HomeMy WebLinkAbout75-163Report No. 161
REPORT ON APPLICATION for OFFICIAL PLAN
AMENDMENT NO.50. Ri'�e Pin, e Park, Lots
1. 2 and 3. B.F. Cc..-ession, Darlington: -
1. Purpose of Application -
An application was submitted to the Region for an amendment to
the Darlington Official Plan to permit a Light Industrial Subdivi-
sion on a 185 acre parcel comprising of lots 1, 2 and 3, Broken
Front Concession, Darlington. This application was referred to the
Town of Newcastle for processing on May 6, 1975, and was subsequ-
ently referred to the Planning Advisory Committee.
2. Official Plan Provisions -
The Darlington Official Plan designates the subject site
"Agricultural". The site is designated "Rural" and "Environmental
Protection Area" in the Interim District Plan. Since the applicant
is proposing a 200 foot wide park on the section of the site desig-
nated "Environmental Protection Area", an Amendment would not be
required for this section.
However, the applicant would require an "Industrial" designation
on the rest of the site.
3. Zoning Provisions
The site is presently zoned "Agricultural" in the Darlington
Zoning By-law. This zoning would not permit the proposed Industrial
Park. The applicant wishes to apply for rezoning to Industrial if
this application for Official Plan Amendment is approved.
2 -
4. Circulation of Application -
This application was circulated to the following agencies for
their comments.
(1) Durham Works Department
(2) Durham Health Unit
(3) Bell Canada
(4) Central Lake Ontario Conservation Authority
(5) Ministry of Transportation and Communications
(6) Ontario Hydro
(7) Newcastle Works Department
(8) Newcastle Building Department
(9) Newcastle Fire Department
(10) Canadian Nation Railroad
(11) Canadian Transport Commission
(12) Ministry of Industry and Tourism
All of these agencies replied.
5. Resume of Comments -
(1) The Durham Works Department - advised that the subject lands
are located outside the sewer and water service areas and that they
have no plans to extend services to the area at this time.
They also requested an indication from the Region and the Town
of Newcastle Planning Department as to their position with respect
to both developments proposed by Ridge Pine Park in order that the
developers proposals for servicing may be given consideration by the
Regional Works Department and Works Committee.
(2) The Durham Health Unit - advised that they had no objections
to the applicant's proposal.
(3) Bell Canada - advised that they had no objections to the
applicant's request.
that the land appears generally suitable for the proposed develop-
- 3 -
(4) (continued).....
ment. However, they expressed concern about the well defined drain-
age course which traverses the property. They pointed out that the
manner in which this applicant proposes to deal with the drainage
course in relation to the water reservoir is very vague. They sug-
gested that more detailed plans should be required by the Town of
Newcastle before the proposal is approved for development.
The waterfront on this property is slated for eventual acquisition
as part of a waterfront park of regional significance. The rate of
erosion at the crest of the bluff is, on the average, approximately
1.1 feet per year.
(5) The Ministry of Transportation and Communications - advised
that the rezoning of this property would be beyond their juriddic-
tion and that the property could be served by the Cobbledick and
Bennett Road interchanges.
(6) The Ontario Hydro - advised that there is both three phase
primary voltage and sub -transmission voltage available in the area
to serve commercial and industrial customers. They also stated
that the recommended route for the Solandt Commission runs through
this site.
(7) The Newcastle Works Department - advised that the applicant
will be required to enter into an agreement with the Town and meet
their specifications. They recommended that consideration be
given to improving Bennett Road in relation to such things as pave-
ment widths and granular base. The advisability of directing the
major traffic flow from the industrial site into a residential
4 -
site was questioned. It was suggested that this route be relocated.
(8) The Newcastle Building Department - advised that there is,
at present, serviced and unserviced land not being used.
(9) The Newcastle Fire Department - advised that the subject
site has no access from an improved road and that the existing
roads would need to be improved. The recommended travel distance
from a fire station for industrial areas is not more than one and
a half to two miles.
The Department would require the following safety devices.
1. watermains capable of producing 6000 gallons per
minute, primary feeders, secondary feeders and
distributors of a gridron arrangement, no dead
end mains
2. storage reservoir or stand-by pump
3. hydrants which would deliver 250 gallons per
minute from each 22 inch outlet. These hydrants
should have a large suction connection and should
be spaced not more than 300 to 400 feet from the
building be protected
(10) The Canadian National Railway - advised that they had no
objections to the proposal.
(11) The Canadian Transport Commission - advised that rail
traffic on the C.N.R. line which crosses the property is fast and
frequent. At the very least, it is entirely likely that autom-
atic signal protection would be required and, if vehicular traffic
is appreciable, a grade separation could be required.
(12) Th�_yinistry of Industry and Tourism - stated that the
availability of fully serviced industrial sites is needed in
Durham Region. The location of this site is good. Housing avail-
- 5 -
(12) (continued).....
ability in the area is good and with further development it would
provide the necessary work force.
It was suggested that these lots be available for purchase, not
lease, and that lots of this size would call for fairly large oper-
ations unless subdividable.
6. Comments -
A decision as to the desirability and practicality of a develop-
ment of this nature on the subject site must take into consideration
several major factors which affect the site; namely access, servic-
ing, surrounding land use, agricultural capability and Lake-
shore recreational potential.
(1) Access - The subject site is located south of the 401 and
the C.N.R. mainline and east of the existing Bennett Road Interchange.
The proximity to this C.N.R. mainline is highly desirable
from the standpoint of transportation of materials which could be
facilitated by a spur line. However, this line is heavily used
and the problem of workers and industrial traffic crossing the line
to get to the site would have to be resolved. This would require
the construction of a grade separated crossing.
At present, access from Hwys. 401 and 115 is possible via
the Bennett Road Interchange. However9 there are at present too
many Interchanges in the Bowmanville area. The Bowmanville Con-
cept Plan suggests the elimination or restriction of the Bennett
Road and Liberty Street interchanges and their replacement by an
6 -
interchange at Carastrap Street. The widening of Highway 401 is
currently under study by DeLeuter Cather consultants on behalf of the
Ministry of Transportation and Communications, and the Bennett Road
interchange may be downgraded to a simple overpass without access
to the Highway. This interchange is already too close to the Hwy.
115 interchange for proper design and the present structure is not
wide enough to accomodate six lanes of traffic and acceleration
and deceleration lanes. It is likely that this interchange will be
replaced by another located somewhere between Liberty Street and.
Bennett Road.
If this were implemented, an east -west service road would be
11 required south of the 401 from the new interchange to this subdivi-
sion. Conservative estimates of the cost of construction of this
road, the construction of the bridge over the Rail line on the pro-
posed road, the upgrading of Bennett Road south of the 401, and
the upgrading of Bennett Road to Hwy. 2, exceed $3 million. Since
the applicant would be the only major benefactor of this upgrading
he should be required to pay the costs incurred.
(2) Servicine - The Interim District Plan suggests that only
those industrial uses which can properly function on private water
supply and/or sewage disposal systems will be permitted. where ser-
vices are not available. These industries would necessarily be low
water users. Most industry presently requires full piped services
to function effectively. Full piped services are especially essen-
tial in an area such as this, which is fairly low and contains
a watercourse which could easily be containinated.
- 7 -
The Town's sewer and water mains do not serve these lots or
any nearby lands. The nearest sewer connections in either direction
are 22 miles away. The cost of extending these mains to serve one
development would be prohibitive and would have to be bourne by the
applicant. The servicing of these lands would only be economically
feasible if and when urban development extended to this either from
Bowmanville on the west or Newcastle on the east.
(3) Surrounding Land Use - The subject land includes the route
suggested by the Solandt Commission for a600 foot wide power Trans-
mission Corridor. This corridor would remove 57 acres from the
developable land. A reduction of this scale might make the costs
involved on the provision of services uneconomical.
The eastern half of the applicant's property has been proposed
for a Mobile Home Park. The problems cited for the Industrial Park
also apply to this proposed Mobile Home Park. Additional problems
would be caused by allowing the main access to this residential
area to pass through an industrial park. There could be a traffic
conflict between residential and industrial traffic passing through
an industrial area and eastbound industrial traffic would be likely
to pass through the proposed adjacent residential development.
(4) Aggicultural Capability - The site is designated in the
Canada Land Inventory as Class I agricultural land. If this were
an extension of an existing industrial area which could be easily
serviced, the loss of agricultural land might be justified, but
when the enormous costs of servicing this site are considered, the
sacrifice of agricultural land seems unjustifiable.
(5) Lakeshore - The Conservation Authority have long term
plans to eventually acquire the waterfront lands in this area.
Indeed, it would be desirable for the remaining strip of land to the
south of the proposed transmission line to b•e acquired for recrea-
tional purposes at the same time as land for the Hydro corridor is
expropriated. We consider that a 200 foot wide strip is inadequate
for recreational use and would tend to be encroached upon by open
storage, being located at the rear of industrial lots. In fact
allowing industry to approach so close to the lake would encourage
the disposal of waste materials into the lake itself. A 1000 foot
setback would be more appropriate.
7. Conclusion - It is evident that the proposed Industrial Park would
economically impractical unless the Regional Official Plan proposed
extensive development to the east or west of the site to justify the
installation of the necessary infrastructure. (ie. sanitary services,
roads and bridges) to serve the site. It should aslo be noted that
there is already sufficient land zoned for industry and within or
near serviced areas to accomodate more current rate of industrial
development for many years to come. It is therefore recommended
that the Region be advised as.follows:
(a) This proposal for amendment to the Darlington Official Plan
does not appear to constitute the most appropriate location for
industrial development at this time.
(b) The ,proposal appears to be potentially viable only if urbaniza-
tion is to occur to the immediate east or west of the site.
- 9 -
(c) The proposal can only be further evaluated when decisions have
been made with respect to the widening and reconstruction of
Hwy. 4019 the use of lakefront lands, and the location of the
proposed power transmission corridor.
Respectfully submitted,
George F. Howden,
Planning Director.