Loading...
HomeMy WebLinkAboutWD-43-96THE CORPORATION OF THS 1~lONICIPALITY OF CLARINt~l'ON xxx~Rfe~~iE~NcStk7~i~!€ICT~hk9t~li~}19E4'C~~[T1~1~{XX REPORT Meeting: Date: Report #: Subject: GENERAL PURPOSE AND ADM2NISTRATION COMMITTEE DECEMBER 2, 1996 WD-43-96 File#: GRASS CDTTING TBNDSR CL96-2 - OVHR 8XP8NDITIIRB File # ~jQ • ~-u q Res. # l~ By-Law # Recommendations: It is respectfully recommended that the General Purpose and Administration fiommittee recommend to Council the following: `1. :THAT Report WD-43-96 be received for information. REPORT 1.0 ATTACSNSNT3 _NO. 1: "End. of Season" Summary 2.0 BACKGROUND 2.1 At a meeting held on April 15, 1996, the Council of the Municipality of Clariagton passed the following Resolution #GPA-160-96: "THAT ReportTR-26-96 be received; .THAT Tom's Landscaping Maintenance and Design, Oshawa, Ontario, with a total bid amount of $43,173.84 (including G.S.T.) for Ward 1 and $34,558.05 (including G.S.T.) for Ward 3, being the lowest responsible bidder meeting allterms, conditions and specifications of- Tender CL96-2, be awarded the three (3) year contract for grass cutting and trimming for Wards 1 and 3, as required by the Department of Public Works; THAT Abba PYoperty Maintenance, Pontypool,Ontario, with a total bid amount of $71,849..34 (including G.S.T.) for Ward.2, being the lowest responsible bidder meeting all terms, conditions and specificationaof TenderCL-96-2, be awarded the three (3) year contract for grass cutting 1114 .e,E ~®° ~.,., RHPORT NO.: WD-43-96 and trimming for Ward 2, as required by the Department of Public Works; THAT the contract awarded to Abba Property Maintenance for Ward 2 be subject to a one (1) year probationary period; THAT staff report back to Council with recommendations for the balance of the contract for Ward 2 at the completion of the probationary period, if the probationary period is not completed to the satisfaction of the Department of Public Works; and THAT Level (V) Rural Roadside maintenance of Tender CL- 96-2 not be awarded." PAGB 2 2.2 Provision in 1996 Current Sudset Provisions were made in the 1996 Current Budget for $153,500 to cut the grass at municipal properties, parks and cemeteries. 2.3 Sxce~tional Grass Growth in 1996 With the above normal amounts of rain throughout the spring, summer and fall season, the grass grew continuously without any stoppage of growth. As a result, more cuts and an extension to the contract were required. Staff monitored the grass growth and the number of complaints throughout the whole season. It was decided by staff to continue the same level of service and an over expenditure, due to grass growth, was anticipated and expected to occur. 2.4 Level of Service Due to the number of complaints from residents and user fee groups, it was decided by staff that original levels of service would need to be restored and, in some cases, increased. Due to the level of service adjustment, staff realized there would also be an over expenditure due to the change in service. The following is a breakdown of the changes in service throughout the cutting season: a) Neceasarv Chances to the Contract It was noted that, after the contract was awarded, the following items were missing from the contract: 1115 REPORT NO.: WD-43-96 PAGE 3 • Cycle start week of June 17 and July 22 on Levels of Service 1 and 2; • Cycle start week of September 23 on Level of Service 2; and • Level of Service 2 to be cut every seven (7) calendar days from June 3 to September 6. These changes increased the contract by $19,991.78. b) Additions to the Contract During the cutting season the following areas were added to the contract: • Lambs Lane Road Allowance - existing property not on the contract; • Soper Creek Drive - required to be cut twice per cycle; • Argent Street - rear frontage; • C.L.O.C.A. - Jackman Road area and Port Darlington Road area; • Baseline Road and West Side Drive - new development; • Bowmanville Court House - existing property not on the contract; • Highway No. 2; • Trulls Road and Cecil Found Crescent; • Andrew Court; • Peachtree Crescent; • Duke Street; • Liberty Street North; • McMann Crescent; • Poolton Crescent; • Darlington Sports Complex; and • Lillian Crescent. These additions increased the contract by $6,253.17. c) Chances to the Level of Service During the season, the level of service was increased to the following areas: • Waverly Park from Level of Service 3 to 1; and • Nash Road open space from Level of Service 4 to 2. 1116 RBPORT NO.: WD-43-96 PAO$ 4 These changes in the Level of Service increased the contract by $7,276.85. d) 8xtenaion of the Coatract The contract, after making the necessary changes and additions, would be completed on September 16 for Levels of Service 1 and 2 and October 5 for Level of Service 3. It was decided in September, by the Public Works staff, that the contract would be extended for two (2) more cycles for all of Levels of Service 1 and 2 and some selective cutting would be required after that as the growing season was not completed. This increased the contract by $18,662.11. 2.5 Probationary Period - Abba Proaerty Naiateaance The probationary period for Abba Property Maintenance was performed to the satisfaction of the Director of Public Works. 2.6 Over 8xueaditure Council approved funding for $149,581.23. Due to the new additions, Level of Service changes, increased cutting, and extension of the contract, Tender CL-96-2 was expended by $47,856.01 over the amount originally approved by Council. The final cost to cut municipal properties, parks and cemeteries totalled $197,437.24. This is $43,937.24 over the Public Work's budgeted amount. 2.7 1997 Cuttiaa Season It is anticipated that this level of service will be continued in 1997 and the coats would remain at $197,437.24. As well, an additional estimated $6,500 would be required in 1997 to include new areas added during 1997, i.e. new parks and purchased lands. This will increase the Public Work's budget for cutting grass at the Municipality's parks, cemeteries, and properties by 32~ in 1997. 2.8 1996 Public Worka Budaet It is anticipated that Public Works will have a surplus of $125,000 at the end of 1996. The following areas are under budget: • catchbasin repairs, • storm sewer maintenance, and ~t17 RBPORT NO.: WD-43-96 PA(7~ 5 • surface treatment. There possibly may be more savings depending on the November and December winter conditions. Respectfully submitted, Reviewed by, ~~v~~ Stephen A. Vokes, P.Eng. Director of Public Works W. H. Stockwell Chief Administrative Officer GA*ph Attachment November 26, 1996 1118 1 7'7~7D8R Cs.96-2 GR1,S5 Ci7TTI1QF Al4D TRZ~Ix76 SNI) OF S73A30N" SUlR~lARY - r..---- '~ . , j r. •~ :J.Ppprevet3 yr aEr'~ ~~ InYAiced .nreLqunt• ... •:.--.TRa;2L--95:. ._:.:AmQt?nta ;<'Syer.. :~: 'A'Om'e Landsoapirig $16,713.9 1st install. 623,7.93.34 $20,763.89 2nd install, ward 1 $43,173.84 $19,488.92 3rd install. HpXd 3 5i3~~558.~ $19,488.52 .ith install. $13,'r6B.69 5th ii:stall. Tatar $77,73x,69 $_9,2;? .86 extend work . ^<.3 tot:al _ 5100, 9[5 _~__ _ Abby P_•Operty t4aint. _ _ _ II $16,280 06 1st install. $24,662.67 $7[,280.06 2nd install. ward 7. Y71, 849.34 i 577,102.20 3rd install. 1 $18,E94.22 4t1~ install. $, 9.46 .25 @rt And work $96,512.07 eOCal - All ii.qures includo G.S.T. _ ___ ATTACHMENT N0. 1 WD-43-96 1119