Main Street CIP reserve fund. The reserve is being built to address anticipated grants due for issuance once construction of the qualifying developments is complete and is confirmed to meet the project performance criteria for sustainability and high-quality urban design. Planning and Development Services staff has included $210,000 in the 2022 budget to continue to build the reserve fund. 2.10. The Courtice Main Street CIP has been in place for five years. The CIP includes a Monitoring Program to ensure the incentive programs remain relevant and effective. In 2022, staff will undertake a review and update to ensure the performance criteria and requirements continue to incent development projects that (i) exceed industry standards in the areas of sustainability, urban design, and affordability, and (ii) contribute to the realization of the vision established by the Courtice Main Street Secondary Plan. Recommendations to adjust the financial incentive programs will be brought forward for Council’s consideration but would not require a formal amendment to the CIP. Page 93 Municipality of Clarington Page 6 Report PDS-002-22 3. Concurrence 3.1. The Director of Financial Services has reviewed this report and confirmed the budget and monies allocated to date. 4. Conclusion 4.1. The purpose of this report is to provide an update and overview of CIP program activity in 2021 and the associated funding framework. COVID-19 has impacted several municipal programs in 2021, including applications for CIP grants. However, the interest in and uptake of the CIP programs for Bowmanville and Orono was strong and steady in pre-pandemic 2019. It is anticipated that as businesses continue to adjust to the presence of COVID-19, applications for CIP grants will return to prior levels. 4.2. Two developers are interested in pursuing development charge grants under the Courtice Main Street CIP. Qualifying applications will be brought forward to Council for consideration and commitment of funding. The Courtice Main Street CIP reserve fund is being built to address anticipated demand for grants in future years. Staff will undertake a review of the Courtice financial incentive programs in 2022 to ensure they continue to achieve the goals of the CIP. 4.3. It is respectfully recommended that Council receive this report for information. Staff Contact: Sarah Allin, Planner II, 905-623-3379 x 2419 or sallin@clarington.net. Interested Parties: List of Interested Parties available from Department. Page 94 Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: January 17, 2022 Report Number: PDS-004-22 Submitted By: Ryan Windle, Director of Planning and Development Services Reviewed By: Andrew C. Allison, CAO By-law Number: File Number: S-C 2020-0001, ZBA 2020-0006 Resolution#: Report Subject: A Draft Approved Plan of Subdivision and Rezoning, west of Green Road north of Durham Highway 2, in Bowmanville Recommendations: 1. That Report PDS-004-22 be received; 2. That the application by DG Group for a Draft Plan of Subdivision and Rezoning, on the west side of Green Road, north of Durham Highway 2, Bowmanville be supported subject to conditions as generally contained in Attachment 1 to Report PDS-004-22; 3. That the Zoning By-law Amendment application submitted by DG Group be approved as contained in Attachment 3 to Report PDS-004-22; 4. That once all conditions contained in the Official Plan and the Zoning By-law with respect to the removal of the (H) Holding Symbol are satisfied, the By-law authorizing the removal of the (H) Holding Symbol be approved; 5. That the Region of Durham Planning and Economic Development Department and Municipal Property Assessment Corporation be forwarded a copy of Report PDS-004-22 and Council’s decision; and 6. That all interested parties listed in Report PDS-004-22 and any delegations be advised of Council’s decision. Page 95 Municipality of Clarington Page 2 Report PDS-004-22 1. Application Details 1.1 Owner: Players Business Park Ltd. West Diamond Properties Inc. 1.2 Applicant: DG Group 1.4 Proposal: Draft Plan of Subdivision for approximately 200 residential units consisting of;  50 Single detached units  43 street townhouses  Two future development blocks to accommodate: o 3 single detached dwellings o 10 street townhouses o 8 condominium townhouses; and o 86 low-rise apartments Zoning By-law Amendment  To rezone the lands from Agricultural (A) to permit the proposed Draft Plan of Subdivision 1.5 Area: 6.2 hectares Report Overview This is a recommendation report relating to the application for a Draft Plan of Subdivision and a Zoning By-law Amendment by DG Group to permit 50 single detached dwellings and 43 street-related townhouse units. The Plan also contains two future development blocks which are proposed to be used for Single detached dwellings, low rise apartments and condominium townhouses. There are also Environmentally Protected lands (0.442 ha) on the west side of the Plan to be dedicated to the Municipality. Page 96 Municipality of Clarington Page 3 Report PDS-004-22 1.6 Location: 2400 Green Road, west side of Green Road,1 kilometre north of Durham Highway 2, Bowmanville (see Figure 1) 1.7 Roll Number: 18-17-010-020-18435 1.8 Within Built Boundary: No Figure 1 – Area subject to applications 2. Background 2.1 DG Group (formerly Metrus) submitted applications for a Draft Plan of Subdivision and Rezoning in March 2020. Planning staff provided a status letter July 30, 2020 outlining comments received from various agencies and departments, including Planning staff review of the proposal. Through discussions with staff and the conservation authority, Page 97 Municipality of Clarington Page 4 Report PDS-004-22 the environmentally protected lands and buffer, as shown in green on Figure 1, were added to the proposed plan. 2.2 DG Group developed the lands to the south of the subject lands, as well as the la nds to the east of Green Road. The street pattern in the proposed draft plan has been set as they are an extension of earlier phases south of Ross Wright Avenue. 2.3 The following reports were submitted in support of the applications:  Environmental Impact Study  Traffic Brief  Servicing Plan  Parking Plan  Noise Assessment  Functional Servicing Report  Archaeological Report 2.4 A Statutory Public Meeting was held on October 5, 2020, to provide background information regarding the application and to obtain public comments. The proposal was for 194 units consisting of 53 single detached lots, 36 townhouse lots, and two condominium blocks of 105 units. Several residents had concerns regarding the proposal. In consideration of the comments from residents, Committee pas sed a resolution requiring the owner/applicant to hold a public open house prior to a subsequent report on these applications coming back to Committee. 2.5 Following the Public Meeting, the applicant made changes to the plans for the site based on feedback that was heard during the meeting. On February 10, 2021, the applicant/owner and their consultant team hosted a virtual open house to obtain comments from the public on the revised plan and to answer questions. The revised plan proposed a total of 211 units, consisting of 47 single detached dwellings, 83 townhouse units and a block for an 81 unit apartment building. 2.6 A summary of submissions, from both the Statutory Public Meeting and the Public Information Meeting, are provided in Section 8 of this report. 2.7 Since then, modifications were made to the plan to further address comments and alleviate some concerns with the development. The proposed unit mix is now 50 single detached dwellings and 43 street townhouses (frontage on a public road) with two future development blocks along Green Road. The two future development blocks are planned to be used for 3 single detached dwellings, 18 townhouses, and an apartment building containing 86 units. The single detached dwellings and the street townhouse blocks Page 98 Municipality of Clarington Page 5 Report PDS-004-22 fronting onto Marsden Way would ultimately be created through the exemption from Part Lot Control permitted in the Planning Act. Details of the townhouses that face the internal laneway and the apartment block would be further refined through the required Site Plan process. 2.8 Since the Public Meeting Report, the applicant has worked towards resolving staff, agency, and public comments. The latest Draft Plan of Subdivision has been revised as follows:  Murray Tabb Street extends north and then runs parallel to Longworth Ave. connecting into Marsden Way;  The condominium townhouse block has been relocated along Green Road, adjacent to the apartment block;  As a result of the reconfiguration, the number of street townhouse dwellings has been slightly revised from 36 street townhouse dwellings to 64 (including the units on the future development blocks). 2.9 The two future development blocks would have a Hold provision on the lands until details of the development have been further established and agreed upon. Prior to removing the Hold, the applicant must demonstrate that the number of units and density can be accommodated on-site in accordance with the Official Plan and Brookhill Secondary Plan policies, including the urban design policies. If it has been demonstrated that the site can accommodate the density, and the appropriate development agreements are in place, a by-law would be forwarded to Council to remove the Hold. 3. Land Use Characteristics and Surrounding Uses 3.1 The subject lands are currently vacant. A portion is being cultivated and another portion is used to stockpile topsoil from previous phases. 3.2 The surrounding uses are as follows: North - Lands for the future extension of Longworth Avenue and beyond woodlands and wetlands South - existing residential development East - existing residential development West - woodlands and wetlands Page 99 Municipality of Clarington Page 6 Report PDS-004-22 4. Provincial Policy Provincial Policy Statement 4.1 The Provincial Policy Statement encourages planning authorities to create healthy, livable and safe communities by accommodating an appropriate range and mix of residential, employment, recreational and open space uses to meet long term needs. New development shall occur adjacent to built-up areas, shall have compact form and a mix of uses and densities that allow for the efficient use of land, infrastructure and public services. 4.2 Natural features shall be protected for the long term. Development shall not be permitted in, or adjacent to, significant woodlands unless it has been demonstrated that there will be no negative impacts. 4.3 The applications are consistent with the Provincial Policy Statement. Provincial Growth Plan 4.4 The Provincial Growth Plan encourages municipalities to manage growth by directing population growth to settlement areas, such as the Bowmanville. Municipalities are encouraged to create complete communities that offer a mix of land uses, employment and housing options, high quality open space, and access to stores and services. 4.5 The development allows for the efficient use of land, infrast ructure and public services and forms part of a neighbourhood where various housing types would be accommodated as development proceeds. Municipal water and sanitary sewer are available to the site. Transit will be made available to the site in the future. 4.6 The applications conform to satisfy the policies and objectives of the Growth Plan. 5. Official Plans Durham Regional Official Plan 5.1 The Durham Region Official Plan designates the lands as Living Areas. Lands designated as Living Area permit the development of communities incorporating the widest possible variety of housing types, sizes and tenure to provide living accommodations that address various socio-economic factors. 5.2 The site is adjacent to Green Road and the future extension of Longworth Aven ue, designated as a Type B and Type C arterial roads in the Region Official Plan. 5.3 The proposed development conforms with the Living Area designation. Page 100 Municipality of Clarington Page 7 Report PDS-004-22 Clarington Official Plan 5.4 The lands are designated Urban Residential. The Urban Residential designation is predominately intended for housing purposes. Other uses may be permitted which by the nature of their activity, scale, design and location are supportive of and compatible with residential uses. 5.5 The policies require new residential development and emerging neighbourhoods to be designed to provide for a variety of housing types and supportive land uses, including commercial and community facilities and encourage accessible, walkable neighbourhoods that prioritize pedestrians over cars and provide for a variety of uses. 5.6 Green Road is designated as a Type “B” arterial Road and the future extension of Longworth Avenue to the west of Green Road is designated as a Type “B” arterial road but has been deferred by the Region of Durham, which designates it as a Type “C” arterial road. Longworth is a Type “C” arterial road, east of Green Road in both Official Plans. 5.7 The areas of the subject lands that are adjacent to the arterial roads ar e to have slightly higher densities than the areas that are internal to the neighbourhood in order to create more vibrant streetscapes along the arterial roads and to utilize infrastructure, such as public transit routes and cycling networks. Internal to the neighbourhood, the minimum net density is 13 units per net hectare. For areas at the edge of the neighbourhood, the minimum density is 19 units per net hectare. Buildings are to be between 1 -3 storeys and limited apartments (along arterial roads), as well as townhouses and single detached dwellings are permitted. 5.8 The draft plan shows townhouses along Longworth Avenue that would front onto Longworth Avenue, with two future development blocks along Green Road to accommodate a mix of detached dwellings, townhouses and a low-rise apartment. The net density for the single detached and street townhouse areas is approximately 22 units per net hectare. The density for the future development blocks is proposed to be 70 units per net hectare, however further refinements would be determined through further details of the Site Plan. 5.9 The proposal conforms to the Clarington Official Plan. Current (In Effect) Brookhill Secondary Plan 5.10 The lands are designated Low Density Residential and Medium Density Residential in the Brookhill Secondary Plan. The permitted uses, densities, and built forms in these designations rely on the Clarington Official Plan policies 5.11 The draft plan is consistent with the policies of the Secondary Plan. Page 101 Municipality of Clarington Page 8 Report PDS-004-22 Recently Adopted Brookhill Secondary Plan Update 5.12 The updated Brookhill Secondary Plan has recently been adopted by Clarington and is with the Region of Durham for approval. The subject lands are designated Low Density Residential and Medium Density Residential. The Medium Density designation is identified in the south west of the future extension of Longworth Avenue and Green Road. 5.13 The predominant use of lands within the Low Density Residential designation shall be a mix of housing types and tenures in low-rise building forms. Other uses, including small scale service and neighbourhood retail commercial uses, which are supportive of and compatible with residential uses, are also permitted in accordance with the Official Plan. 5.14 The following building types are permitted: a) Detached dwellings; b) Semi-detached dwellings; c) Street townhouses; and d) Accessory apartments, as per Policies 7.2.21 and 7.2.22 of this Plan. 5.15 Buildings within the Low Density Residential designation shall not exceed 3 storeys in height and the minimum net density is 13 units per net hectare. 5.16 Detached and semi-detached dwelling units shall account for a minimum 80 percent of the total number of units in the Low Density Residential designation, with units in other building types accounting for the remaining 20 percent. Generally, this ratio should be applied for each plan of subdivision to encourage an even distribution of townhouse units. Private streets and private lanes are not permitted within the Low Density Residential Designation. 5.17 The predominant use of lands within the Medium Density Residential designation are a mix of housing types and tenures in mid and low-rise building forms. Other uses, including small scale service and neighbourhood retail commercial uses, which are supportive of and compatible with residential uses, are also permitted in accordance with the Official Plan. 5.18 The following building types are permitted: a) Street townhouses; b) Block townhouses; c) Stacked townhouses; Page 102 Municipality of Clarington Page 9 Report PDS-004-22 d) Back-to-back townhouses; e) Apartment buildings; and f) Accessory apartments, as per Policies 7.2.21 and 7.2.22 of this Plan. 5.19 Building heights shall be a minimum of 2 storeys and a maximum of 4 storeys. Development on lands designated Medium Density Residential shall have a minimum net density of 40 units per net hectare. This is slightly denser than what the Clarington Official Plan typically permits for areas at the edge of neighbourhoods and adjacent to arterial roads. 5.20 Residential development shall contribute to the overall appearance of the streetscape. Garage doors shall not dominate the view of the streetscape. Front and exterior side yard porches shall be encouraged. 5.21 The applications conform to the updated adopted Brookhill secondary Plan policies. 6. Zoning By-law 6.1 Zoning By-law 84-63 zones the subject lands Agricultural (A) Zone. 6.2 A Zoning By-law Amendment is required to place lands in appropriate residential zones to implement the Draft Plan of Subdivision. Open space lands and their buffers would be placed in the Environmental Protection (EP) Zone. A draft Zoning By-law Amendment for the subject lands is provided in an attachment to this report. 6.3 The proposed Zoning By-law amendment would also place the two future development blocks in a Holding Zone. Development on these two blocks would not be permitted to proceed until the following has been completed: a) A detailed site plan is submitted and approved for the density blocks in accordance with the Official Plan policies and underlying zone category and to the satisfaction of the Director of planning; b) Execution of a Development Agreement (Site Plan); and c) Final approval and clearing of subdivision conditions. 7. Summary of Background Studies Planning Brief, Bousfields Inc., March 2020 7.1 The report provides a brief analysis and planning justification for the proposal. In summary, the development is the fifth phase in the Brookhill neighbourhood. It continues the development patterns from the south, including the grid like street pattern Page 103 Municipality of Clarington Page 10 Report PDS-004-22 and provides a greater range of housing options for the neighbourhood in a form that is compatible with the existing and planned uses in the neighbourhood. The proposed subdivision also includes important infrastructure components, such as the westerly extension of Longworth Avenue. 7.2 The surrounding context is predominantly low rise residential with nearby commercial uses. The proposed built form is suggested to be generally consistent with the neighbourhood. The proposed townhouses along Longworth Avenue would frame the street and vehicle access would be from the rear, along Murray Tabb Street and Marsden Way. The intent of the two future development blocks is to rezone it to accommodate higher density built forms along the arterial roads, consistent with the Official Plan policies. Scoped Environmental Impact Study, Niblett Environmental Associates Inc., Feb. 2020 7.3 A scoped Environmental Impact Study (EIS) was completed to update an existing EIS that was completed in 2017. The study area is immediately adjacent to the Maple Grove Wetland Complex, which is a provincially significant wetland. Traffic Impact Brief, GHD, Feb. 2020 7.4 A Traffic Brief was prepared to address the proposed changes to the layout of the streets. There was an initial Traffic Impact Study completed in 2010 for the entire Brookhill Neighbourhood. There were no major traffic issues raised as a result of the proposed subdivision design and street layout. The site design and street layout slightly changed in February 2021, from the original application that was submitted in March 2020. No major concerns were raised with the revisions to the Draft Plan. 7.5 Environmental Noise Assessment, YCA Engineering Ltd., January 2020 7.6 A Noise Assessment was completed for the subject lands. Based on the analysis, there are no residential dwelling units that will require air conditioners. There are some lots and blocks along the future extension of Longworth Avenue that will require forced air heating system with ducting sized to accommodate a central air conditioner unit, in order to allow the homeowner the option of installing central air conditioning in the future. Appropriate warning clauses are also to be included in the purchase and sale agreement. 7.7 The noise assessment will need to be reviewed for the two condominium blocks along Green Road once details are available. This would be addressed as necessary through the Subdivision agreement and Site Plan process. Page 104 Municipality of Clarington Page 11 Report PDS-004-22 7.8 An updated Noise Study, based on the final grading and site design, will be required as a condition of final subdivision approval to ensure the development agreements include appropriate conditions to mitigate noise and warning clauses. Functional Servicing & Stormwater Management report, GHD, February 2020 7.9 The Functional Servicing and Stormwater Management Report finds that water and sanitary services are available to service the proposed development. The existing stormwater facility was previously sized to account for this development. Impervious surface ratio has been increased to include the condominium blocks and found that there is surplus capacity to provide required controls and treatment for the developmen t. An updated report to reflect the final design of the subdivision will be required as a condition of final approval. The two condominium blocks may need to be reassessed once further details have been provided. This can be done through the Site Plan application stage of the development. Stage 1 and 2 Archaeological Assessment, This Land Archaeology Inc., May 31, 2007 and revised September 15, 2008 7.10 A Stage 1 and 2 Archaeological Assessment was completed for the subject lands. The assessment was carried out in 2006 and 2007. Only seven pieces of chert representing the past occupation of the land by Native Peoples were found scattered across the field. None of these constituted a significant archaeological site and no further assessment is warranted. Should any archaeological or human remains be found on the property during construction, the Ministry of Tourism, Culture and Sport shall be notified immediately. Phase One Environmental Site Assessment, EXP Services Inc., January 17, 2019 7.11 The majority of the property was under agricultural use, consisting of vacant land with a forested area. No permanent structures were developed on site and the stockpile of topsoil was generated from preliminary on-site grading activities. No imported fill materials of unknown quality were brought to the subject lands. Based on the findings of the assessment, no areas of potential environmental concern were identified. Based on the conclusions of the report, a phase two assessment is not required. The proponent will have to satisfy the Region’s Site Contamination Protocol to address site contamination matters as a condition of final approval. 8. Public Submissions 8.1 A Statutory Public Meeting was held on October 5, 2020, followed by a Public Information Centre on February 10, 2021. Notification was provided to all property owners within 120 metres of the site. Signage was posted on the property and notification was also posted to the Municipality’s website. Page 105 Municipality of Clarington Page 12 Report PDS-004-22 8.2 Public Meeting notice was mailed to area residents, five Public Notice signs were displayed on the subject property at each frontage. The application and supporting documents were posted on the municipality’s website. The details of the application were included in the Planning and Development Services E-update. 8.3 Staff have received over 40 inquiries regarding the application. Below is a summary of comments that have been received:  One individual inquired about the timing of construction of Longworth Avenue.  One individual supports the application.  One individual, who resides on Ross Wright Avenue inquired about the height of the units in the condominium blocks, who the builder is, the timing for the extension of Longworth Avenue and how will construction vehicles and dust be managed.  Another resident, residing on Murray Tabb is concerned about water diversion into his back yard, the extension of Murray Tabb Street, traffic impacts and construction traffic.  Lack of green space or recreational space in the neighbourhood to support the number of new residents.  Increase in traffic throughout the neighbourhood .  Ross Wright Avenue will be the main source of traffic to the neighbourhood until Longworth is built. There is no proposed connection to Green Road other than Ross Wright Avenue.  Most traffic will travel south through the subdivision to get to the commercial areas.  Enjoys the small neighbourhood character. Does not support townhouses or apartments in this neighbourhood.  Increased impacts to on-street parking.  Higher density housing will affect the existing community demographics.  Concerned about the safety of children with the increased traffic. There are a number of children that board buses in this area. 8.4 A petition was received on September 2020 with approximately 200 names from individuals residing in previous phases of Brookhill. They are opposed to stacked townhouses and mid-rise apartments that will cause traffic, impact schools, destroy local wildlife, over crowd the park and potentially lower property values. The residents only want single detached dwellings. After this petition was received, a Public Information Centre was held virtually to present modifications to the proposed plan and address the resident’s concerns. Page 106 Municipality of Clarington Page 13 Report PDS-004-22 9. Agency Comments Region of Durham 9.1 Region of Durham Planning and Economic Development Department advises that the draft plan has been reviewed and provided comments regarding Provincial Plan Polices, Regional Plan Policies, municipal services and transportation. 9.2 The Region states that the lands are designated as Living Area and shall be used predominantly for housing purposes with the widest variety of housing types, sizes and tenure. 9.3 Living Areas shall be developed in a compact form through higher densities and by intensifying and redeveloping existing areas, particularly along arterial roads, and shall be developed with consideration for supporting and providing access to public transit. 9.4 The majority of the draft plan is designated Low Density Residential with two future development blocks for townhouses and apartments along Green Road. The proposed development would add a mix of housing types and contributed to the Municipality’s intensification targets as outlined in the Durham Regional Official Plan. 9.5 A scoped Environmental Impact Study concluded that the proposed development would not have a negative impact on the natural heritage features with the buffers proposed and if all the mitigation measure and recommendation made by the EIS are implemented. 9.6 The Phase One Environmental Site Assessment (ESA), prepared by EXP. Services Inc. reported that no further site investigation is required. The proponent will be required to provide a regional Reliance Letter and Certificate of Insurance to the Region as a requirement of final approval. 9.7 Archeological Site Assessment was prepared in in 2008 for lands west and east of Green Road. The Ministry of Tourism, Culture and Sport has issued a clearance letter for the development. 9.8 Municipal water supply and sanitary sewers is available to service the proposed development from Murray Tabb Street, Procknow Street, Carl Raby Street and Marsden Way. Watermain shall also be extended to the north property limit on Green Road and proposed Longworth Avenue west of Green Road. 9.9 The Region has no objection to the approval of the proposed Draft Plan of Subdivision and provided conditions to be fulfilled prior to clearance by the Region for the registration of the plan. Page 107 Municipality of Clarington Page 14 Report PDS-004-22 Central Lake Ontario Conservation Authority 9.10 The Central Lake Ontario Conservation Authority (CLOCA) does not have any objection to the approval of the Draft Plan of Subdivision. CLOCA approved the recommendations of the EIS and is satisfied with the Functional Servicing Report. As conditions of Draft Plan approval, the authority recommends the Environmentally Protected lands and the buffer be dedicated to the Municipality. Conditions, such as, restoration planting in the vegetation buffer, amphibian habitat mitigation measures, an update to the Environmental Impact Report, have all been added to the conditions of Draft approval and will need to be addressed prior to any on-site grading or final registration of the Plan. Kawartha Pine Ridge District School Board 9.11 The Public School Board offered no objection to the Draft Plan approval subject to the inclusion of warning clauses in Agreements of Purchase and Sale for homeowners regarding school bus pick-up points. A school site is reserved in the Phase 4 Draft Approved Plan of the Brookhill Neighbourhood. This school may not be built for some time, if at all, in which case students from this area may have to attend existing schools. 10. Departmental Comments Public Works 10.1 The Public Works Department has reviewed the revised concept and is generally satisfied with the proposed concept. The standard comments are applicable with respect to temporary turning circles, general requirements, and the Development Agreement. Temporary Turning Circles 10.1.1. The applicant will be responsible for removing the temporary turning circle on Marsden Way and Murray Tabb Street, and reconstructing the roadways to a full urban standard as required. Emergency and Fire Services 10.2 The Emergency and Fire Services Department offer no objections. 11. Discussion 11.1 The lands are situated in the Brookhill Neighbourhood of Bowmanville. The existing development south of the subject lands are only the first two phases. The other two phases, 3 and 4, are on the east side of Green Road. It includes open space lands for Page 108 Municipality of Clarington Page 15 Report PDS-004-22 trails, a park and a site for a future elementary school (to the east of the creek), should either school board wish to purchase the site. 11.2 The subject lands are designated for low and medium residential development in the Brookhill Secondary Plan and is approximately a 15-minute walk to the commercial centre. The Draft Plan is an extension of the existing residential development to the south. The proposed grid like street pattern maximizes walkability and would extend the existing street network, including Carl Raby Street which would extend north and connect to the future Longworth Avenue. 11.3 The lands at the very west of the site provide a buffer to the environmentally sensitive lands to the west. This means that the existing lotting pattern on the west side of Murray Tabb, would not continue north. Murray Tabb does not connect to the future Longworth Avenue. It turns east and provides for dual frontage townhomes along Longworth Avenue. 11.4 The proposed plan includes important infrastructure components, such as the extension of Longworth Ave, which will also be extended further east, 85 metres past Green Road. The owner will be responsible for the cost and construction of Longworth Ave., including any services or utilities required to those limits. The Municipality will be responsible for the cost of the design and construction of any oversizing of Longworth Avenue and the roundabout proposed at the intersection of Longworth Avenue and Green Road. The actual construction of Longworth will coincide with the construction of the Draft Plan. The Owner would also be responsible for the urbanization of Green Road. 11.5 The existing stormwater management pond situated at Green Road and Brookhill Boulevard is sized to accommodate the proposed development. Page 109 Municipality of Clarington Page 16 Report PDS-004-22 Figure 2 – Brookhill Phasing Plan and General Context Page 110 Municipality of Clarington Page 17 Report PDS-004-22 Brookhill Secondary Plan (Adopted) 11.6 The existing Brookhill Secondary Plan has recently been reviewed and updated. Council adopted an amendment to the Plan on May 25, 2021. The updated Secondary Plan requires approval from the Region of Durham, which may result in modifications to the Secondary Plan. 11.7 The adopted Plan designates the majority of the subject lands as Low Density Residential. The Medium Density designation runs along the future extension of Longworth Avenue and along Green Road. Figure 3- Adopted Land Use Plan for the Brookhill Secondary Plan (subject area outlined in blue) 11.8 The predominant use of lands within the Low-Density Residential designation shall be a mix of housing types and tenures in low-rise building forms. Detached dwellings and street townhouses are permitted. Detached and semi-detached dwelling units shall account for a minimum of 80 percent of the total number of units in the Low-Density Residential designation, with units in other building types accounting for the remaining Page 111 Municipality of Clarington Page 18 Report PDS-004-22 20 percent. Generally, this ratio should be applied for each plan of subdivision to encourage an even distribution of townhouse units. Private streets and private lanes are not permitted within the Low-Density Residential Designation. 11.9 The proposal has 50 single detached dwellings and 43 street townhouse units, as well as two future development blocks. The portion of single detached dwellings within the Low-Density Residential designation is approximately 71%. There are about 20 townhouse units proposed in the Low-Density Designation and they are all fronting a public street. 11.10 The revision presented at the Open House eliminated the previously proposed Block 61, a 34-unit medium density townhouse block, which extended approximately half the width of the property, from the north limits of the property, future Longworth Avenue, southerly into the subject lands. The elimination of the medium density block is more consistent with the Secondary Plan. 11.11 The predominant use of lands within the Medium Density Residential designation are a mix of housing types and tenures in mid and low-rise building forms. Other uses, including small scale service and neighbourhood retail commercial uses, which are supportive of and compatible with residential uses, are also permitted in accordance with the Official Plan. 11.12 The following residential building types are permitted:  Street townhouses;  Block townhouses;  Stacked townhouses;  Back-to-back townhouses;  Apartment buildings; 11.13 Building heights shall be a minimum of 2 storeys and a maximum of 4 storeys. Development on lands designated Medium Density Residential shall have a minimum net density of 40 units per net hectare. This is slightly denser than what the Clarington Official Plan typically permits for the edge of neighbourhoods, which is 1 -3 storeys and a minimum net density of 19 units per net hectare. 11.14 The area along Longworth Avenue is planned to have dual frontage townhouse units with a frontage of 6.1 metres. The units would have the front door facing Longworth Avenue and vehicle access would be at the rear on Murray Tabb Street and Marsden Way. The Municipality typically requires on-street townhouses to have a minimum frontage of 7.0 metres. The exception to this is for on-street townhouse lots that have a dual frontage. Therefore, the townhouse blocks conform to the policies of the Plan. Page 112 Municipality of Clarington Page 19 Report PDS-004-22 Figure 4 – Proposed Draft Plan of Subdivision Future Development Blocks 11.15 There are two future development blocks (Blocks 59 and 60). Block 59 is to be used for low rise apartments and townhouses. Block 60, on the south side, is to be used for condominium townhouse units (that would be developed in conjunction with the apartment block) and single detached dwellings. Both blocks are within the Medium Density designation of the adopted Brookhill Secondary Plan. The proposed uses are permitted. 11.16 Site plan approval is required for the two condominium blocks. The applicant has demonstrated that the two future development blocks would be able to generally accommodate the proposed land uses. Private outdoor amenity spaces are shown, as well as parking. Further design details for the site would be addressed through the Site Plan approval process such as vehicle access points, loading spaces, landscaping, etc. 11.17 There is a service connection from Marsden Way to the condominium block on the north part of block 60. This area has the potential to be used as a pedestrian access to the condominium block. It also separates the different typologies of the townhouses and single detached dwellings. Page 113 Municipality of Clarington Page 20 Report PDS-004-22 11.18 There are two vehicle access points proposed to the condominium block, one connecting to Longworth Avenue and one connecting to Green Road which would reduce vehicle traffic from filtering into the neighbourhood. Further discussions with the Clarington Public Works Department and an update to the Traffic Impact Brief would be required to ensure this is feasible without interfering with the proposed roundabout at the intersection of Green Road and Longworth Ave. There is a possibility that the access off Longworth Avenue could be a right-in/right-out only access. These technical details would be able to be addressed through the Site Plan process and should not have an overall impact on the Draft Plan. Addressing Comments and Concerns from Residents 11.19 There are three main concerns regarding the proposal.  The type of built form (townhouse and apartment) not related to the existing character of the neighbourhood;  Overall increase of traffic within the neighbourhood; and  Not enough park space and school capacity for the increase in density. 11.20 The first concern is related to the built form proposed. Areas that are along main road networks are intended to have greater densities than the areas internal to the neighbourhood in order to take advantage of the capacity of higher order roadways and make efficient use of public transit options. It is also necessary to provide a variety of housing options to meet the needs of different demographics. The proposal conforms to the medium density residential designation in the adopted Secondary Plan. 11.21 Staff are working with the applicant to try to direct vehicle traffic to the main arterial roads from the condominium block to see if it is feasible given the close proximity to the intersection. There were no major traffic issues raised as a result of the proposed subdivision design and street layout. The site design and street layout slightly changed in February 2021, from the original application that was submitted in March 2020. No major concerns were raised with the revisions to the Draft Plan. The traffic analysis can be updated to compare the additional traffic generated between the two different proposals (access off Marsden Way or access off Longworth Ave.). As mentioned, the technical details for the most ideal access point, from a safety perspective, would be addressed through the Site Plan process. 11.22 There is an existing park located in the neighbourhood to the south of the subject lands. There is also a planned park on the east side of Green Road with trail connections. Refer to Figure 2. The amount of parkland in the area satisfies the Secondary Plan targets. The future development block for the condominium townhouses and the apartment would also be required to provide private outdoor amenity space according to the Municipality’s Amenity Guidelines for Medium and High Density Residences. Page 114 Municipality of Clarington Page 21 Report PDS-004-22 12. Conclusion 12.1 In consideration of all agency, staff and public comments, it is respectfully recommended that the application for Draft Plan of Subdivision and the Zoning By-law Amendment, as submitted by DG Group, be su pported and approved respectfully, subject to the Draft Plan conditions included in Attachment 1. Staff Contact: Nicole Zambri, 905-623-3379 extension 2422 or nzambri@clarington.net. Attachment 1: Proposed Conditions of Draft Approval Attachment 2: Draft Plan of Subdivision Attachment 3: Draft Zoning By-law Amendment Interested Parties: List of Interested Parties available from Planning and Development Services Department. Page 115 Conditions of Draft Approval File Number: S-C-2020-0001 Issued for Concurrence: October 28, 2021 Notice of Decision: _____________ Draft Approved: ________________ __________________________ Ryan Windle, RPP, MCIP, AICP Director of Planning and Development Services Municipality of Clarington Part 1 – Plan Identification 1.1 The Owner shall have the final plan prepared on the basis of approved draft plan of subdivision S-C-2020-0001 prepared by Bousfields Inc. identified as job number 0147-1a-97dp, dated October 13, 2021, as redlined, which illustrates 50 single detached units, 43 street townhouse units, block for a low rise apartment, a block for townhouses in a condominium tenure, environmentally protected lands and associated buffer, and roads. 1.2 Redline Revisions (a)Add blocks for 0.3 metre reserves along Longworth Avenue and Green Road, save and except an access point on Green Road and Carl Raby Street. (b)The density (UPH) reference be deleted from the Block descriptions on the Draft Plan for Blocks 59 and 60. Part 2 – General 2.1 The Owner shall enter into a subdivision agreement with the Corporation of the Municipality of Clarington (the “Municipality”) that contains all of the terms and conditions of the Municipality’s standard subdivision agreement respecting the provision and installation of roads, services, drainage, other local services and all internal and external works and services related to this plan of subdivision. A copy of the Municipality’s standard subdivision agreement can be found at https://www.clarington.net/en/do-business/resources/application-forms/subdivision- agreement.pdf Page 116 P age | 2 2.2 The Owner shall name all road allowances included in the draft plan to the satisfaction of the Municipality and the Regional Municipality of Durham (the “Region”). 2.3 All works and services must be designed and constructed in accordance with the Municipality’s Design Guidelines and Standard Drawings. Architectural Control 2.4 (1) The Owner shall pay 100% of the cost for the “Control Architect” to review and approve all proposed models and building permits consistent with the approved architectural design guidelines for the Brookhill Neighbourhood prepared by Watchorn Architects, to the satisfaction of the Director of Planning and Development Services. (2) No residential units shall be offered for sale to the public on the draft plan until such time the exterior architectural design of each building has been approved by the Director of Planning and Development Services. (3) No building permit shall be issued for the construction of any building on any residential lot or block on the draft plan, until the exterior architectural design of each building and the location of the building on the lot has been approved by the Director of Planning and Development Services. (4) In keeping with the Urban Design Principles in the Brookhill Secondary Plan, the Owner acknowledges and agrees that for Blocks 51-54, 57 and 58, the front façade of the houses will face Longworth Avenue, while the driveways and garages will be accessed from Murray Tabb Street. Marketing and Sales 2.5 (1) The Owner shall prepare a Land Use Plan which shows the draft plan and surrounding land uses. The Land Use Plan shall be in a format approved by the Director of Planning and Development Services. (2) The Owner shall erect and maintain a sign on the development site and/or in the sales office which shows the Land Use Plan as approved by the Director of Planning and Development Services. (3) The Owner shall submit its standard Agreement of Purchase and Sale to the Director of Planning and Development Services which includes all warning clauses/ notices prior to any residential units being offered for sale to the public. Site Alteration 2.6 Draft plan approval does not give the Owner permission to place or dump fill or remove fill from or alter the grade of any portion of the lands within the draft plan. Page 117 P age | 3 The Owner shall be required to obtain a permit from the Municipality under Site Alteration By-law 2008-114, as amended, for any such work. If any portion of the lands are within an area regulated by a conservation authority, the Owner shall obtain a permit from the conservation authority in addition to obtaining approval from the Director of Public Works regarding the intended haulage routes, the time and duration of the site alteration work and security relating to mud clean up, road damage and dust control in accordance with the Dust Management Plan in Section 4.7. After registration of a subdivision agreement, the provisions of the Municipality’s standard subdivision agreement shall apply to any proposed site alteration on the lands covered by the subdivision agreement. Part 3 – Final Plan Requirements 3.1 The following road allowances shown on the draft plan shall be dedicated to the Municipality upon registration of the final plan: (a) Murray Tabb Street (b) Procknow Street (c) Carl Raby Street (d) Marsden Way 3.2 The Owner shall transfer to the Municipality (for nominal consideration free and clear of encumbrances and restrictions) the following lands and easements: (a) Reserves 0.3 metre reserves along Longworth Avenue and Green Road (b) Sight Triangles A 15 metre X 15 metre site triangle at the corner of Green Road and Longworth Avenue (c) Environmental Protection Lands Block 61 on the draft plan Block 62 on the draft plan. Page 118 P age | 4 Part 4 –Plans and Reports Required Prior to Subdivision Agreement/Final Plan Registration 4.1 The Owner shall submit the following plans and report or revisions thereof: Phasing (1) This draft plan shall be developed in one registration only. Noise Report (2) The Owner shall submit to the Director of Public Works, the Director of Planning and Development Services and the Region, for review and approval, an updated noise report, based on the preliminary noise report entitled Environmental Noise Report, prepared by YCA Engineering Limited, dated January 2020, prepared for West Diamond Properties Inc. Functional Servicing (3) The Owner shall submit an updated Functional Servicing Report satisfactory to the Director of Public Works and Central Lake Ontario Conservation Authority. Community Theme Plan (4) The Owner shall submit a “Community Theme Plan” to the Director of Planning and Development Services and Director of Public Works consistent with the approved plan for previous phases, for approval. Such plan shall include design concepts for a community theme including gateway treatments, landscape treatments, lighting fixtures, fencing details and related design issues for the overall design, location and configuration of trails and open space buffers. All Engineering Drawings shall conform with the approved Community Theme Plan. Environmental Sustainability Plan (5) The Owner shall submit Environmental Sustainability Plan to the satisfaction of the Director of Planning and Development Services. Such plan shall identify the measures that the Owner will undertake to conserve energy and water in excess of the standards of the Ontario Building Code, reduce waste, increase recycling of construction materials and utilize non-toxic, environmentally sustainable materials and finishes. Soils Management Plan (6) Prior to Authorization to Commence, the Owner shall provide a Soils Management Plan for review and approval by the Director of Public Works. Such plan shall provide information respecting but not limited to any proposed import or export of fill to or from any portion of the Lands, intended haulage routes, the time and duration of any proposed haulage, the source of any soil to be imported, quality assurance measures for any fill to be Page 119 P age | 5 imported, and any proposed stockpiling on the Lands. All imported material must originate from within the Municipality of Clarington. The Owner shall comply with all aspects of the approved Soils Management Plan. The Director may require the Owner to provide security relating to mud clean up, dust control and road damage. Dust Management Plan (7) Prior to Authorization to Commence Works, the Owner is required to prepare a Dust Management Plan for review and approval by the Director of Public Works. Such plan shall provide a practical guide for controlling airborne dust which could impact neighbouring properties. The plan must: (a) identify the likely sources of dust emissions; (b) identify conditions or activities which may result in dust emissions; (c) include preventative and control measures which will be implemented to minimize the likelihood of high dust emissions; (d) include a schedule for implementing the plan, including training of on- site personnel; (e) include inspection procedures and monitoring initiatives to ensure effective implementation of preventative and control measures; and (f) include a list of all comments received from the Municipality, if any, and a description of how each comment was addressed. Part 5 –Special Terms and Conditions to be Included in the Subdivision Agreement 5.1 Lands Requiring Site Plan (a) The Owner will be required to make a site plan application for Blocks 59 and 60 to address vehicle access points to the sites, private amenity space, landscaping, etc. (b) The Owner shall not make an application for a building permit in respect of Blocks 59 and 60 until the Owner has received site plan approval from the Municipality under Section 41 of the Planning Act, R.S.O. 1990, C.P.13. 5.2 Longworth Avenue The Owner shall be responsible for construction of Longworth Avenue from approximately 85 metres east of Green Road westerly to the Urban Area Boundary including the roundabout at Green Road and Longworth Avenue. The Owner is 100% responsible for the cost and construction of Longworth Avenue including any services and/or utilities required to the limits described. The Municipality will be responsible for the cost of the design and construction of any oversizing of Longworth Avenue and the intersection improvements for Longworth Avenue and Green Road. Page 120 P age | 6 5.3 Green Road The Owner shall be responsible for the urbanization of Green Road from approximately 15 metres north of the Ross Wright Avenue to approximately 90 metres north of the intersection of Green Road and Longworth Avenue including the construction of the roundabout. The Municipality will be responsible for the cost of the design and construction of any oversizing of Green Road and the intersection improvements for Longworth Avenue and Green Road. 5.4 Block 158 (Part 9 of 40R-28857) The Owner shall be responsible for fulfilling the outstanding condition 5.9 from the Conditions of Draft Approval, dated June 15, 2015, for SC-2012-0003 (Brookhill Phase 3 Plan) which states that a Concept Plan shall be prepared for Block 158. The Concept Plan shall be included in the Engineering Drawings. The Owner is 100% responsible for the construction and installation of the work identified on the approved concept plan. 5.5 Clean Water Pipe The Owner is 100% responsible for the construction of all infrastructure required to convey external flows to the Brookhill tributary via a clean water pipe in the Longworth Avenue right-of-way, similar to the clean water pipe on Brookhill Boulevard. 5.6 Parkland The Owner shall pay the Municipality an amount in lieu of conveying land for park or other public recreational purposes under section 5.1. of the Planning Act, R.S.O. 1990, c.P.13. The Owner acknowledges that this amount represents the value of the land that would otherwise be required to be conveyed at the rate of 1 hectare of land for each 300 dwelling units in the draft Plan as of the day before the approval of draft Plan of Subdivision S-C-2020-0001. 5.7 Noise Attenuation (1) The Owner shall implement the noise attenuation measures recommended in the updated noise report entitled Environmental Noise Assessment prepared by YCA Engineering Limited and dated January 2020 (the “Noise Report”). (2) The Owner shall not make an application for a building permit for any building on the Lands until an acoustic engineer has certified that the plans for the building are in accordance with the Noise Report. 5.8 Temporary Turning Circles (1) Temporary turning circles are required at phase limits where roadways are incomplete and any lots abutting temporary turning circles will be frozen and not eligible for building permits. Page 121 P age | 7 (2) Where part of all of a temporary turning circle is on lands outside of the road allowances, the Owner shall convey an easement to the Municipality in a form satisfactory to the Municipal Solicitor. Such easement shall be released for nominal consideration when the turning circle is removed and the roads are reconstructed to a full urban standard to the satisfaction of the Director of Public Works. (3) Where proposed road connects to existing temporary turning circle, the Owner shall restore all areas to municipal standards. This includes curbs, sidewalks, asphalt, drainage, boulevard topsoil and sod, street trees and streetlighting relocations, all to the satisfaction of the Director of Public Works Part 6 – Agency Conditions Part 6 – Agency Conditions 6.1 Region of Durham (1) The Owner shall provide for the extension of such sanitary sewer and water supply facilities which are external to, as well as within, the limits of this plan that are required to service this plan. In addition, the Owner shall provide for the extension of sanitary sewer and water supply facilities within the limits of the plan which are required to service other developments external to this subdivision. Such sanitary sewer and water supply facilities are to be designed and constructed according to the standards and requirements of the Region. All arrangements, financial and otherwise, for said extensions are to be made to the satisfaction of the Region, and are to be completed prior to final approval of this plan. (2) Prior to entering into a subdivision agreement, the Region shall be satisfied that adequate water pollution control plant and water supply plant capacities are available to the proposed subdivision. (3) The Owner shall agree in the Municipality of Clarington Subdivision Agreement to implement the recommendations of the report, entitled “Environmental Noise Assessment” prepared by YCA Engineering Limited dated January 2020, which specifies noise attenuation measures for the development. The measures shall be included in the Subdivision Agreement and must also contain a full and complete reference to the noise report) i.e author, title, date and any revisions/addenda and shall include warning clauses identified in the study). (4) The Owner shall grant to the Region any easements required for provision of Regional services for this development and these easements shall be in the location and of such widths as determined by the Region. (5) All land dedications, easements, sight triangles and reserves as required by the Region for this development must be granted to the Region free and clear of all encumbrances and in a form satisfactory to the Region’s Solicitor. Page 122 P age | 8 (6) The Owner shall satisfy all requirements, financial and otherwise, of the Region. This shall include, among other matters, the execution of a subdivision agreement between the Owner and the Region concerning the provision and installation of sanitary sewers, water supply, roads and other regional services. (7) Prior to the finalization of this plan of subdivision, the Owner shall provide satisfactory evidence to the Regional Municipality of Durham in accordance with the Region’s Site Contamination Protocol to address site contamination matters. Such evidence may include the completion of a Regional Reliance Letter and Certificate of Insurance. Depending on the nature of the proposal or the findings of the Record of Site Condition (RSC) Compliant Phase One Environmental Site Assessment (ESA), an RSC Compliant Phase Two ESA may also be required. The findings of the Phase Two ESA could also necessitate the requirement for an RSC through the Ministry of Environment Conservation and Parks, accompanied by any addition supporting information. 6.2 Conservation Authority (1) Prior to any on-site grading or construction of final registration of the Plan, the Owner shall submit and obtain approval from the Municipality of Clarington, and the Central Lake Ontario Conservation Authority for reports describing the following: (a) The intended means of controlling stormwater flow on the site and conveying stormwater flow from the site to an appropriate outlet, including use of stormwater techniques which are appropriate and in accordance with the provincial guidelines; (b) The intended means of providing water quality treatment for the site in accordance with provincial guidelines; (c) The means whereby erosion and sedimentation and their effects will be minimized on the site and downstream of the site during and after construction, in accordance with provincial guidelines. The report must outline all actions to be taken to prevent an increase in the concentration of solids and prevention of downstream erosion in any water body as a result of on-site, or related works: and (e) Details on the types of Low Impact Development (LID) measure to be implemented within the development to assist in reducing stormwater runoff and meeting infiltration targets in accordance with the water balance and CLOCA requirements. (2) That, an educational Homeowners Guide be developed to be distributed to the future lot owners regarding the significant wetland and buffer area as well Page 123 P age | 9 as the benefits, functions, and maintenance requirements of low impact development measures on the individual lots. (3) That, a Landscape Plan(s) be submitted for review and approval by CLOCA for the restoration planting within the vegetation protection areas (buffer lands) shown as Blocks 61 and 62 within the draft plan. (4) That amphibian habitat be addressed through detailed design measures to the satisfaction of CLOCA including appropriated exclusion fencing to be installed in the northern limits of development and the buffer interface at the west as a mitigation measure. (5) That a Hydrogeological Study be prepared to the satisfaction of CLOCA pursuant to the recommendations of the Functional Servicing Report. (6) That the Environmental Impact Study be further revised, as necessary to the satisfaction of CLOCA in order to respond to the comments contained in the May 26, 2020 memo from CLOCA Environmental Engineering. (7) The Owner shall satisfy all financial requirements of the Central Lake Ontario Conservation Authority. This shall include Application Processing Fees and Technical Review Fees as per the approved Authority Fee Schedule. (8) That the Municipality’s Subdivision Agreement contain all the above noted conditions. (9) The Owner agrees to maintain all stormwater and erosion and sediment control structures and measures operating in good repair during the construction period, in a manner satisfactory to CLOCA. (10) The Owner acknowledges that the site is within an area that is subject to CLOCA regulation, therefore a permit is required prior to any development activity on site. 6.3 Canada Post Corporation (1) The Owner covenants and agrees to provide the Municipality of Clarington with evidence that satisfactory arrangements, financial and otherwise, have been made with Canada Post Corporation for the installation of Lockbox Assemblies as required by Canada Post Corporation and as shown on the approved engineering design drawings/Draft Plan, at the time of sidewalk and/or curb installation. The Owner further covenants and agrees to provide notice to prospective purchasers of the locations of Lockbox Assemblies and that home/business mail delivery will be provided via Lockbox Assemblies or Mailroom. (2) The Owner shall satisfy the following requirements of Canada Post Corporation and the Municipality with respect to the provision of mail delivery Page 124 P age | 10 to the Subdivision Lands and the provision of community mailbox locations, as follows: (a) The Owner shall advise Canada Post as to the excavation date for the first foundation/first phase as well as the date development work is scheduled to begin. (b) If applicable, the Owner shall ensure that any street facing installs have a pressed curb or curb cut. (c) The Owner shall advise Canada Post as to the expected first occupancy date and ensure the site is accessible to Canada Post 24 hours a day. (d) The Owner will consult with Canada Post and the Municipality to determine suitable permanent locations for the Community Mail Boxes. The Owner will then indicate these locations on the appropriate servicing plans. (e) The Owner agrees, prior to offering any units for sale, to display a map on the wall of the sales office in a place readily accessible to potential homeowners that indicates the location of all Community Mail Boxes within the development, as approved by Canada Post. (f) The Owner will provide a suitable and safe temporary site for a Community Mail Boxes upon approval of the Municipality (that is levelled with appropriately sized patio stones and free of tripping hazards), until curbs, sidewalks and final grading are completed at the permanent locations. Canada Post will provide mail delivery to new residents as soon as the homes or units are occupied. (g) Owner agrees to provide the following for each Community Mail Boxes and to include these requirements on the appropriate servicing plans (if applicable): i) Any required walkway across the boulevard, per municipal standards; and ii) Any required curb depressions for wheelchair access, with an opening of at least two meters (consult Canada Post for detailed specifications). 6.4 Utilities (1) The Owner shall coordinate the preparation of an overall utility distribution plan that allows for the safe installation of all utilities including the separation between utilities to the satisfaction of the Director of Public Works. (2) All utilities will be installed within the proposed road allowances. Where this is not possible, easements will be provided at no cost to the utility provider. Proposed easements are not permitted on lands owned by the Municipality unless it can be demonstrated that there is no other alternative. Such Page 125 P age | 11 easements must not impede the long term use of the lands and will be at the discretion of the Director of Public Works. (3) The Owner shall cause all utilities, including hydro, telephone, and cable television within the streets of this development to be installed underground for both primary and secondary services. Part 7 – Standard Notices and Warnings 7.1 The Owner shall include a clause in Agreements of Purchase and Sale for all Lots informing the purchaser of all applicable development charges in accordance with subsection 58(4) of the Development Charges Act, 1997, S.O. 1997, C.27. 7.2 The Owner shall include the notices and warnings clauses set out in Schedule 3 of the Municipality’s standard subdivision agreement in Agreements of Purchase and Sale for all Lots or Blocks. 7.3 The Owner shall include the following notices and warning clauses in Agreements of Purchase and Sale for the Lots or Blocks to which they apply: 7.4 Noise Report (1) The Owner shall include the following notice in the Agreements of Purchase and Sale for Blocks 51 to 58: “Purchasers are advised that sound levels due to increasing road traffic may interfere with some activities of the dwelling occupants as the sound levels will exceed the Ministry of Environment Conservation and Parks noise criteria.” (2) The Owner shall include the following notice in the Agreements of Purchase and Sale for Lots 51-54, 57, and 58: “This dwelling unit was ducting to accommodate a central air conditioning unit. The installation of central air conditioning by the homeowner will allow windows and exterior doors to be kept closed, thereby achieving indoor sound levels within the limits recommended by the Ministry of the Environment Conservation and Parks (Note: The location and installation of the outdoor air conditioning device should be done so as to comply with noise criteria of Ministry of the Environment, Conservation and Parks publication NPC-300.” (3) The Owner shall include the following notice in the Agreements of Purchase and Sale for Lots Blocks 51-54, 57, and 58: “Despite the inclusion of noise control features in the design of the subdivision and individual units, noise levels from road traffic may be of concern and may occasionally interfere with some activities of the Page 126 P age | 12 dwelling occupants as the noise exposure level may exceed the noise criteria of the Ministry of the Environment, Conservation and Parks.” 7.5 Farm Operations The Owner shall include the following warning clause in agreements of purchase and sale for All Lots “Farm Operations –There are existing farming operations nearby and that such farming activities may give rise to noise, odours, truck traffic and outdoor lighting resulting from normal farming practices which may occasionally interfere with some activities of the occupants.” 7.6 Chain Link Fencing The Owner shall include the following notice in the agreements of purchase and sale for Block 51 (westerly unit): “Chain Link Fencing – Chain link fencing is a required feature between this lot and the adjacent open space. This fencing must be located on the public portion of the abutting land and will be maintained by the Municipality after the developer has been released from any further responsibility for the fence.” 7.7 Environmentally Protected Lands The Owner shall include the following notice in the agreements of purchase and sale for Block 51 (westerly unit): “Environmentally Protected Lands - Purchasers may not dump any material, debris or grass clippings on these lands. Purchasers shall not drain swimming pool water or spa water directly into these areas. Water should be directed to the road, where it enters the storm sewer system, and is treated by stormwater management controls” 7.8 Noise Attenuation Fencing The Owner shall include the following notice in the agreements of purchase and sale for Blocks 54 and 57 end units abutting Carl Raby Street: “Noise Attenuation Fencing - Noise attenuation fencing is a required feature for this lot to assist in reducing the noise levels to comply with Ministry of the Environment Conservation and Parks standards. This fencing must be located on the private property portion of the lot and must be designed and constructed in compliance with the recommendations of the noise attenuation report. The maintenance of this fencing is the responsibility of the owner of the lot after the developer has been released from any further responsibility for the fence.” Page 127 P age | 13 7.9 Schools The Owner shall include the following notice in the agreements of purchase and sale for all lots: “School buses” - -Purchasers are advised that school bus pick up points will generally be located on a through street at a convenient location to the Student Transportation Services of Central Ontario. “New Schools - Purchasers are advised that attendance at the public school on designated sites within the community are not guaranteed. Attendance at schools in the area yet to be constructed is also not guaranteed. Pupils may be accommodated in temporary facilities and/or be directed to schools outside the area in accordance with continued development and accommodation pressures” 7.10 Canada Post Corporation The Owner shall include the following notice in the agreements of purchase and sale for all lots: “Mail Service - Purchasers are advised that Canada Post intends to service this property through the use of community mailboxes that may be located in several locations within this subdivision.” Part 8 - Clearance 8.1 Prior to final approval of the plan for registration, the Municipality’s Director of Planning Services shall be advised in writing by, (a) Durham Region how Conditions 2.2, 4.1 (2), 6.1 (1) to (7), 7.4, 7.8 have been satisfied; (b) Central Lake Ontario Conservation Authority, how Conditions 4.1 (3), 6.2 (1) to (10) have been satisfied; (c) Canada Post, how Conditions 6.3 (1) and (2), 7.10 have been satisfied; Part 9 – Notes to Draft Approval 9.1 Terms used in these conditions that are not otherwise defined have the meanings given to them in the Municipality’s standard subdivision agreement. 9.2 As the Owner of the proposed subdivision, it is your responsibility to satisfy all conditions of draft approval in an expeditious manner. The conditions of draft approval will be reviewed periodically and may be amended at any time prior to final approval. The Planning Act provides that draft approval, may be withdrawn at any time prior to final approval. 9.3 If final approval is not given to this plan within three (3) years of the draft approval date, and no extensions have been granted, draft approval shall lapse and the file shall be closed. Extensions may be granted provided valid reason is given and is Page 128 P age | 14 submitted to the Director of Planning Services for the Municipality of Clarington well in advance of the lapsing date. 9.4 Where an agency requirement is required to be included in the Municipal subdivision agreement, a copy of the agreement should be sent to the agency in order to facilitate their clearance of conditions for final approval of this plan. The addresses and telephone numbers of these agencies are: (a) Durham Regional Planning Department, 605 Rossland Road East, P.O. Box 623, Whitby, Ontario L1N 6A3 (905) 668-7721. (b) Central Lake Ontario Conservation Authority, 100 Whiting Avenue, Oshawa, Ontario LIH 3T3 (905) 579-0411. (c) Canada Post, Metro Toronto Region, 1860 Midland Ave. 2nd Floor Scarborough ON, M1P 5A1 (d) Kawartha Pine Ridge District School Board, 1994 Fisher Drive, Peterborough, Ontario K9J 6X6 (705) 742-9773. Page 129 7.07.07.37.07.0 7.379.59.511.611.6FF 157m0.3m RESERVE Kilpatrick CourtF F 397m 14.120297.3 386.93099.4 F F 121m0.3m RESERVE 0.3m RESERVE 0.3m RESERVE0.3m RESERVE7.115.66.7 7.2 72m 20.0 20.0 15.018.015.030.030.030.019.120.521.727.110.123.722.618.218.0 18.018.00.3m RESERVE 39.630.030.0102.519.0 151m 125m18.0 15.015.018.016.820.313.79.424.8 30.07.17.1F F F 20mR81R8137.4 28.5 7. 1 14.511.611.611.611.611.612.812.813.732.0 32.0 32.0 32.0 G G G F F F F F FF 32.0 32.0 32.0 32.0 32.0 1 2 3 32.0 32.0 32.0 32.0 32.014.611.6 11.6 11.6 11.611.6 12.8 12.8 13.814.611.6 11.611.611.6 11.6 12.8 12.8 14.111.6 11.6 11.6 11.6 11.612.812.814.335.2 34.8 35.4 34.5 35.5 34.3 33.1 32.2 32.214.6F F G G G G G GG G G F F F F F F 41.3 39.6 39.6 44.530.030.030.07.118.015.7 35.5 117.789.4 14. 1 7.1 26.032.0 30.925.87.127.027.07.1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50112m 32.0 32.0 32.0 31.642.568.1 38.7107.611.611.6 11.611.611.611.611.611.611.611.611.611.6F F F F F F F F F F F F F F PVACANT EXISTING RESIDENTIAL APPROVED RESIDENTIALP H A S E 3VACANTBUFFER PROCKNOW STREET (ST. A)CARLRABY ST.MARSDENWAYMURRAYTABB ST.PROCKNOWSTREETG R E E NR O A DCARL RABY STREET (ST. B)MARSDEN WAY (ST. C)LONGWORTH AVENUE ROSS WRIGHT AVENUEBLOCK 62 - ENVIRONMENTAL PROTECTION BUFFER BLOCK - 0.302 haBLOCK 56 6.1m OSTH 0.119 ha 6u BLOCK 55 6.1m OSTH 0.121 ha 5u MURRAY TABB STREET (ST. D) BLOCK 51 6.1m OSTH 0.124 ha 6u BLOCK 61 - ENVIRONMENTAL PROTECTION BLOCK -- 0.140 haBLOCK 57 7.0m OSTH 0.098 ha 4u BLOCK 58 7.0m OSTH 0.098 ha 4u BLOCK 52 6.1m OSTH 0.119 ha 6u BLOCK 53 6.1m OSTH 0.119 ha 6u BLOCK 54 6.1m OSTH 0.142 ha 6u BLOCK 59 RESIDENTIAL TOWNHOUSE AND APARTMENT BLOCK 1.165 ha BLOCK 60 RESIDENTIAL SINGLE DETACHED AND TOWNHOUSE BLOCK 0.398 ha 99.6 and submit a draft plan of subdivision for approval. being the registered owner(s) of the subject lands hereby authorize to prepare subdivided as shown on this plan, and their relationship to K. the adjacent land are accurately and correctly shown. I hereby certify that the boundaries of the land to be OWNER'S AUTHORIZATION SURVEYOR'S CERTIFICATE I/we, Additional land owned by the applicant or in which the applicant Sanitary & storm sewers to be provided. Clay loam soil. Piped water to be provided. has an interest in the vicinity is as shown on the key plan. D. H. I. C. ADDITIONAL INFORMATION REQUIRED UNDER SECTION 51(17) OF THE PLANNING ACT Additional Land Owned LEGEND Boundary of Subdivision KEY PLAN Subject Property WEST DIAMOND PROPERTIES INC. PLAYERS BUSINESS PARK LTD. ASPEN SPRINGS CORNERS CLARINGTON N.T.S. BOUSFIELDs INC. SEE ORIGINAL SUBMISSION SEE ORIGINAL SUBMISSION Residential Singles, OSTH, Residential Townhouse and Apartment Block, Residential Single Detached and Townhouse Block, Environmental Lands & Roads. Additional LandsOwned A, B, E, F, G, J, L - As Shown on Plan 1 : 750 January 11, 2022 0147-1a - 105dp Toronto, Ontario M5E 1M2 P (416) 947-9744 F (416) 947-0781 3 Church Street, Suite 200 BOUSFIELDs INC. REVISED DRAFT PLAN OF PROPOSED SUBDIVISION PART OF LOT 17, CONCESSION 2 (GEOGRAPHIC TOWNSHIP OF DARLINGTON) NOW IN THE MUNICIPALITY OF CLARINGTON REGIONAL MUNICIPALITY OF DURHAM Rev. S-C-2020-001 All area measurements are computer generated. All existing buildings to be demolished. All dimensions are in metres. All elevations refer to Geodetic Datum. NOTES "UUBDINFOUUP3FQPSU1%4 Page 130 Attachment 3 to Report PDS-004-22 C:\Program Files\eSCRIBE\TEMP\16473565903\16473565903,,,Attachment 3 - Draft Zoning By-law.docx If this information is required in an alternate format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131 The Corporation of the Municipality of Clarington By-law Number 2022-XX being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for the Corporation of the Municipality of Clarington Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for ZBA-2022-XX Now Therefore the Council of the Municipality of Clarington enacts as follows: 1. Section 15.4. “Special Exceptions – Urban Residential Type Four (R4) Zone” is amended by introducing a new Subsection 15.4.47 as follows: “Section 15.4.47 “Special Exceptions – Urban Residential Type Four (R4-47) Zone” Notwithstanding Sections 15.2 a., and h., those lands zoned R4-47 shown on the Schedule to this By-law, shall be subject to the following zone regulations: a. Density (maximum) 100 units per hectare b. Outdoor amenity space (minimum) 4.0 square metres per dwelling unit 2. Section 14.6. “Special Exceptions – Urban Residential Type Three (R3) Zone” is amended by introducing a new Subsection 14.6.65 as follows: “Section 14.6.65 “Special Exceptions – Urban Residential Type Three (R3-65) Zone” Notwithstanding Sections 14.4 those lands zoned R3-65 shown on the Schedule to this By-law, shall be subject to the following zone regulations: a. Density (maximum) 40 units per ha b. Lot Frontage (minimum) 7.0 metres c. Yard Requirements (minimum) i) Front Yard 6.0 metres to private garage or carport; Page 131 3.0 metres to a dwelling; and 1.2 metres to unenclosed porch ii) Interior Side Yard 1.2 metres, nil where building has a common wall with any building iii) Exterior Side Yard 3.0 metres iv) Rear Yard 7.5 metres d. Dwelling Unit Area (minimum) 85 square metres e. Lot Coverage (maximum) 45 percent for townhouse dwelling 55 percent for total of all buildings and structures A covered and unenclosed porch/balcony having no habitable floor space above it, shall be permitted subject to the following: a) In the case of an interior lot, an unenclosed porch/balcony up to a maximum area of 10.0 square metres shall be permitted provided it is in the front yard of the lot and shall not be calculated as lot coverage. b) In the case of an exterior lot, an unenclosed porch/balcony up to a maximum area of 15.0 square metres shall be permitted provided it is located in the front and/or exterior side yard of the lot and shall not be calculated as lot coverage f. Landscaped Open Space (minimum)30 percent g. Building Height (maximum) 12.5 metres h. Height of floor deck of unenclosed porch above finished grade (maximum) 1.0 metre 3. Schedule ‘3’ to By-law 84-63, as amended, is hereby further amended by changing the zone designation from: "Agricultural (A) Zone" to "Environmental Protection (EP) Zone" "Agricultural (A) Zone" to " Holding – Urban Residential Exception ((H)(R1-79) Zone” "Agricultural (A) Zone" to " Holding – Urban Residential Exception ((H)(R3-37) Zone” "Agricultural (A) Zone" to " Holding – Urban Residential Exception ((H)(R3-39) Zone” "Agricultural (A) Zone" to “Holding – Urban Residential Exception ((H)(R3-65) Zone” "Agricultural (A) Zone" to “Holding – Urban Residential Exception ((H)(R4-47) Zone” as illustrated on the attached Schedule ‘A’ hereto. 4. Schedule ‘A’ attached hereto shall form part of this By-law. Page 132 5. This By-law shall come into effect on the date of the passing hereof, subject to the provisions of Section 34 and Section 36 of the Planning Act. Passed in Open Council this _____ day of January 2022 __________________________ Adrian Foster, Mayor __________________________ June Gallagher, Municipal Clerk Page 133 Page 134