Report 1/2
REPORT
CORPORATE SERVICES DEPARTMENT
Report #:
COD-056-07
File#_
By-law #
Meeting:
COUNCIL
Date:
December 10, 2007
Subject:
Tender CL2007-43, Guide Rail Installation
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-056-07 be received;
2. THAT Peninsula Construction Inc, Fonthill, Ontario with a total bid in the amount of
$98,174.74 (excluding G.S.T.), being the lowest responsible bidder meeting all terms,
conditions, and specifications of Tender CL2007-43. be awarded the contract for the
Guide Rail Installation as required by the Operations Department;
3. THAT the total funds required in the amount of $118,033.77 ($98,174.74 tender plus
consulting, contingencies, emergency work and administration) be drawn as follows:
a) $45,000.00 from 2007 Capital Budget for Guide Rail Installation Account # 110-
36-330-83639-7401 ;
b) $39,714.95 from the 2006 Capital Budget for Asphalt Resurfacing Account # 110-
32-330-83212-7401 ;
c) $33,318.82 from Municipal Capital Works Reserve Fund; and
4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to
execute the ne ssary agreement be approved.
Submitted By:
AS. Cannel a
Direc~( of Engineering Services
Reviewed bY:(/) ;.....e~ ~
Franklin Wu,
Chief Administrative Officer
Submitted by:
Submitted by:
Fr 0 , MR, RRFA,
Director of Operations
MMlLABINnFHlkm
-
PAGE 2
REPORT NO.: COD-OS6-07
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Guide Rail
Installation within the Municipality of Clarington, as required by the Operations Department.
subsequently, tenders were advertised and received as per Schedule "B" attached.
The 2007 Guide Rail Installation tender included a guide rail installation that was not included in
the 2007 Capital Budget. Municipal staff were out doing routine inspection on the 2006 asphalt
resurfacing contract and noticed a safety concern in regards to the guide rail and the road. Staff
are doing due diligence in including this guide rail installation in the 2007 tender.
The total project cost of $118,033.77 including Project Administration will be funded from the
2007 Guide Rail Capital Budget in the amount of $45,000.00, $39,714.95 from the unspent
funds of the 2006 project for Asphalt Resurfacing, and $33,318.82 from the unspent funds of the
2006 Guide Rail project that was transferred to the Municipal Capital Works Reserve Fund at
the 2006 year end.
The 2006 Asphalt Resurfacing Phase 2 project required additional funds in the amount of
$595,000.00 and Council approved that the additional funds be allocated from the MOVE
Ontario Funds received from the Province in 2006. At present, the 2006 Asphalt Resurfacing
project is near completion and there is unspent funds of $95,000.00 which is the MOVE Ontario
funds that were previously allocated. It is recommended that $39,714.95 of the unspent MOVE
Ontario funds from the 2006 Asphalt resurfacing project be used for the 2007 Guide Rail project
and the remaining unspent funds of $55,285.00 of the MOVE Ontario from the 2006 Asphalt
resurfacing project be transferred to the capital deferred revenue account. The MOVE Ontario
funds are a one time grant from the Province in 2006 for municipalities to use on its road
infrastructure.
The Guide Rail Installation project in the 2006 Capital Budget was completed in 2006 and the
remaining funds of $35,006.00, was transferred to the Municipal Capital Works Reserve Fund in
accordance with the approved report #TR-79-00, Capital Fund Accounting System. It is
recommended that $33,318.82 of the unspent funds of the 2006 Guide Rail project transferred
to the Municipal Capital Works Reserve Fund be used for the 2007 Guide Rail project.
--
REPORT NO.: COD-056-07
PAGE 3
The low bidder has previously performed similar satisfactory work for the Municipality of
Clarington in 2005 and 2006.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Operations.
After further review and analysis of the bids by the Operations Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Peninsula
Contracting Inc., Fonthill, Ontario, be recommended for the contract of Guide Rail Installations.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
-
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2007-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Peninsula
Contracting Inc., Fonthill, Ontario, to enter into an agreement
for Guide Rail Installation.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between, Peninsula Contracting Inc., Fonthill, Ontario, and said Corporation; and
2. THAT the contract attached hereto as Schedule "An form part of this By-law.
By-law read a first and second time this day of
,2007.
By-law read a third time and finally passed this
day of
,2007.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
--
.
TIH
SCHEDULE -S'"
engineers
architects
planners
Totten Sims Hubicki Associates
300 Water Street
Whitby, Ontario, Canada 11 N 9J2
1905} 668-9363 Fax: 1905) 668.0221
E-mail: tsh@tsh.ca WWW.tsh.ca
November 26th, 2007
Municipality of Clarington
40 Temperance Street
Bowmanville, Ontario
LlC 3A6
Attention:
Mr. J. Barber, C.P.P.O.
Purchasing Manager
No. Tender
I. Peninsula Construction Inc., Thornhill
2. Powell (Richmond Hill Contractin Limited, Gormle
3. Atlas Fence West Inc., Mississau a
The En . eer's Estimate was
Note: Total Tender Amount excludes 6% GST
Total Tendered Amount
$98,174.74
$127,448.00
$170,901.00
$ 175,071.00
Dear Sir:
Re: Guiderail Installations
Tender No. CL2007-43, Municipality of Clarington
TSH Project No. 42-65106
Tenders for the Municipality of Clarington Tender No. CL2007-43, were received and opened on
Thursday, November 8th, 2007.
The following is a summary of the three (3) tenders received:
The tenders appear to be arithmetically correct and complete, complying with the general tendering
requirements. Neither Powell Contracting Limited nor Atlas Fence West Inc. provided a NEER or CAD-7
rating. Peninsula Construction Inc. provided both.
Peninsula Construction Inc. has done the guide rail contract for the Municipality of Clarington for the last
several years. They have knowledgeable staff, proper equipment and have completed past projects on
schedule and on budget. There have been no unwarranted claims for extra work. Staff are easy to work
with.
In this regard, we have no reason to believe that Peninsula Construction Inc., Thornhill is incapable of
performing the contract works.
SCHEDULE "B" .
2
Municipality ofClarington
Mr. J. Barber, C.P.P.O.
November 26, 2007
Total
$98,174.74
$5,203.26
$4,655.77
$10,000.00
$118,033.77
All costs are exclusive of GST.
The contract work was tendered in parts representing the various components of the work and includes
the following:
PART A-CULVERT 99125
Part A provides for the installation of approximately 255 m of steel beam guiderail, including extruder
end treatments and entrance end treatments at Culvert 99125 located on Townline Road between Durham
Regional Road 3 and Concession Road 9.
PART B - CULVERT 99521
Part B provides for the installation of approximately 30.5 m of steel beam and thrie beam guiderail,
including eccentric end treatments and additional shouldering at Culvert 99521 located on Concession
Road 6 between Leask Road and Langmaid Road.
PART C - CULVERT 98043
Part C provides for the installation of approximately 40 m of steel beam and thrie beam guiderail,
including extruder end treatments and entrance end treatments at Culvert 98043 located on Reid Road
between Concession Road 4 and Concession Road 5.
The contract is open for acceptance for a period of ninety (90) days after the tender closing date of
November 8th, 2007. The contract work is scheduled for completion by December 21", 2007.
We recommend acceptance of the low tender and award of a contract to Peninsula Construction Inc.,
Thornhill. Please advise if you require additional information to supplement the above.
be satisfactory, I remain,
TRP/gc
L:\PROJECTS\42-6\42-65'42-65106 Clarington Operations 2006 Tendering\42-65106 Clarington Operations 2006 Tendering\Culvert
Guiderail\Tender Report. November 26. 2007.doc