HomeMy WebLinkAboutPD-128-98DN: PD-128-98
~~ THE CORPORATION OF THE MUNICIPALITY OF CLALINGTON
REPORT
PUBLIC MEETING
Meeting:
Date:
General Purpose and Administration Committee
Monday, November 2, 1998
Report #: PD-128-98 File #: 18T-98012
Res. #1C->P i7 - S`s' ~ - y ~~
By-law #
Subject: DRAFT PLAN OF SUBDIVISION APPLICATION 18T-98012
APPLICANT: H. KASSINGER CONSTRUCTION LTD & GEARING FARMS LTD.
PART LOT 33, CONCESSION 3, FORMER TOWNSHIP OF DARLINGTON AND
BLOCK 219, tOM-826
FILE NO.: 18T-98012
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report PD-128-98 be received;
2. THAT the application for proposed Plan of Subdivision, submitted by D. G. Biddle and
Associates Ltd. on behalf of H. Kassinger Construction Ltd. and Gearing Farms Ltd., be
referred back to Staff for further processing and preparation of a subsequent report
pending receipt of all outstanding comments, taking into consideration all of the
comments received;
3. THAT within 15 days of the Public Meeting, the Commissioner of Planning for the
Region of Durham be advised and provided by sworn declaration from the Clerk, the
following:
i) that the Municipality held a Public Meeting in accordance with Section 51 (21.1)
of the Planning Act for the subject subdivision application;
ii) a copy of the minutes of said meeting;
iii) a copy of all written submissions received by the Municipality;
iv) a list of all persons and public bodies, including their mailing addresses, which
made oral submissions at the public meeting, or written submissions; and
v) a copy of the report and the Council decision. and,
4. THAT all interested parties listed in this report and any delegations be advised of
Council's decision.
bi0
- 'REPORT PD-128-98 PAGE 2
1. APPLICATION DETAILS
1.1 Applicant: H. Kassinger Construction Ltd. and Gearing Farms Ltd.
1.2 Agent: D. G. Biddle and Associates Ltd.
1.3 Proposed Draft Plan of Subdivision:
To develop a draft plan of subdivision containing 10 lots and 12 blocks,
for a total of 16 single detached dwelling units, and to retain a 2.14
hectare block having frontage on Tooleys Road.
1.4 Site Area: 3.37 hectares
2. LOCATION
2.1 The area proposed for development is located at the western end of McLellan Drive in
Courtice. The site has frontages on both McLellan Drive and Tooley Road, as depicted
in Attachment No. 1. The portion which fronts onto Tooley Road is located in Part Lot
33, Concession 3, former Township of Darlington. The McLellan Road portion is Block
219, 10M-826, which was a reserved block within the Kassinger Highland Gardens
subdivision immediately to the east.
3. BACKGROUND
3.1 On September 3, 1998, the applicant filed the application for draft plan of subdivision
with both the Region of Durham Planning Department and the Clarington Planning
Department. On September 18, 1998, the Region of Durham notified Clarington
Planning of the file number for the application and the proposal was duly circulated.
4.
4.1
EXISTING AND SURROUNDING USES
Existing Use: Tooley Road portion -large lot residential
Block 219, 10M-826 -vacant land
4.2
Surrounding Uses: North -
large lot residential
South -
large lot residential
East - urban residential
b~~
' REPORT PD-128-98
West - large lot residential
5. OFFICIAL PLAN POLICIES
PAGE 3
5.1 The Durham Region Official Plan identifies the subject property as being designated
"Living Area" and "Major Open Space" with "Environmentally Sensitive Areas". The
primary function of the Living Area designation is for housing purposes. The Major
Open Space system is noted for its ecological benefits with stream valleys being
identified as one of the main features of the system. It is the goal of the Durham Region
Official Plan to link the Lake Ontario shoreline to the Oak Ridges Moraine by utilizing
the Major Open Space system corridors throughout the Municipality.
5.2 The subject lands are designated "Urban Residential" and "Environmental Protection
Area" within the Clarington Official Plan. The Environmental Protection Area
designation covers approximately one half of the site. This designation identifies
Farewell Creek, which flows in a north south direction through the middle of property,as
well as the environmentally sensitive areas surrounding the creek bed. The balance of
the property is designated Urban Residential.
5.3 Section 14.4 of the Clarington Official Plan contains specific policies addressing
Environmental Protection Areas. On such lands the setback for development is to be
determined in consultation with the Conservation Authority and the Province. The
setback is to be from top-of-bank and is to be based on the stability of the slope and the
sensitivity of the valley. The setback for all other natural features within the
Environmental Protection Area, such as woodlots, shall be determined based on the
sensitivity of the specific natural feature.
5.4 The Natural Features Map C1 identifies Farewell Creek as a Cold Water Stream with
Hazard Lands. A Tableland Woodlot is indicated, and the entire property falls within
- 612
' REPORT PD-128-98
PAGE4
the Lake Iroquois Beach. These natural features are recognized as major components of
the natural environment.
5.5 The Lake Iroquois Beach is identified for its extensive forested areas and wildlife habitat,
and its locally significant functions of groundwater discharge and recharge. Plans of
Subdivision located within the Lake Iroquois Beach are to contain provisions for the
maintenance of groundwater functions. These may include special house and
infrastructure design requirements, storm water management or construction techniques.
Section 4.7.4 of the Clarington Official Plan states that prior to the approval of any
development proposal which includes the removal of part or all of a woodlot, the
significance of the woodlot shall be assessed in accordance with Section 4.3.8 of the
Plan, and if appropriate, a woodlot preservation plan and management plan shall be
prepared.
5.6 Section 4.3.8 requires that an Environmental Impact Study (EIS) be undertaken for
development applications located within or adjacent to any natural features identified
on Map C, and the expense of the study is to be borne by the applicant. The applicant
has been informed of the requirement of an EIS and is aware that a recommendation
cannot be made to the Region of Durham on the application until the Study is submitted
and accepted by the Municipality.
5.7 Section 20.2.3 of the Clarington Official Plan requires asub-watershed plan to be
prepared and approved prior to approval of any draft plan of subdivision unless prior to
the approval of the Official Plan, a master drainage plan had been approved for the area
subject to development. This proposed application has been included in the master
drainage plan for the Highland Gardens development. Therefore, asub-watershed plan
is not required for this development.
6. ZONING BY-LAW CONFORMITY
613
` REPORT PD-128-98 PAGE 5
6.1 The subject lands are currently zoned "Holding Residential Type One (R1)" for the area
west of Farewell Creek, "(Holding) Urban Residential Type One ((H)R1)" for the area
east of Farewell Creek, and "Environmental Protection (EP)" for the creek valley and its
floodlands. The R1 zone permits single detached and semi-detached/ linked dwelling
units. Single detached units require a minimum lot frontage of 15 metres. Semi-
detached or linked dwelling units require a minimum lot frontage of 18 metres. The
application proposes minimum lot frontages of 16 metres which would allow for the
construction of single detached units only. The Environmental Protection zone does not
permit the construction of any buildings or structures, and all construction must be set
back a minimum of 3 metres from the EP boundary.
6.2 Prior to development of the plan of subdivision a removal of Holding would be required
to be approved by the Municipality. As of the writing of this report an application has
not been filed to remove the Holding symbol.
7. PUBLIC NOTICE AND SUBMISSIONS
7.1 Pursuant to Council's resolution of July 26, 1982, and the requirements of the Planning
Act, the appropriate signage acknowledging the application was erected on the subject
lands. The required notice was also mailed to each landowner within the prescribed
distance.
7.2 Staff have received four verbal inquiries into the application. Two were from residents
of Tooley Road, inquiring whether the proposal would be serviced from the Tooley
Road frontage. A resident of Mull Cres., whose property backs onto Block 219,
expressed a desire for the preservation of the woodlot behind his property. The fourth
inquirer requested clarification of the site location.
7.3 No written submissions have been received on this application.
- 614
'REPORT PD-128-98 PAGE 6
8. AGENCY COMMENTS
8.1 The application was circulated to solicit comments from other relevant agencies and
departments. To date, comments of no objection have been received from Ontario
Hydro, the Clarington Fire Department and Community Services Department.
8.2 The Clarington Public Works Department has no objection to the proposal subject to
standard conditions and the following:
• The configuration of the cul-de-sac bulb must be revised so that it conforms to the
Municipality of Clarington Standard Drawing N-710. A 15 metre radius transition is
required between the straight section of the road allowance and the circle.
• Prior to the issuance of building permits, the applicant must provide for the removal
of the existing dead end barricade at the existing limit of McLellan Drive.
• The applicant will be responsible for 100% of all costs required to connect the
existing sidewalk on McLellan Drive with the new pedestrian sidewalk within the
subject draft plan.
• The applicant must provide confirmation that a required payment for oversized
downstream storm sewers or storm water management facilities has been completed
by private arrangement.
• The applicant's engineer will be required to prepare a Preliminary Lot Grading and
Drainage Plan that details the configuration of the on-site storm sewer system (minor
system) and the conveyance of the overland flow (major system) from this
subdivision. The location of any rear yard catchbasins and storm sewers must be
identified. Any large trees designated for removal due to the presence of storm
sewer facilities on private property must also be identified.
• The applicant will be required to provide an appropriate cash contribution in lieu of
the normal parkland dedication.
8.2 Comments remain outstanding from the following agencies: Durham Region Planning
Department; Durham Region Works Department; Peterborough Victoria
Northumberland Clarington Separate School Board; Kawartha Pine Ridge District School
Board; and Central Lake Ontario Conservation.
- bi5
' REPORT PD-128-98
PAGE 7
9. STAFF COMMENTS
9.1 Section 14.4.3 of the Clarington Official Plan requires a minimum setback of 5 metres
for all development from the top-of-bank as identified for a stream valley, as well as a
minimum 5 metre setback from a tableland woodlot. Lot lines are not permitted to
extend beyond the required setback.
The applicant has determined the top-of-bank line as being the rear property line of
Blocks 13 to 22. It has also been depicted as being close to, or within, the required 5
metre setback for Lots 7 to 9. The exact location of the top-of-bank will be confirmed
through the Environmental Impact Study.
9.2 Staff have informed the applicant that a parking plan is to be submitted for review and
comment. This proposal is for 16 metre frontage lots, which is larger than any single
detached lots within the area. The applicant's agent has confirmed that these lots have
been designed to accommodate large homes with double car garages. Therefore, each
lot will have accommodation to park four vehicles on the property, two being within the
garage space and two being in the double wide driveway. This available on-site parking
should help eliminate any excessive on street parking problems.
10. CONCLUSIONS
10.1 The purpose of this report is to satisfy the requirements for the Public Meeting under the
Planning Act. Considering the number of outstanding comments, it is respectfully
respected that this report be referred back to Staff for further processing and the
preparation of a subsequent report.
Respectfully submitted, Revie by,
Franklin Wu, M.C.I.P., R.P.P., .Stockwell,
Director of Planning & Development ~ Chief Administrative Officer
_ E~ih
REPORT PD-128-98 PAGE 8
IL*LDT*FW*cc
October 26, 1998
Attachment No. 1 - Key Map
Attachment No. 2 - Proposed Draft Plan of Subdivision
Interested parties to be notified of Council and Committee's decision:
Mr. Bob Annaert
D. G. Biddle and Associates Ltd.
96 King Street East
Oshawa, Ontario
L1H 166
Mr. Paul Gearing
Gearing Farms Ltd.
Box 12, R. R. #3
Bowmanville, Ontario
L1C 3K4
Kassinger Construction Ltd.
cJo Gearing Farms Ltd.
Box 12, R. R. #3
Bowmanville, Ontario
L1C 3K4
~' ', 7
ATTACHMENT N0.1
® SUBJECT SITE
LOT 33 LOT 32
---_
---
-__
~; ,-~-rT-r rrT,
~~ ~ ii I
~~
- - - ~~ i ' f
U ~
~ ~ i~~F" ~ ~ ~~C
__~ _- _ i
- ~, ,~ i
--; '-
~ ~~ ~ ~ ~I7
- ~~ ~ 1 /
1---
- - 1, -
~ ~ ~
_ ~` r
_-,_~ z
--
G fi
- ~~A ~ J -_
J ~--
~~'
----
-~ Q _~~ ~ HIGHLAND = ~
-_ - it _ ~ ,. PARK -_ (n
~ I LLJ
STR' - U
~ _--~ i \ ~
_ Z
J ,~ i i
---
-- ~ ~~ U
F- i ~ ~.
1 ~ ~~
F ~ ---~ ~;
--- -___ r ~ ~J
i ~-
1 i ' ~'
l i /~
~ ~ / ~ ~ ~ N ASH ~R A(5 ~ ~~'-
9
0
COURTICE
KEY MAP ~ 8T-9SO7 2
bits
Z'ON 1N3WH~t/11V b i