HomeMy WebLinkAboutPDS-025-21Staff Report
If this information is required in an alternate access ible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: April 26, 2021 Report Number: PDS-025-21
Submitted By:
Reviewed By:
File Number:
Report Subject:
Ryan Windle, Director of Planning and Development Services Andrew C.
Allison, CAO By-law Number:
PLN 26.15.1 Resolution#:
Darlington New Nuclear Build, License Renewal Hearing
Recommendation:
1.That Report PDS-025-21 be received for information; and
2.That Council adopt the following resolution:
That the Darlington Nuclear Generating Station has been a significant part of the
Municipality of Clarington since the 1980s, and has provided many positive
benefits to the community with minimal adverse effects on the natural
environment;
That the Municipality of Clarington Council and Staff have attended numerous
meetings and information sessions with respect to the Darlington New Nuclear
Power Plant Project and are therefore very knowledgeable with respect to the
Project; and
That the Municipality of Clarington retained a qualified team of professionals to
undertake a detailed peer review of the draft Environmental Impact Statement for
the Darlington New Nuclear Power Plant Project and, on the basis of this peer
review, can state with confidence that the Environmental Impact Statement
meets the requirements of the Guidelines for the preparation of the document
and that it satisfactorily addresses the Municipality's issues and concerns with
respect to the Project;
Municipality of Clarington Page 2
Report PDS-025-21
That the Municipality of Clarington's peer review of the Environmental Impact
Statement for the Darlington New Nuclear Power Plant Project agreed with the
study’s conclusions;
That Council and the residents of the Municipality of Clarington have been
steadfast in their support for the proposed Darlingto n New Nuclear Power Plant
Project and are eager to have nuclear power generation continue as a positive
presence in our community;
That Council and the community of Clarington are very supportive of the use of
Small Modular Reactors (SMR) as it would avoid the use of cooling towers, thus
minimizing the impact on aquatic organisms and habitat and any associated
socio-economic impacts for Clarington and Durham Region, for the Darlington
New Nuclear Power Plant Project;
That Clarington Staff has worked with representatives of the Canadian Nuclear
Safety Commission (CNSC), Ministry of Municipal Affairs and Housing, Durham
Region and Ontario Power Generation to ensure that sensitive land uses are
addressed within the three-kilometer buffer zone;
That many traffic and transportation network improvements have been
implemented over the past decade to address potential deficiencies within the
network and Clarington Staff have reviewed the findings of the updated Traffic
Assessment Report, September 2019; and
That the Council of the Municipality of Clarington hereby advises the CNSC that
it supports the Darlington New Nuclear Power Plant Project and strongly
supports the use of SMR technology;
3. That the Mayor and Senior Staff accept the invitation of the CNSC to appear at the
hearing in June to outline the Municipality’s support for the project, our involvement and
comments as set out in Report PSD-010-11 and reaffirmed in this Report PDS-025-21;
and
4. That the Canadian Nuclear Safety Commission and Ontario Power Generation and all
interested parties be notified of Council’s decision.
Municipality of Clarington Page 3
Report PDS-025-21
Report Overview
Ontario Power Generation has applied for renewal of their Canadian Nuclear Safety
Commission license for site preparation in anticipation of the Darlington New Nuclear Plant.
Clarington participated in the review of the Environmental Assessment and fully supports the
findings and the works that have occurred over the past decade .
It is recommended that Clarington continue to support and prom ote the development of New
Nuclear at the Darlington site and particularly the development of Small Modular Reactors.
1. Background
Purpose of the Report
1.1 To advise Council of the notice and invitation from the Canadian Nuclear Safety
Commission (CNSC) to submit comments and attend the public hearing on June 9-10,
2021.
1.2 To inform Council of the Municipality’s previous comments on the New Nuclear site
preparation licence and updates that have taken affect over the decade.
The Project
1.3 Ontario Power Generation (OPG) was directed by the Ontario Ministry of Energy in June
2006 to begin the federal approvals process (including an environmental assessment
(EA)) for new nuclear units at an existing site. OPG initiated this process, and in
September 2006 submitted an application for a Licence to Prepare the Site to the CNSC
for a new nuclear power generating station at the Darlington Nuclear site, located in the
Municipality of Clarington on the north shore of Lake Ontario, in the Region of Durham.
1.4 The Darlington New Nuclear Plant (DNNP) is proposed to be located primarily on the
easterly one-third of the Darlington Nuclear site, with reactor buildings a nd other related
structures located south of the CN rail line. The proposed development involves the
construction and operation of four nuclear reactor units supplying up to 4,800
Megawatts (MW) of electrical capacity to meet the baseload electrical requi rements of
Ontario. Figure 1 shows the site of the DNNP and the existing Darlington Nuclear
Generating Station in proximity to St. Marys Cement and Bowmanville’s residential area.
Municipality of Clarington Page 4
Report PDS-025-21
Figure 1 is the New Nuclear Site within the OPG lands.
CNSC Licence
1.5 The EA considered the three phases of the DNNP (Site Preparation and Construction,
Operation and Maintenance, and Decommissioning and Abandonment) extending over
approximately 140 years. OPG was first granted approval by the CNSC for a Site
Preparation license in 2012. The license has a ten-year lifespan and is now being
considered for renewal.
1.6 CNSC is holding the hearing to consider OPG’s application to renew its nuclear power
reactor site preparation licence for the DNNP. The licence expires in August 2022.
1.7 The current licence authorizes OPG to prepa re the Darlington Nuclear site for the
potential future construction and operation of a new nuclear generating station. A
separate application and licensing process, with public participation, will be necessary
should OPG decide to go forward with the construction and operation of new nuclear
reactors within the Darlington site.
Municipality of Clarington Page 5
Report PDS-025-21
1.8 OPG is currently managing the site, focusing on items with longer lead times, such as
the Bank Swallow Program, aquatic environment characterization and once -through
condenser cooling.
1.9 OPG is seeking a 10-year licence renewal and amendment of its licensing basis to
include modern regulatory references as well as modern codes and standards.
Clarington’s Prior Actions
1.10 During the preparation of the EA by OPG, Clarington undertook a Pe er Review and
provided comments to OPG to strengthen their EA submission (Report PSD-073-09), a
subsequent report provided support for the OPG recommended once-through lake
water cooling system and strongly opposed the use of cooling towers (Report PSD-076-
10). Report PSD-010-11 set out Clarington’s support for the DNNP project. Clarington
also entered into a Host Community Agreement (Report CAO-003-09). Clarington’s
Mayor and Senior Staff appeared in support of OPG’s application during the March
2011 CNSC Hearing.
2. Progress on Issues
CNSC Recommendations – Land Use
2.1 As a result of the March 2011 CNSC hearing and review, Recommendations 43, 44, 45
and 59 were in whole or part directed to the Municipality of Clarington. We were to
address land use planning in and around nuclear generating stations and regarding
sensitive residential development and public facilities (e.g. schools and recreation)
within a three-kilometre buffer. As a result of these recommendations CNSC staff-
initiated discussions with representatives from the Ministry of Municipal Affairs and
Housing, Durham Region, Clarington and OPG. The result of this process were
changes to the Provincial Policy Statement (PPS) in 2014 to address the inclusion of
electricity generation facilities under the definitions of development, infrastructure and
major facilities such that Policies 1.2.6.1 and 1.2.6.2c would apply for sensitive land
uses.
2.2 Once included in the PPS, Clarington amended their Official Plan (Policy 3.7.9) to
address the appropriate setbacks from the Nuclear Plant for sensitive land uses. To
ensure this is implemented, any development applications within three kilometres of the
OPG site, using the centre of the site, are circulated to OPG and CNSC for their
comments.
Municipality of Clarington Page 6
Report PDS-025-21
Traffic Improvement Implementation
2.3 For renewal of the license, OPG is required to show it has taken reasonable steps to
update all studies previously completed as part of the licensing process to account
for any changes since 2009. Since that time, Highway 418 has been built, the Holt
Road Interchange has been totally redeveloped and South Service Road has been
shifted south. The following table from the updated Traffic Assessment Report
outlines the improvements to intersections that have occurred over the past decade.
Table 3-1 from the Traffic Assessment Report Intersection Changes – 2009 to 2019
Intersection Applied Changes Since 2009
King Street at Courtice Road Introduction of an exclusive southbound right-
turn lane
King Street at Solina Road Southbound left-turn prohibited (temporary)
King Street at Maple Grove Road Signalization of the intersection
Introduction of a southbound left-turn lane and
channelized southbound right-turn lane
Introduction of a northbound left-turn lane and
channelized northbound right-turn lane
Highway 401 Eastbound Ramps at
Courtice Road
Intersection modified to have an exclusive left-turn
lane and a shared through/right-turn lane at the
off-ramp
On-ramp relocated to be aligned with on-ramp
(currently under construction, assessed as
existing as part of this study)
Courtice Road at Energy Drive New stop-control Intersection (as Energy Drive
did not exist previously)
Park Road at Energy Drive Previously Park Drive at South Service Road
Introduction of a westbound left-turn lane
Introduction of a northbound right-turn lane
Highway 401 Westbound Ramps
at Holt Road
Change from stop-control to roundabout-control
Additional through lanes on both approaches of
Holt Road with removal of southbound left-turn
lane
Introduction of westbound left-turn lane
Highway 401 Eastbound Ramps
at Holt Road
Change from stop-control to roundabout-
control Intersection now separate from what
was previously South Service Road (i.e. no
westbound receiving lane)
Additional through lanes on both approaches of
Holt Road with removal of northbound left-turn
lane
Energy Drive at Holt Road New roundabout intersection
Highway 401 Eastbound Previously Highway 401 Eastbound Ramps at
Municipality of Clarington Page 7
Report PDS-025-21
Intersection Applied Changes Since 2009
Ramps at Energy Drive* South Service Road
*Note: Energy Drive (previously South Service Road) at its intersection with the Highway 401 Eastbound ramps, as well
as the Highway 401 Westbound off-ramp at its intersection with Bowmanville Avenue, were previously assessed with
additional turning lanes per the 2010 study (compared to the 2019 existing conditions.
2.4 Clarington Staff participated along with MTO, the Region, OPG, Metrolinx and others on
the Transportation Working Group to ensure implementation of the traffic improvements
in Table 3-1. The updated Traffic Assessment Report was completed in 2019 and
submitted to Clarington staff for comment. Public Works staff have reviewed and
accepted the report.
2.5 The 2019 Traffic Assessment Report also analyzed the traffic associated with the
progress of the DNNP through its various stages of construction and operation. It is
projected to have a minor impact on the traffic operations within the study area road
network under the 2022 future total conditions. The additional traffic is projected to have
a negligible impact on delay at the signalized study intersections during the study
periods. Additionally, all turning movements at the stop-controlled intersections are
projected to remain under capacity with a Level of Service D or better, except for select
turning movements at the intersection of Energy Drive at Courtice Road.
2.6 The Traffic Assessment Report modelled five-year increments of traffic generation for all
OPGs activities. The traffic generation model considered the DNNP site, DNGS
operations (staff), Refurbishment contractors and OPG Headquarters Campus. I n the
modelling forecast it is anticipated that by 2031 a signalized intersection will be
necessary at Holt and Baseline Roads. This recommendation will have to be reviewed
in the context of a future update to the Clarington Master Transportation Plan to account
for growth in the area.
OPGs Application
2.7 OPG’s current Power Reactor Site Preparation Licence is for up to four reactor units
with a maximum net electrical output of 4,800 megawatt (MW).
2.8 Site preparation activities listed in the renewal application include:
a. Construction of site access control measures;
b. Clearing and grubbing of vegetation;
c. Excavation and grading of the site to a finished elevation of approximately 78 masl
(metres above sea level);
d. Installation of services and utilities (domestic water, fire water, sewage, electrical,
communications, natural gas) to service the future nuclear facility;
e. Construction of administrative and support buildings inside the future protected area;
Municipality of Clarington Page 8
Report PDS-025-21
f. Construction of environmental monitoring and mitigation systems; and
g. Construction of flood protection and erosion control measures.
2.9 OPG’s application for licence renewal replicates their original 2009 application .
However, the new nuclear project development now being proposed is much smaller at
300 to 400 MW net facility output. OPG in their Notice of Intent for Submission, dated
December 2, 2020 to the CNSC, notified the regulator that they “intend to apply for a
licence to construct for a grid-scale Small Modular Reactor (SMR) facility.” SMRs are in
the range of 300-400 MW net facility output and would not require cooling towers. SMRs
are small nuclear reactors aimed at new markets to tackle global needs for safe, clean ,
economic energy.
2.10 Subsequent to the EA approval in 2011, OPG prepared an options assessment for
condenser cooling water and concluded that once through cooling with lake water was
the best available technology economically achievable. OPG is now working towards
the construction of SMRs for DNNP, which is a smaller project in scope. OPG undertook
a study in 2020 to assess the cost competitiveness for a SMR scope. OPG will need to
demonstrate the performance criteria for once through cooling can be met during the
detailed design stage and as part of the application for a licence to construct.
2.11 OPG is considering potential options for the on-grid deployment of SMR technology with
three SMR technology development companies. OPG is positioning themselves to lead
the development and deployment of grid-scale SMRs.
2.12 OPG has not selected a technology partner, or reactor design, for the DNNP, that is a
future step. OPG continues to be open to potential opportunities, including from other
developers. They are seeking a strong business case. The specific technology would
be the subject of a subsequent application to CNSC for a license to construct. OPG has
committed to provide CNSC with a Licence to Construct Plan document by June 30,
2021.
3. Clarington’s Comments
3.1 Clarington supports Canada’s SMR Action Plan launched in December 2020. Clarington
supports OPG’s development of the first on -grid SMR application in Canada, if that is
the technology selected.
3.2 Durham Region is the home of the Centre for Canadian Nuclear Sustainability and is a
hub of nuclear academia, engineering and manufacturing. The Region is positioned to
be the centre of excellence in Canada for nuclear generation, research and
development, supply chain, and deployment of innovative nuclear technology, nuclear
waste minimization and fuel recycling.
3.3 Clarington values OPG’s continued dedication to community organizations, our post-
secondary institutions, local procurement and the relocation of their administrative
headquarters to Clarington.
Municipality of Clarington Page 9
Report PDS-025-21
3.4 As a leader in municipal efforts to address climate change, Clarington appreciates that
the clean electricity supply provided by the DNNP will enable our community to pursue a
strategy to help meet Clarington’s Climate Change initiatives and the Durham
Community Energy Plan target of 80% below 2007 levels by 2050 for greenhouse gas
(GHG) emissions.
3.5 Clarington is pleased to work in partnership with OPG on various initiatives including
public awareness, emergency management, transportation network improvements,
potassium iodide (KI) pill distribution, and on the Darlington Community Advisory
Council. Clarington is committed to strengthening this partnership.
3.6 Clarington has implemented land use policies and protocols to address the restriction of
sensitive land uses within the three kilometre buffer from the centre of the site.
Clarington is committed to ensuring appropriate land use and emergency planning.
4. Concurrence
4.1 This report has been reviewed by the Director of Public Works and the Fire Chief who
concur with the recommendation.
5. Conclusion
5.1 The effectiveness of Clarington and OPGs ongoing partnership is reflected in our
ongoing open dialogue on a range of issues. OPG provides briefings and updates to
Council and the community on a regular basis and at the Darlington Community
Advisory Council meetings.
5.2 It is respectfully recommended Council endorse the Resolution outlined in
Recommendation #2. That Staff register and provide this Report as Clarington’s written
submission to the CNSC Secretariat by May 3, 2021 indicating the Mayor and Senior
Staff will be attending the hearing as requested .
5.3 Inform CNSC, Clarington has confidence in the approved EA from 2010 and support
OPGs application to renew its site preparation licence.
Staff Contact: Faye Langmaid, Manager of Special Projects, 905-623-3379 x2407 or
flangmaid@clarington.net.
Attachments:
Not Applicable
Interested Parties:
List of Interested Parties available from Department.