HomeMy WebLinkAboutPSD-021-10Staff Report # 1
~~~~~~ REPORT
Leading the Way
PLANNING SERVICES
Meeting: COUNCIL
Date: February 8, 2010 Resolution #: ~' -(}(o a -I ~ By-law #: IV~i4
Report #: PSD-021-10 Fite #: PLN 33.3.10
Subject: DURHAM/YORK RESIDUAL WASTE ENVIRONMENTAL ASSESSMENT
RE-ENGAGEMENT OF PEER REVIEW CONSULTANTS -AIR QUALITY
IMPACTS
RECOMMENDATIONS:
It is respectfully recommended to Council the following:
THAT Report PSD-021-10 be received;
THAT the Peer Review consultants for the EFW (Air Quality Impacts) not be re-engaged
given that the modification of the Project Description in the EA from a 400,000 tonne per
year facility to a 140,000 tonne per year facility addresses the air quality comments
previously provided by the peer reviewers;
THAT a copy of Report PSD-021-10 and Council's decision be forwarded to the Region
of Durham, the Region of York, and Ministry of Environment; and
4. THAT all interested parties listed in Report PSD-021-10 and any delegations be advised
of Council's decision.
Submitted by: li Reviewed by: (/ ~` "'"' -' -~
y ang ai , CSLA, MCIP Franklin Wu,
cf g Director f Planning Services Chief Administrative Officer
FL/sn/df
2 February 2010
THE
CLARINGTON
STREET,
REPORT NO.: PSD-021-10
1.0 BACKGROUND AND PURPOSE OF REPORT
PAGE 2
1.1 The Environmental Assessment (EA) for York/Durham Residual Waste,
undertaken jointly by the Regions of York and Durham, began in March 2005 with
consultation on the Terms of Reference for the EA Study. The York/Durham
Residual Waste EA was submitted to the Ministry of Environment (MOE) on July
31, 2009, triggering the start of the formal MOE review process. The review
process is on-going; however, MOE will soon be releasing their comments on the
EA for public review and comment.
1.2 Council, at their meeting of January 25, 2010; passed the following resolution:
"WHEREAS the health and welfare of our residents is of primary concern to
the Municipality of Clarington; and
WHEREAS questions and concerns have arisen through the EA process with
respect to the current state of the local airshed and the potential negative
impact the proposed incinerator may have on local airshed quality;
THEREFORE BE IT RESOLVED THAT staff investigate and report by the nexf
Council meeting on the potential costs of peer review of air quality issues
arising from the EFW EA, and that should remaining funding for peer review
studies from Durham Region be available, that the Purchasing by-law be
suspended and that staff retain a peer review team to comment on air quality
issues relating to the EA and the proposed incinerator."
1.3 The purpose of this report is to discuss the possible re-engagement of the
Municipality's peer review consultants in order to review the air quality issues
arising from MOE's review of the EA for the proposed Durham/York Energy-From-
Waste (EFW}facility.
2.0 YORKIDURHAM RESIDUAL WASTE EA PROCESS
2.1 Environmental Assessment Process
2.1.1 The Regions of Durham and York have jointly conducted an EA to determine how
to manage the residual solid waste remaining after blue box and green box
diversion efforts. Key dates in the EA study process are as follows:
March 2006: Ministry of Environment approval of EA Study Terms of
Reference
June 2006: Selection of preferred approach to managing residual waste
(Alternatives To)
REPORT NO.: PSD-021-10.
PAGE 3
July 2007: Issuance of Request for Qualifications (RFQ) to potential
technology vendors
October 2007: Recommendation on preferred site (Alternative Methods)
December 2007: Durham and York Region Council's approval of preferred
site
January 2008: Approval of Qualified Bidders
April 2009: .Identification of Preferred Vendor
January-May 2009: Completion of all site specific studies
May 2009: Clarington Council endorses Host Community Agreement
(HCA)
June 2009: York and Durham Region Councils approve HCA, and EA for
submission to MOE
July 2009: Submission of EA to Ministry of Environment (MOE)
2.1.2 Subsequent to the submission of the final EA to the MOE in July, there are five
phases to the EA review, as follows:
Phase 1: Inspection of the EA (7 weeks)
Phase 2: Preparation of Ministry Review (5 weeks)
Phase 3: Issue of Notice of Completion
Phase 4: Inspection of Ministry Review (5 weeks)
Phase 5: Final Ministry Evaluation Period (13 weeks)
2.1.3 The Ministry is about to complete Phase 2. The Region of Durham's Report 2010-
WR-1 to the Works Committee discusses these five phases in greater detail.
2.2 Municipality of Clarington Comments on the Environmental Assessment
2.2.1 Clarington Staff have been involved in the EA process for Residual Waste since its
inception in 2005, when the initial terms of reference were being drafted and the
conceptual description of the undertaking was being formulated. The Municipality
has had numerous opportunities throughout the EA process to submit comments,
through both staff reports to Committee and Council and staff-level meetings.
REPORT NO.: PSD-021-10 PAGE 4
These include:
PSD-018-06 Feb, 13, 2006: Comments on the Terms of Reference
PSD-070-07 .May 22, 2007: Municipal Peer Review and Other Studies
PSD-097-07 September 4, 2007: Update on Municipal Peer Review
PSD-141-07 December 3, 2007: Municipal Comments on Step 7 -Evaluation of
Short-List of Sites and Identification of
Preferred Site
PSD-141-07 Addendum: December 10, 2007
FND-002-08 January 21, 2008: Peer Review & Economic Studies Costs to
Date
FND-022-08 Addendum: February 25, 2008
CAO-002-09 May 11, 2009: Status of EFW Host Community Agreement
Negotiation
CAO-002-09 Addendum: May 11, 2009
PSD-071-09 July 6, 2009: Municipality of Clarington Peer Review
Comments on Pre-Submission EA
2.2.2 The Municipality of Clarington's comments during the EA process are part of the
public comment documentation. Comments made in PSD-071-09, including the
appendices, have been addressed by the Project Team and are posted to the
project website.
2.3 Proiect Description
2.3.1 For the EA, the purpose of the undertaking (the Project Description), was set out in
the approved Terms of Reference, as follows:
To process -physically, biologically and/or thermally -the waste that remains
after the application of both Regions' at-source waste programs in order to
recover resources -both material and energy -and to minimize the amount
of material requiring landfill disposal. In proceeding with this undertaking, only
those approaches that will meet or exceed all regulatory requirements will be
considered.
The waste proposed to be managed will be primarily Municipal. Solid Waste
(MSW) from residential sources generated within Durham and York Regions
remaining after at-source diversion, a portion of post-diversion Industrial,
Commercial and Institutional (IC&I) waste traditionally managed by the
Regions at their waste disposal facilities; and Municipal post-diversion
REPORT NO.: PSD-021-10
PAGE 5
residual waste from neighbouring non-Greater Toronto Area (GTA)
municipalities that may provide disposal capacity for processing residues.
2.3.2 Over time, the Project Description has been refined and altered based on the EA
Study findings and public/stakeholder input.. In the July 2009 EA submission, the
Project Description was as follows:
"The Undertaking, as defined by this Environmental Assessment, is a
Thermal Treatment Facility, capable of processing post-diversion
residual waste and recovering. materials and energy of sufficient quality
and quantity to export to the marketplace (recovered metals, electricity
and eventually the possibility of district heating and cooling) with a
projected maximum design capacity of 400,000 tpy. The Facility will be
designed, built and operated on the Clarington 01 site, located in the
Municipality of Clarington, Regional Municipality of Durham."
2.3.3 In November 2009, the Project Description in the EA was amended as follows
(underlined):
"The Undertaking, as defined by this Environmental Assessment, is a
Thermal Treatment Facility, capable of processing post-diversion
residual waste and recovering materials and energy of sufficient quality
and.quantity to export to the marketplace (recovered metals, electricity
and eventually the possibility of district heating and cooling) with an
approved capacity of 140,000 tonnes per year. It is anticipated that
legislation at the time of expansionl. The Facility will be designed, built
and operated on the Clarington 01 Site, located in the Municipality of
Clarington, Regional Municipality of Durham."
2.3.4 The EA Project Team has indicated that the description of the undertaking was
modified in consultation with the MOE to ensure that it was consistent with
regulatory requirements. One consequence of this revision is that assumptions
concerning future baselines will be validated at the time of expansion through
the EA screening process. This will provide the Regions, Clarington and its
citizens an opportunity to validate the project's environmental impacts. In
addition, expansion will have to meet the regulatory limits in effect at that time.
3.0 RE-ENGAGEMENT OF THE PEER REVIEW CONSULTANT
3.1 The Municipality previously retained the consulting firm SENES to undertake a
peer review of the technical studies that related specifically .to the air quality
impacts of the proposed EFW facility, including how the air quality impacts affect
REPORT NO.: PSD-021-10 PAGE 6
the Site Specific Human Health and Ecological Risk Assessment. In accordance
with Council's resolution (see Section 1.2), Staff requested SENES to submit a
proposal to review the amended EA documentation as it relates to air quality
impacts.
3.2 To prepare their proposal, the representatives from SENES reviewed the
information that has been posted to the Project website, contacted the professional
experts on the EA Project Team, and verified that the risk assessment and air
quality assessment have received sign-off from the MOE technical reviewers as
being complete. SENES has confirmed that the amendments made to the Air
Quality and Site Specific Human Health and Ecological Risk Assessments do not
affect the conclusion. The amendments and addendums are posted to the project
website.
3.3 SENES has advised that "[they] feel that the modified undertaking confirms the
Regions' intentions to construct an EFW facility that is right-sized to the need
[shown] into the next decade at 140,000 tonnes per year and recognizes the
requirements for future expansion up to a total of 400,000 tonnes per year." In
addition, the revised project description allows for confirmation at the time of
expansion of the environmental impacts of the project because of the requirements
under the EA Act, through the screening process.
SENES further indicated that, in light of the modification to the project description,
they do not feel a further peer review is necessary. The peer reviewers are
available at their daily charge out rate, ($1300/day/professional) to meet with
Clarington Staff and/or the Project Team if requested to do so.
3.4 On April 18, 2007, Council for the Regional Municipality of Durham adopted the
following:
"That each respective Region shall provide adequate funding to any of the
potential host communities located within their respective Region. And
further, that such adequate funding shall include the costs of all necessary
studies and legal advice incurred by the potential host community to
investigate and complete its due diligence in arriving at its decision
whether or not it will become a host community for the EFW facility. And
further, the total of such costs shall be deducted from the combined
royalty fee, if any and not otherwise."
Through subsequent resolutions and discussions, $500,000 was set aside by the
Region of Durham for the retention of economic consultants, legal counsel, and
peer review consultants for the host community. To date, Clarington has spent
$476,573 of this amount.
REPORT NO.: PSD-021-10
4.0 CONCLUSIONS
PAGE 7
4.1 The change in the EA Project Description of the proposed EFW facility from a
400,000 tpy (tonnes per year) facility to a 140,000 tpy facility addresses the major
concerns expressed by the Municipality's Peer Review team. More specifically, it
has been confirmed by Clarington's consultant SENES that the air quality impacts,
including how they relate to the site specific human health and ecological risk
assessment, have been addressed. As a result, re-engaging the consultant to
carry out further review is not recommended.
4.2 The Project Team has made numerous changes to the EA to provide clarification,
elaboration and explanation as requested by MOE to address the regulatory
agency and public comments. These changes detail and rationalize the
conclusion previously reached by the EA.
Staff Contact: Faye Langmaid
List of interested parties to be notified of Councils decision:
Erin Mahoney, Reg. of York
Cliff Curtis, Durham Works
Jim McKay, Stantec
Gavin Battarino, MOE
Joachim Baur
Alexandra Bennett
Barry Bracken
Kath Bracken
Wendy Bracken
Karen Buck
Terry Caswell
Katie Clark
Shirley Crago
Kevin Diamond
Wayne Ellis
Linda Gasser
James Gibson
Glenda Gies
Tenzin Gyaltsan
Ron Hosein
Dr. Debra Jefferson
Laurie Lafrance
Lee McCue
Warren McCarthy
Cathrine McKeever
Kerry Meydam
John Mutton
Karen Nichol
Dave Renaud
Jim Richards
Andrew Robson
Yvonne Spencer
Nicole Young
Lucy Wunderlich
Ontario Power Generation
Anthony Topley
Paul Andre Larose
Don Wilkinson
Noah Hannah
Katherine Miles
Donna Mcaleer-Smith
Kristin Robinson
Steve Tharme
David Climenhage
Steve Conway
Chester Miles
Bernadine Power
Hilary Balmer
Willis & Marilyn Barrabal
Stewart and July Dayes
Maureen Dingman
Carl Zmozynski
Gaston Morin
Ann and Mike Buckley
Fraser and Cathy Grant
Jean and Wallace Mcknight
Stephanie Adams
Julie Allen-Freeman
John and Dale Cerniuk
Garland and Anne Foote
Slyvain Gagnon
Melissa Girard
Beth Hewis
Manuel Jimenez
Debbie Kuehn
John MacDonald
Ralph Machon
Mary Anne and Gerry Martin
Kristin McKinnon-Rutherford
Lorna McSwan
Bretn Mersey
Donna Packman
Devon Richard
Brian and Sharon Thompson
Bill and Lorna Turner
Doug Woods
Don Wright
Lakeridge Health
Lorraine Huinink
John Oates
Rev. Christopher Greaves
Leslie Heinrichs
Diana Kanarellis
Elaine and Vincent Ho
Ron Campbell
Stephanie Adams
Betty Robinson
REPORT NO.: PSD-021-10
PAGE 8
Nicola Keeme
Mable M. Low
Rebecca Harrison
Charlie and Irene Briden
Nadia McLean-Gagnon
Dorothy Barnett
Marc Tepfenhart
Rosemary Davies
Wendy Bracken
Libby Racansky
Beav201
Louis Bertrand
Sandra Viau
Tim Finnis
Hugh Allison
Marke Nelson
Jeremy Woodcock
Kevin LeGrand
Doug Anderson
Elaine Gillies