TOWN OF B OWMANV ILLE
BY -LAW NO. }.
A By -law of the Corporation of the Town of
Bowmanville to authorize the construction of certain
works as Local Improvements under the Local Improve-
ment Act.
WHEREAS petitions have been received by the Council of
The Town of Bowmanville for the construction of certain works as ,
0%6.,;-c * ot)" 1
Local Improvements as set forth in Schedule "A" hereto annexed and
*4vA.w the Clerk has certified that the petitions are sufficiently signed,
and it is expedient to grant prayer of the petitions in the manner
herewith provided;
AND dHEREAS the Council has procurred reports in regard
to the works as required by Section 40 of the Local Improvement Act,
Chaps. 223 R.S.O. 1960.
NOW THEREFORE the Council of the Corporation of the Town
of Bowmanville enacts as follows:
1. That the report procured by the Council in connection with the
works set forth in Schedules "A" "B" "C" & "D" hereto attached be, and
the same are hereby approved and adopted.
2. That the works set forth in Schedules "A" "B" "C" & "D't hereto
attached shall be constructed on the streets between the points as
therein mentioned as Local Improvements under the provisions of the
Local Improvement Act.
3. That the Public Utilities Commission of the Town of Bowmanville
do forthwith arrange for plans, profiles and specifications and furnish
such information as may be necessary for the making of a contract for
the execution of the work.
4. That the work shall be carried on and executed under the supervision
and according to the direction and order of such Public Utilities Com-
"` Mission.
5. That the Mayor and Clerk be authorized Vo cause a contract for the
construction of the work to be made and entered into with some person
or persons, firm, or corporation, subject to the approval of this
-z-
Council to be leclaro;A by resJj-utj-)i,,.
6. Th.tt t1io Treasurer may, subject to the approval of Council, agree
with ally Batik or .)er-3,.,)n for the temporary a-v;jIlcos of money to ryteet
the CO-A of the ,,;()rks pelld'11, tile co;-Rpletion
I _� )f it.
7. "that the spacial asaessAent for each of the s ail works shall be
I
P:Aid by Lila number of illatalmenLs as set forth in the said 3chodules
8. That the debentures to be issued for the loan to be effected to
pay nor thi... c;)st �.f eacA if tila'. s aid wc)r.: 3 wile,, comple,
%. shall bear
i"tere-14L at s-ch rlatas j.5 the Council may detertuirie and shall be made
PaYatie
On Lae inz;talrient
plan
within the nuraher of years as km shown
ill S aij
ft� i Tt TfB"
3ell edulas
It(,V "
& "D".
i
90 1 any iohat ersoil iose lot is specially assessed may commute for a
T
payment in cash the specia.-L rates im-tpoi;ed theAn by payillt-, the portion
Of th-0 c0st, cf constructiun asseused upon such lot, withouL the interest
J,jW 4 4 til
fort . -after the sT�ecial as3ess,-:&nt roll has been certified by the
Clerk.
This by-law Shall not take effect until approved by the
Ontario Municipal board.
-�'Aj a first and sec.,.nd time this 'j_4
day of 4-44--1- A.D. 1964.
Mayor
_7-
Clerk
�i finally passed this _1'4daY OfOol6e✓ H.J. 1964.
Ulerk
I, Jack L. Reid, Clerk - Treasurer of the Corporation of
the Town of Bowmanville, hereby certify this to be a
true copy of Town of Bowmanville By -law No. 1921, passed
by the Council of the Town of Howmanville on the 5th
day of October, 1964.
Clerk
• �. Tf1WN OF R ANV ER, ONTARIO Schedule -'A" to
By -law 1921.
ENGINEER'S REPORT RE LOCAL IMPROVEMENT
NATURE OF WORK Installation of a 6" diameter Watermain and Appurtenances on Duke
Street from the South Limit of Highway No. 401 to a point 550' South.
Lifetime of the improvement.
Estimated Lifetime 21 years
400.2eductions, if any, which ought to be made unaer the
provisions of Section 28 in respect of any lot and the
aggregate amount of such reductions.
nil
Estimate of the cost of the improvement.
L
Total Estimated Cost $ 65,025.00
roportion of the cost which should be borne by the
Portion of cost borne by Corporation $ 1,677.60
land abutting directly on the work and by the Corpor-
portion of cost borne by Owners $ 4,347.40
ation respectively.
` _.cial rate per foot frontage.
Special Rate per foot frontage $3.60
p vial annual rate per foot frontage.
20 year debentures at 5 -3/4% interest
Special Annual Rate per foot frontage 30.750
Number of instalments by which special assessment
should be made payable.
20 Equal Annual Installments
Whether it would be equitable or inequitable to charge
It would be equitable t0 charge the whole of the
the whole of the owner's portion of the cost on the
land abutting directly on the work.
owner's portion of the cost on the land abutting
directly on the work.
uitable to do so, what portion of the cost should
Note: The cost of individual house service connections
be born the Corporation ; what portion thereof
may be charged to the respective owners Ori 8
should be specs ssessed upon the land abutting
directly on the work, hat land not abutting
frontage basis over and above the special rate
directly on the work will be imm ' 1 benefited and
per foot frontage shown. The total estimated
'ould be specially assessed for any par he cost
cost shown above includes an allowance of $625.00
and the portion of the cost which should be speci
for 5 individual house service connections.
assessed upon it.
PROCTOR & REDFERN _ �'-
CIVIL AND CONSULTING ENGINEERS
TORONTO, June 1st., -19- 64_
3 -59 an Butler, P.Eng. Engineer
• TOWN OF BOWMANVILLE, ONTARIO Schedule "B" to
By -law 1921
ENGINEER'S REPORT RE LOCAL IMPROVEMENT
NATURE OF WORK Installation of an 8" diameter Sanitary Sewer on Meadowview Blvd.
from Liberty Street to a point 310' west of Liberty Street.
Lifetime of the improvement.
Estimated Lifetime 21 years
�2eductions, if any, which ought to be made unaer the
Flankage Reductions:
provisions of Section 28 in respect of any lot and the
aggregate amount of such reductions.
North -west corner of Liberty Street and
Meadowview Blvd.- 110
Sath -west corner of Liberty Street and
Meadowview Blvd.- 110
Total Reductions 220 feet
Estimate of the cost of the improvement.
Total Estimated Cost $3,770.
proportion of the cost which should be borne by the
Portion of cost borne by Corporation $1,174.60
land abutting directly on the work and by the Corpor-
Portion of cost borne by Owners $2, 595.40
ation respectively.
'- °cial rate per foot frontage.
Special Rate per foot frontage $4.935
cial annual rate per foot frontage.
20 year debentures at 5 -3/4% interest
Special Annual Rate per foot frontage 42.16¢
Number of instalments by which special assessment
should be made payable.
20 Equal Annual Installments
Whether it would be equitable or inequitable to charge
It would be equitable to charge the whole of
the whole of the owner's portion of the cost on the
the owner6 portion of the cost on the land
land abutting directly on the work.
abutting directly on the work.
mequrtable to do so, what portion of the cost should
Note: The cost of individual house service connections
be bo the Corporation ; what portion thereof
should be specs ssessed upon the land abutting
may be charged to the respective owners on a
directly on the work, a hat land not abutting
frontage basis over and above the special rate
directly on the work will be imme telV.b�en_efited and
per foot frontage shown. The total estimated
I�hould be specially assessed for any part ooy_ cost
cost shown above includes an allowance of $720.00
Knd the portion of the cost which should be spec7,a_1rP
for 6 individual house service connections.
assessed upon it.
PROCTOR & REDFERN
CIVIL AND CONSULTING ENGINEERS
TORONTO, June 1st, 19-64
3 -58
� ` ,may►.
Ian Butler, P.Eng.
Engineer
TOWN OF BOWMANVILLE, ONTARIO Schedule "C" to
r Rv —1,' °J 1921
ENGINEER'S REPORT RE LOCAL IMPROVEMENT
NATURE OF WORK Installation of a 1211 diameter Sanitary Sewer on Simpson
Avenue from Prince Street to Highway No. 2.
Lifetime of the improvement.
Estimated Life time 21 years
6.Zeductions, if any, which ought to be made unaer the
Flankage Reductions:
provisions of Section 28 in respect of any lot and the
aggregate amount of such reductions.
South -west corner of Simpson Avenue
and Highway No. 2 110,
Total Reductions 110'
Estimate of the cost of the improvement.
Total Estimated Cost $12,400.
Proportion of the cost which should be borne by the
Portion of cost borne by Corporation $1,845-41
land abutting directly on the work and by the Corpor-
Portion of cost borne by Owners $10,554-59
ation respectively.
vial rate per foot frontage.
Special Rate per foot frontage $7.294
pecial annual rate per foot frontage.
20 year debentures at 5 -3/4% interest
Special Annual Rate per foot frontage 62.32¢ -
Number of instalments by which special assessment
20 Equal Annual Installments
should be made payable.
Whether it would be equitable or inequitable to charge
It would be equitable to charge the whole Of
the whole of the owner's portion of the cost on the
the owner's portion of the cost on the land
land abutting directly on the work.
abutting directly on the work.
I itable to do so, what portion of the cost should
be borne a Corporation ; what portion thereof
should be specially a ssed upon the land abutting
directly on the work, an t land not abutting
directly on the work will be imme I benefited and
4ould be specially assessed for any part cost
nd the portion of the cost which should be specia
assessed upon it.
PROCTOR & REDFERN
CIVIL AND CONSULTING ENGINEERS
TORONTO,
June lst, -1964
3 -58 Ian Butler, P.Eng. Engineer
TOWN OF BOWMANVILLE, ONTARIO Schedule ''D" to
Icy -law 1921.
ENGINEER'S REPORT RE LOCAL IMPROVEMENT
NATURE OF WORK Installation of a 6" diameter Watermain on Simpson
Avenue from Prince Street to Highway No. 2.
Lifetime of the improvement.
Estimated Lifetime 21 years
�,Zeductions, if any, which ought to be made unaer the
provisions of Section 28 in respect of any lot and the
Flankage reductions
aggregate amount of such reductions.
South —West corner of Simpson Avenue
and Highway No. 2 110'
Total Reductions 110'
Estimate of the cost of the improvement.
Total Estimated Cost $8,870.
—�,y
Proportion of the cost which should be borne by the
Portion of cost borne by Corporation
$ 1,919.08
land abutting directly on the work and by the Corpor-
ation respectively.
Portion of cost borne by Owners
$ 6,950.92
'-^ecial rate per foot frontage.
Special Rate per foot frontage $4.684
ial annual rate per foot frontage.
20 year debenture at 5 -3/4% interest
Special Annual Rate per foot frontage
40.010
Number of instalments by which special assessment
should be made payable.
20 Equal Annual Installments
Whether it would be equitable or inequitable to charge
It would be equitable to charge the whole of
the whole of the owner's portion of the cost on the
the owner's portion of the cost on the
land
land abutting directly on the work.
abutting directly on the work.
e uitable to do so, what portion of the cost should
be bor the Corporation ; what portion thereof
should be spec ssessed upon the land abutting
directly on the work, what land not abutting
directly on the work will be imm ' 1 benefited and
hould be specially assessed for any pa the cost
nd the portion of the cost which should be spe
assessed upon it.
PROCTOR & REDFERN
— C
CIVIL AND CONSULTING ENGINEERS
TORONTO. June l st . 19 6
a -se Ian Butler;` .Eng. Engineer