HomeMy WebLinkAboutIAS-004-21Clarftwn Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Audit and Accountability Committee Date of Meeting: November 30, 2021 Report Number: IAS-004-21 Submitted By: Trevor Pinn, Director of Financial Services/Treasurer Reviewed By: Andrew C. Allison, CAO Resolution#: File Number: [If applicable, enter File Number] By-law Number: Report Subject: Financial Update as at September 30, 2021 Recommendation: 1. That Report IAS-004-21 and any related communication items, be received for information. Municipality of Clarington Report IAS-004-21 Report Overview Page 2 The COVID-19 pandemic has had a lasting impact on the Municipality of Clarington. It has changed the way in which we provide services (a strong movement towards online services), work, and live. The Municipality's most significant financial impact has been the reduction of services in Community Services. This continued to affect revenues in the first two quarters of 2021 as the second (December to February) and third lock -downs (April to July) impacted our ability to provide services and have facilities opened. The attached report provides information on the variances by service area with anecdotal commentary where appropriate. 1. Background 1.1 The Budget Policy outlines a requirement for the Treasurer to report to Council on a quarterly basis each year starting with the second quarter. This report fulfills that requirement. 1.2 To improve the usefulness of the information, and consistency of format with the annual budget, the quarterly report is attached to this report as Attachment 1. Each department is broken down by sub -department with the expenses grouped together like the requirements for financial reporting and the annual budget. 1.3 Where there are key variances, these have been identified and are expanded upon for Committee's, and the public's, information. 1.4 This report is solely for operating expenses. Finance will be reporting separately on the capital budget. The capital budget will be reported on semi-annually, once in the fall which captures the "construction season" to September 30, and once in the spring which summarizes the prior year's activities. 2. Impact of COVID-19 2.1 Where appropriate, the impact of COVID-19 has been identified and discussed in Attachment 1. 2.2 Overall, the greatest impact from COVID-19 continues to be felt by the Community Services Department. While we had budgeted for reduced revenues in 2021 compared to 2020, the third and fourth waves along with the roadmap to recovery have reduced the Municipality's ability to run programs and facilities as we had hoped in the 2021 budget. Municipality of Clarington Page 3 Report IAS-004-21 2.3 The Municipality took steps to provide financial support to taxpayers through flexible payment arrangements for taxes, deferral programs and financial support to businesses (CIP). There does not appear to be a significant impairment in our tax receivable and we have not received requests for assistance outside of the normal levels of request. 2.4 The Municipality has been diligent in applying for, and has been successful, grants offered by various organizations for both capital and operating funds. Staff continue to seek out and apply for grant opportunities for the benefit of our community and its residents. 3. Concurrence Not Applicable. 4. Conclusion It is respectfully recommended that the report be received for information Staff Contact: Alexandra Baker, Financial Analyst, 905-623-3379 ext. 2623, abaker@clarington.net Attachments: Attachment 1 — Financial Update for the Period Ending September 30, 2021 Interested Parties: There are no interested parties to be notified of Council's decision. Clarftwn Staff Report f this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Date of Meeting: Submitted By: Reviewed By: Audit and Accountability Committee Report Number: FSD-037-21 Trevor Pinn, Director of Financial Services Andrew C. Allison, CAO By-law Number: File Number: [If applicable, enter File Number] Resolution#: Report Subject: Capital Budget Update as at September 30th, 2021 Recommendation: 1. That Report FSD-037-21 be received for information. Municipality of Clarington Report FSD-037-21 Report Overview To provide an update of capital projects as of the October 30th, 2021. 1. Background 1.1 The Municipality of Clarington is responsible for the repair, rehabilitation, and replacement of over $778 million dollars' worth of tangible capital assets. Page 2 1.2 The Municipality's capital investment from the approved 2021 budget was approximately $24.9 million which includes $8 million directly from the tax levy, $4.8 million from development charge reserve funds, $11.3 million from reserve funds (Federal Gas Tax and Ontario Community Infrastructure Funding) and reserves The 2021 capital budget is predominantly infrastructure based with over $14.8 million being invested in bridges, roads, sidewalks, stormwater management and traffic signals. 2. Summary of Capital Projects Summary of YTD 2021 Activity 2.1 The 2021 budget added 82 new capital projects which includes 25 that are annually funded and reoccurring projects. 2.2 The following table is a high-level summary of the status of capital projects. The attachment to this report provides more detail per asset category. Buildings $ Environmental Fleet Administrative Parking Parks 11,483,966 $ 3,187,805 4,352,355 6,549,627 547,417 10,419,493 3,538,540 $ 7,945,426 760,883 2,426,922 3,375,164 977,191 3,589,347 2,960,280 267,379 280,039 4,925,594 5,493,900 Roads 50,889,474 30,365,174 20,524,300 Roadside 8,390,828 6,278,408 2,112,420 $ 95,820,965 $ 53,100,488 $ 42,720,477 Municipality of Clarington Report FSD-037-21 Cancelled or Completed Projects in 2021 Page 3 2.3 There were 173 capital projects active at the beginning of 2021 spanning all asset categories and departments. Within the year, 12 of those projects were either completed and added to our Tangible Capital Asset database or were cancelled. 2.4 This table highlights the project(s) that were cancelled during the year with applicablereasoning for the decision. No activity for 3 year; Parks — Tooley Miles Signage 2018 Closed as per Budge Policy 2.5 The following table outlines those projects that are at risk of being closed in 2022 as per the Budget Policy which states; `Any funds budgeted for a capital project that are unexpended at the beginning of the third year following the year in which the project received approval, shall be automatically returned to the appropriate reserve fund. The only exception is if there exists an approved commitment for further expenditures in relation to the capital project in the form of a signed purchase order, contract, or other legal agreement the provisions of which contemplate further mandatory or discretionary expenditures' Budget Roads — Hancock Rd Box Culvert 2019 $ 90,000 Roads — Trulls Rd (S of Yorkville Dr to Bloor St) 2019 $ 20,000 Roads — Wilmot Creek Whistle Cessation 2019 $ 150,000 Roads- Capital Works Fill Management 2019 $ 10,000 Roads — Queen St Extension 2019 $ 20,000 Roads — Trulls Rd — Rural Upgrade 2019 $ 15,000 Roads — Prestonvale Rd 2019 $ 15,000 Roads — Lambs Rd 2019 $ 20,000 Municipality of Clarington Page 4 Report FSD-037-21 2.6 The following table represents the completed projects accomplished so far in 2021. Budget Year Legislative Services - Replace Heat Seal/Binding Machine 2021 Required Add'I Funds to complete Streetlights - RR57 (Conc Rd 3 to Urban Limit) 2018 Unexpended funds of $2,055 Intersection Improvements - Longworth Ave @ Green Rd 2017 Unexpended funds of $59,883 Mill St - Active Transportation Improvements 2016 Unexpended funds of $8,824 Sidewalk - Paving of existing limestone trail (Waverly Rd to West Beach) 2018 Unexpended funds of $109,677 Sidewalk - RR57 (Conc Rd 3 to Urban Limit) 2018 Unexpended funds of $25,167 Parks - Baxter Park - Rubberized Surface Replacement 2021 Unexpended funds of $6,756 Bldg. & Property Mtnc - Newcastle Community Hall 2019 Required Add'I Funds to complete Bldg. & Property Mtnc - Orono Town Hall - Accessibility Upgrades 2019 Installed an elevator Bldg. & Property Mtnc - Library Refurbishment 2018 Bowmanville branch improvements SCA - Replace Ice Resurfacer 2021 Unexpended funds of $1,560 Municipality of Clarington Page 5 Report FSD-037-21 Annually Funded Capital Projects 2.7 The annual capital budget consistently includes 25 projects that receive funding for a broader scope of various projects. 2.8 The following table lists all the annually funded projects with both the 2021 budget allotment and the unexpended capital funds (UECF) as at 10/31/2021. Computer - Hardware $ 545,413 $ 211,594 $ 333,819 Computer - Software $ 2,222,295 $ 1,667,581 $ 554,714 Bunker Gear/HazMat Suits/Boots $ 188,415 $ 130,652 $ 57,763 SCBA Equipment $ 49,190 $ 36,786 $ 12,404 EMS - Equipment $ 90,000 $ 75,047 $ 14,953 St. Light installation - Various $ 238,649 $ 26,343 $ 212,306 Parks -Park Furniture/Equipment $ 227,168 $ 169,672 $ 57,496 Parking Lot Rehabilitation - Various Locations $ 457,010 $ 182,104 $ 274,906 Pavement rehabilitation program $ 4,435,089 $ 3,610,442 $ 824,647 Roads - Structures Rehab - Bridge Improvements $ 6,146,010 $ 5,408,544 $ 737,467 Roads - Roadside Protection Program $ 277,269 $ - $ 277,269 Roads - Retaining Walls - various $ 527,500 $ 39,013 $ 488,487 Roads - Rural Road resurfacing $ 4,124,203 $ 2,997,023 $ 1,127,180 Sidewalk Replacement $ 302,136 $ (14,014) $ 316,149 Erosion Control -Various Protection Works $ 762,281 $ 720,581 $ 41,700 SWM - Stormwater Pond Cleanout $ 525,523 $ 40,302 $ 485,222 Fleet -Replacement of Fleet - Roads $ 1,504,609 $ 1,472,709 $ 31,899 Fleet -New Fleet - Roads $ 655,066 $ 594,943 $ 60,123 Fleet -Fleet Replacement - Parks $ 490,000 $ 408,356 $ 81,644 ADMIN - Annual Building Studies $ 152,878 $ 102,526 $ 50,352 Bldgs. & Property - Roof Replacements $ 267,921 $ 17,551 $ 250,370 CCC - Bldg Expense $ 715,100 $ 37,496 $ 677,604 CCC - Equipment $ 77,365 $ 65,501 $ 11,864 RRC - Bldg Expense $ 376,352 $ 76,641 $ 299,711 Land Acquisition $ 3,429,315 $ 1,462,611 $ 1,966,704 Municipality of Clarington Page 6 Report FSD-037-21 2.9 Additional notes of the annually funded projects are as follows: a) Parking Lot — no activity pertaining to 2021 budget allotment for Bowmanville boat launch parking lot ($215,000) b) Roads — Roadside Protection — no activity pertaining to the 2021 budget allotment ($ 150,000) c) CCC — Bldg Expense — the 2020 Budget approved $561,000 for roof replacement that is still in design phase. Municipality of Clarington Page 7 Report FSD-037-21 Additional Funding Required 2.10 During 2021, seven capital projects required additional funding. The additional funding could be a scope of work change or in most cases the actual costs are higher than anticipated when developing the initial budget. 2.11 The following table outlines the applicable projects and the funding source for the additional funding requirements. Bowmanville Ave DC Roads and Streetlighting (Hwy#2 to $ 148,000 related 150m N of Stevens Rd) Legislative Services - $ 75 Municipal Capital Heat/Seal Machine Works RF Legislative Services - Replace Animal Services Van $ 22,443 Animal Services RF Municipal Capital Rhonda Park $ 14,500 Works RF & DC Park Dev Municipal Capital Fleet - Roads $ 7,088 Works RF & DC Ops Newcastle Community Hall $ 7,075 Municipal Capital Works RF Glanabbey Parkette Municipal Capital Upgrades $ 25,777 Works RF Total Additional Funds $ 224,959 Memo to Council - Sept.20.21 This is a cost sharing agreement with the Region. Additional funds required to complete purchase of machine Report FND-043-20 was approved for additional funding Additional funds required in order to award contract Additional funds required in order to purchase mini excavator Additional funds required in order to complete envelope repairs Additional funds required to complete playground installation - used the excess funds from the Westside Park. Municipality of Clarington Page 8 Report FSD-037-21 3. Concurrence Not Applicable. 4. Conclusion It is respectfully recommended that the 2020 Year End Capital Update be received for information. Staff Contact: Erika Watson, Asset Management and Development Financing Manager, 905- 623-3379 ext. 2607, ewatson@clarington.net Attachments: Attachment 1 — Capital Projects 2021 and prior Interested Parties: There are no interested parties to be notified of Council's decision. Attachment 1: 2021 Year End Capital Update Includes details per asset category • Buildings • Environmental • Fleet • Parking • Parks and Related • Roads and Bridges • Roadside Municipality of Clarington - 2021 Mid Year Capital UpdateAsset Category: Buildings and Related As of 1013112021 Mun Admin Centre 2017 1,347,018 $ 1,347,018 932,612 21,493 106,893 $ 1,060,998 Newcastle Community Hall - 2018 280,000 $ 280,000 108,420 178,655 $ 287,075 2019 Library Refurbishment 2018 1,479,542 $ 1,479,542 692,709 1,653 $ 694,362 Bowmanville Museum (Silver St) 2018 121,500 $ 121,500 14,495 81,987 19,256 $ 115,737 Haydon Community Hall - 2019 12,500 $ 12,500 2,407 $ 2,407 addition for storage Orono Town Hall - Accessibility 2019 497,007 $ 497,007 369,256 120,117 $ 489,373 Upgrades Visual Arts Centre 2020 25,000 $ 25,000 Operations Depot Improvements 2020 65,000 $ 65,000 10,990 5,495 $ 16,485 Safety Bollards/Planters 2020 9,000 $ 9,000 SBC - South Bowmanville Centre 2020 4,200,000 $ 4,200,000 Inclusive Charging Stations 2021 52,884 $ 52,884 32,462 10,976 $ 43,438 SCA - Replace Ice Resurfacer 2021 95,000 $ 95,000 93,440 $ 93,440 Accessibility Improvements - 2021 245,000 $ 245,000 0 30,324 $ 30,324 Orono Library Building Improvements -Various 2021 353,150 $ 353,150 200,267 41,685 $ 241,952 Interior Improvements- Various 2021 614,050 297,375 $ 911,425 110,015 15,781 $ 125,795 DSC - Equipment 2021 21,000 $ 21,000 14,674 4,975 $ 19,649 DHRC - Equipment 2021 11,700 $ 11,700 4,053 $ 4,053 DHRC - Bldg. Expense 2021 47,000 $ 47,000 0 $ - ASC - Equipment 2021 24,600 (6,600) $ 18,000 11,112 $ 11,112 RRC - Roof Replacement 2021 100,000 $ 100,000 0 $ - ADMIN - Annual Building Studies Annually 98,878 54,000 $ 152,878 28,155 74,371 $ 102,526 Roof Replacements Annually 157,461 110,460 $ 267,921 6,106 11,445 $ 17,551 CCC - Bldg. Expense Annually 655,100 60,000 $ 715,100 13,050 24,446 $ 37,496 CCC - Equipment Annually 65,665 11,700 $ 77,365 33,358 32,143 $ 65,501 RRC - Bldg. Expense Annually 179,652 196,700 $ 376,352 76,641 $ 76,641 $ 9,193,322 $ 1,944,360 $ 343,659 $ 11,481,341 $ 2,130,889 $ 1,027,236 $ 377,790 $ 3,535,915 Municipality of Clarington — 2021 Mid -Year Capital Update Asset Category: Environmental and Related As of 1013112021 Erosion Control - Brookhill Tributary Nick 2020 250,000 Point Remedial Works SWM - Swm Pond Technology Park 2020 1,600,000 SWM - Orono Creek Blockage Cleanout 2021 $ 250,000 $ 1,600,000 50,000 $ 50,000 Erosion Control -Various Erosion Protection Annually 562,281 200,000 $ 762,281 495,939 224,642 $ 720,581 Works SWM - Clarington Stormwater Pond Annually 400,523 125,000 $ 525,523 37,566 2,735 $ 40,302 Cleanout $ 2,812,805 $ 375,000 $ 3,187,805 $ 533,505 $ 227,377 $ 760,883 Municipality of Clarington — 2021 Mid -Year Capital Update Asset Category: Fleet As of 1013112021 Fleet Replacement - Animal Services 2020 57,443 $ 57,443 49,793 $ 49,793 Fleet Replacement - MLE Truck 2021 50,000 $ 50,000 - $ - EMS - Vehicle Replacement 2021 17,988 895,000 $ 912,988 849,363 $ 849,363 Fleet - New fleet for Building Inspectors 2021 390,000 $ 390,000 - $ - Fleet -Replacement of Fleet - Roads Annually 664,609 840,000 $ 1,504,609 150,153 1,322,556 $ 1,472,709 Fleet -New Fleet - Roads Annually 535,066 120,000 $ 655,066 594,943 $ 594,943 Fleet -Fleet Replacement - Parks Annually 180,000 310,000 $ 490,000 143,333 265,023 $ 408,356 $ 1,455,106 $ 2,605,000 $ 4,060,106 $ - $ 938,222 $ 2,436,942 $ 3,375,164 Municipality of Clarington -2021 Mid -Year Capital Update Asset Category: General Administrative Related As of 1013112021 Educational Tools - 2020 (Inflatable 2020 $ 20,000 0 $ - Safety House) 20,000 Admin. - Replace Heat/Seal/Binding 2021 5,000 $ 5,000 5,075 $ 5,075 Machine Computer - Hardware Annually 344,013 201,400 $ 545,413 179,263 32,331 $ 211,594 Computer - Software Annually 1,626,915 595,380 $ 2,222,295 259,998 1,407,583 $ 1,667,581 Bunker Gear/HazMat Suits/Boots Annually 84,915 103,500 $ 188,415 77,350 53,302 $ 130,652 SCBA Equipment - upgrade Annually 9,190 40,000 $ 49,190 36,786 $ 36,786 EMS - Equipment Annually 18,000 72,000 $ 90,000 46,152 28,895 $ 75,047 Land Acquisition Annually 2,718,582 710,733 $ 3,429,315 1,462,611 $ 1,462,611 $ 4,821,614 $ 1,728,013 $ 6,549,627 $ - $ 2,067,235 $ 1,522,112 $ 3,589,347 '•� Municipality of Clarington — 2021 Mid -Year Capital Update Asset Category: Parking and Related As of 1013112021 EV Charging Station(s) Parkinq Lot Rehabilitation Municipality of Clarington - 2021 Mid -Year Capital UpdateAsset Category: Parks and Related As of 1013112021 Bowmanville Valley Creek Bridge 2017 1,044,003 $ 1,044,003 228,209 720,665 95,128 $ 1,044,003 Farewell Creek Park trail - Phase 1, Phase 2 2017 2,075,748 $ 2,075,748 659,880 355,664 841,687 $ 1,857,231 Bowmanville Cemetery Expansion 2017 1,360,000 50,000 $ 1,410,000 13,605 33,555 71,001 $ 118,161 Toyota Trail 2019 870,600 $ 870,600 47,686 11,368 811,546 $ 870,600 Newcastle Community Park - Phase 1 (2019) 2019 1,575,000 $ 1,575,000 31,151 106,691 248,210 $ 386,052 Parks -Various Park Upgrades 2019 180,968 $ 180,968 129,612 875 $ 130,487 Rhonda Park 2020 54,500 $ 54,500 38,819 15,681 $ 54,500 Wilmot Creek Conservation Viewing Dock 2021 31,500 $ 31,500 $ - Soper Creek Baseball Diamond Upgrades 2021 384,400 $ 384,400 $ - North Bowmanville Dog Park 2021 230,000 $ 230,000 $ - Penfound Park Upgrades 2021 92,000 $ 92,000 57,425 $ 57,425 Orono Gazebo Refurbishment 2021 23,000 $ 23,000 $ - Newtonville Estates Parkette 2021 250,000 $ 250,000 $ - Westside Park Upgrades 2021 103,000 (25,777) $ 77,223 66,636 $ 66,636 Northglen East neighbourhood Park (Middle 2021 $ 650,000 $ - Rd)Northglen 650,000 Phase 8 - Parkette 2021 250,000 $ 250,000 6,425 8,381 $ 14,806 Baxter Park - Rubberized Surface 2021 $ 22,000 $ 15,244 Replacement 22,000 15,244 Tennis Court Upgrades (Stuart & Guildwood) 2021 300,000 $ 300,000 $ - Upgrades to Glenabbey Parkette 2021 100,000 25,777 $ 125,777 125,777 $ 125,777 Stuart Park - Pickleball Courts 2021 200,000 $ 200,000 $ - Courtice Secondary School Courts 2021 50,000 $ 50,000 $ - Misc. Outdoor Recreation 2021 125,000 $ 125,000 15,000 $ 15,000 Park Furniture/Equipment Annually 97,168 130,000 $ 227,168 57,427 112,245 $ 169,672 Newcastle Lions Trail (ICIP funding) Non- Budget 144,829 $ 144,829 - $ - $ 7,257,987 $ 2,990,900 $ 144,829 $10,393,716 $ 1,110,143 $ 1,346,733 $ 2,468,718 $ 4,925,594 Municipality of Clarington - 2021 Mid -Year Capital Update Asset Category: Roads and Bridges As of 1013112021 Orchard View Blvd. 2012 31,779 $ 31,779 31,779 - $ 31,779 Grady Dr Environmental Assessment 2013 231,500 $ 231,500 151,497 28,531 49,735 $ 229,763 Concession Rd 3 2013 2,265,455 $ 2,265,455 2,148,927 2,986 103,023 $ 2,254,936 Brookhill Rd Oversizing 2014 310,000 $ 310,000 - 398 $ 398 Scugog St/Middle Rd (Bons Ave to Conc Rd 3) 2015 1,201,000 $ 1,201,000 939,186 - 176,331 $ 1,115,518 Green Rd (Harvey Jones to Ross Wright) 2015 145,870 450,000 $ 595,870 60,870 - $ 60,870 Longworth Ave. Extension EA (Green Rd to Holt 2016 281,000 $ 281,000 245,660 $ 280,959 Rd) 10,970 24,329 Mill St - Active Transportation 2016 759,324 $ 759,324 750,501 - $ 750,501 Middle Rd 2016 2,577,401 $ 2,577,401 2,262,860 - 186,060 $ 2,448,920 North Scugog Crt Reconst. - 2011 2016 722,927 $ 722,927 722,927 (67,178) $ 655,749 Port Darlington Subdivision 2016 1,453,757 $ 1,453,757 1,312,830 - 125,792 $ 1,438,622 Lambs Rd Interchange 2016 330,000 $ 330,000 16,679 - 239,716 $ 256,395 Lambs Lane 2016 926,875 $ 926,875 760,996 - $ 760,996 Church St 2017 393,451 $ 393,451 346,709 - 9,238 $ 355,946 Prospect St & Lambs Lane - 2014 area design 2017 1,335,912 $ 1,335,912 1,181,213 (2,551) 81,464 $ 1,260,127 Baseline Rd. (Lambs to Bennett) 2017 2,505,000 193,000 $ 2,698,000 1,823,983 (24,190) 343,160 $ 2,142,953 George Reynolds Dr. Connecting Link - 2017 & 2017 2,490,417 $ 2,490,417 115,199 $ 165,756 2019 3,256 47,300 Alexander Blvd and Liberty PI Reconstruction 2017 545,000 $ 545,000 509,540 - 7,800 $ 517,340 King St Cycling Facility 2017 275,000 $ 275,000 19,442 3,775 $ 23,217 Longworth Ave & Green Rd Intersection 2017 59,853 650,000 $ 709,853 - 14,787 $ 14,787 Darlington Blvd (Hwy#2 to South Limit) 2018 100,000 1,472,000 $ 1,572,000 1,007 16,200 $ 17,207 Trulls Rd - Shoulder Improvements (Mitchell's 2018 205,886 $ 205,886 - $ 12,541 Corner) 12,541 Lake Rd Extension - (Bennett Rd to 310m West) 2018 813,996 $ 813,996 34,910 5,945 736,140 $ 776,995 Lambs Rd (Baseline to 275m N of Baseline) 2018 790,000 65,000 $ 855,000 733,244 4,642 56,756 $ 794,642 Lambert St (King to Church) 2018 30,000 $ 30,000 2,211 - 6,632 $ 8,843 Lambs Rd (Hwy #2 to Concession St E) 2018 2,200,000 $ 2,200,000 28,353 30,406 $ 58,759 Municipality of Clarington - 2021 Mid -Year Capital Update Asset Category: Roads and Bridges As of 1013112021 Parkway Ave 2019 285,000 $ 285,000 18,801 266,199 $ 285,000 Nash Rd (Future Clarington Blvd) 2019 30,000 $ 30,000 5,273 - $ 5,273 North St (George St to Grady Dr) 2019 400,000 $ 400,000 40,260 6,302 353,438 $ 400,000 Baseline Rd (Mearns to Lambs Rd) 2019 170,000 $ 170,000 8,638 - $ 8,638 Baseline Rd Structure ( W of Green Rd) 2019 35,000 $ 35,000 6,618 19,480 $ 26,098 Hancock rd Box Culvert 2019 90,000 $ 90,000 - - $ - Trulls Rd (S of Yorkville Dr to Bloor St) 2019 20,000 $ 20,000 - - $ - George St (North St to Reg d 17) 2019 37,000 $ 37,000 14,047 19,041 $ 33,088 Brown St (Victoria St to Queen St) 2019 91,000 40,000 $ 131,000 38,735 21,910 30,222 $ 90,867 Nash Rd Reab & Bicycle Facilities (Soling Rd to 2019 450,000 $ 450,000 337,059 $ 345,287 Hancock Rd) 8,228 Wilmot Creek Whistle Cesation 2019 150,000 $ 150,000 - $ - Capital Works Fill Management 2019 10,000 $ 10,000 - $ - Queen St Extenstion 2019 20,000 $ 20,000 - $ - Trulls Rd - Rural Upgrade 2019 15,000 $ 15,000 - $ - Prestonvale Rd 2019 15,000 $ 15,000 - $ - Lambs Rd 2019 20,000 $ 20,000 - $ - Baseline Rd (Trulls Rd to Courtice Rd)_ 2019 2,500,000 $ 2,500,000 121,218 17,371 12,025 $ 150,614 Longworth Ave - Oversizing 2020 162,000 $ 162,000 - $ - Port Darlington 2020 60,000 $ 60,000 - $ - Old Scugog Rd (Edmonson Ave to N Limit of 2020 1,050,000 $ 1,100,000 $ 21,702 Hampton) 50,000 18,123 3,473 106 Roads - Rudell Dr 2020 1,245,000 $ 1,245,000 - $ - Haines St 2020 125,000 $ 125,000 - $ - Millstream Lane Rehab (King Ln to Old Scugog Rd) 2020 375,000 $ 375,000 6,090 - $ 6,090 George St 2020 25,000 $ 25,000 - $ - Kendal Drainage 2020 50,000 $ 50,000 3,786 - $ 39786 High St & Odell St Reconstruction 2021 45,000 $ 45,000 9,479 $ 9,479 Municipality of Clarington — 2021 Mid -Year Capital Update Asset Category: Roads and Bridges As of 1013112021 Flett St Reconstruction (Parkway Cr to Southway 2021 470,000 $ 470,000 - 470,000 $ 470,000 Dr) Bondhead Jetty 2021 75,000 $ 75,000 - $ - Whistle Cessation @ Cobledick Rd & Bennett Rd 2021 1,194,000 $ 1,194,000 - $ - Bloor St Multi -use Path (Prestonvale Rd to 0 m 2021 240,000 $ 240,000 - $ 14,015 14,015 Accessible on -street parking spot - Newcastle 2021 10,000 $ 10,000 - $ - r Mill St Ditching 2021 14,000 $ 14,000 - 14,000 $ 14,000 Pavement rehabilitation program Annually 2,435,089 2,000,000 $ 4,435,089 736,418 2,874,024 $ 3,610,442 Structures Rehab - Bridge Improvem. Annually 4,446,010 1,700,000 $ 6,146,010 1,532,526 3,876,017 $ 5,408,544 Roadside Protection Program Annually 127,269 150,000 $ 277,269 - $ - Retaining Walls - various Annually 317,500 210,000 $ 527,500 39,013 $ 39,013 Rural Road resurfacing Annually 224,203 3,900,000 $ 4,124,203 2,997,023 $ 2,997,023 $ 36,961,474 $ 13,928,000 $ 50,889,474 $ 14,496,263 $ 5,689,975 $ 10,187,238 $ 30,373,476 Municipality of Clarington - 2021 Mid -Year Capital Update Asset Category: Roadside As of 1013112021 Sidewalk - Rudell Rd (Region project) Sidewalk - Liberty St. Sidewalk - 2011 Intersection Improvements -King St at Scugog St Sidewalk - North St, Newcastle Sidewalk - Waverly Rd Intersection Improvements -Scugog St at Wellington St Intersection Improvements -Longworth Ave and Green Rd St. Light installation - LED Conversion St. Light installation - RR57 (Hwy#2 to 150m N of Stevens Rd) St. Light installation - RR57 (Conc Rd 3 to Urban Limit) Sidewalk - RR34 (Nash to N Urban Limit) Sidewalk - Trail - Waterfront (Waverley Rd to West Beach Rd) Sidewalk - RR57 (Conc Rd 3 to Urban Limit) Sidewalk - Multi -use Trail RR57 (Aspen Springs to Hwy#2) region project Traffic Signal -King & Roenigk St. Light installation - Baseline Rd & Lambs Rd Sidewalk - King Lane, Hampton Traffic Signal - Accessible Signal Upgrade - Clarington Blvd & Stevens Rd Sidewalk - Pedestrian Crossovers Sidewalk - Hwy #2 (Clar.Blvd-RR57 - South Side) Sidewalk - Bloor St (Townline to 415m E) Developer installing SW Sidewalk - RR17 (Mill St to CPR) East Side Sidewalk - Trulls Rd (Avondale to Hwy2 (East side)) Developer Sidewalk - Active Transportation Masterplan Traffic Signal - Pedestrian Countdown Indicators Traffic Signal - King & Roenigk - Accessible Upgrades Traffic Signal - King & Temperance - Accessible Upgrades Traffic Signal - Pedestrian Countdown Indicators 2015 43,000 $ 43,000 $ - 2016 98,000 $ 98,000 81,763 (7,130) $ 74,633 2016 100,000 $ 100,000 98,395 (6,954) 8,527 $ 99,968 2017 85,000 $ 85,000 6,571 1,386 77,043 $ 85,000 2017 145,000 $ 145,000 5,647 - $ 5,647 2017 170,935 $ 170,935 121,085 61,513 $ 182,598 2017 10,147 $ 10,147 10,147 - $ 10,147 2018 3,393,204 $ 3,393,204 3,311,132 (115,516) 191,713 $ 3,387,329 2018 100,000 $ 100,000 218 248,010 $ 248,228 2018 340,000 $ 340,000 30,352 307,593 $ 337,945 2018 25,000 $ 25,000 8,304 - $ 8,304 2018 386,289 $ 386,289 382,323 3,966 $ 386,289 2018 250,000 $ 250,000 1,470 223,363 $ 224,833 2018 255,000 $ 255,000 - $ - 2018 120,000 $ 120,000 22,858 22,088 53,933 $ 98,879 2019 200,000 $ 200,000 141,522 1,059 57,419 $ 200,000 2019 294,914 $ 294,914 294,914 (28,816) 34,177 $ 300,276 2019 85,000 $ 85,000 46,226 14,732 8,971 $ 69,929 2020 151,554 $ 151,554 52,646 69,580 28,030 $ 150,256 2020 135,000 $ 135,000 - - $ - 2020 30,000 $ 30,000 - - $ - 2020 310,000 $ 310,000 13,335 2,624 144,860 $ 160,819 2020 30,000 $ 30,000 - - $ - 2020 70,000 $ 70,000 $ - 2020 126,000 $ 126,000 $ - 2020 130,000 $ 130,000 130,000 $ 130,000 2020 105,000 $ 105,000 105,000 $ 105,000 2021 160,000 $ 160,000 $ - Municipality of Clarington — 2021 Mid -Year Capital Update Asset Category: Roadside As of 1013112021 Traffic Signal - Accessible upgrade (King St & Bowmanville Mall) 2021 130,000 $ 130,000 - $ Traffic Signal - Accessible upgrade (King St & Simpson Ave) 2021 110,000 $ 110,000 $ Traffic Signal - Semi -permanent Radar Message Boards 2021 40,000 $ 40,000 $ - I oil Traffic Signal - Portable Speed Cushions 2021 13,000 $ 13,000 $ Streetscape - Hwy#3 ( east of Trulls Rd) 2021 60,000 $ 60,000 - $ - St. Light installation - Various Annually 138,649 100,000 $ 238,649 23,997 2,346 $ 26,343 Sidewalk Replacement Annually177,136 125,000 $ 302,136 14,014 $ 14,014 $ 7,504,828 $ 738,000 $ 8,242,828 $ 4,628,689 $ 559,689 $ 1,090,030 $ 6,278,408