Loading...
HomeMy WebLinkAboutEngineering Memo Jan 30-74 (2)MEMORANDUM TO: A. D. Wearn - Chairman - Works Committee FROM: C. E. Watt, P. Eng., Director of Engineering SUBJECT: Status of Projects DATE: January 30, 1974 Subdivisions: Bowmanville: Bowmanville Heights - Phases 1, 2. 1 Underground servicing complete - in the process of being accepted for 2 years maintenance. Base Coarse of asphalt only on roadways. Wj,verl�Gardens - Phase 1 Minor repairs being completed including Base Line Pumping Station. When completed satisfactorily, I will recommend acceptance of subdivision to Council. Waverly Gardens - Phase 2 Expropriation procedures under way presently for storm sewer easement. Contractor scheduled to re- commence work on underground services Monday, Feb. 4, 1974. Northerly half of subdivision has underground services completed and base coarse of asphalt on roadways. Beau Valles Underground services complete except for sanitary sewer connection from Town pumping manhole on Base Line Road to pumping station. We will probably have to expropriate property for same. Base coarse of asphalt on roadway. Cean Investments Underground services complete and base coarse of asphalt on roadways. No housing construction yet. Bowtown Construction I have been attempting to negotiate an agreement with the Developer to extend the trunk sanitary sewer from Beau Valley Subdivision to this subdivision at his expense, recoverable to the extent of his lot levies, rather than installing a pumping system. I would think that the details of said agreement should be finalized and engineering drawings approved within 2 months. - 2 - Dali Developments Underground servicing is presently being installed. F & T Developments A subdivision agreement was signed in 1969, but const- ruction never commenced. I am trying to have amendments made to said agreement to bring it up to present day standards. Construction should commence in 6 - 8 weeks. Lorraine Court Underground servicing completed and base coarse of asphalt laid. House construction under way. Peter Louws, Lamers Bros.. Marianna Developments These three small subdivisions are serviced and house construction under way. Village of Newcastle I have been approached by Milani, Marianna Developments and Dali Developments regarding proposed subdivisions. However, the water supply is presently inadequate for the existing population and will become worse as the homeowners connect to the sanitary sewers presently being completed. I will be approaching a number of developers to see if they would be willing to contribute 1.3 million dollars (estimated) to construct a water filtration plant. This cost would be recoverable to them to the maximum of.their lot levies. Construction Projects Bowmanville• West Beach Bridge Design is basically completed (by Totten, Sims & Hubicki) and necessary approvals applied for. Estimated cost is $145,000.00 if constructed early this year. (Subsidy from Ministry of Transportation & Communications would be 80% or $116,00o.0o). Prospect Street Storm Sewer Second Street to O'Dell - design basically completed by myself. Estimated cost $4o - V+5,000.00 Subsidy rate 500. - 3 - Storm Sewer Study for Town of Bowmanviile It will probably take me about a year to gather enough information on existing storm sewer services and complete the study on same. Cemetary Road Sanita.rY Sewer The sanitary sewer should be extended north from Base Line Road to immediately south of the cemetary to service industrial land on the west side of Cemetary Road, if it is sold as such. No design commenced yet. In discussions with J. Dunham and M. Ross, it was mentioned that there might be some major road re- construction in the Township areas. If so, I would assume that I would carry out the design and field work, then the construction could be carried out by the Works Departments under J. Dunham or if tendered out to Contractors, by my department.