Loading...
HomeMy WebLinkAboutCAO-005-10 Q REPORT Leading the Way CHIEF ADMINISTRATIVE OFFICER Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: JUNE 21, 2010 Resolution#: 3y0��0 By-law#: NIA Report M CAO-005-10 File#: Subject: ENERGY MANAGEMENT STEERING COMMITTEE - UPDATE RECOMMENDATIONS: It is respectfully recommended to the General Purpose and Administration Committee that Council approves the following: 1. THAT Report CAO-005-10 be received; 2. THAT the draft Energy Management Plan be received; 3. THAT Council authorize staff to proceed with the completion of energy audits for South Courtice Arena, Clarington Fitness Centre and Clarington Community Resource Centre with funds to be drawn from the Municipal Government Enterprise Reserve Fund. 1 —� Submitted by: Franklin Wu Chief Administrative Officer CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-0720 REPORT NO.: CAO-005-10 PAGE 2 1.0 BACKGROUND 1.1 Since its formation, the Energy Management Steering Committee (Committee) has been working within the energy management framework that was approved by Council in 2008. This report will keep Council advised of the various activities of this Committee. 1.2 On July 14, 2008 Council authorized staff to proceed with an RFP process to complete the first two energy audits of municipal buildings with an estimated cost of $30,000. Based on the pricing received approximately 50% of this amount was left uncommitted and Council subsequently authorized staff to complete two additional audits utilizing the remainder of the approved funds which were drawn from the Municipal Government Enterprise Reserve Fund. 2.0 ENERGY MANAGEMENT PLAN 2.1 The Committee has developed a draft Energy Management Plan (EMP) as identified in the Green Energy Act 2009. The Plan will provide direction to the Committee and all municipal staff as we collectively target energy conservation and other green strategies. 2.2 The Plan will be a working document and will be reviewed and revised as needed. 3.0 2009 ENERGY CONSERVATION TARGETS 3.1 As a requirement of the EMP, conservation targets are to be established. In order to establish a baseline for energy consumption by facility, usage was calculated for the 2008 budget year. During the 2009 budget preparations each department was directed to adjust their utility budgets to reflect a decrease of 10% in heat, hydro and water consumption. REPORT NO.: CAO-005-10 PAGE 3 3.2 Throughout 2009 utility usage reports were prepared on a quarterly basis and provided to the Committee to assist in tracking the progress. Based on the year-end usage report the following results were realized: Natural Gas 13.2% decrease Hydro 7.5% decrease Water 3.5% decrease These results reflect an average utility usage reduction of 8.06% 3.3 The Committee will continue to reinforce the targeted reductions and will assist staff in achieving the 10% overall reduction at the end of 2010. 4.0 ENERGY AUDITS 4.1 Energy audits provide a technical analysis of energy consumption, equipment efficiencies and building characteristics as well as analyzing utility usage. From the information collected a list of recommendations are developed, complete with estimated costs that quantify conservation measures and calculate anticipated pay back periods. Equipped with this information staff are in a position to substantiate implementation strategies during budget preparations. 4.2 To date energy audits have been completed on four municipal buildings: Garnet Rickard Complex Municipal Administrative Centre/Library Courtice Community Complex Fire Hall #1 The Plan has identified a schedule to have energy audits completed on all municipally operated buildings by 2012. 4.3 For 2010 the Committee has proposed the completion of energy audits for South Courtice Arena, Clarington Fitness Centre and Clarington Community Resource Centre. The estimated cost of the audits is $20,000. The Director of Finance has FREPORT -005-10 PAGE 4 sufficient funds remain in the Municipal Government Enterprise Reserve ete this work. DGE COMMUNITY CHALLENGE 5.1 The municipality will take part in this Ontario Power Authority initiative in 2010. Clarington took part in 2009 when the program was known as Count Me In. The program consists of two components. The first challenge will track the highest percentage drop in electricity consumption on August 11`h by municipality. The second challenge will calculate the highest per capita participation in the Power Pledge drive. 5.2 The public information developed to promote this program will be provided to staff and will assist in raising the overall awareness of energy conservation both in the workplace and at home. 6.0 LAS MUNICIPAL ENERGY PERFORMANCE BENCHMARKING PROJECT 6.1 This Local Authority Services Ltd project sought the submission of detailed organizational and facility data relating to energy performance from Ontario municipalities that would be analyzed and benchmarked with buildings of similar types. 6.2 The Committee submitted survey information on four facilities including a swimming pool, arena, fire hall and administrative building. Recently we received the results of the survey as well as receiving the case studies from the Best in Class facilities. 6.3 The overall survey results showed a low level of energy performance in Ontario's municipal sector. Staff will review our current practices as well as those of the highest performing facilities from the survey to develop a strategy for improved performance. REPORT NO.: CAO-005-10 PAGE 5 7.0 COMMENT 7.1 The Steering Committee will continue to work on the various initiatives of the Energy Management Plan in 2010 and will provide leadership to staff in terms of energy conservation and other green strategies. Attachments: Attachment 1 — Draft Energy Management Plan i" ;i, °��i((iI'�i' To Report CAO-005-10 II (� (,I, I �(iiIIIIIIIIiIIi'iIIIIlI�4I�(IIIi �' " ' ' I' �,��1 �I� .I(II9IIIII f�III�III i kiEtiiitlk4ittff { �) � �;(Eh Fr tf ' II (II I Ii��ti i lr i i it 4 I , i . x i ( ( i�11(1 i nili�*m7i�i,uuaz+. I B e m e g �n:nii I:§ "BLE OF CONTENTS Introduction........................................................................... 1 Goals...................................................................................... 1 Objectives.............................................................................. 1 Energy Management Plan Committee .........................................2 Energy Management Plan........ ................ ................................—2 Energy Consumption Data Collection .........................................2 1i! Energy Reduction Target..............................................................3 Energy Audit Program..................................................................4 Staff Education and Engagement................................................4 Green Procurement.......................................................................5 GreenFleet....................................................................................6 Green Construction ......................................................................8 Implementation/Future Considerations .............................. 9 PENDIXI ._............................:_..........................................10 Energy Management Steering Committee —2008-2010....._.:....... 10 PENDIX II ENERGY USE STUDY...... ...... ...................11 PhaseOne ...................................................................................11 Hydro:... .............—.— ......... ... ....._ .. . ....._... 11 Heating:......... ....... ................ ...... .._.... ............... ...... .. .._............_.....13 Water:...... ._...... .. ......__... .... .................................. .. ..13 Fuel (Gas. Clear Diesel & Marked Diesel): .................... ............ 14 PhaseTwo ...._................_........._............ ................_._.............. 15 Hydro:...... ............. _ . _ ......15 Heating:.... ...... . . ......... .. ........................... ......16 Water:....... ................... .._,. ............. ..................._.__..16 Fuel (Gas, Clear Diesel & Marked Diesel):._............. ....................... ...... 17 ,;PENDIX 111 2009 CONSUMPTION REVIEW........................18 PENDIXIV................................................... ......................20 Energy Audit Program..... .---..___.... _._.__ ... __.20 Method: . ..... ..........-......-...... .. ............20 Financial Consideration:......... .... .... _ .. . ........ _.— .........21 AuditSchedule: ...... .......... . ......... _ ...._ ...... .--..... ...... ......_..........21 Municipal Administrative Centre ....... _.........-- —............_ .._.............21 Garnet Rickard Recreation Complex... ................................ ........_._...... 22 Fire Hall #1 ........ _ .........--..... _22 Courtice Community Complex............... . ............22 Proposed2010.. .............. . _..... ...... ........... . ..........._....._.............__.. ...23 Proposed 2011 . ..... ........_.... ._._..__.. ........23 Proposed 2012... ... ... ..... ........ . .. .......23 MUNICIPALITY OF CLARINGTON ENERGY MANAGEMENT PLAN is Introduction F In response to the growing need for energy and environmental stewardship, the municipal administration is working towards additional energy conservation through a coordinated plan. The purpose of the Energy Management Plan (EMP) is to provide the Municipality with a strategy to improve the overall energy efficiency of operations within the control of the Municipality. By increasing awareness with all employees in energy conservation we will assist in the promotion of an environmentally-friendly workplace and do our part in saving the environment, energy and money by promoting and practicing all energy conservation measures and programs t The Plan will be the key instrument to assist the Municipality to achieve these goals. The Plan will be reviewed and updated on an annual basis. The Energy Management Committee shall report to Council on a regular basis with respect the status of various energy conservation undertakings. i Goals 1. To improve energy efficiency of all Municipal operations 2. To create, through education, a culture of energy conservation in the workplace 3. To reducing green house gas emission and our carbon footprint 'E Objectives 1 . Develop an Energy Management Plan 2. Implement all strategies identified in the Energy Management Plan 3. Monitor and Revise the Energy Management Plan 4. Report to Council annually - Bement Plan - -- - Page 1 c' : Energy Management Plan Committee In 2007, Council endorsed the formation of a staff committee to undertake all necessary actions to effect municipal energy '•( conservation. Under the direction of the Chief Administrative Officer, an interdepartmental Energy Management Steering Committee (Committee) was formed to provide leadership; guidance and direction to ensure all energy management efforts "" are coordinated and sustained over the long term. For a current list of committee members see Appendix I. The mandate of this Committee is to take charge and take ownership of all energy conservation measures including the preparation and implementation of an Energy Management Plan (Plan). Allowing staff to be engaged in the process of setting and choosing priorities Will contribute to the Ipng term implementation of the Plan. Energy Management Plan As the Committee moves toward the creation of the Energy Management Plan six key components to the plan were identified including: 3� l -1, Energy Consumption data collection 2 Energy Reduction Target 3. Energy Audit Program 4. Staff Education and Engagement 5. Green Procurement 6. :,Gre en:, Fleet 7. Green Construction Standards Energy Consumption Data Collection The Corporation of the Municipality of Clarington spends close to three million dollars annually on energizing municipal facilities and equipment. These numbers represent a significant annual budget outlay. In an attempt to gain a better understanding of their significance, a comprehensive energy use study was undertaken. is agement Plan Page 2 i• r The first phase of the energy use study involved the review of historical energy consumption covering the period from January 1 , 2005 to December 31, 2007. This review involved; 165 different hydro accounts supplying power to Municipal streetlights, traffic signals, playing fields, park lights and facilities; a total of 25 Municipal facilities were supplied heat using ,r Natural Gas, Heating Oil or Propane; 64 different accounts supplying water to Municipal parks and facilities; and fuel (including gas, clear diesel and marked diesel) to maintain the fleet was delivered to 5 locations within the Municipality. , The second phase of the study involves the ongoing tracking and monitoring of energy consumption information for all of the r' accounts identified in phase one, with the hope that it will j provide knowledge to assist management in budgeting for future energy requirements. During the second phase, 2008 was set as the baseline for which ftiture comparisons can be made. This year was chosen be(ddG it was the year before the corporation made a concerted effort to reduce energy consumption. The 0omplota breakdown of the energy use statistics and methodologies are documented in detail in Appendix Il. It outlines all energy sources`reviewed in each phase. , Energy Reduction Target 2008 tlsnee In September 2008, the Chief Administrative Officer issued a challenge to all municipal departments to reduce energy Water * 66,871 m consumption by 10% in 2009. To support this initiative each VANII 11111: Gas 1,857;623 m department was asked to make the required changes to their 2009proposed operating budgets to reflect a 10% decrease in Electricity *to,t �i5 kvf , hydro, heat and water usage. trxdd,npsaniu— ; ;,, ,,, . Following the year end review, we experienced a reduction in energy consumption reduced in all three areas of the challenge (see Appendix III). Although we did not attain a 10% overall reduction in all three areas this objective remains in place for 2010, using the 2008 energy consumption data on the baseline. Subject to achieving this goal for 2010, the Committee will review and recommend targets for future years. Bement Plan Page 3 .. -- i y Energy Audit Program The municipality operates a number of facilities ranging in size and type of use from a small community centre to a multifunctional recreation complex. Each facility consumes energy (electricity and natural gas or heating oil) for light, HVAC systems and the operation of mechanical equipment needed for 4. the production and maintenance of ice surfaces. In addition to the consumption of energy, each of these facilities consumes water for drinking, sanitation and ice surface preparation. Costs of these resources represent a significant cost to the municipality as identified in the energy consumption section of this plan. Energy Audits provide a technical analysis of energy consumption, equipment efficiencies and building characteristics as well as analyzing utility usage. From the information collected a list of recommendations are developod:,IIQomplete with estimated costs that quantify conservation measures and calculated anticipated pay back periods. Equipped with this information staff are Ina position to substantiate implementation strategies during budget preparations._ To date energy audits have been completed on four municipal buildings and the goal is to have all buildings audited by 2012. The detailed',Energy Audit program can be found in Appendix IV. Energy audits completed Following,the completion of an energy audit, departmental staff Garnet Rickard Gample „ LL and members of the Committee review the document and meet Munidpal adm nistratiu2 "" with the consultant to discuss the report. Once the report is Gentreji�larar� ` finalized it remains the responsibility of the user department to °tl CourticeComn .. plan an implementation strategy to address all Eire Malt#2I i, ,yi= recommendations made in the report. In some cases this may " 'L.. require minimal costs that can be funded through an operating i budget For the larger initiatives the department will need to add i i�!i ` „ �a � ���y I j to their Capital budget program. (( Staff Education and Engagement F Using resources available, the Committee will share with staff energy savings ideas. Efforts will spotlight: • The Corporation's energy efficiency successes; • Promoting education programs in energy efficiency, - -- -- -- - - ------ ---- ..................... agement Plan Page 4 t (' €p • Partnerships in promoting efficiency programs; and • Sharing personal energy efficiency success stories and tips. These are all within the intention to provide the tools and informational for employees to be stewards of the environment. Green Procurement Green procurement is set within the context of achieving value for money. It requires the integration of environmental performance considerations into the,procurement process including planning, acquisition, use'and disposal. Green procurement also requires an understanding of the environmental aspects and potential impacts and costs associated with the life cycle assessment of goods and services being acquired. In order to contribute to the reduction of waste, toxic Or harmful emissions and substances and to increase the development and awareness of environmentally preferred purchasing, the Municipality of Clarington urges its contractors to, wherever possible during the provision of goods and services, to propose amendments to the icjp6ii and requirements to provide for the expanded use of durable products, reusable products and products (including those used by service contractors) that contain the maximum level of post- consumer waste,-and the least amount of toxic or harmful content for the sustainability of a clean environment without significantly altering the effectiveness of the product or services. It is recognized that a cost analysis is required in order to ensure that the products are made available at competitive prices The "Governments Incorporating Procurement Practices which are Environmentally Responsible" (GIPPER) Statement of Principle as outlined above expresses the Municipality's commitment to environmentally responsible (Green) procurement and overall waste reduction. Products considered to be environmentally responsible may be given preference during the evaluation stage of the submission when the tender/proposal documents either directly calls for "green" products or where "green" products may be priced as an option. I gement Plan Page 5 In the future the Committee may seek an amendment the purchasing by-law to incorporate the principles of green procurement. Green Fleet it When the Municipality undertakes a green fleet initiative and demonstrates its success, it benefits Clarington in four ways. First, the initiative helps Clarington reduce emissions. Second, it helps the Municipality reduce fuel consumption. Third it improves air quality and reduces climate change. Fourth, demonstrating new technologyprornotes development, commercialization and wide spread adoption of green technologies, reduces prices and speeds infrastructure development. Clarington currently has a variety of green fleet initiatives for vehicles and is promoting sustainable fleet-related choices and green maintenance and management practices. The Municipality's fleet includes two gasoline — electric hybrid pickup trucks; four alternative fueled ice surfacing equipment and eight current emission controlled heavy vehicles. Making the Municipality of Clarington fleet'operations more environmentally friendly requires more than purchasing cleaner vehicles. The Municipality also purchases cleaner fuels. Orono and Hampton yards use Ultra low sulphur diesel fuel in its heavy equipment Gasoline used in vehicles contains an average of 11 ten percept ethanol The Municipality will also be looking into using some form of biodiesel. 5070 litres of used oil was recycled in 2008 instead of burned to reduce carbon dioxide emissions resulting from vehicle maintenance. Used oil filters are collected and disposed of using an environmentally approved method. Used tires collected from the road sides are also disposed of by a licensed disposal company. To reduce resources required the fleet garage use rebuilt alternators, starters, brake cores and other components when available. Other green fleet approaches include continually seeking best practices by networking with other fleets and participating in Fleet Challenge. 1 agement Plan Page 6 Ii E Clarington, with Council's direction, will purchase commercially available green vehicles as a standard practice. The plan provides the flexibility to adopt promising new technologies as they become available. A large portion of our fleet is made up of light-duty trucks and vans. Green solutions are needed for these units. In 2009/2010 full hybrid pickup trucks will be commercially available along with ultra fuel-efficient diesel power. As these products become available they will be evaluated and implemented accordingly. Stricter diesel engine emission standards being phased in mean that new diesel engines will be much cleaner then old equipment they are replacing. Replacing aging equipment as they come due with state of the art emission controlled diesels will reduce emissions from those trucks. Heavy trucks are a major,contributor to smog because of their particulate emissions. Diesel particulate filters reduce particulate matter—soot,-,,,by more than W%; Replacing existing;older, high level of emissions diesels in the future with current green fleet ' technology will reduce ClanngtdWs particulate emissions dramatically. Light trucks and cars should include flex fuel options along with fuel efficiency as a priority. Other emerging technologies will be evaluated as they become available. I- The use of alternate fuels such as biodiesel and blends of ethanol and gasoline will, aid Clarington in reducing emissions for both heavy and light vehicles. Investigating and implementing the use of such fuels will be an ongoing process As they become comm6rc ally available. Participating in programs such as Green Fleet Expo and Fleet Challenge are excellent opportunities to learn about green fleet technologies and best practices. Educating employees on fuel managern nt techniques both at work and during their commute to work will'benefit both staff and the Municipality of Clarington t&10 onserve fuel. Fleet services through networking with other fleets can learn about and implement proven green fleet best practices. Investigating benefits and feasibility of adopting green fleet best practices, such as extended oil change intervals and using energy conserving synthetic oils can aid in achieving sustainable goals. The Municipality should explore having its fleet reviewed under the E3 Fleet Rating System (fleet consultants) to identify opportunities to reduce emissions and fuel usage. agement Plan Page 7 .t Ii �i P! Green Fleet Flan Directive • Participate in Fleet Challenge fleet review program • Identify and implement viable recommendations from review • Expedite replacement of oldest plow trucks • Continue educating Municipal employees on fuel conscious driving techniques Green Construction In 2009, staff began researching ways to ensure that new municipal building projects would be designed and constructed with high regard for energy efficiency, environmental sustainability and fiscal responsibility. The Canada Green L: Building Council's (CaGBC) Leadership in Energy and Environmental Design (LEED) program was identified by staff as the preferred model for governing;new municipal building projects. LEED has gained the market share in both the United " States and Canada, emphasized third party verification of environmental and energy efficiency claims and offered a holistic approach to sustainable building design. i LEED is a consensus based voluntary rating system for designing, constructing operating and certifying green buildings. It was first developed by the US Green Building Council and was later adopted in Canada by the Canada Green Building Council. It was developed to prevent "green washing" �' and to give credibility to green building claims through qUP ratification/qualification and third party review. LEED is:flexible enough to accommodate a wide range of green building strategies.'The following is a list of the key performance categories and examples of strategies used to fulfill the credits. • Sustainable Sites: Close to public transit routes and essential services reduced site disturbance, reduced light pollution. Water Efficiency: Low flush fixtures, grey water systems, drought resistant landscaping. Energy & Atmosphere: Renewable energy systems, ozone protection, energy efficient building operations. --------- - - - - -- ----- - --------------....-........--------------------- agement Plan Page 8 j { f • Materials & Resources: Recycled, regional, and renewable materials, management plans, certified wood. Indoor Environmental Quality: CO2 monitoring, low VOC materials, occupant controls day lighting in occupied spaces. Innovation & Design: New or inventive designs, LEER Accredited Professional I on design team. Within each of these six areas is a series of design attributes and, depending on the number of design attributes selected and included in the building construction, the building can be designated as either LEER certified (bronze), sifter, gold or platinum. Quite a number of municipalities in Ontario and across Canada have adopted the use of the LEEDTm Green Building Rating System for new municipal facilities.' These include; Kingston, East Gwillimbury; York Region,.Ottawa and Richmond Hill. Someaf the municipalities have adopted a minimum ratings standard'such as LEED Silver, and many have further qualified thi&to apply to a minimum sized building. The norm is 500 m2 Considering LEED for new construction and major renovations makes good business sense, in that a high performance green building,can reduce energy consumption and water usage and mm reduced environmental greenhouse gas (GHG) emissions. Implementation/Future Considerations I As the draft EMP develops, the Committee will formalize a full implementation strategy as well as looking forward to other opportunities. r _. --- -- -- — ........— ----- _ -..- Bement Plan Page 9 i1' �1 APPENDIX I i ` ENERGY MANAGEMENT STEERING COMMITTEE—2008-2010 j George Acorn, Chair Community Services Frank Wu Chief Administrator's Office Jane Pascoe Chief Administrator's Office Ken Ferguson Community Services Marie Marano Corporate Services Jerry Barber Corporate Services Laura Barta Finance Patti Barrie Clerks Fred Horvath Operations Lockie Longhurst Operations Rob Groen Operations Gord Weir Emergency & Fire Services Mark Berney Emergency&-Fire Services Lisa Backus Planning Leslie Benson Engineering I ii gement Plan Page 10 is APPENDIX II ENERGY USE STUDY RASE ONE The first phase of the study involved the review of the municipal energy consumption covering the period from January 1, 2005 to December 31, 2007, is an attempt to obtain an understanding of current usage. Included in the assessment was a review of charges from 122 Hydro One accounts; 43 Veridian Hydro accounts, 23 Enbridge natural gas accounts, 64 Durham Region water accounts, 8 Shell Canada heating oil accounts and 5 Shell Canada fuel accounts All accounts have been matched to the budget account they are charged to on an annual basis. During this process no adjustments were made to reallocate -' minor posting inconsistencies identified in the ledger, nor were the numbers changed to factor out the effect of year end accounting accruals. Accruals would normally be done to account for the estimated value of consumption up t''" he end of l the calendar year in the year it was used. This entry would be reversed in the beginning of the following year, recognizing that „ the first billing period includes consumption from the prior year. { In the initial assessment of municipal hydro, we requested the following account (1) monthly or quarterly usage in kilowatt hours (kWh), (2) rate per kWh, (3) meter readings used and (4) any other charges or rates that may have applied to our accounts since January 1, 2005. The information supplied detailed the total kilowatt hours used for each period and the total amount billed. Details of 165 accounts were requested as part of this assessment. These included accounts for street lighting, traffic signalization, playing fields or park lighting and power for Municipal facilities. Of the 122 Hydro One accounts submitted, 102 were specifically identified as street lighting accounts that are billed a flat rate each period. These billings have no consumption information provided for our review. An additional 3 accounts are charged to the street lighting operating account and for these the consumption was provided. Of the 43 Veridian Hydro accounts submitted, 14 were specifically identified as street lighting or traffic signal lighting accounts that are billed a flat rate each period. These billings have an --— - ----— --- - ---- - p gement Plan Page 11 t: estimated value for consumption for the year that is equally divided between the periods. All of the Municipality of Clarington's street lighting and traffic signal lighting accounts at the time of the review were billed based on the RPP (Regulated Price Plan). This plan charges a fixed rate for each kilowatt hour regardless of the current market price. Our street lights are utilized during off peak hours when the market rates are low and we do not automatically benefit from this cost reduction while remaining on the RPP. The total cost for street lighting and traffic signalization has increase 24.3% between 2005 and 2007. A large part of this increase is due to maintenance of street lights, which has increase 1561% over the same period. The increase in costs associated with,hydro rate increases cannot be specifically isolated without consumption details. It is further complicated by the fact that each year the Municipality assumes new responsibility for the maintenance of street lights in new subdivisions from developers who have completed the construction to the specifications of the Director of Engineering. Park maintenance for playing field lighting is charged for consumption on 4 Hydro One accounts and 9 Veridian hydro accounts. The detail of this consumption for each location was provided for review. It was noted that the playing field lighting hydro consumption has increases by 87.9% from 86,369.21 kWh in 2005 to 162 248.16 kWh i62007. This increase is due, in large part to the activation of lighting at 2375 Baseline Road in 2006. If you factor out the addition of 2375 Baseline Road, the increase in consumption,of hydro is only 2.5% from 86,369.2 'kWh in 2005 to 88,528.16 kWh in 2007. These accounts are billed based on the RPP with no discounts given for the off peek consumption of hydro. The remaining 13 Hydro One accounts and 20 Veridian hydro accounts, late to facilities operated by the Municipality, some a. -with more than one meter assigned. Consumption details were reviewed for 26 operating facilities. During the assessment period, the total consumption increased by 3.8% from 9,625 100.97 kWh in 2005 to 9,988,876.35 kWh in 2007. Most of these accounts are billed based on the RPP, with delivery and regulatory charges dependant on the expected kilowatt requirement. Bement Plan Page 12 n45 TING: In the initial assessment of municipal heating, we were able to obtain information on 25 municipal facilities that required some form of heat. Our research shows that Enbridge natural gas accounts exist and billing details were provided for 18 accounts. The cubic meters of natural gas consumed by the Municipality over the three year period has declined approximately 6% from 1,259,479 in 2005 to 1,184,524 in 2007. The most notable decrease in consumption over the three year period is evident at the Courtice Community Complex. The CCC has a documented 21.4% decrease in consumption from 316,201 cubic meters in 2005 to 248,686 in 2007. Of the remaining facilities, 2 use a combination of heating oil i and natural gas, 6 use primarily heating oil and 1 uses propane. Shell Canada supplies heating oil to 8 municipal facilities. In total they delivered 99 436 1Itres in 2005, 94,073 litres in 2006 and 94,002 litres in 2007. Th€ decrease is partly due to the fact that the Operations Depot in Hampton installed a natural gas furnace in 2006. In the initial assessment of water usage, we requested details 6h':,64 water billing accounts held with the Regional Municipality of Darharn, The Region was very accommodating in providing = details 1 2006 and 2007;however the 2005 billing details were not provided-as requested, as they were not available on line. Included in these accounts are 44 accounts for water usage at various munidipad,,parks. Many of these accounts have no documented consumption and are billed a minimum charge. Consumption is documented on the accounts that have Municipa[water parks as part of the services offered. Overall, the cost of'supplying water to these parks increased 24.1% from $18,404 in 2005 to $22,842 in 2007. The increase in costs associated with water has not been reviewed in great detail, as it is further complicated by the fact that part of the increase each year comes from the Municipality assuming responsibility for new parks in subdivisions from developers. agement Plan Page 13 k I. The remaining accounts with the Region of Durham, detail the consumption data for 20 of our operating faculties that are connected to the Regional water and sewer system. The details show a decrease in consumption of 2.7% from 74,666 cubic metres in 2006 to 72,676 cubic metres in 2007. A review of various facilities highlights substantial reductions in the cubic metres used at the Courtice Community Complex (3,694), the South Courtice Arena (2,751) and the Clarington Fitness Centre (1,315) that was partially offset by a significant increase at the Bowmanville Indoor Soccer facility (6.814). The total costs did not reflect this reduction. They show an increase of 5.8% from li $124,929 in 2006 to $132,227 in 2007. UEL (GAS, CLEAR? DIESEL & MARKED DIESEL 1: Fuel is purchased and tracked in three forms;(1) Gas used to operate municipal cars, gas powered trucks, and light equipment. (2) Marked Diesel used;for unlicensed/off road equipment. (3) Clear Diesel used for all other licensed vehicles operated by the Municipality. The majority of fuel used for the operation of the municipal fleet was, supplied during the initial assessment by Shell Canada. Sortie minor additional purchases are made through purchasing cards or on account With independent local Fuel stations. These additional p 1:'urchases have not been included in the consumption totals, as no tracking information is available. Shell Canada;delivers fuel'to 5 locations within the Municipality pf Clanh ton; (1) Flampton'=Repot, (2) Orono Depot, (3) Fire 11 Station #1 in Bowmanville, (4) Fire Station #2 in Newcastle, (5) Fire Station #4 in Courtice. All receipts and disbursements of fuel at the Hampton Depot and Orono Depot are computerized to ensute accurate inventory chargeback for use of fuel to individual; €feet accounts. The variation in litres from 2005 !168,788 to 2006 401,061 to 2007 492,706 is based on actual tequirements. Fuel requirements can be influenced by weather conditions, planned project locations and age or fuel efficiency of equipment used. tP Shell Canada delivers only Clear Diesel to fire stations 1 , 2 & 4, as this is used to operate the fire trucks. All purchases and withdrawals from the tanks are manually tracked to ensure the fuel storage tanks are not allowed to run out. For the purposes of this assessment we used the number litres of fuel purchased in each year as the total used. In 2005 44,122 litres were purchased, compared to 38,453 in 2006 and 47,544 in 2007. --- agement Plan Page 14 �i �A �I! The overall demand for fuel fluctuates depending on the number, location and severity of the fire calls in a given year. The requirement for fuel from these tanks may also be impacted f trucks from stations 3 & 5 fill up from them instead of using the Hampton or Orono Depot. f BASE TWO The second phase of the study involved the ongoing tracking and monitoring of energy consumption information. This incorporates accounts identified in the initial review, while adjusting for any accounts added or closed during the period under review. The same budget and yearend assumptions continued into the second;;phase of the review. I HYDRO: lk As of December 31, 2009, the Municipality has 186 active Hydro accounts. Tttese include 143 Hydro One accounts and 43 Veridian accounts: This is an increase of 21 accounts since the initial review. The majpfity of this increase relates to new street lights added during the pest two years. As with stage 1, street light consumption is not metered and reflects only an estimated value for the year split equpliy by billing frequency. An investigation to have street lighting removed from the regulated price plan to take advantage of off peek market rate billing is still in process. The total cost for street lighting and traffic signalization has increasedi an additional 19.04% between 2007 I "'a,64,2009: Charges for maintenance of street lights continued to increase over the 2007 to 2009 period accounting for 32.86% of the increase in related expenditures. Charges for the hydro to operate the street lights have also increased by 14.97% between2007 and 2009. This is due in part to the addition of , new streetlights and part to the rate increases experienced by the Municipality. ' Park maintenance for playing field lighting is charged for consumption on 6 Hydro One accounts and 9 Veridian hydro accounts. As with the street lighting, these accounts are billed based on RPP with no discounts given for the off peek consumption of hydro. ...._-___. agement Plan Page 15 (l The remaining 14 Hydro One accounts and 20 Veridian hydro accounts relate to facilities operated by the Municipality including 2 added to the list in 2008 (Newcastle and District Recreation Complex and Operations Depot Yard 42 Building) and one removed (old Trulls Road Fire hall). Consumption details are maintained and reviewed for 26 operating facilities. During the second stage of the review the total consumption increased from 9,988,876 kWh in 2007 to 10,164,445 kWh in 2009. When you factor out the consumption for the added and deleted facilities, the Municipality shows a 13.1% decrease in kWh used between 2007 and 2009; This is due mainly to conservation efforts initiated late in 2008 and continued into 2009 with the 10% in '09 program. EATING: 3 is As of December 31, 2009;, the Municipality has 118 active Enbridge natural gas accounts. These include 166f the accounts originally reported on in stage 1; along with 2 new _! accounts for facilities added (Darlington Township Office and Newcastle and District Recreation Complex); while excluding 2 accounts for deoommissioned buildings (Trulls Road Fire station and Newcastle Pcol). During the second stage of the review the t ial consumption increased from 1,;182,363 cubic meters in X007 to 11,252,929 cubicters in 2Q0,9. When you factor out 11 the consumption for the added and deleted facilities, the Muniedpality shows a 12.1010 decrease in cubic meters used between 2007116h62009. This is due mainly to conservation efforts initiated late in 2008 and continued into 2009 with the 10% in '09 program. There was 64,530!litres of heating oil delivered during 2008 and 49,181 litres delivered during 2009. In 2008 only 3 facilities received deliveries throughout the year and continued to receive deliveries in 2009. The other facilities converted to natural gas or propane heat. TER,' As of December 31, 2009, the Municipality has 54 active Region of Durham Water billing accounts. Included in these are 34 accounts for water used in various parks. Overall the cost of supplying water to these parks increased 91.27% from $22,842 in 2007 to $43,689 in 2009. This increase is significantly impacted by the addition of water park amenities used heavily during the summer months. agement Plan Page 16 The remaining 19 accounts include 18 of those originally reported on in stage 1 ; along with 1 new account for a facility added ( Newcastle and District Recreation Complex); while excluding 2 accounts for decommissioned buildings (Trulls l€ Road Fire station and Newcastle Pool). During the second stage of the review the total consumption decreased from 72,676 cubic meters in 2007 to 68,753 cubic meters in 2009. When you factor out the consumption for the added and deleted r; facilities, the Municipality shows a 15.5% decrease in cubic meters used between 2007 and 2009. This is due mainly to (� conservation efforts initiated late in 2068 and continued into 2009 with the 10% in '09 program. U L (6--AS, CLEAR )E'S L #'P ,4i KED IESE O: =' In 2009 the Municipalit,,ly'liphanged fuel suppliers and Petro Canada now delivers fo the 5 locations listed in stage 1 of the review. In 2008 the Municipality took delivery of 558,193 litres of fuel compared to 492,706 in 2:007 and 470,551 in 2009. Fuel requirements for Clear Diesel during 2008 were higher than normal due to extreme winter conditions. agement Plan Page 17 i' I (`� APPENDIX Ili UNICIPAL ENERGY MANAGEMENT COMMITTEE ebruary 24, 2010 EVIEW OF CONSUMPTION FOR THE 2009 YEAR The 10% in 2009 Challenge was issued in an attempt to reduce the Energy consumption in all Municipal operations. This reduction was incorporated into the 2009 budget numbers and estimates whenever feasible. During the past year, information has been tracked to various degrees ' in operating departments and summarized to assist management in making day to day energy decisions. Finance staff has also undertaken to track consumption and cost data associated with 411 Municipal facilities for Hydro, Natural Gas, Water and Bulk fuel This data is used to analyze trends in consumption over time and for estimating future budget requirements. The budget estimates are then forwarded to departments for their consideration in preparing:their current budget and five year forecast. The review of the consumption of Natural Gas for Heating at the end of the 2009 year shows a 13.21% decrease or 165,336 cubic meters comparedtothe same period: n 2008. This decrease is consistent with the Municipality's overall objective and has factored out facilities it significant discrepancies year over year. This number is up only slightly from the 13% decrease reported at the end of September due in par# to the mild weather in the last few months of the year. The reviewiof the consumption of Hydro at the end of the 2009 year shows a 7.48% decrease or 701,290 kilowatt hours compared to the Same period in 2008. This decrease is below the Municipality's bv6rall objective of 10% while factoring year to year facility discrepancies out of the equation. The number is down from the 9% decrease reported at the end of September. ii The review of the consumption of water at the end of the 2009 year shows a 3.5% decrease or 2,165 cubic meters compared to the same period in 2008. This decrease is significantly lower than the Municipality's overall objective and has factored out facilities with significant discrepancies year over year. It is slightly higher than the 2% decrease reported at the end of September, as the winter period is traditional not high for water usage. agement Plan Page 18 I sumption for the 2009 Year Page 2 A review of the fuel used in the operation of the fleet is also looked at annually. These consumption numbers are not factored into the total, as the requirements are more volatile and change based on weather conditions. During 2007 and 2008 when winter conditions were extreme, the consumption of Clear Diesel increased substantially. In 2009 it dropped back to the 2005 level. Fire fleet Diesel purchases I� tend to mirror the weather conditions as well. Called outs tend to increase more when the weather is bad due to an increase in the number of accidents. In looking at the dollars spent on fuel for the same period, it is important to note that fuel prices in 2008 were $1.50 per liter or higher for a period of time and did not level back down to around $1 per liter until early 2009. t With the heating conservation efforts put in place by various departments; warmer weather, and the favorable Natural Gas rates negotiated during the 2009 year, the Municipality has:been able to realize more than $243,000 in-lb udget savings. Many of he conservation efforts will continue to have positive impact on future consumption while efforts to establish`stable Natural Gas'rates through the use of hedging agreements should help in the process of providing more accurate annual budgeting data. The electrical conservation efforts put in place,by various departments dunhg 2009 have been successful to a lesser extent realizing more than $74,000 in budget surplus. These conservation efforts will continue into 2010 along with efforts to reduce rates through the use of forward hedging agreements for the purchase of electricity. The water conservation efforts put in place by departments during 2009-,have had.a limited impact. The majority of the almost $50,000 budget savings resulted from overestimating the requirements for the new Newcastle Facility's first full year of operation. Conservation efforts willpontinue into 2010 with the goal of reducing usage to offset expected_rate increases. The consUt ption requirements for the 2009 year have decreased in all areas. `Factoring the 13.21% decrease in Heating; the 7.48% decrease in Hydro; and the 3.50% decrease in Water; the average overall consumption decrease for 2009 would be 8.06%. I`'Cd — -— - --- — - .... agement Plan Page 19 I APPENDIX IV NERGYAUDIT PROGRAM The municipality operates a number of facilities ranging in size and type of use from a small community centre to a multifunctional recreation complex. Each facility consumes energy (electricity and natural gas or heating oil) for light, HVAC systems and the operation of mechanical equipment needed for the production and maintenance of ice surfaces. In addition to j the consumption of energy, each of these facilities consumes E water for drinking, sanitation and ice surface preparation. Costs of these resources represent a significant cost to the municipality as identifiedljmthe energy consumption section of this plan. Purpose: r;. With the ever-increasing cost of energy and the concern about the consumption of energy on the environment, the municipality I is undertaking aerogram aimed to address the following: Reducing consumption, Reducjpg green house gases, shrinking the carbon footprint; Reducing-cost; Increasingicperating efficiencies; and • Increasing the ife expectancy of the facilities. i ETHOD: Within each facility there exists multiple opportunities to achieve the foregoing objectives. These range from the simple turning off lights to the complex replacement of refrigeration plant. To determine the methods best suited to achieving the objectives one & more of the following processes will be implemented depending on the size and complexity of the facility and its systems: Identify the significant facilities operated by the municipality, establish a proposed schedule of audits or facility reviews, and factor this schedule in to the annual budget and planning process. See attached Schedule "A" for the Municipality of Clarington's proposed facility review i' schedule. gement Plan Page 20 • By engaging the professional services of an energy audit firm, reviews or audits of facilities can be undertaken to identify the energy saving opportunities as well as operating efficiencies. Included in the report will be an indication of the impact on the environment. • On the smaller less complicated facilities such as community halls staff can acquire the knowledge and ability to identify i opportunities such as furnace upgrades, use of energy saving bulbs, programmable thermostats and improved operating and maintenance procedures. • Educating the staff and facility Baser groups about simple steps that will reduce the energy consumption such as simply turning of the lights of when,not required, keep the heating temperature slightly lower or cooling temperature slightly higher. 1NANCIAL CONSIDERATION: Implementation of facility upgrades will come with a cost, however, this can be mitigated by first identifying grant opportunities available from the Federal and Provincial governments and possibly';local utilities. The cost of all upgrades will fall to the owner but these costs can be viewed as providingi Improvements to the facility, reducing pollution and providing a savings in energy and or operating costs, which will trffset the upgrade costs over a period of time. Cost recovery through savings,is viewed as the period required to pay back the cost end this can range from one too many years. The [nunicipality will have to consider these costs in their budgets and.the facility,upgrades in their short, medium and long term planning. An effective audit report and a sound facility maintenance program will assist in this decision making process. U,4,),1,T SCf4E1)ULE: The following facilities have had energy audits completed to date. I i UNICIPAL ADMINISTRATIVE CENTRE This facility was audited late in 2008 with the final report issued in February 2009. The report identified a various number of conservation measures and potential savings. In addition to identifying the specific measures, the consultant also provided a '�gement Plan Page 21 Iti r i• budget cost for implementation of each specific measure and the calculated pay-back in energy savings. Staff will continue to strategically plan for the implementation of the recommended measures taking into consideration the cost of the measures and their anticipated pay-back period. ARNET RICKARD RECREATION COMPLEX This facility was also audited in late 2008 with a final report released in February 2009. As was the case with the above noted report, a number of measures were identified. Due to the characteristics of this recreation facility, a number of the measures provided attractive pay-back;periods. Due to the potential savings to be realized this facility identified as a priority for retrofit should adequate funds be,:available. Subsequent to the completion of the audit, staff submitted a grant application for a Build Canada Fund grant. The application was submitted utilizing the facility,audit report as the:business case for the funds. The grant received approval and a major energy retrofit,project is scheduled for the summer/fall of 2010. IRE HALL #1 This facility audit report was submitted in January 2010. As a smaller facility the nurnber'of conservation measures were fewer as were the potential cost savings. Staff will use this report as;a guideline for future retrofit/upgrade strategies in the future. COUR7fCE COMMUNITY COMPLEX This facility audit report was also submitted in January 2010 and identified a`number of conservation measures with attractive ..potential savings. Staff will use this report as a guideline to plan an implementation strategy for the conservation measures identified. In addition to the energy audits that have been completed, the following list provides a proposed schedule to complete the audit of all significant municipal buildings. In developing this schedule, the committee considered the characteristics of the buildings and the potential impact on the annual costs for energy consumption that an audit would address. --- gement Plan Page 22