Loading...
HomeMy WebLinkAboutEngineering Memo 62-76MEMORANDUM #62 TO: Bruce Tink, Chairman of the Public Works Committee FROM: John Ferguson, C.E.T., Engineering Department TOPIC: Hobbs Drive Townhouses DATE: August 16, 1976 The storm sewers for the Hobbs Drive townhouse project have now been installed as per the Town specifications. The system has been checked; any problems corrected and rechecked. The storm sewers were water tested after installation and passed successfully. Therefore, I would recommend that the storm sewers be placed on the two-year maintenance program as of August 10th, 1976. At the present time, the Region has not accepted the underground systems under their control but this will be their own responsibility to check the systems and confirm the maintenance date with the Town.