TOWN OF NEWCASTLE
REPORT
Fi Ie # /0 .;) . D
Res. #
By-Law #
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
June 4, 1990
TR-48-90
FILE #:
TENDER NW90-6, RECONSTRUCTION OF PORT GRANBY CULVERT
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. That Report TR-48-90 be received;
2. That Dave Boyle Excavating Ltd., Bowmanville, Ontario,
with a total bid in the amount of $394,049.20, being
the lowest responsible bidder meeting all terms,
conditions and specifications of Tender NW90-6, be
awarded the contract for the Reconstruction of Port
Granby Culvert, as required by the Department of Public
Works;
3. That the funds in the amount of $175,000.00 and
$250,000.00 be drawn from the approved 1990 Public
Works Capital budget, Account #'s 7205-90001-0261 and
7204-89001-0261 respectively; and
4. That the additional funds required in an approximate
amount of $48,500.00 be drawn from Public Works Lot
Levies (total project cost $473,500.00 less budgeted
706
cost 425,000.00).
Page - 2 -
TR-48-90
TENDER NW90-6, RECONSTRUCTION OF PORT GRANBY CULVERT
Tender specifications were provided by Totten Sims Hubicki
Associates for the reconstruction of Port Granby Culvert, as
required by the Department of Public Works.
Tenders were advertised in the local papers, as well as the Daily
Commercial News. Subsequently, tenders were received and
tabulated as per Schedule "A" attached.
The engineer's estimate for the contract was $426,990.00. Other
associated costs are estimated and detailed as follows:
Contract $ 394,049.20
Contingencies 8,450.80
Design and Tendering 17,000.00
Construction Administration 33,000.00
Relocation of Utilities 4,000.00
Land Acquisition and Legal Fees 17,000.00
Total Required Funds $ 473,500.00
The total required funds of $473,500.00 are over the budget
allocation of $425,000.00. It is proposed that funds in the
amount of $175,000.00 and $250,000.00 be drawn from the approved
1990 Public Works Capital budget, Account #'s 7205-90001-0261 and
7204-89001-0261 respectively and that the additional required
funds be drawn from Public Works Lot Levies.
The total bid price is substantially under the estimated budget,
however, other associated costs are more than originally
estimated.
The low bidder has previously satisfactorily performed for the
Town of Newcastle. See attached letter from Totten Sims Hubicki
Associates, marked Schedule "B".
The Treasurer has reviewed the funding requirements and concurs
707
Page - 3 -
TR-48-90
TENDER NW90-6, RECONSTRUCTION OF PORT GRANBY CULVERT
with the recommendation. Queries with respect to department
needs, specifications, etc., should be referred to the Director
of Public Works.
After further review and analysis of the bids by Public Works,
Totten Sims Hubicki Associates and Purchasing, it was mutually
agreed that the low bidder, Dave Boyle Excavating Ltd.,
Bowmanville, Ontario, be recommended for the contract for the
Reconstruction of Port Granby Culvert.
Respectfully submitted,
Recommended for presentation
to the Committee,
') /j/ ~?!
//~&~,:?f' ~ . /(a
'/Marie Mlfrarf6, H .C~~ SC . ,
Treasurer.
~f);;0
Lawrenc~ . Kotseff,
Chief Adm nistrative Officer.
r//)
k;. Lftwn4<e--
W.A. Evans, P. Eng.,
Director of Public Works.
LAB/hjl
Attachments
708
SCHEDULE "A"
Bid Summary
Tender NW90-6, Reconstruction of Port Granby
Culvert and Approaches
Bidder Total Bid Amount
Dave Boyle Excavating Ltd. $ 394,049.20
Bowmanville, Ontario
Ron Robinson Limited $ 396,715.48 **
Oshawa, Ontario
Elirpa Construction & Materials Ltd. $ 400,846.87 **
Pickering, Ontario
James A. Hennekam Construction
Limited
Lindsay, Ontario
$ 410,623.57
Craftwood Construction Company Ltd.
Toronto, Ontario
$ 424,467.50
$ 432,364.56
$ 434,134.30
$ 435,602.95
$ 455,347.65 **
$ 457,214.40 **
$ 504,832.50
Dunedin Construction (1983)
Whitby, Ontario
Behan Construction
Cobourg, Ontario
Dawn Enterprises Ltd.
Thornhill, Ontario
Dagmar Construction Inc.
Markham, Ontario
Advice Contracting Limited
Markham, Ontario
Harnden & King Construction
Whitby, Ontario
** extension error
709
.",It--1.-,.::;...;:;;;;o-::;."1:.:,.I '.I__II~I
~ ...::... . -::.0.::.0
I .=:0 r-1 . '- I_I .1:' l.-t ,...... I-=- r t-1 .....
...... .=-1"::" .:=oe-..::...1.
r-~ . 1:::1 .1.
SCHEDULE "8"
n
CONIANTS
Q,L. TOTTEN B.Se., P.EnQ.
R,e. SIMS i,A,So.. p,eng.
J.M, HUBIOKI a,A,So" OAA, P,Eng.
R,L. WINooveR M,$o., P.Eng,
P.O. EBli"Lee eASe" P,Eng.
'1'OTTIlN SIMS HUlllCKI ASSOCIA1"ES (ltel) IJMITGD
lA KING STRIlEr EAST P.O. BOX ~Qn, CODQURG
ONTARIO, CANAQ" Kll" ~1
totten sims hubicki associates
(410) 372.2121
FAX (410) 3724021
FAX NO. 416-623-4169
Ms. Lou Ann Birkett
Purchasing & Supply Agent
Corporation of the Town of Nawcastle
Municipal Building, 40 Temperance Street
BOWMANVILLE, Ontario L1C 3A6
May 28, 1990
Dear Ms. Birkett:
Re; Contract No. NW90-6, Reconstruction of ~ort Granby Culvert and Road App~oacbea,
Corporation of the Town of Newcastle
i~
Tenders ror the construction of the subject project were opened at the Municipal
offices on ~ednesday, May 23, 1990. The list of bidders with respective bids are
summarized &$ follows:
Engineer'S Estimate
$504,832.50
$457,214.40
$455,347.65
$435,602.95
$435,134.30
$432,364.56
$424,467.50
$410,623.57
$400,846.87
$396,715.48
$394,049.20
$426,990.00
Harnden & King Construciton
Craftwood Construction Company Ltd.
Advice Contracting Ltd.
Dagmar Construction Inc.
Dawn Enterprises Ltd.
Behan Construciton
Dunedin Construction (1983)
James A. Hannekam Construction
Elirpa Construction & Materials Ltd.
Ron Robinson Ltd.
Dave Boyle Excavating Ltd.
We have checked the low Bidder's tender and wish to advise that all requirements
have been duly completed and the appropriate certified deposit cheque accompanied
the tender.
.. /2
710
ENGINEERS ARCHITECTS AND PLANNERS
P~AY-:"::'='-'''''12:1 P10t-l
~2:.:S4
18H.CU~U~~ ~AX U 672
~;62~
P.12:12
- 2 -
Cont~act No. NW90-6, Corporation of the Town of Newcastle
May 28, 1990
Dave Boyle Excavating Limited have completed a number of contracts in recent years
under the supervision of our firm. Among recent projects completed are Baseline Road
Contract No. T87-17, $400,000, Penwest Subdivision Phase 3, BQwmanville, $450,000 and
Kingsdale West Subdivision Phase 2B, Stage 3, $170,000 both completed in 1989. We
have no hesitation in recommending acceptance of the low bidder for this contract.
Scheduling in the contract calls for work to be underway by June 18, 1990 with
completion ~ithin forty~five working days.
Based on the low bid the overall contract costs are summarized as follows:
By Contract
Land AcquiSition and Legal Fees
Design and Contract preparation
Layout and Contract Administration
Contingencies
Utility Relocation
$394,049.20
$ 17 ,000.00
$ 17,000.00
$ 33,000.00
$ 8,450.80
$ 4,000.00
$473,500.00
!l
The lo~ bid for this work is an extremely good price, well belOW out construction
estimate of $426,990.00. The budget estimate was prepared at a very prelim!nary
stage of the design ~hen full design implications were not known. We recommend
that this contract proceed.
Of the total cost of $473.500, approximately $471,500.00 is elisible for subsidy
by the Ministry of T~ansportation Ontario.
We have reviewed the total cost with Tony Cannella and although the cost exceeds the
budgeted amount by approximately $50,000.00, the additional monies can be provided
from lot levies.
Yours very truly,
TOTTEN SIMS BUSICKI ASSOCIAtES
~.J,,~~
~w' D. Ro. Bourne
D Projects Manager
RAKlag
cc~ Mr. W.A. Evans, P.Eng., DirectOr of Public Works
Mr. A.S. Cannella, C.~.T., Manager of Engineering
Mr. D. Patterson, Manager of Operations
71 1