Loading...
HomeMy WebLinkAboutWD-64-94./xr THS REPORT o~~). wG Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # ~ la Res.#C~Pia- 7JS"`~`~ Date: DECEMBER 12, 1994 By-Law# Report #: - +.,,.~_~ File #:- ^~~-.002 Subject: ASpgN SPRINGS SUBDIVISION. PHASE 1, PLAN 40M-1686, CERTIFICATE OF ACCEPTANCE, STORM SEWER SYSTEM Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following:. 1. THAT Report WD-64-94 be received; and 2. THAT the Director of Public Works be authorized to issue a 'Certificate of Acceptance' for the storm sewer system constructed within Plan 40M-1686. REPORT 1.0 ATTACHMENTS No.l: Key Map 2.0 BACKGROUND 2.1 On September 5, 1991, the former Town of Newcastle entered into a subdivision agreement with Martin Road Holdings Limited and West Bowmanville Developments Ltd. to develop lands by plan of subdivision, located in Bowmanville, and described as Plan 40M-1686 (Attachment No.l). The agreement required the developer to construct all roadworks including hot-mix paving, curb. and gutter, sidewalks, boulevard sodding and street trees, a storm drainage system and street lights, hereinafter referred to as the 'Works'. ~n?z ,.oE ~®ao~.~.. REPORT NO.: WD-64-94 PAGE 2 2.2 The subdivision agreement provides for the separation of the Works into five (5) stages: a) Storm Sewer System; b) Roads and Above Ground Services; c) Tributary Stormwater Manaaement Works; d) Water Quality Works; and e) CPR Underpass Works 2.3 'The Storm Sewer Svstem was completed and a 'Certificate of Completion' was issued dated January 31, 1992. The system was placed on a two (2) year maintenance period which expired on January 31, 1994. The works were subsequently re-inspected and all deficiencies have now been corrected to the satisfaction of the Director. 2.4 it is now appropriate to issue a 'Certificate of Acceptance' for the Storm Sewer System. The subdivision agreement provides for this certificate to be issued by the Director of Public Works, subject to the approval of Council. Respectfully submitted,. Walter Evans, P.Eng. Director of Public Works Reviewed by, W.H. Stockwell ~ Chief Administrative Officer. WAE*NAC*PH December 5, 1994 Attachment 1024 ASPfY NGS S BIB VIS N 40M— 6, MAST s a an P a m m � o eadow d Hartwell m O w e ndl 0 � o }u m 0 Bonn A �8fonwaY � Ni hwa No. Q k o UUCJ O CY, o�QUP C:\ATFACHS\SUBD\40ml686.DWG o� o�uo DRAWN BY: JM DATE: DEC. 1994 9aselin ood TJ n ATTACHMENT N0. 1 KEY MAP WD-64-94 biI)?5