Loading...
HomeMy WebLinkAboutPW Memo 36-76PSI E M O R A N D U M -- hIo . 36 TO: B. Tink, Chairman of the Public Works Committee FROM: J. Dunham, Director of Public Works Department DATE: February 4, 1976 SUBJECT: Public Works Budget The attached is a proposed supplementary. As proposed, would be somewhat closer to the same level of service as provided in 1975. With this proposal a lesser cut back could be expected. However, if no further financial assistance can be obtained, numerous cut backs will be obvious. The Ministry have said that a minimal amount of construction monies have been retained to allow consjderation of relief to certain municipalities should they be faced with large, non-recurring expenditures which cannot be deferred. In discussing this with the Ministry, their clar- ification of non-recurring expenditures which cannot be deferred are unexpected bridge failure or street re -surfacing due to a sewer contract. At this time, it would therefore appear that no further subsidy allocations will be availablev for this municipality. With this in mind, a pro- posed supplementary would be totally a municipal expenditure. To further clarify obvious cut backs, which would pertain to normal maintenance, the following items are suggested if it should become necessary. 1) snow removal from streets 2) snow plowing reduction in overtime 3) sanding and salting reduction in material 4) reduction in dust control 5) reduction in surface treatment 6) reduction in pavement resurfacing (continued). . . . • • 2 7) reduction in gravel resurfacing 8) no occasional summer help The above mentioned would be approximately a 15% reduction in service. At this time, how- ever2 I can see a possibility of retaining a service approximately equal to 1975 if the Works Department has the same municipal dollars as in 1975 plus the—growth-dollars of the past year. 1 9 7 6 - PROPOSED SUPPLEMENTARY MAINTENANCE TOTAL _ C. BARDTOP MAINTENANCE C-1 Patching and spray patching C-2 Sweeping, flushing and cleaning; Brading.,...pitching,.______ ._. _. _, .... ... wahsoutsr dust layer C-4 Resurfacing 10.000..00 D LOOSETOP MAINTENANCE...._..___ D-1 Patching and wahsouts D-2 Grading and scarifying D-3 Dust layer D-4 Prime or priming D-5 Gravel resurfacing _. _80,,000.0o. H. QVEPMAD 6,000.00 CONSTRUCTION E Roads and Streets - Mearns Avenue Railway Crossings Engineering 4,Oo0.00 Maintenance Totals 96,000.00 Construction Totals 4.000.00 GRAND TOTAL ..... 1100 000.00