REPORT
OPERATIONS DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: March 21, 2011 Resolution#: GPi4-a6G-lt By-lavu#: N/A
Report: OPD-004-11 File#:
Subject: 2010 WINTER REPORT
Recommendations:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
THAT Report OPD-004-11 be received for information.
Submitted by: Reviewed
Fr H th .~ -
B.A., R. .M.R., R. R. F.A.
Director of Operations
Franklin Wu,
Chief Administrative Officer
FH1kr
Clar' ~
Leading the Way
REPORT
OPERATIONS DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: March 21, 2011 Resolution#: By-law#: N/A
Report: OPD-004-11 File#:
Subject: 2010 WINTER REPORT
Recommendations:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
THAT Report OPD-004-11 be received for information.
Submitted by: Reviewed
F H th_.-
B.A., R. .M.R., R. R. F.A.
Director of Operations
Franklin Wu,
Chief Administrative Officer
FHlkr
REPORT NO. OPD-004-11
PAGE 2
BACKGROUND AND COMMENT:
Further to our 2010 Winter Budget Report #OPD-002-10, submitted June 21,
2010, staff is providing a final update to the costs of the 2010 winter maintenance
program.
Winter Maintenance:
As of December 31, 2010, the following table illustrates the expenditures
incurred.
Winter Control 2010 Budget 2010 Actual Variance
Plowing $ 329,600.00 $ 102,560.31 $227,039.69
Sanding/Salting $ 1,153,500.00 $ 812,634.83 $340,865.17
Winter Maintenance
Other $ 227,500.00 $ 300,276.70 ($ 72,581.56)
Total $1,710,600.00 $1,215,276.70 $495,323.30
The 2010 winter maintenance budget from January 15` to December 31St actual
expenditure of $1,215,276.70 includes the sand/salt year end inventory
adjustment of ($98,443.90). Included in the above total is the 2010 cost of
$145,755.15 to provide winter maintenance to unassumed developments, which
is recovered from developers. Extensive clean up of facilities, fire halls and
Municipal parking lots was experienced in the spring of 2010. The increase in
winter maintenance work such as thawing of culverts and the spring clean up
impacted the "Winter Maintenance Other" account.
The Municipality of Clarington delivers winter control services across a road
system of 1,700 lane kilometers. The Operations Department winter response
capacity features twenty-nine (29) units in total. Our response is composed of a
mix of vehicles from the Orono, Hampton, and Yard 42 depots.
In 2010, The Operations Department had thirty-nine (39) responses. A full
callout is categorized by calling all available drivers. An event is categorized by
calling any number less than all available drivers. The breakdown is as follows:
ten (10) full callouts and twenty-nine (29) events. Of these thirty-nine (39)
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 263-2292 F (905) 263-4433
REPORT NO. OPD-004-11
PAGE 3
callouts, twenty-eight (28) were for snow accumulation, one (1) was for freezing
rain, seven (7) were for drifting snow and three (3) were for ice /clean up
conditions.
Winter callouts:
Year Jan Feb Mar Apr Oct Nov Dec Total
2007 17 27 13 2 0 10 20 89
2008 19 23 18 0 1 8 27 96
2009 21 12 1 2 0 1 14 51
2010 12 16 0 0 0 1 10 39
Please note that winter operations were down significantly from the previous
three year average of 79 callouts. During 2010 depth of snow in the BIA's never
met the criteria for snow removal operations to be scheduled.
Winter Patrol is a critical winter control function. It provides us the assurance
that the road system is observed on a continual basis during the winter season,
so that any potentially hazardous conditions encountered can be addressed.
Road Patrol is also backed up by an On Call Lead Hand available to visit the
areas of concern if necessary and to make judgement calls as appropriate. An
Operations Supervisor is also on call to assist with winter maintenance.
Senior Citizens and Physically Disabled Sidewalk Program
The total budget for this program in 2010 was $44,800.00 with an actual
expenditure of $8,683.58. As per the 2010 approved budget, there is an annual
administration fee of $60.00 plus HST per registered property. Staff costs for the
administration of the program and night patrol during November and December
cost the Municipality an additional $7,100.00. Revenue collected for the January
to April season totaled $14,040.00 which had been intended to subsidize the
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 263-2292 F (905) 263-4433
REPORT NO. OPD-004-11 PAGE 4
actual costs of this program. The contractor was only required to provide mainly
sanding of sidewalks a total of fourteen (14) times during January and February.
The actual budget for 2011 has been adjusted to $19,500.00, recognizing
decrease in number of applicants since a paid service has been introduced. For
the 2010 - 2011 season there has been $16,560.00 received from the residents.
For November and December there has been nine (9) callouts costing a total of
$2,487.00. As per report COD-007-11; the price has increased by $2,268.21 per
callout and the expectation would be that the cost of the program for the 2010 -
2011 season will exceed the actual fees received.
Program Call-Out Statistics
January February March April November December Total
2010 6 8 0 0 1 g 23
2011 8 12 20
Looking back, it can now be said that this period from January 2010 to April 2010
had remarkably low snowfall amounts compared to previous years.
Since the charge has been implemented the Senior Citizens and Physically
Disabled Sidewalk and Driveway Windrow Snow Clearing Program has declined
to 276 residents on the program.. There are 42 new participants to the program
since last season.
Area 2fl10-2011 Season
Resuming Tota~I
Bowmanville 120 136
Burketan 2 2
Courtice 66 81
Enniskillen 2 2
Hampton 7 7
Newcastle 23 30
Newtonville 3 4
Orono 11 14
Tptals 234 T76
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 283-2292 F (905) 263-4433
REPORT NO. OPD-004-11
PAGE 5
Sidewalk Snow Clearing Contract:
The total budget for sidewalk snow clearing portion of the program in 2010 was
$120,000.00 with an actual of $41,538.92. The snow clearing service on
municipal sidewalks starts when a snowfall ends and only when there is more
than two centimeters of snow on sidewalks. The driveway windrow snow
clearing service is not undertaken until the snow plowing on all municipal streets
has been completed.
Below is a table of call-out statistics for this program from 2001 to 2010:
Call-Out Statistics
January February March April November December Total
2001 17 13 6 0 1 16 53
2002 10 10 7 0 2 11 40
2003 23 14 11 4 1 6 59
2004 20 9 3 0 1 9 42
2005 11 5 4 0 5 10 35
2006 7 9 2 0 0 3 21
2007 12 12 6 1 2 12 45
2008 11 10 9 0 2 13 45
2009 8 4 0 1 0 4 17
2010 7 7 0 0 1 13 28
Pavement Patching:
The total budget for pavement patching in 2010 was $418,000.00 with an actual
of $546,248.31. The condition of our rural roads is rapidly declining and the
liability issues with pot holes are a growing concern. The mild winter during the
first four months of 2010 produced afreeze /thaw affect that created havoc on
the rural road system. Staff and equipment that are normally performing winter
maintenance activities were deployed in an effort to keep the roads passable
during this time period.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1 C 3A6 T (905) 263-2292 F (905) 263-4433
REPORT NO. OPD-004-11 PAGE 6
Salt Management and Winter Control Improvements
New GPS units are installed as trucks are replaced, to track location and quantity
of material used.
Road thermometers are included with truck replacements. RWIS weather data is
continually being improved and allows for proactive decision making resulting in
fighting the storms from the bottom up rather than from the top down. Increased
training with the 2010 patroller's course, involved all supervisors, lead hands,
patrol staff, and improved the knowledge base of materials application for all
concerned. The program dealt with Weather 101 /Road weather /Winter
Minimum Maintenance Standards /Winter Patrol Documentation /winter specific
Health and Safety Legislation /Salt Management Overview /Review of Pre-
Wetting, Anti Icing and De- Icing technology /Event Management /Managing
Available Staff Hours of Service.
The addition of one (1) patrol man allowed more proactive responses to storm
events and the plowing and salting of facility parking lots during the afternoon
shift.
CONCLUSION:
The Operations Department continues to closely monitor weather forecasts
including the Provincial Road Weather Information System (RWIS) which
accurately predicts each hour anticipated precipitation, air, and pavement
temperature, dew point temperature (the moment fog occurs) and wind speed /
gusts, and respond accordingly. General conditions encountered are lake effect
flurries, drifting snow on rural roads, freezing rain, icy /flash freeze conditions, or
snow accumulations that require maintenance.
A follow up report before summer recess will update Council on the 2011 winter
costs as it relates to the approved budget.