Report To: Audit and Accountability Committee
Date of Meeting: June 29, 2021 Report Number: FSD-037-21
Submitted By: Trevor Pinn, Director of Financial Services
Reviewed By: Andrew C. Allison, CAO By-law Number:
File Number: [If applicable, enter File Number] Resolution#:
Report Subject: Capital Budget Update as at December 31, 2020
Recommendation:
1. That Report FSD-037-21 be received for information.
Municipality of Clarington
Report FSD-037-21
Report Overview
To provide an update of capital projects as of the year ended December 31, 2020.
1. Background
1.1 The Municipality of Clarington is responsible for the repair, rehabilitation, and
replacement of over $778 million dollars worth of tangible capital assets.
Page 2
1.2 The Municipality's capital investment from the approved 2020 budget was
approximately $28.7 million which includes $8.3 million directly from the tax levy, $7.6
million from development charge reserve funds, $7.4 million from reserve funds
(Federal Gas Tax and Ontario Community Infrastructure Funding). A proposed
debenture of $4.2 million relates to the start of work on the proposed South
Bowmanville Recreation Centre was included in the 2020 budget but was not
undertaken as Council directed a review of funding opportunities for the project. The
2020 capital budget was predominantly infrastructure based with over $15.2 million
being invested in bridges, roads, sidewalks, stormwater management and traffic
signals.
2. Summary of Capital Projects
Summary of 2020 Activity
2.1 The global pandemic did affect capital projects throughout 2020. Construction slowed
down and sourcing for goods and services took longer than in past years.
2.2 The 2020 budget added 86 new capital projects which includes 20 that are annually
funded and reoccurring projects.
2.3 The following table is a high-level summary of all capital projects from the beginning of
2020 to the status of projects and funding at year end. The attachment to this report
provides more detail per asset category.
Buildings
Environmental
Municipality of Clarington
Report FSD-037-21
Fleet
2,417,246
1,722,108 • •
Administrative
3,436,136
3,033,828
Parking
591,117
528,009
Parks
11,183,197
6,806,429 - •
J
Roads
50,849,734
31,020,228 •
Roadside
8,579,412
6,299,956 • - •
$ 93.379.321
$ 53.430.326 • • - : • M,
Cancelled or Completed Projects in 2020
Page 3
2.4 There were 150 capital projects active at the beginning of 2020 spanning all asset
categories and departments. Within the year, 26 of those projects were either
completed and added to our Tangible Capital Asset database or were cancelled.
2.5 This table highlights the projects that were cancelled during the year with applicable
reasoning for the decision.
Project cancelled - no
Parks - Waterfront Trail Extension
2017 longer pursuing after
surveys were completed
Bridges - Longworth Ave culvert at
Development Has Been
Brookhill Tributary
2017 Delayed - to be budgeted
for in the future
Roads - Lambs Rd (275m N of
2020 Delay from Region - to be
Baseline to Hwy#2)
budgeted in the future
Sidewalk - Prestonvale Rd (Bloor St
2020 Project cancelled and to be
to 230m N)
budgeted in the future
Sidewalk - RR22 Multi -use path
2020 Project cancelled and to be
(Prestonvale Rd to 65m E)
budgeted in the future
Municipality of Clarington Page 4
Report FSD-037-21
2.6 following table represents the completed projects accomplished during 2020.
..-
Central Parking Meter - Replace
2019
Fleet New - MLE Electric Car
2020
St. Light installation - Baseline Rd (Green Rd to West
Side Dr) 2015
Parks - Outdoor Recreation Needs Study
2019
Parks - Leash Free dog Park - Courtice
2017
Parks - Port Darlington - East Beach Park - Phase 1
2013
Cemetery Improvements -Hampton Columbarium
2019
Roads - Rudell Road Reconstruction (Grady Dr to
North Limit) 2020
Roads - North Scugog Court Reconstruction
2016
Roads - Green Rd - Grade Separation (Bridge)
2013
Roads - Mill St Orono
2015
Sidewalk - Tooley Rd (Nash Rd to 265m N of Nash Rd)
2020
Traffic Signal - Green Rd at Stevens Rd
2017
Intersection Improvements - Green Rd & Boswell Dr
2017
Buildings - Kendal Community Centre - floor
replacement 2019
Buildings - Orono Town Hall - Clock Tower restoration
2019
Buildings - Station #3 - Boiler replacement
2019
Municipality of Clarington Page 5
Report FSD-037-21
DHRC - Gymnasium safety padding
2020
CCC - Fitness equipment and oven for Older Adults 2019
RRC - Replace walk behind floor scrubber
2020
SCA - Replace heat pump and Pad B steel door
2020
Annually Funded Capital Projects
2.7 The annual capital budget consistently
includes 23 projects that receive funding for a
broader scope of various projects.
2.8 The following table lists all the annually funded projects with both the 2020 budget
allotment and the unexpended capital funds (UECF) at the year end.
2020
Budget
Computer - Hardware $
151,400 $
309,926
Computer - Software
571,100
2,172
Emergency Fire
Services (EFS) - Bunker
122,425
43,021
Gear
Self-contained breathing
apparatus (SCBA)
37,500
9,190
Equipment - upgrade
EFS - Equipment
18,000
18,000
St. Light installation -
100,000
324,648 (a)
Various
Park
Furniture/Equipment
255,000
97,168
Various Park Upgrades
155,000
50,812
Municipality of Clarington
Page 6
Report FSD-037-21
Parking Lot
Rehabilitation - Various
215,000
26,304
Locations
Pavement rehabilitation
3,295,000
1,874,055
program
Structures Rehab -
2,100,000
2,380,562
Bridge Improvement
Roadside Protection
150,000
39,840
Program
Rural Road resurfacing
150,000
0
(Engineering)
Rural Road resurfacing
2,530,000
219,580
(High Float)
Sidewalk Replacement
183,000
97,445
Clarington Stormwater
305,000
364,227
(b)
Pond Cleanout
Replacement of Fleet -
610,000
512,147
(c)
Roads
New Fleet - Roads
95,000
143,283
(d)
Fleet Replacement -
180,000
20,701
Parks
Buildings - Various
50,000
0
Arenas
Buildings- Roof
150,000
157,461
(e)
Replacements - Various
ADMIN -Annual Building
45,000
24,507
Studies
Land Acquisition
703,696
2,718,582
(f)
2.9 Additional notes of the annually funded projects are as follows:
a) In 2021, FSD-017-21 transferred $223,595 to fund shortfall in the LED Streetlight
project
b) No contracts awarded since 2017
Municipality of Clarington
Report FSD-037-21
c) Outstanding for single axle truck and tandem truck
d) Outstanding (2) plows from 2019 budget
e) No contracts awarded towards 2020 budget
f) To be used according to the Land Strategy
Additional Funding Required
Page 7
2.10 During 2020, there were 8 capital projects that required additional funding. The
additional funding could be a scope of work change or in most cases the actual costs
are higher then anticipated when developing the initial budget.
2.11 The following table outlines the applicable projects and the funding source for the
additional funding requirements.
dditional -LF
Project
IWC
Bowmanville Vallley Municipal Capital FND-044-20 - due to changes in
Trail $ 242,964 Works RF and DC design
Roads & Related
Traffic Signals -
Green Rd & Stevens
Rd
Fleet
RRC - Building
Maintenance
Orono Town Hall
5,358 DC Roads & Related
16,404 Operations
Equipment RF
Required for completion of traffic
signals
Required for the replacement of (2)
single axle trucks
1,021 Community Services Required for the replacement of Pad
Capital RF B dressing room door.
239 Facility & Parks
Maintenance RF
Required for the clock tower
restoration
Hampton Cemetery 3,759 Municipal Capital Required for the columbarium
Works RF
Municipality of Clarington
Report FSD-037-21
Orono Town Hall
North Scugog Court
38,700 Municipal Capital
Works RF
Municipal Capital
40,817 Works RF and DC
Roads & Related
Total Additional 349,262
Funds
3. Concurrence
Page 8
CSD-012-20 - Elevator work
Required for completion of final
surface asphalt
Not Applicable.
4. Conclusion
It is respectfully recommended that the 2020 Year End Capital Update be received for
information.
Staff Contact: Erika Watson, Asset Management and Development Financing Manager, 905-
623-3379 ext. 2607, ewatson@clarington.net
Attachments:
Attachment 1 — Capital Projects 2020 and prior
Interested Parties:
There are no interested parties to be notified of Council's decision.
Attachment 1: 2020 Year End Capital Update
Includes details per asset category
• Buildings
• Environmental
• Fleet
• Parking
• Parks and Related
• Roads and Bridges
• Roadside
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Buildings and Related
As of 12/31/2020
Municipal Administration Centre
2017 $
1,347,018
$
$ 1,347,018 $
909,331 $
23,281 $
932,612 $
106,893 $
1,039,505
Newcastle Community Hall - 2019
2018
200,000
80,000
280,000
-
108,420
108,420
169,537
277,957
.Library Refurbishment
2018
1,430,000
-
1,430,000
78,804
613,906
692,709
-
692,709
Bowmanville Museum (Silver St)
2018
121,500
121,500
8,561
5,934
14,495
99,614
114,109
Haydon Community Hall - addition for storage
2019
12,500
-
12,500
-
2,407
2,407
-
2,407
Orono Town Hall - Accessibility Upgrades
2019
345,007
152,000
497,007
25,202
344,054
369,256
79,976
449,232
Kendal Community Centre - floor replacement
2019
17,910
-
17,910
-
17,910
17,910
-
17,910
Orono Town Hall - Clock Tower restoration
2019
20,239
20,239
-
20,239
20,239
20,239
Fire Station #3 - Boiler replacement
2019
55,648
-
55,648
6,798
48,850
55,648
55,648
Courtice Community Centre - Equipment
2019
13,013
55,000
68,013
-
2,348
2,348
-
2,348
156 Church St Reno (Shaw House)
2020
475,000
300,000
775,000
2,625
2,625
5,251
59,937
65,187
Visual Arts Centre
2020
-
25,000
25,000
-
-
-
-
Public Works Depot Improvements
2020
65,000
65,000
10,990
10,990
5,495
16,485
Diane Hamre Recreation Centre - Bldg Expense
2020
-
13,000
13,000
7,327
7,327
-
7,327
Courtice Community Centre - Bldg Expense
2020
2,460
702,000
704,460
39,343
39,343
-
39,343
Rickard Recreation Centre - Bldg Expense
2020
5,000
210,000
215,000
151,298
151,298
24,871
176,169
Rickard Recreation Centre - Equipment
2020
(6,757)
11,000
4,243
4,243
4,243
-
4,243
South Courtice Arena - Bldg Expense
2020
36,000
36,000
28,906
28,906
28,906
Various Facilities - Safety Bollards/Planters
2020
9,000
9,000
-
-
-
South Bowmanvlle Centre - Phase 2 Design/Construction
2020
-
4,200,000
4,200,000
-
-
-
-
Various Arenas
Annually
140,845
50,000
190,845
35,461
155,384
190,845
190,845
Roof Replacements - Various
Annually
7,461
150,000
157,461
-
-
-
Ann-1 Ridirlinn C4nrlice
Annn.11y
R1 AriQ
Ar, Mn
IAR AFQ
_
7 r,R1
7 9;R1
7A 471
R1 Qr,9
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Environmental and Related
As of 1213112020
rosion Control - Brookhill tributary remedial works
2020
$
$ 250,000
$ 250,000
$ $
$
-
Various Erosion Protection Works
2020
396,340
200,000
596,340
34,059
34,059
562,281
596,340
SWM Pond - Technology Park
2020
-
1,600,000
1,600,000
-
-
-
Retaining Walls - various
2020
6,573
321,100
327,673
31,145
31,145
36,764
67,909
Kendal Drainage
2020
-
50,000
50,000
3,786
3,786
3,786
SWM - Clarington Stormwater Pond Cleanout
Annually
95,523
305,000
400,523
4,855
4,855
36,297
41,152
Land Ac uistion
Annually
2,042,945
703,696
2,746,641
7,936
7,936
20,123
28,059
$ 2,541,381
$ 3,429,796
$ 5,971,177 $
- $ 81,782 $
81,782 $
655,465 $
737,247
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Fleet
As of 1213112020
Fleet New - MLE Electric Car
2020
$ (3,858) $
45,000
$ 41,142
$ 41,142 $
41,142
$
41,142
Fleet Replacement - Animal Services
2020
22,443
35,000
57,443
-
-
49,443
49,443
EMS - Vehicle Replacement
2020
-
115,000
115,000
97,012
97,012
6,981
103,993
Fleet -Replacement of Fleet - Roads
Annually
496,404
610,000
1,106,404
496,404
496,404
97,853
594,257
Fleet -New Fleet - Roads
Annually
682,490
95,000
777,490
149,262
149,262
484,945
634,207
Fleet -Fleet Replacement - Parks
Annuallv
139,767
180,000
319.767
189,264
189,264
109,803
299.066
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: General Administrative Related
As of 1213112020
Computer - Hardware
Annually
$ 281,845 $
151,400
$ 433,245
$ 89,232
$ 89,232 $
34,087
$ 123,319
Computer - Software
Annually
2,095,232
571,100
2,666,332
1,041,918
1,041,918
1,622,243
2,664,161
Educational Tools - 2020
2020
-
20,000
20,000
-
-
- I off
Bunker Gear
Annually
73,050
122,425
195,475
117,001
117,001
35,453
152,454
SCBA Equipment - upgrade
Annually
4,533
37,500
42,033
32,843
32,843
32,843 '
EMS - Equipment
Annually
61,051
18,000
79,051
61,051
61,051
61.051
4t 9 F1 F 711 4t
Q9n d9F
It I d3R 9IR
_ 1 �d9 ndF
4t 1 'qd9 nAR '�
1 FQ1 791
-IK 3 nll R9R
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Parking and Related
As of 1213112020
Central Parkling Meter - Replace 2019 $ 35,690 $ 35,690 $ 35,690 $ 35,690 $ 35,690
Parking Lot Rehabilitation - EV Charging Station 2020 55,407 35,000 90,407 - - 53,603 53,603
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Parks and Related
As of 1213112020
Parks - Rhonda Park - Trail
2020
Parks - Bowmanville Valley Creek Trail
2017
Parks - Outdoor Recreation Needs Study
2019
Parks - Farewell Creek Park trail - Phase 1, Phase 2
2017
Parks - Leash Free dog Park - Courtice
2017
Parks - Toyota Trail
2019
Parks - Port Darlington - East Beach Park - Phase 1 - 2013
2013
Parks - Newcastle Community Park - Phase 1
2019
Parks - Waterfront Trail Extension
2017
Parks -Park Furniture/Equipment
Annually
Parks -Various Park Upgrades
Annually
Cemetery Improvements -Hampton Columbarium
2019
(.omatani lmnrnxiomontc - Rninimnnvillo Fvnnncinn
7n17
$
$ 40,000
$ 40,000
$ -
$
655,759
655,759
194,542
33,667
228,209
75,000
75,000
34,487
23,971
58,458
1,625,748
450,000
2,075,748
505,956
153,924
659,880
125,870
125,870
120,687
5,183
125,870
620,000
620,000
48,705
(1,019)
47,686
3,451,124
3,451,124
3,316,971
-
3,316,971
67,500
1,500,000
1,567,500
31,151
31,151
2,286
2,286
2,286
2,286
440,000
255,000
695,000
597,832
597,832
311,151
155,000
466,151
415,339
415,339
48,759
48,759
48,759
48,759
815,794
1,044,003
58,458
16,839
676,719
125,870
39,245
86,931
3,316,971
350,068
381,219
2,286
597,832
415,339
48,759
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Roads & Bridges
As of 12/31/2020
Bridges - Longworth Ave culvert at Brookhill Tributary
2017
$ 67,000
$
67,000
project cancelled
$
-
$
-
Roads - Parkway Ave
2019
40,000
385,000
425,000
5,094
13,707
18,801
18,801
Roads - Nash Rd (Future Clarington Blvd)
2019
30,000
30,000
5,273
-
5,273
5,273
Roads - Longworth Ave oversizing
2020
-
162,000
162,000
-
-
-
Roads - Church St
2017
393,451
393,451
343,864
2,845
346,709
9,238
355,946
Pavement rehabilitation program
Annually
1,660,108
3,295,000
4,955,108
1,693,630
1,693,630
1,387,423
3,081,053
Roads - North Scugog Crt (Dan Sheehan Ln to Conc Rd 3)
2020
-
75,000
75,000
-
-
-
Roads - Longworth Ave. Extenstion EA (Green Rd to Holt Rd)
2016
281,000
281,000
221,140
24,520
245,660
36,083
281,742
Roads - Prospect St & Lambs Lane - 2014 area design
2017
1,335,912
1,335,912
970,947
217,879
1,188,826
73,859
1,262,685
Roads - Mill Street Grade Separation - 2005
2016
759,324
759,324
738,325
12,176
750,501
19,753
770,254
Roads - North St (George St to Grady Dr)
2019
50,000
350,000
400,000
69,305
69,305
44,425
113,730
Roads - Structures Rehab - Bridge Improvem.
Annually
3,126,299
2,100,000
5,226,299
564,495
564,495
2,281,242
2,845,737
Roads - Port Darlington Rd (East Shore Or to East Beach Rd)
2020
-
60,000
60,000
-
-
Roads - Darlington Blvd (Hwy#2 to South Limit)
2018
27,640
27,640
16,777
-
16,777
6,378
23,155
Roads - Trulls Rd - Shoulder Improvements (Mitchell's Corner)
2018
205,886
205,886
12,541
12,541
12,541
Roads - Baseline Rd (Mearns to Lambs Rd)
2019
170,000
170,000
8,638
-
8,638
8,638
Roads - Baseline Rd. (Lambs to Bennett)
2018
2,505,000
2,505,000
1,698,890
125,093
1,823,983
316,876
2,140,860
Roads - Old Scugog Rd (Edmonson Ave to N Limit of Hampton)
2020
-
50,000
50,000
18,123
18,123
1,718
19,841
Roads - Grady Dr Environmental Assessment - Construction in 2015
2013
231,500
231,500
121,669
29,828
151,497
78,266
229,763
Roads - Rudell Road Reconst. - (Grady Or to North Limit)
2020
-
1,245,000
1,245,000
3,826
3,826
3,826
Roads - Roadside Protection Program
Annually
211,129
150,000
361,129
233,860
233,860
87,429
321,289
Roads - Baseline Rd Structure ( W of Green Rd)
2019
35,000
35,000
-
-
26,098
26,098
Roads - North Scugog Crt Reconst. - 2011
2016
682,110
682,110
652,285
652,285
12,201
664,486
Roads - Hancock Rd Box Culvert (S of Nash Rd ) 99077
2019
90,000
90,000
-
-
-
Roads - Scugog StlMiddle Rd (Bons Ave to Conc Rd 3)
2015
1,201,000
1,201,000
176,331
176,331
Roads - Trulls Rd (S of Yorkville Dr to Bloor St)
2019
20,000
20,000
-
-
-
Roads - George Reynolds Dr. Connecting Link - 2017 & 2019
2017
2,490,417
2,490,417
80,748
34,453
115,200
47,300
162,500
Roads - Conc Rd #3-(Middle Rd -Liberty St.) - 2013
2013
2,265,455
2,265,455
2,126,931
21,996
2,148,927
123,284
2,272,211
Roads - Green Rd - Grade Separation (Bridge) - 2013
2013
7,551,252
7,551,252
7,519,543
31,709
7,551,252
7,551,252
Roads - Lake Rd Extenstion - (Bennett Rd to 310m West)
2018
813,996
1,160,000
1,973,996
14,201
20,709
34,910
10,028
44,938
Roads - Brookhill Blvd Oversizing
2014
310,000
310,000
-
-
-
Roads - Port Darlington Subdivision Rd (Pt Darlington to East)
2016
1,453,757
1,453,757
1,311,038
1,792
1,312,830
142,719
1,455,549
Roads - Lambs Rd Interchange @ Hwy 401 - JUST A STUDY - NOT TC
2016
330,000
330,000
16,679
-
16,679
13,461
30,140
Roads - Lambs Lane Reconstruction (Odell St to North Limit)
2016
926,875
926,875
760,996
-
760,996
760,996
Roads - Alexander Blvd and Liberty PI Reconstruction
2017
545,000
545,000
6,211
501,414
507,624
122,878
630,502
Roads - King St Cycling Facility
2017
275,000
275,000
3,966
15,475
19,442
19,442
Roads - George St (North St to Reg d 17)
2019
37,000
37,000
3,263
8,047
11,310
19,041
30,351
Roads - Brown St (Victoria St to Queen St)
2019
91,000
91,000
3,785
34,951
38,735
28,415
67,151
Roads - Nash Rd Reab & Bicycle Facilities (Solina Rd to Hancock Rd)
2019
450,000
450,000
8,228
8,228
8,228
Roads - Whistle Cessation Study - Wilmot Creek
2019
150,000
150,000
-
-
10,176
10,176
Roads - Capital Works Fill Management
2019
10,000
10,000
Roads - Queen St Extension (St George to Frank St)
2019
20,000
20,000
-
-
-
Roads - Trulls Rd Rural upgrades (Baseline Rd to Bloor St)
2019
15,000
15,000
Roads - Prestonvale Rd (Baseline Rd to S of Southfield Ave)
2019
15,000
15,000
Roads - Lambs Rd (Concession St E to CPR)
2019
20,003
20,003
Roads - Hains St (Baseline to Hwy#2)
2020
-
125,000
125,000
-
-
-
Roads - Millstream Lane Rehab (King Ln to Old Scugog Rd)
2020
375,000
375,000
6,090
6,090
6,090
Roads Lambs Rd (275m N of Baseline to Hwy#2)
2020
-
50,000
50,000
project cancelled
-
-
Roads - George St (Mill St to Beaver St)
2020
-
25,000
25,000
-
-
-
Roads - Rural Road resurfacing
Annually
37,378
150,000
187,378
75,903
75,903
111,475
187,378
Roads - Lambs Rd (Baseline to 275m N of Baseline)
2018
790,500
790,500
654,743
78,502
733,244
56,756
790,000
Roads - Lambert St (King to Church)
2018
30,000
30,000
2,211
-
2,211
6,632
8,843
Roads - Lambs Rd (Hwy #2 to Concession St E)
2018
2,200,000
2,200,000
28,155
198
28,353
30,406
58,759
Roads - Baseline Rd (Trulls Rd to Courtice Rd)_
2019
2,500,000
2,500,000
33,354
87,863
121,218
19,290
140,508
Rnads - Rural Rnad resurfaninn
Annually
2112 743
263n_nnn
4.642.743
4 419_54n
4 41 R_54n
4 623
4.423.163
Municipality of Claringhton - 2020 Year End Capital Update
Asset Category: Roadside
As of 1213112020
St. Light installation - LED Conversion
2018 $
3,255,658
$
3,255,658 $
2,066,423 $
923,925 $
2,990,348 $
260,612 $
3,250,960
St. Light installation - Various
Annually
260,727
100,000
360,727
33,483
33,483
2,596
36,079
St. Light installation - Baseline Rd (Green Rd to West Side Dr)
2015
55,000
55,000
41,619
1,116
42,735
3,947
46,682
St. Light installation - RR57 (Hwy#2 to 150m N of Stevens Rd)
2018
20,000
80,000
100,000
-
-
St. Light installation - RR57 (Conc Rd 3 to Urban Limit)
2018
340,000
340,000
30,352
-
30,352
30,352
St. Light installation - Baseline Rd & Lambs Rd
2019
200,000
200,000
13,997
127,525
141,522
58,478
200,000
Sidewalk - Various Replacement
Annually
201,053
183,000
384,053
190,878
190,878
95,730
286,608
Sidewalk - Pedestrian Crossovers
2020
71,554
80,000
151,554
52,646
52,646
97,610
150,256
Sidewalk - North St, Newcastle
2017
85,000
85,000
3,571
3,571
3,571
Sidewalk - Hwy#2
2020
-
135,000
135,000
-
-
Sidewalk - Waverly Rd
2017
145,000
145,000
5,647
5,647
-
5,647
Sidewalk - Rudell Rd (Sunset Blvd to Hart)
2015
43,000
43,000
-
Sidewalk - Prestonvale Rd (Bloor St to 230m N)
2020
-
35,000
35,000
-
Sidewalk - RR22 Multi -use path (Prestonvale Rd to 65m E)
2020
-
15,000
15,000
-
-
Sidewalk - Liberty St. Sidewalk - 2011
2016
98,000
98,000
509
74,124
74,633
15,901
90,534
Sidewalk - RR17 (Mill St to CPR) East Side
2020
-
310,000
310,000
-
-
Sidewalk - Trulls Rd (Avondale Rd to Hwy#2) East Side
2020
-
30,000
30,000
-
-
Sidewalk - RR34 (Nash to N Urban Limit)
2018
25,000
25,000
8,304
-
8,304
92
8,395
Sidewalk - Trail - Waterfront (Waverley Rd to West Beach Rd)
2018
230,000
230,000
343,047
343,047
343,047
Sidewalk - Active Transportation Master Plan
2020
-
70,000
70,000
-
-
Sidewalk - King Lane, Hampton
2019
294,914
294,914
294,914
294,914
5,362
300,276
Sidewalk - Tooley Rd (Nash Rd to 265m N of Nash Rd)
2020
309
30,000
30,309
30,309
30,309
30,309
Sidewalk - RR57 (Conc Rd 3 to Urban Limit)
2018
250,000
250,000
1,470
-
1,470
1,470
Sidewalk - Multi -use Trail - RR57 (Aspen Springs to Hwy2)
2018
15,000
240,000
255,000
-
-
Traffic Signal -King & Roenigk
2018
120,000
120,000
22,858
22,858
71,642
94,500
Traffic Signal - Pedestrian Countdown Indicators
2020
-
126,000
126,000
-
-
126,000
126,000
Traffic Signal - Accessible Signal Upgrade - Clarington Blvd & Stevens R
2019
85,000
85,000
46,226
46,226
10,155
56,381
Traffic Signal - Green Rd at Stevens Rd
2017
255,358
255,358
305
255,053
255,358
255,358
Traffic Signal - Accessible Upgrade - King & Roenigk
2020
-
130,000
130,000
-
-
130,000
130,000
Traffic Signal - Accessible Upgrade - King & Temperance
2020
-
105,000
105,000
-
-
105,000
105,000
Intersection Improvements -Scugog St at Wellington St
2017
170,935
170,935
14,192
106,893
121,085
121,085
Intersection Improvements -Longworth Ave and Green Rd
2017
70,000
70,000
10,147
-
10,147
10,147
Intersection Improvements -King St at Scugog St
2016
100,000
100,000
28,468
69,927
98,395
98,395