HomeMy WebLinkAboutFSD-013-21Clarington Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: March 8, 2021 Report Number: FSD-013-21 Submitted By: Reviewed By: File Number: Trevor Pinn, Director of Financial Services Andrew C. Allison, CAO CL2021-2 Report Subject: Farewell Creek Trail Phase 2A Recommendations: 1. That Report FSD-013-21 be received; Resolution#: GG-245-21 By-law Number: 2. That Ratcliff Excavating & Grading Inc. with a total bid amount of $ 1,150,694.96 (net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of Tender CL2021-2 and subject to a satisfactory reference check be awarded the contract for the work required to complete the Farewell Creek Trail Phase 2A project; 3. That the total funds required for this project in the amount of $1,360,100.00 (net HST rebate), which includes the construction cost of $ 1,150,694.96 (net HST rebate) and other costs such as material testing, utility daylighting, inspection and contract administration, permits fees and contingencies in the amount of $209,405.04 (net HST rebate) is within the approved project budget and will be funded by as follows: Description Account Number Amount Farewell Creek Trail Phase 2 110-32-325-83288-7401 $1,261,800 Various Erosion Protection Works 110-36-340-83437-7401 98,300 4. That all interested parties listed in Report FSD-013-21 and any delegations be advised of Council's decision. Municipality of Clarington Report FSD-013-21 Report Overview Page 2 To request authorization from Council to award the contract for the completion of Phase 2A of the extension of the Farewell Creek Trail as detailed in Tender CL2021-2 1. Background 1.1 This project is for the completion of the new trail extension for Farewell Creek Trail including benches, two pedestrian bridges, stormwater management pond outfall culvert crossing as well as creek bank stabilization work. 1.2 Design and tender specifications for the trail extension were prepared by CIMA and provided by the Public Works Department. 1.3 Tender CL2021-2 was prepared and issued by the Purchasing Services Division. The tender was posted electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyers Association's website. 1.4 The tender closed on March 1, 2021. 2. Analysis 2.1 Forty-one companies downloaded the tender document. Eight submissions were received by the stipulated closing time. One submission was received after the closing time and was deemed non -compliant. 2.2 The Municipality contacted the thirty-two companies who chose not to respond, to inquire as to why they chose not to submit a bid. Their responses are as follows: • One company is an association for distributing the tender document to its members; • Three companies advised that after reviewing the document they could not take on the project due to their current workload; • Three companies advised that the work was outside of the scope which they could complete; • Two companies advised that they felt they could not bid competitively; • Three companies advised that they downloaded the document with the interest of being a sub -contractor for the project; • One company advised that they were interested in the project however upon further review of the specifications felt that they could not bid competitively; and Municipality of Clarington Report FSD-013-21 Page 3 Nineteen companies contacted did not respond to the Municipality's request for information. 2.3 The eight bids received prior to the closing were reviewed and tabulated by the Purchasing Services Division (see Attachment 1). All eight submissions were deemed compliant. 2.4 The bid results were forwarded to the Public Works Department for their review and consideration. 2.5 After review, analysis, and discussions it was mutually agreed by the Public Works Department and the Purchasing Services Division that the low bidder, Ratcliff Excavating & Grading Inc., be recommended for the award of Tender CL2021-2. 2.6 Ratcliff Excavating & Grading Inc. has not completed work for the Municipality in the past and therefore references provided are being contacted. 3. Financial 3.1 The total funds required for this project in the amount of $1,360,100.00 (net HST rebate), which includes the construction cost of $ 1,150,694.96 (net HST rebate) and other costs such as material testing, utility daylighting, inspection and contract administration, permits fees and contingencies in the amount of $209,405.04 (net HST rebate) is within the approved project budget and will be funded by as follows: Description Account Number Amount Farewell Creek Trail Phase 2 110-32-325-83288-7401 $1,261,800 Various Erosion Protection Works 110-36-340-83437-7401 98,300 4. Concurrence This report has been reviewed by the Director of Public Works who concurs with the recommendations. 5. Conclusion It is respectfully recommended that Ratcliff Excavating & Grading Inc. being the lowest compliant bid and subject to a satisfactory reference check be awarded the contract for the construction of the Farewell Creek Trail Phase 2A in accordance with all the terms, conditions, specifications, and drawings of Tender CL2021-2. Municipality of Clarington Report FSD-013-21 Staff Contact: David Ferguson, Purchasing Manger, 905-623-3379 ext. 2209 or dferguson@clarington.net. Attachments: Attachment 1 — Bid Summary Interested Parties: List of Interested Parties available from Department. Page 4 Municipality of Clarington Report FSD-013-21 Attachment 1 - Bid Summary Page 5 Municipality of Clarington CL2021-2 — Farewell Creek Trail Phase 2 Bid Summary Bidder Total Bid (including HST) Total bid (Net HST Rebate) Ratcliff Excavating & Grading Inc. $1,277,796.09 $1,150,694.96 Elirpa Construction & Materials Limited $1,345,135.66 $1,211,336.32 CSL Group Ltd. $1,350,783.07 $1,216,422.00 Urgiles Brothers Excavating Inc. $1,595,019.00 $1,436,364.01 Blackstone Paving and Construction Ltd. $1,714,726.18 $1,544,164.38 Dynex Construction Inc. $1,841,346.30 $1,658,189.38 39 Seven $1,996,993.50 $1,798,354.50 DigCon International Limited $2,251,541.95 $2,027,583.26 MS Architectural Limited noncompliant