HomeMy WebLinkAboutCOD-019-11CORPORATE SERVICES
REPORT
DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:. May 30, 2011 Resolution#: (~~R -yo F-// By-law#: N/A
Report: COD-019-11 File#:
Subject: CL2011-7 BOWMANVILLE CREEK EROSION PROTECTION
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-019-11 be received;
2. THAT The Ontario Construction Company Limited, Niagara on the Lake, ON with
a total bid in the amount of $269,047.33 (net HST rebate), being the lowest
responsible bidder meeting all terms, conditions, and specifications of Tender
CL2011-7, be awarded the contract for the. Bowmanville Creek Erosion
Protection project;
3. THAT the funds required in the amount of $384,133.67.00 (which includes
$269,047.33 tender, design, contract administration, contingencies and net HST
costs) be drawn from the following accounts: and
Bowmanville Creek Erosion Control
Account # 110-32-340-83234-7401 $330,000.00
Bridge & Culvert Repair Program
Account#110-32-330-83607-7401(2010Budget) $33,133.67
Baseline Road Structure
Account #110-32-330-83314-7401 $21,000.00
Total Project Costs $384.133 67
REPORT NO.: COD-019-11 PAGE 2
'~. THAT the Mayor and the Clerk be authorized to execute the necessary
agreement.
Submitted by: ~ _
Marie Marano, H.B.Sc., C.M.O.,
Director of Corporate Services
(~ ~~ ~~
Uo1 Nancy Taylor, B.B.A., C.A.,
"ll Director of Finance
Reviewed by:
Franklin Wu,
Chief Administrative Officer
MMWDB1km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379
REPORT NO.: COD-019-11 PAGE 3
1.0 BACKGROUND AND COMMENT
1.1 Tender specifications were provided by AECOM Canada Ltd. for the
Bowmanville Creek Erosion Protection project as required by the Engineering
Department.
1.2 Tenders were advertised in the Daily Commercial News, as well as electronically
on the Municipal and Ontario Public Buyer's Association websites.
Subsequently, tenders were received and tabulated as per the letter from
AECOM Canada. Ltd., Schedule "A" attached.
2.0 ANALYSIS
2.1 A total of eleven (11) submissions were received in response to the tender call
and all were deemed compliant.
2.2 After further review and .analysis by the Engineering Department, AECOM
Canada Ltd. and Purchasing, it was mutually agreed that the low bidder, The
Ontario Construction Company Limited (OCC), Niagara on the Lake,-ON, be
recommended for the .contract for the Bowmanville Creek Erosion Protection
project. A copy of the recommending memos from the Department of
Engineering and the consultant AECOM are attached as Schedule "A".
2.3 Although OCC has not completed any projects forthe Municipality of Clarington
their references were checked and OCCL has completed a number of projects
of similar scope and value for the Fram Development (Engineering by
Shoreplan Engineering), Goderich Port Management Corp. (Engineering by
B.M. Ross Engineering) and CAPREIT Partnership (Engineered by Bard &
Associates). All references were satisfied with work completed by OCC.
REPORT NO.: COD-019-11 PAGE 4
2.4 Queries. with .respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
3.0 FINANCIAL
3.1 The total project cost, including tender price of 269,047.33, design, .contract
administration, contingencies amounts to $384,133.67 (Net of HST Rebate).
The detailed funding required for 'the project is outlined in the memo from
Engineering Services and the letter from AECOM Canada Ltd., marked
Schedule "A" and summarized below.
3.2 Funding for this project will be drawn from the following:
Department and Account Number
Engineering Department -Capital Budget
Bowmanville Creek Erosion Control
Account# 110-32-340-83234-7401
Bridge & Culvert Repair Program
Account#110-32-330-83607-7401(20106udget)
Baseline Road Structure
Account#110-32-330-83314-7401
Total Project Costs
$330,000.00
$33,133.67
21 000.00
$384 133 67
REPORT NO.: COD-019-11 PAGE 5
4. INPUT FROM OTHER SOURCES
4.1 The Director of Finance has reviewed the funding requirements and concurs with
the recommendation.
4.2 This report has been reviewed for recommendation by the Purchasing Manager,
with the appropriate departments and circulated as follows:
Concurrence: Director of Engineering
Attachments:
Schedule "A" -Memo from Engineering Services & Letter from AECOM Canada Ltd.
SCHEDULE "A"
~~~~
LeaAieg tAe Way
MEMO
TO: Jerry Barber, Purchasing Manager
FROM: Ron Albright, Manager, Infrastructure and Capital Works
DATE: May 20, 2011
RE: 2011 Erosion Control Works, Bowmanville
CL2011-07
The Engineering Services Department has reviewed the recommendation provided by AECOM
Canada Ltd. ("AECOM") and offers the following comments.
As part of the Municipality of Clarington's ongoing efforts to address erosion issues within lands
owned by the Municipality of Caarington, the Engineering Services department, with approval
from Central Lake Ontario Conservation, have completed designs to address 3 existing erosion
concerns as follows:
Bowmanville Creek East Bank (roughly opposite 147 Queen Street)
Bowmanville Creek East Bank at Rotary Park Pedestrian Bridge
Darlington Creek at North End of Structure 99055 at Baseline Road
The proposed works will address bank erosion issues at these locations and help to reduce
sediment loading of the creek as well as protecting the Municipality's infrastructure as is the
case with the Pedestrian Bridge and Structure 99055 works. Although the proposed works at
the Rotary Park pedestrian bridge will address the immediate concern of the erosion
compromising the walking path at the east abutment of the bridge there will be additional work
required in the future to address additional erosion north of the bridge on the east bank. This
will be designed and planned for as part of future budget deliberations.
We concur with AECOM's recommendation to award the contract to The Ontario Construction
Company Limited (OCC) in the amount of $264,394.00, exclusive of HST, or $269,047.33 net
HST, to complete the erosion remedial works at the three locations outlined above.
A detailed breakdown of Clarington's funding for the complete project costs is provided on the
Cost Apportionment supporting AECOM's tender review letter.
Due to past experiences on similar projects, a contingency amount of approximately 10% is
carried forward. Therefore, including design and tender fees, construction, as well as contract
administration fees, the Engineering Department advises the following breakdown for the above
referenced project net of H.S.T.:
SCHEDULE "A"
2011 Erosion Control Works.
Bowmanville
May 20, 2011
Project Breakdown
Total Project Value $384,133.67
Budget Amount
Bowmanville Creek Erosion Control
110-32-340-83234-7401(2010&2011) $330,000
Bridge and Culvert Repair Program
110-32-330-83607-7401(2010) $200,000
Baseline Road Structure $ 21,000
110-32-330-83314-7401 (2011
Estimated Unexpended Budget $166,866.33
Additional Funding Required $0
The unexpended budget amount from the Bridge and Culvert Repair Program will be used in a
future tender this year to address additional structure needs.
We recommend the report to Council move
Attached for your files is the recommendatio
detailed breakdown of estimated project costs.
feel free to contact the undersigned.
forward based on the above apportionments.
n provided by AECOM which includes a more
Should you have any further questions, please
Regards,
R Albright, P. Eng.
Manager, Infrastructure and Capital Works
RA/ra
Attachment
Cc: Will McCrae, P. Eng., Manager, Cobourg Office, AECOM
Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
SCHEDULE "A"
G~s'~Tiil
AECOM
573 Division Street
Cobourg, ON, Canada K9A 5G6
vrxw.aecom.com
May 18, 2011
Mr. A. S. Cannella, C.E.T.
Director, Engineering Services
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario L1C 3A6
Dear Sir:
Project No: 12-29677-20
Regarding: 2017 Erosion Control Works,
Contract No. CL2011-07 (the "Contract")
Municipality of Clarington
v~zan.m rawer n.av ~enarmc
905 372 2127 tel
905 372 3827 fax
Tenders for the above project were opened at the Municipal Offices on Friday, May 13, 2011 at
2:15p.m. A list of the bids received is provided in the table below.
SCHEDULE "A"
A=COM
Page 2
May 18, 2011
Ron Robinson Ltd.
Bowmanville, ON $ 374,238.00 $ 422,888.94 $ 380,824.59
Hard-Co Construction Ltd.
Whitby, ON $ 394,848.00 $ 446,178.24 $ 401,797.32
Elirpa Construction & Materials Limited
Pickering, ON
*Calculation Error
$ 600,302.94 I $ 678,342.32 I $ 610,868.27
The Municipality of Clarington's Purchasing Department (the "Purchasing Department") reviewed all
bids to confirm compliance with the Clarington Purchasing By-Law. All bids were deemed compliant
by the Purchasing Department. AECOM Canada Ltd. ("AECOM") has reviewed the two lowest bids
and confirmed the bid values noted above. The Ontario Construction Company Limited (OCC) is the
lowest bidder.
As requested by the Purchasing Department, references were checked only for the lowest bidder.
OCC has completed a number of projects of similar scope and value including work for the Fram
Development (Engineering by 5horeplan Engineering), Goderich Port Management Corp.
(Engineering by B.M Ross Engineering), and CAPREIT Partnership (Engineering by Bard &
Associates). Engineering references stated that OCC has completed work to specification and to
their satisfaction.
With the low bid from OCC, and other associated project costs noted on the attached cost
apportionment, the project is within budget. Should funding be available, it is our opinion, based on
the input provided by the references contacted regarding performance on previous projects, that the
bid in the amount of $264,394.00 (exclusive of HST) may be awarded to The Ontario Construction
Company Limited of Niagara on the Lake, Ontario subject to all provisions of the Clarington
Purchasing Bylaw being met.
Bid Cheques or Bid Bonds shall be retained for OCC and R&M Construction, the second low bidder,
until the Contract has been executed.
Should you have any questions regarding this matter, please contact the undersigned.
Sincerely,
AECOM Canada Ltd.
i
~~~ '~~~
Will McCrae, P.Eng.
Manager, Cobourg Office
wi II. mccrae@aecom. com
WM:pc
EnG.
cc~ ~fvlr Roh,~lprght P Eng ; Manager oftnfrastruClGr~and~GapiiatUJorks Myhicip$liiy af.Ctanngtor~%
GLM11-Oi TmEm AweN Le11or.DOc
SCHEDULE "A"
oe
rvy
6-
m'm
Pr
~'- N
~ $u
R
rv m ~ C
$
~ € m ~ pp g
v ~ 2 S $ as a
Q
tG
U
Q
C
T g
tl
Z 6 ~ ~ 8 m
o ~ 3 m
fi
S 5
a
n ~
o ~
b m 8
~ ~
a
8
s
w¢ a ~ = 6 b EmE m
E ~ ~ ~ a
n` _
$$ 8
$ 8 8 8 8 ~ ~ 8 8
~
m ~ m
~I
~ I
$
~ S
$
S
~ ~°~
~ 8
~ '°'
8 ,
° ~ ~ ~
rc ~
F a
E m
'$ s 8 8 .rv 8° 8 8 » m 6 8 R
~ 3 ~ I
w1
JL .~ t " ~ » 8 8 8
; U a E %%
A
~
a r~
e c , &
i a a g
~ V
C
u m
v
a ~ x 8 8 8I 8 $ 8 8 ~. r 6 ° 8 8
m $ ~ S ~ ~ $ 8 ~ $ $ A
w
i m ~
S u° ~
~ & rv »I p
~
~
~
~
~
S
~
"d~
R ~°~
' T o ~
o M
N d~
m
8
8
8 ° ° 8 8 3 °'
,.
~ 8 ~ "' $ R S
8
m
° ~
~ m ~
g
rc g „ c° ~
n ~
t
"
i I ~
g
~
~ ~
m E
~
3 a
r
~ a
~ _
~ x
a
u
~
~
2
.
_ E
$ ~ ~
. a ~@ < n 5 ~ 5 o g 3 ~ ~ ~
J v $~ P ~ N y C ~ ~
a
~' ~
E
"
v
w
°
~
~
E
i
q °.
~
a a
°
E ~
~
F
~
3
ti
$ Xx
5
E p m a
rc c a
c W ` x m
m u
~ ° a m i
r v
~ p' ~ o °c
. $ cg
~ n 8
g '3 '°s 5
4 E
a
o ~ a ' a ~ A m 5 .
°
U $ ry
F n
iiyy q
S F o n
~
a 4 ~ c
m ~
^ m
s
~ ~
~ a rc 8~
V€ ~' C
~ p9 ~ m
~ O ~ ~ C g ~ F. 9 ffi 4 n
~ 6 J E '
~ ~ ' _ ° g C V £ y ~ W E
X i
~ ~ _
o
~ O
~ S
^
6 ~'
U t~ ° °
n U N S w 'S
F ~ ~
S a
F 6 O F S f 6 ' ~ ~ J