Loading...
HomeMy WebLinkAboutCSD-003-21Clarington Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: May 10, 2021 Report Number: CSD-003-21 Submitted By: George Acorn, Director of Community Services Reviewed By: Andrew C. Allison, CAO Resolution#:* File Number: By-law Number: Report Subject: Future Indoor Recreation Facility Recommendations: 1. That Report CSD-003-21 be received; 2. That Council provide direction on the preferred option and associated actions as presented in this report: Option 1 -]Original Facility Plan and Location C That Council approve the proposed indoor recreation facility plan, as recommended in Report CSD-009-19, to be located at the South Bowmanville Community Park; F- That Council approve the total project budget of $50,000,000 to be funded, as recommended in Report FND-031-20 through debenture debt financing with the Region of Durham; F- That Council direct staff to issue a Request for Proposal (RFP) for the architectural and engineering design for the new facility; C That staff report back to Council to present the final facility design for approval; and L That, following design approval, staff issue a tender to prequalified general contractors for the construction of the new recreation facility; Municipality of Clarington Page 2 Report CSD-003-21 Option 2 -1 Further Consideration of a Public L Private Partnership (P3) L That Council direct staff to issue an Expression of Interest (Market Sounding) for the design, construction, financing, operation and maintenance of a new recreation facility, to be located at the South Bowmanville Community Park; and That staff report back on the results of the Expression of Interest, as well as providing the estimated costs for the provision of P3 advisory services and independent financial and legal services that would be required to move forward with a P3; Option 3 -1 Consideration of an Alternate Location L That Council provide staff direction on a preferred location, as identified in this report, or otherwise; That staff be directed to prepare a conceptual facility design plan for the preferred location; L That staff be directed to prepare a detailed project budget, for this location, that would include design/engineering, project management, and construction costs, as well as land acquisition and site servicing costs, if necessary; L That the Director of Financial Services prepare updated funding options for & R-❑FLOVF 1111 ❑ That Council approve the costs to prepare the conceptual plans and project budget, not to exceed $25,000, which will be funded from the Community Services Capital Reserve Fund; ❑ That staff report back to Council, with the above noted information, this fall; and 3. That all interested parties listed in Report CSD-003-21 and any delegations be DGYL—GI [& R❑EF10[Q FUR❑❑ Municipality of Clarington Report CSD-003-21 Report Overview Page 3 At the February 1, 2021 Special General Government Committee Meeting, Council directed staff to undertake a request for information from qualified parties for Public -Private Partnership (P3) opportunities and design build options for a proposed new recreation facility or expansion. They also directed staff to consider potential alternative locations to the South Bowmanville Recreation Centre site and propose possible components for this facility. Staff have investigated the requests and the findings are outlined below. To provide Council options for consideration, staff have identified four potential locations in Bowmanville for siting a new indoor recreation centre. In addition to the originally proposed location in south Bowmanville on Baseline Road, an expansion on the Garnet Rickard site has also been identified. Two other possible locations include future Community Park sites at Liberty Street and Concession Road 3 and Lambs Road and Concession Street. This report also includes a summary of the recommendations that were included in the Indoor Facilities Development Strategy that was presented, for information, to Council in January 2017. This Strategy identified a comprehensive indoor facility expansion plan, that would guide facility development, for the period 2016 - 2031. In addition to the South Bowmanville project, major facility expansions were identified for South Courtice Arena, Courtice Community Complex and Diane Hamre Recreation Complex (known then as Newcastle & District Recreation Complex). 1. Background 1.1 &R❑CFLCV[6%D MLF[3®❑[E[I❑❑❑LLU2022 included VVHIJFUCiU HYHOS-V1H[FR FHSW financing, project plan and potential construction schedule for the South Bowmanville Recreation Centre for Council in 2019, for consideration in the 2020 budget, with a design to follow. —Staff presented Report CSD-009-19 at the General Government Meeting of October 15, 2019. The report identified a Phase 1 Facility Program that would include a twin pad arena, indoor walking track, gymnasium, multi -purpose community/program space, administrative office and tourism space, and a branch library at the Bowmanville Indoor Soccer location on Baseline Road in Bowmanville. 1.2 Council approved referring the project, with revisions, to the 2020 budget, and directed staff to apply for funding through the Investing in Canada Infrastructure Program. Mid way through 2020 staff were notified that this funding application was not successful. 1.3 At the Joint Committee meeting of September 14, 2020 Report FND-031-20 was presented. This report, following the unsuccessful infrastructure funding application, provided an alternative project funding plan to Council, that was seeking approval to move forward on the design and construction of the South Bowmanville Recreation Centre. Staff were recommending the project be funded through the issuing of a debenture of $50,000,000 from Durham Region. It was estimated that approximately 74% of the total project cost was eligible for development charge funding, with the remainder to be funded by the tax levy. Municipality of Clarington Page 4 Report CSD-003-21 1.4 Following discussion by Members of Council, the report was referred to the 2021 budget. During these discussions, the matter of finding alternative project financing options, such as a Public -Private Partnership (P3) was raised. Although specific direction was not included in the approved resolution, staff subsequently undertook researching the feasibility of utilizing the P3 model for this new community centre project. 1.5 Report FSD-006-21, outlining the findings of the investigation into the option of a P3 Partnership for this facility, was considered at the February 1, 2021 Special General Government Committee meeting. As a result, the following amended Resolution #GG- 085-21 was referred to staff to consider potential alternative locations and to propose possible components: 17 ❑DVE HSRIYJ 6'-006-21 be received; and That Staff be directed to undertake a request for information from qualified parties for: a) private -public partnerships Indoor Facilities Development Strategy 1.6 In January 2017, Community Services staff presented CSD-001-17 Indoor Facilities Development Strategy to Council. To develop this Strategy, the Community Services Department engaged the services of Monteith Brown Planning Consultants to prepare a long -VP A1I ❑1RUVVH!3 IYHVSP Hd1Wl VM[O 11ELFISDUMANLIV14LGbor recreation facilities. 1.7 The intent of the Strategy was to provide Council and staff with a framework to advance indoor recreation facility development, to respond to public requests for future recreation facilities and to provide a guide in determining facility components to meet the needs of residents to 2031. 1.8 The research for the Strategy included a review of facility trends on a local / regional / provincial and national level, providing insight applicable to Clarington. It also considered our existing inventory of facilities, recognizing the age, expansion potential and required upgrades at each of the existing sites. 1.9 In developing the Strategy, there was consultation with Members of Council, staff, key stakeholders and the general public. Public Information Centres were hosted in Courtice, Bowmanville, Newcastle and Orono. 1.10 Council passed Resolution #GG-035-❑❑E[7dD(5HSRLY46'-001-17, Indoor Facilities Development Strategy, be referred back to staff to reprioritize a South Bowmanville pool DFMNfl3ID1LdLJ ❑SlRM Municipality of Clarington Report CSD-003-21 CSD-009-19 South Bowmanville Recreation Centre Page 5 1.11 CSD-009-19 was taken to the October 15, 2019 GGC meeting, recommending a proposed Phase 1 and Phase 2 facility program, that the Phase 1 project budget of $48,005,300 be referred to the 2020 budget, and that Council authorize staff to complete the application for funding for this project through the Investing in Canada Infrastructure Program. 1.12 At a meeting held on October 28, 2019, Council approved the following Resolutions: That Report CSD-009-19 be received excluding section 2.4 of Report CSD-009-19 and sections 3.51, 3.55, 3.59 of Attachment 1 to Report CSD-009-19; That Council approve the proposed facility program as presented; That Council refer the proposed Phase 1 project budget of $48,005,300 to the 2020 budget deliberations; That Council authorize staff to complete the application for funding for this project as prescribed in the Investing in Canada Infrastructure Program; That all interested parties listed in Report CSD-009-19 and any delegations be advised RI [& R❑F-FDJ1G-FLVIR❑L-DEG❑ That Staff report back to the October 28, 2019 Council meeting on the cost of adding a wellness/fitness component, amongst other items, in place of the office space of 5,600 square feet. #GG-467-19: That the following remaining portions of Report CSD-009-19 be received: [Section 2.4 of Report CSD-009-10 and sections 3.51, 3.55, 3.59 of Attachment 1 to Report CSD-009-19. 1.13 A memo to Council for the October 28, 2019 Council Meeting (Attachment 1) outlined that staff met with the consulting team, and prepared a revised facility program, as LIHTLIHWM IGARU& R-111RCVF 1111$ 1FD(8LOB2❑[RI ANHWL1DUH1l J HRI 0WH facility and the associated impact on the overall project budget was provided. 1.14 The memo included that should Council approve the revised facility program to include wellness/fitness, Resolution #C-286-03 would need to be rescinded. The Resolution LIFO-GHG_Ib R-ILWH HRUHEHJVVH\/FZGHGZ❑$7MI[O L]AFISDMM[Clarington hereby advises the local fitness facility owners that it will not enter into direct competition with the local fitness industry in new facility construction; and THAT the Association of 0 ❑E FLSDOWVl L2 ❑ WUREHDGMMGRI [& R❑❑FLU G -FLI R and be requested to forward V UA/RQX&'R❑ i[P HP EHLF ❑JFLSDBNWRlANH.LF 1.15 The October 28, 2019 memo was referred to the consideration of Report CSD-009-19. Municipality of Clarington Page 6 Report CSD-003-21 1.16 Staff submitted a comprehensive application for funding of the South Bowmanville Recreation Centre to the Investing in Canada Infrastructure Program in November of 2019 but was subsequently denied funding. 2. Recreation Facility Considerations - Bowmanville South Bowmanville Baseline Road 2.1 Following the acquisition of three parcels of land in 2002 for the future South Bowmanville Community Park, Community Services and Engineering staff prepared a site master plan for future indoor and outdoor recreation. It was determined that indoor construction would be situated on the portion of land adjacent to Baseline Road and outdoor facilities would be planned for the southern portion from Green Road to Martin Road. 2.2 Following budget approval in June 2003, the design on an indoor soccer and outdoor lacrosse facility commenced. Additionally, a conceptual layout was prepared that identified a plan for future indoor facility expansion. The plan was to build onto the indoor soccer facility and extend to the west and north to Baseline Road. This conceptual plan was the basis for the revised expansion plan presented to Council in October 2019. 2.3 The site can accommodate both future phases of indoor facility expansion, as well as the provision of adequate parking. Preliminary discussions began early in 2020 with Engineering staff to discuss what adjacent road improvements would be needed, including the possible relocation of the main entrance to better align with Westside Drive. This site is also strategically located with good vehicular access from Green Road, Bowmanville Avenue as well as 401 through the Bowmanville Avenue and Holt Road interchanges. 2.4 Regional water/sewer and natural gas services are existing, as is storm water management. It is expected upgrades to the servicing and storm water management will be required and has been considered in the proposed project budget. 2.5 In 2007, Engineering staff coordinated the construction of temporary outdoor soccer fields on the future facility location, utilizing excess fill from Green Road reconstruction work. All parties were aware this was a temporary situation and that the fields would need to be removed at such time as the indoor facility expansion began. Subject to approval by Council for this location, staff will need to communicate the plan with the Darlington Soccer Club and work with them to discuss options to minimize the impact to their outdoor soccer program. Municipality of Clarington Report CSD-003-21 Garnet B. Rickard Recreation Complex Page 7 2.6 Council has directed staff to consider constructing the new recreation facility on the site of the Garnet B. Rickard Recreation Complex. In addition to the existing indoor facility, there are two baseball fields, an outdoor playground area, a skateboard park, parking for approximately 600 vehicles as well as the Clarington Emergency and Fire Services Headquarters. 2.7 It is estimated that the existing baseball fields and playground area represent approximately seven acres of green space. Given that the total proposed square footage (Phase I and II) of the new facility is estimated at 184,000, it is feasible that this could be constructed within that area. However, even a modest calculation of 600 additional parking spaces needed, could not be achieved at this location without considering the relocation of the fire headquarters which is not recommended. 2.8 Due to the current demand for quality baseball fields in Clarington, two new fields would need to be constructed and put into operation prior to the removal of the fields on this site. Additionally, the skateboard park and outdoor playground would need to be removed and reconstructed somewhere on the property. 2.9 Further to discussions with the Clarington Public Library Director, we have been advised that, due to the proximity to their Main Branch, there is no interest in constructing a branch location on this site. This would reduce the overall area of Phase I by 10,000 square feet and the budget by $4.5M. However, there remains interest to proceed with a branch library on the other Bowmanville locations. 2.10 This location is situated at an extremely busy intersection and access to and from the property can be challenging, especially during large indoor or outdoor events. This has been evidenced in recent years with Junior hockey and lacrosse playoffs, fishing shows and butter tart festivals as well as each year on Canada Day. Constructing additional indoor recreation facilities on this site would more than double the daily vehicular traffic and further exacerbate congestion on the adjoining roads. Major improvements to entrances on to the site could be complicated as Highway 2 West and Regional Road #57 (Bowmanville Avenue) are both Durham Region roads. This may restrict entrance improvements to Stevens Road and Clarington Boulevard. 2.11 The Durham Region Works Department has advised us that existing sewer capacity is available on Clarington Boulevard, with a future trunk sewer planned for Bowmanville Avenue. However, the facility design plan would have to address a greater demand for on -site storm water management. Future Community Park Location [I Liberty Street and Concession Road #3 2.12 & OU J \R-] V 2 I I FM ®-IE2 3 EEED/ 3H R[LdMi& RP P M DLW& 3 T(BFCIAt-\/- within the existing Bowmanville Urban BR❑❑CDUIII$ FFRLGLJ VVM2 3 —Community Parks are designed to serve the recreational needs of several neighbourhoods, providing outdoor and indoor recreational facilities, non -programmed open space and linkages to the Regional and Municipal trail system. Community Parks shall have a size of between 6 to 12 hectares. ❑ Municipality of Clarington Report CSD-003-21 Page 8 2.13 The first future Community Park is identified for the property located at the north east corner of Liberty Street and Concession Road #3 (see Attachment 2). This property falls within the Soper Springs Secondary Plan area, which is currently in progress. Planning staff have indicated a Plan completion for Summer/Fall 2022. 2.14 In the Terms of Reference for this Secondary Plan, the area is summarized as follows, IThe site generally consists of farmland and woodland between a number of ditches or tributaries of Soper Creek, draining towards the southeast. The site gradient drops uniformly towards the southeast, having the grade difference of more than 30 m across the site. This area includes lands which appear to be the headwaters for a number of tributaries of the Soper Creek. Similar to the Northglen Neighbourhood in northwest Bowmanville and the Farewell Heights Neighbourhood in north Courtice, Soper Springs is located on the former Lake Iroquois Shoreline, an area identified as hydrologically significant- 2.15 The existing topography of this location does present some challenges to providing a flat area suitable for the construction of the new facility and associated internal roadways and parking lots and further site investigation would be needed. Prior to construction, geo-technical work would need to be completed. 2.16 As this property would need to be purchased, Planning and Development staff sought information on the current open market value of a 25-acre parcel of land, in this area. Based on the assessment received, the current price for the property identified would be in the range of $175 - $225,000 per acre, or $4.4 - $5.6M. 2.17 As the site servicing plans for this Secondary Plan have yet to be submitted, Durham Region is not able to provide any specific details on future servicing within the study area at this time. A preliminary review indicates a possible sanitary sewer connection at the north end of the subdivision immediately south of Concession Road #3 near Liberty Street. Detailed capacity calculations for the new facility would be required to confirm this. Otherwise a connection could be required to an existing sewer on Mearns Avenue, south of Concession Road #3. Enbridge Gas has confirmed existing natural gas service is close to this location, however, detailed calculations on anticipated demand would be required to determine if the existing line pressure would be adequate. 2.18 This site would be able to accommodate both proposed phases of this new facility, however, the total project budget would have to be increased to accommodate for the cost of land acquisition and the provision of water, sewer and natural gas services to the property. Until the Secondary Plan site servicing plan is finalized, our Public Works staff are unable to provide a cost estimate for servicing. Future Community Park Location a Lambs Road and Concession Street 2.19 The second future Community Park identified in the OP is the property located at the north east corner of Lambs Road and Concession Street. This property falls within the Soper Hills Secondary Plan area, and is also currently in progress, with an anticipated completion in Summer/Fall 2022. Municipality of Clarington Page 9 Report CSD-003-21 2.20 The Terms of Reference for this Secondary Plan summarize the area as follows, [The site is a farm field with scattered farm houses, barns and treed areas. The site gradient is undulating, with drops toward the ditches at the northwest and southeast portion. This neighbourhood is almost completely farmed today.:] 2.21 This property has a consistent slope from east to west and does not appear to present any major topography problems for situating a facility and associated internal roadways and parking lots. Prior to construction, geo-technical work would need to be completed. 2.22 This property would also have to be acquired to locate the proposed recreation facility. Planning and Development staff have confirmed this property would have a similar current open market value of $175 - $225,000 per acre. While the Municipality has an agreement with the property owners for the future purchase of this site it is at fair market value. Assuming the same 25-acre parcel of land, the current price for the parcel would also be in the range of $4.4 - $5.6M. 2.23 Durham Region Works Department advised us there is no servicing close to this parcel of land at this time. However, sewer servicing in the area will be extended closer to the property with the development to the south. Work is currently underway to confirm how much area within the Soper Hills Secondary Plan can be serviced by the Timber Trails development. Any excess demand would need to be delayed until the construction of a new trunk sanitary sewer. The water feeder main will be extended to the north east corner of Lambs Road and Concession Street, as part of a Durham Region project that is currently in design. Enbridge Gas has confirmed existing natural gas service is close to this location, with adequate pressure to satisfy the demand. 3. Indoor Recreation Facilities Development Strategy F Summary of Facility Expansion Plans 3.1 In addition to the major facility expansion that has been identified for South Bowmanville, the 2017 Strategy included other facility expansion projects at existing facilities in Courtice and Newcastle. The initial proposed timelines have been provided (see Attachment 3). 7 EHAM-MiLS(EDLV-DLWA/LP P D1Jll__HGff1AR❑-FLG/-1 information. 3.2 The background information that formed the basis of the recommendations in the Strategy has not been fully updated and some facility components may need to be reconsidered. For instance, in recent years Council has approved annual funding for the creation of dedicated youth centre space, through our partnership with the John Howard Society, at South Courtice Arena and Diane Hamre Recreation Complex. Also, the pandemic has had a drastic impact on the fitness industry and, as a result, we may need to re-evaluate what types of fitness/wellness facilities and services will be needed by our residents in the future. Municipality of Clarington Report CSD-003-21 Page 10 3.3 The project budget information has also not been recently reviewed or updated and estimates 2016 values for the base cost. From this base cost, an annual inflation rate of 3.5% was added to better estimate the project costs for the proposed project year. Prior to bringing forward specific recommendations for Council approval on any of these expansion plans, a more detailed facility plan and project budget would be completed. 3.4 The project timing has also not been updated and was originally based on the South Bowmanville project moving forward in 2018. Staff will need to review and update the expansion plan prior to bringing forward further recommendations for approval. Diane Hamre Recreation Complex Phase I: Fitness/Wellness Centre Youth and Older Adult Space Design Early 2022 Project Budget - $10,400,000 Phase II: Twin Pad Arena Indoor Walking Track Design Early 2026 (subject to results of an arena needs assessment in Mid 2023) Project Budget - $41,300,000 Courtice Community Complex New Teaching Pool Design Early 2024 Project Budget - $10,000,000 South Courtice Arena Gymnasium Expansion Design — Early 2027 Project Budget - $8,500,000 (2016) 3.5 The two future Community Park locations were briefly mentioned in the 2017 Strategy, but were not given consideration for specific future facilities, as it was estimated the need to build on these sites was outside the 2017 L 2031 planning period. 4. Project Methodology 4.1 This report will attempt to provide Council with a basic overview of project methodology options that could be considered to move forward with the approval of the new recreation facility. The information provided is not an exhaustive list of the specifics of each option, nor a full list of advantages and disadvantages of each. Municipality of Clarington Page 11 Report CSD-003-21 Design ❑ Bid - Build 4.2 This is the traditional methodology the Municipality has used for new building construction and major renovations projects in the past. For this reason, municipal staff are the most comfortable with this process. Through public procurement, the Municipality would contract an architectural/ engineering project team who, acting on behalf of the owner, would prepare design drawings and project specifications for tendering. 4.3 Prior to finalizing the tender documents, the Municipality would issue a request for pre - qualification for general contractors. This will ensure only general contractors with experience in building similar types and sizes of facilities are eligible to bid on the project. 4.4 Following Council approval of the successful construction bid, the stipulated cost of construction is set, and the Municipality would execute a contract with the successful General Contractor (CCDC 2). Although the stipulated price for construction remains fixed, there will be exceptions where changes are necessary. This could be the result of unforeseen site conditions, errors and omissions, or a lack of clarity in the tender documents. Additionally, the Municipality may request changes to the project. When these occur, the Contractor submits a quotation for the contemplated change and is reviewed, accepted, declined, or further negotiated until all parties agree. All approved changes would be funded through a project contingency, which would be included in the overall approved project budget. 4.5 A project of this size will undoubtedly require changes to the contract price over the course of the construction period and staff will identify an adequate value for contingency. For this new facility staff will be retaining an independent project management team that, in collaboration with the design team and the Municipality, will prepare thorough project drawings, specifications and other tender documents in order to help mitigate instances of errors and omissions. Design []Build 4.6 This methodology requires the Municipality to issue a detailed Scope of Work to general contractors who will provide a bid for both the design and construction for the project. As part of their project team, a general contractor will engage a design/engineering team to work with them to prepare design documents for the contractor to complete the construction. 4.7 The Scope of Work represents the owner's essential project requirements and expectations and is intended to provide adequate information upon which Contractors can prepare technical and price proposals. The scope should clearly define our needs and expectations in a final product, without rigidly controlling the means and methods to be used to meet those needs and expectations. Where applicable, the scope will also identify commonly accepted standards, codes, and specifications. Municipality of Clarington Report CSD-003-21 Page 12 4.8 In a Design -Build project, the Municipality would have no direct relationship with the architects and engineers involved in the design of the facility, as they are retained by and responsible to the Contractor. In addition to putting the Municipality at a disadvantage, the normal checks and balances between design and construction may not exist. 4.9 If we are to consider this as an option, the Municipality would need to retain the services of an architectural and engineering team to prepare the Scope of Work that would be issued with the tender. They would also assist in the prequalification of design -build firms to ensure adequate prior experience with designing and constructing similar projects. Staff would also recommend retaining this team to represent the Municipality throughout the duration of the design and construction stages. The skills and knowledge they would provide would EHIEH❑HEECDEGVVI-i7❑R CaEH VREDG'YRFDNER-FEH❑DTU of the Municipality. 4.10 Following Council approval of the construction tender, the stipulated cost of the design - build is set, and the Municipality would execute a contract with the successful Contractor (CCDC 14). Although a benefit of this methodology is the fixed price, any necessary changes, at the request of the Municipality, during the design and/or construction can be costly. As the contractor is bound by their approved price for the project, changes to performance requirements and standards, if not clearly articulated in the Scope of Work, could result in design change or material substitutions that may negatively affect the end product. Public -Private Partnership (P3) 4.11 As originally reported in FSD-006-21, staff considered the feasibility of pursuing a P3 for the new recreation facility for South Bowmanville. This included arranging for a presentation from P3 Advisors Inc., an industry leader in providing strategic advice for clients who are considering the P3 model for their projects. Additionally, the President of the Canadian Council for Public- Private Partnerships was contacted to provide some background information. 4.12 Although there are numerous examples of P3 projects in Ontario, no similar municipal projects have been discovered. Most projects are in the transportation, education, and healthcare sectors. Other examples include large spectator arena venues (5,000 seats plus) housing OHL and ECHL hockey clubs. The absence of municipal community centre examples indicates to staff, that the operating model for this type of facility is not attractive to private sector investment. 4.13 However, should Council wish to consider proceeding with the P3 model, specific direction on the facility plan and location would be needed to proceed prior to releasing an Expression of Interest. Should there be interest from the private sector, staff will report on the results as provided estimated costs for the professional services needed to go forward. Municipality of Clarington Report CSD-003-21 5. Other Considerations Aging Arena Infrastructure Page 13 5.1 Currently the municipally operated Darlington Sports Centre and the Board operated Orono Arena and Community Centre and Newcastle Memorial Arena have been in operation between 40 ❑45 years. In 2010, the Municipality completed a $2.2M upgrade to the Darlington Sports Centre. The work included the replacement of the refrigerated arena floor, rink board system, refrigeration equipment as well as an interior lobby expansion and accessibility improvements. The objective of this upgrade was to extend the useful life of the facility by 15 years or to 2025, at a minimum. Based on the current condition of the building, staff are confident the facility will remain fully operational beyond 2025. 5.2 In August 2020, Community Services retained an independent arena engineering firm to provide an assessment of the ice rink and refrigeration systems for the Orono Arena and Community Centre and the Newcastle Memorial Arena. The scope of their work included an assessment of the refrigeration plant equipment, the refrigerated arena floors/associated piping and the rink board/glass systems. In September we received a report for each facility that was shared with each Arena Board Chair. 5.3 The major findings in both reports included the recommendation to replace the ammonia chillers in both arenas. As failure of this equipment could present a hazard to both staff and the public, this work was approved in our 2021 capital budget and is scheduled for completion this summer. The reports also concluded, that based on the age of both refrigerated arena floors, a failure of the imbedded brine piping system could occur at any time. It was recommended that replacement of both floors and the associated refrigeration systems be planned for in the near term. 5.4 To provide some context, both arena floors are original and have been in service for over 40 years. By comparison the floor at Darlington Sports Centre was replaced after 35 years and Pad A at the Garnet Rickard Complex was replaced after 30 years. With a median useful life of 25 30 years for arena floors, both have far exceeded their useful life. A major floor failure at the start of or during an ice season could result in a loss of that ice season, with significant impact to rental revenues. 5.5 Staff will be working with the two Arena Boards in the coming months to discuss the details of the repairs needed and will report back to Council this fall seeking funding approval for the necessary renovations. The objective of these renovations would be to extend the useful life of both arenas by a minimum of 10 years. Municipality of Clarington Report CSD-003-21 Page 14 5.6 Based on the existing (pre COVID-19) demand in Clarington for ice time, the construction of two new ice pads in Bowmanville will serve this current pent up demand (estimated at one ice pad) and allow for expansion related to residential growth in the near term. This will require the two Board operated arenas, as well as the Darlington Sports Centre, to effectively operate until the new ice pads planned for Diane Hamre are constructed and operational. Based on the 2017 Facilities Development Strategy this was identified for the late medium term of the plan with design to commence in 2026. Performing Arts/Major Events Centre 5.7 There has been discussion regarding the need for a performing arts and/or a major events venue for Clarington. Currently our large events are held at the Garnet B. Rickard Recreation Complex. The main arena has seating for approximately 1,200 and is also the home to our Junior hockey and lacrosse teams. 5.8 With the construction of two new ice pads in Clarington, staff are confident there would be some flexibility in the annual scheduling for Pad A at the Garnet Rickard Complex that could accommodate additional large spectator events. 5.9 There was some very preliminary discussions, pre COVID-19, on providing large indoor space for performing arts. At this time there does not appear to be an immediate need for such a facility in Clarington and it may warrant further consideration in the future. 6. Concurrence 6.1 This report has been reviewed by the Director of Financial Services who concurs with the recommendations. 7. Conclusion 7.1 It is respectfully recommended that Council approve the recommendations, identified in this report as Option 1. This facility plan, as outlined in Report CSD-009-19, would include the design and construction of a twin pad arena, gymnasium, program/community space, administrative offices and a CPL branch library and would be located at the South Bowmanville location. The total project budget of $50,000,000 is to be funded through the issue of debt financing by the Region of Durham, as outlined in Report FND-031-20. 7.2 Should Council wish to reconsider the facility plan, the location, the budget and financing or the project methodology, we are asking that this report be referred back to staff for further investigation. Subsequently, staff would report back to Council in the Fall of 2021. Municipality of Clarington Page 15 Report CSD-003-21 7.3 Since the early 200019, supported by Development Charges funds, the Municipality has focussed on major indoor and outdoor recreation development in each of our major urban areas along the lakeshore. It commenced with the acquisition of land on Prestonvale Road in Courtice for the South Courtice Community Park, continued with the South Bowmanville Community Park on Baseline Road and finally the Newcastle Community Park on Rudell Road. Although an overall indoor facility plan was developed for each location, to date, we have yet to fully build out on any of these sites. In addition to providing the community a wide variety of indoor recreation and leisure activities LL G4JR_HJU;R AWI-LIHDIIHDmR W -U FD_W;SHLDb J LH I IFLHuFIr tWat can be realized that would effectively minimize the impact to annual operating budgets. 7.4 As was indicated in this report, much of the background work for the 2017 Indoor Facilities Development Strategy was completed in 2016. It is important for this information to remain current D_G-[F;MULLIJI&R:1CFLCVC&HMR❑[R❑Vub new Bowmanville facility, staff will undertake an internal review of the background information and the assumptions that drove the original recommendations. 7.5 We look forward to a decision on this new recreation facility that will provide quality indoor facilities and programs, not only to the residents of Bowmanville, but to all of Clarington. Staff Contact: George Acorn, Director of Community Services, 905-623-3379 ext. 2502 or gacorn@clarington.net. Attachments: Attachment 1 -1 Memo to Council October 28, 2019 Attachment 2 -1 Map of Land Use F1 Bowmanville Urban Area - Including Community Park Locations Attachment 3 -1 Proposed Facility Development Schedule from Indoor Facilities Development Strategy Interested Parties: There are no interested parties to be notified of Council's decision. . Attachment 1 to Report CSD-003-21 c1tv iWamp Memo If this information is required in an alternate format, please contact the Accessibility Co-ordinator at 905-623-3379 ext. 2131 To: Mayor Foster and Members of Council Andy Allison, CAO From: George Acorn, Acting Director of Community Services Date: October 18, 2019 Subject: South Bowmanville Recreation Centre F Items #4, #5 General Government Committee Meeting Minutes October 15, 2019 File: At this General Government Committee meeting the recommendations from staff report CSD-009-19, as outlined in Resolution #GG-458-19, were amended to add: That Staff report back to the October 28, 2019 Council meeting on the cost of adding a wellness/fitness component, amongst other items, in place of the office space of 5,600 Following discussion with the consulting team staff have prepared a revised facility program, as requested, IR5&R -1FL0I1FRL1C1LG-1FUF . This work was limited to a recalculation of the square footage of the facility and the associated impact on the overall project budget. The preliminary concept plan from the report has not been updated to reflect the proposed changes. Facilitv Sauare Footaae Adiustment: Original Gross Floor Area 148,281 square feet Delete Office Space ( 7,000) Add Wellness/Fitness 10,250 Add Fitness Change Rooms 2,863 Revised Gross Floor Area 154,394 square feet The revised plan would increase the gross floor area of the facility by 6,113 square feet. This reflects in a revised project budget increase of $3,403,770. It is important to note the cost per square foot of the fitness area and change rooms is more expensive than the deleted administration and office spaces. You will also see the revised budget includes the provision of fitness equipment. Page 11 The Corporation of the Municipality of Clarington 40 Temperance Street, Bowmanville ON L1 C 3A6 1 905-623-3379 Attachment 1 to Report CSD-003-21 CIVIIII c1tv Memo Revised Project Bu get: Original Construction Budget Delete Office Space Add Wellness/Fitness Add Change Rooms Revised Construction Budget Design/Engineering/Project Mgmnt Furnishings & Equipment Add Fitness Equipment Revised Project Budget $42,100,000 ( 2,069,600) includes 25% gross -up 3,652,500 includes 25% gross -up 1,047,800 includes 25% gross -up $44,730,700 4,473,070 10% of construction budget 1,705,300 500,000 $51,409,070 Project Cost Per Square Foot (average): Original Facility Program $48,005,300/148,281 sq. ft. _ $323.75/sq. ft. Revised Facility Program $51,409,070/154,394 sq. ft. _ $332.97/sq. ft. The revised facility program budget, as requested, reflects the deletion of 5,600 square feet of office space which includes Community Services administration offices and Clarington Tourism space. This space also includes the customer service area, facility and program operations offices, staff kitchenette, staff meeting room and a staff washroom. An allocation of space for some of these critical functions will need to be included in any final design program. Should Council approve the revised facility program to include wellness/fitness, the following resolution, from the Council meeting of May 12, 2003, would need to be rescinded: Resolution # C-286-03 Moved by Councillor Schell, seconded by Councillor Rowe WHEREAS the Municipality of Clarington recognizes that the fitness industry, as a local small business, is at a disadvantage when directly competing with organizations that do not pay the taxes that form a significant part of the small business owner's operating expenses; WHEREAS the Municipality of Clarington does not feel it is in the best interests of its residents to compete with the fitness industry who are meeting the needs of the community, Page 12 The Corporation of the Municipality of Clarington 40 Temperance Street, Bowmanville ON L1 C 3A6 1 905-623-3379 . Attachment 1 to Report CSD-003-21 cUrIn c1twiRw Memo WHEREAS the Municipality of Clarington is committed to responding to opportunities for business retention and attraction; NOW THEREFORE BE IT RESOLVED THAT the Municipality of Clarington hereby advises the local fitness facility owners that it will not enter into direct competition with the local fitness industry in new facility construction; and THAT the Association of Municipalities of Ontario be advised of Council's decision, and be requested to forward the resolution to the member municipalities for their consideration. CN�1:4:7/21#a The project team remains confident with the original recommendations stated in Report CSD-009-19 relating to a wellness/fitness centre and provide the following points from 1M-1-JLSR_Vffl:Z_A R❑J- qDM RIP D\5U[] 4.6 A centrally located fitness facility would be beneficial to the delivery of fitness services to our community, however, in the shorter term, we are concerned about the impact this would have on our existing membership base at Courtice Complex. Our membership base has remained relatively steady over recent years and staff agree that the current facility could accommodate increased memberships. 4.8 The provision of fitness facilities by Clarington is an area that is also serviced by the private sector. An existing Council resolution prevents development of municipal fitness centres in this facility and this must be reconsidered before moving forward with a fitness/wellness centre in this facility. Deferring this component to the second phase will allow staff to gauge the impact of population growth and the ability of the private sector to satisfy the needs of the community. Staff are currently working on the Investing in Canada Infrastructure Program application, with the deadline of November 12 approaching, and are confident we will have a competitive submission for provincial and federal consideration. There is a FM FJRI=-1-FR I❑FRP P ❑❑W lUW111D6SffDARE1D❑C[tourism has been specifically referenced as an integral partner to enhance service delivery for residents and would be a positive component of our funding application. I trust this information will be of assistance to you as you consider this item on October 28. Page 13 The Corporation of the Municipality of Clarington 40 Temperance Street, Bowmanville ON L1 C 3A6 1 905-623-3379 Attachment 1 to Report CSD-003-21 c1tw1w9win Memo Regards, George Acorn Acting Director of Community Services Page 14 The Corporation of the Municipality of Clarington 40 Temperance Street, Bowmanville ON L1 C 3A6 1 905-623-3379 Municipality of Clarington Indoor Recreation Facilities Development Strategy Section 5. Implementation of Expansion & Redevelopment Options Assessments contained in Section 4 have resulted in a number of recommendations, of which Figure 6 illustrates the proposed facility development timeline. The details and costs of each initiative are outlined in the pages that follow. The proposed timeline is contingent upon many factors including the actual level of population growth realized over the next fifteen years in relation to the forecasts used as the basis for this Strategy, participation levels and recreational preferences in the future, the financial capacity of the Municipality to undertake such works, competing priorities and pressures for other municipal services, life expectancy of existing facilities, etc. Figure 6: Proposed Facility Development Schedule Short -Term Design - Bowmanville Indoor Soccer Phase 1 Expansion Twin Pad Arena* Gymnasium Fitness / Wellness Centre Indoor Walking Track Youth & Older Adult Space Administration Offices 0 Medium -Term Design - Newcastle & District Recreation Complex Phase 1 Expansion Fitness / Wellness Centre Youth & Older Adult Space 0 2017 2019 2021 _ �JWI 2018 2020 Long -Term Design — Courtice Community Complex Expansion New Teaching Pool Design - Newcastle & District Recreation Complex Phase 2 Expansion Twin Pad Arena** Indoor Walking Track 2023 2025 2027 2029 2031 =i 1 11 •=• • • • 2022 2024 2026 2028 2030 0 Design - Bowmanville Indoor Soccer Phase 2 Expansion: to Indoor Aquatic Centre Design - South Courtice Arena Expansion: Gymnasium * A twin pad arena in Bowmanville is recommended based on the estimated hours being contracted by minor sport users in surrounding municipalities, expansion of adult hockey opportunities as well as the expansion of recreational programs and services provided by the Municipality. Construction would commence after the Municipality confirms sufficient ice -related demand exists based on market conditions at that future time. ** A twin pad arena is recommended in Newcastle subject to the results of an arena needs assessment in 2023. Monteith Brown Planning Consultants with TRA & MJMA I Page 52