Loading...
HomeMy WebLinkAboutWD-24-94THE CORPS'l'~T~?O~~T~~~,~JJXk1;`X~~~X'X'Xic~XX~~~~NGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # 7 d5 ~ _5~9/ pl Date: APRIL 18, 1994 Res. #GPR-a98'9~ By-Law # Report#: ~"1D-24-94 File#: Subject: GUARD RAIL BARRIER NEAR THE 35/115 OFF RAMP AT MILL STREET, ORONO Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the. following: 1. THAT Report WD-24-94 be received; 2. THAT the request for installation of a steel guard rail on Mill Street, be denied; 3. THAT an open ditch be created on the north side of Mill Street to improve drainage and act as a physical barrier between the roadway and the sidewalk which is scheduled for construction during the summer of 1994; and 4. THAT Paul Brace of the Northumberland-Clarington Board of Education be advised of Council's decision. RBPORT 1.0 AT'PAruHrF*rrS No. L• Key Map No. 2: Correspondence dated January 31, 1994 from the Ministry of Transportation. 2.0 BACKGROUND 2.1 Council, at its meeting of February 26, 1994, passed the following resolution: T Q'~L~~ o.o. F° ~ at~,~,. REPORT NO.: WD-24-94 PAGE 2 "THAT the correspondence dated January 31, 1994, from-the Honourable Gilles Pouliot, Minister of Transportation, to the Northumberland and Newcastle Board of Education, pertaining to the installation of a guide rail on the north side of the off ramp from Highway 35/115 southbound to Mill Street, be received; THAT the correspondence be referred to the Director of Public Works for review and preparation of a report to be submitted to the General Purpose and Administration. Committee; and THAT the Honourable Gilles Pouliot and the Northumberland-Clarington Board of Education be advised of Council's decision. 3.0 REVIEW AND COMl~NT 3.1 The approved 1994 Capital Budget provides for the construction of a sidewalk from Peters Pyke to Mill Street in Orono, along the Highway 35/115 off ramp. The Northumberland-Clarington Board of Education requested that .the Ministry of Transportation erect a barrier in conjunction with the proposed sidewalk at the south end of Peters Pyke to create a separation between the traffic and pedestrians. The Ministry: of Transportation forwarded the correspondence to the Municipality of Clarington as the proposed sidewalk and barrier is within the boundaries of Clarington's jurisdiction. 3.2 Staff reviewed the request for installation of a barrier and discussed several alternatives .with Mr. Paul Brace,. Northumberland-Clarington School Board, based on warrant guidelines indicating where embankment protective devices should be utilized. 3.3 Pedestrians using the sidewalk will be 16 metres (52 feet) from the roadway and are considered to be in a safe area with no .additional protection required. The main purpose of the proposed barrier would be to keep the pedestrians from leaving the sidewalk and using the roadway. Previous observations ~~~ -. REPORT NO.: WD-24-94 PAGE 3 showed that most pedestrians and cyclists used. the grassed area where the sidewalk is being proposed and did not attempt to walk along the roadway. When the sidewalk is constructed a small section of temporary snow fence will be installed to keep pedestrians off the new grass and familiarize them with the new sidewalk. 3.4 Steel Guide Rail The Ministry of Transportation publishes warrant .guidelines. indicating where embankment protective devices should be utilized. The calculations involve design speeds of the roadway and ratio of the embanlanent slope. Mill Street which is posted at 50 km/hr with a 2 metre (6 feet) shoulder and a slope of 4;1 does not warrant a guide rail installation based on Provincial Guidelines. The distance between the roadway and the future sidewalk is 16 metres (52 feet) whereas many municipal .sidewalks are only 1 metre (3 .feet) from the roadway. The .cost of guide-rail- along this 75 metre (246 feet) curved section of roadway is estimated at $5,600. 3.5 Galvanized Fencinc The cost of fencing a distance of 30 metres (100 feet) to keep the children along the walkway is estimated at $1,220 and could be introduced at a later date if the need arises. 3.6 Open Ditch The cost of creating a ditch to act as a barrier is estimated at $300 and would also improve drainage in this area. 1034 REPORT NO.: WD-24-94 PAGE 4 4.0 CONCLIISIONS 4.1 From .the above, it is concluded that a guard rail barrier is not required at this location and that creating a ditch would. provide adequate separation from the roadway and improve drainage. Respectfully submitted, Reviewed by, Walter A. Evans, P. Eng. Director of Public Works. /1 W.H. Stockwell, Chief Administrative fficer RDB:WAE:jco March 29, 1994. Attachments pc: Mr. Paul Brace, Manager Transportation & Planning The Northumberland-Clarington Board of Education 834 D'Arcy Street North P.O. Box 470 Cobourg, Ontario R9A 4L2 ~~~ Q~e ~t5 Q ~~. Peters Pike Proposed Sidewalk Parkette Pro ed Ditch ~~ Pro osed G Existing Ditc "~' ~ ~~~ o ~'~ Q, ., ~` . ~ ~ 01~ 1V 0 ~, Q ~~ ~~ 4S'CBJECT ~ ~ j T ~{ C:\ATTACHS\CLARKE\PPIKESW ~ I 1 L DRAWN BY: JM DATE: JAN. 1994 ATTACHME111T 1110. 1 KEY MAP _D°P=' *:^.. TZ'-24-94 1036 Ministry Min iStPre ~ Ferguson Block,3 ~lo~bl f<i ~t{diFe-FE'rgu5oo(3e Eta e of des 77 Wellesley St. t 1 ~ 77, nre-1N~flesley ouest g Trans Ortation Trans ortS Toronto, Ontario ._.n ~ Toronto (Onta{io) P P M7A 7 Z8 ^~--to17A.1 Z8 Office of the Bureau du Minister ministre . i,vNE . January 31, 1994 _ R.T. Malowney ~--= ~g--- Director of Education and ~ecr-star-}r---.~ The Northumberland and Newcastle Board of Education 834 D'Arcy Street North P.O. Box 470 Cobourg, Ontario K9A 4L2 Dear Mr. Malowney: ~r•, i D ~_ (496) 327-9200 --~-- .- ._ .. .-._ _:._....J i. ~~ ~ i jj~~ {{~ 1 L~ ! 4 ~~ ~~ i' 1 1 1S9v r~:~rui; s orrcr- This is in response to your letter of December 8, 1993 in which you expressed concerns regarding the need for a guide rail to be installed on the north side of the off ramp from Highway 35/115 southbound to Mill Street. This guide rail would be to protect pedestrians using a proposed sidewalk connected to an existing walkway to/from Orono Estates. Ministry staff were requested to investigate your request in an effort to determine the most appropriate course of action necessary to rectify this safety concern. During their investigation they determined that the location which you have indicated a guide rail and sidewalk should be installed is not within the ministry's right-of-way. In view of this determination, I regret we cannot accommodate your request as the ministry has no jurisdiction at this location. As this location is under the jurisdiction of the Municipality of Clarington I am forwarding your concerns to them for their review. I trust this is satisfactory. Sincerely, ORIGINAL SIGNED BY, MINISTER Gilles Pouliot Minister cc. D. Hamre - P. Brace - D. Gray - G. Mills - o ,-~ ) b -. ~ ~' r Fka~' Ir~• ' ,:. ._ r ,tt~,:-- ~i'y~~ j- - ___-_. ..._-r.~..~-. Mayor - Clarington- Manager - Transportation & Planning Principal - Orono Public School MPP Durham East 1' n ~ , Y.t~" lN` W 1 f ~ ~ -7 ATTACHMENT N0, 2 I REPORT NO.: WD~24-94