Loading...
HomeMy WebLinkAboutWD-13-97 Meeting: Date: THE CORPORATION OF THE MUNICIPALITY OF CLARINCTl'ON XXXTLh~?C~~~II~I~~9CQ$7T~~1~7~1~7kS~gl~i~~C~XXX REPORT GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# ~~a,GE Res. # A- ~S-~l~ By-Law # FEBRUARY 17, 1997 Report #: WD-13-97 File #: SPRINGFIBLDS SUBDIVISION, PNA38 1 Subject: pr.nx 40N-1669 'CBRTIFICATB OF ACCBPTANCB' TRISIITARY 3TORNVPATBR NANAG8M8NT WOR&S AND STORMWATBR D8T8NTION AND WATBR QIIALITY WOR&S Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1.. THAT Report WD-13-97 be received; and 2. THAT the Director of Public Works be authorized to issue a 'Certificate of Acceptance' for the Tributary Stormwater Management Works and the Stormwater Detention and Water Quality Works constructed within Plan 40M- 1669. .REPORT 1.0 ATTACH~NTS No. 1: Key Map 2.0 HACKGROIIND 2.1 The former Town of Newcastle entered into a subdivision agreement registered on September 20, 1991, with 708545 Ontario Limited to develop lands by plan of subdivision, located in Courtice and described as Plan 40M-1669 (Attachment No. 1). The agreement required the developer to construct all roadworks, including hot-mix paving, curb and gutter, sidewalks, boulevardsodding and street trees; a storm. drainage system and street lights, hereinafter referred to as the 'WOYka'. 2.2 The subdivision agreement provides for the separation of the Works into four (4) stages: (a) Storm Sewer Svstem, (b) Roads and Above Ground Services; (c) Tributarv Stormwater Mana4ementWOrks, and ~' (d) Stormwater Detention Work and Water Oualitv Work. ...Ew°®.E2raE I ~ 'll RBPORT NO.: WD- -97 FAGS 2 2.3 Council previously approved Report WD-6-94, which authorized the issuance of a 'Certificate of Acceptance' for the Storm Sewer System for plan 40M- 1669, and also Report WD-7-95, which authorized the issuance of a 'Certificate of Acceptance' and road assumption by-law for the Roads and Above Ground Services for Plan 40M-1669. 2.4 The Tributary Stormwater Management Works and Stormwater Detention Work and Water Oualitv Work were completed simultaneously and a 'Certificate of Completion' was issued dated July 1, 1992. The Works were placed on a four (4) year maintenance period which expired on July 1, 1996. These Works were subsequently inspected and all deficiencies have now been rectified to the satisfaction of the Director of Public Works. 2.5 It is now appropriate to issue a 'Certificate of Acceptance' for the Tributary Stormwater Management Works and Stormwater Detention Work and Water Quality Work. The subdivision agreement provides for this certificate to be issued by the Director of Public Works, subject to the approval of Council. Respectfully submitted, Steph~ k(ei~..~-tiJ Director of Public Works SAV*NAC*ph February 12, 1997 Attachments Reviewed by, W. H. Stockwel~~`,~~~~ Chief Administrative Officer d ~9 CRES �C1.AS+ CRESCENT r PPR CRESCENT ti z x U w m INGLIS j D O O W v _ y ROAD ' ORKI�iICE e OR�t/E- yo FOUND ` U CR � SPRI GFlD SUB ISI PH. 1, O 166 m ; c E3cENr \ Existing Alignment Re-alignment EXTENDED Constr ted Ch nnel DETENTION { DETENTION POND POND un n o n� CE U T/]i� a I r L c C:\ATTACHS SUBD SPRPOND.DWG onal Rd 22 — Bloar St DRAWN BY: JM DATE: FEB. 1997 ATTACHMENT N0, 1 KEY MAP WD-13 97