Loading...
HomeMy WebLinkAboutEGD-003-10 Cl�ro� REPORT Leading the Way ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday January 4, 2010 Resolution #: Report#: EGD-003-10 File #: D.01.35.001 By-law#: Subject: ROBINSON RIDGE SUBDIVISION PHASE 4, COURTICE, PLAN 40M-2259, `CERTIFICATE OF ACCEPTANCE', FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-003-10 be received; and 2. THAT the Director of Engineering Services be authorized to issue a 'Certificate of Acceptance' for the Final Works, which include final stage roads and other related Works, constructed within Plan 40M-2259. Submitted by: Reviewed by. i' " `-'� —C" , .4. Cannella, C.E.T. Franklin Wu Director of Engineering Services Chief Administrative Officer ASC/NAC/jo December 14, 2009 REPORT NO.: EGD-003-10 PAGE 2 1.0 BACKGROUND 1.1 The Corporation of the Municipality of Clarington entered into a Subdivision Agreement, registered August 5, 1998, with Robinson Ridge Developments Inc., to develop lands by plan of subdivision, located in Courtice and described as Plan 40M-2259 (Attachment 1). The agreement required the developer to construct all roadworks, including hot-mix paving, sidewalks, curb and gutter, street trees, a storm drainage system and streetlights, hereinafter referred to as the 'Works'. This Subdivision Agreement was subsequently taken over by 2001544 Ontario Limited, being a successor to the original Owner. 1.2 The Subdivision Agreement provides for the separation of the Works into several key stages for this phase: a) Initial Works; b) Final Works; and c) Street Lighting System 1.3 The Initial Works and Street Lighting System were issued 'Certificates of Completion' and subsequent 'Certificates of Acceptance' by the Director of Engineering Services, as per the maintenance requirements set out in the Subdivision Agreement. 1.4 The Final Works were issued a 'Certificate of Completion' dated June 1, 2008. This initiated a one (1) year maintenance period, which expired on June 1, 2009. The Works were re-inspected at that time and, although the developer experienced delays in completing the required repairs, all deficiencies have now been rectified to the satisfaction of the Director of Engineering Services. REPORT NO.: EGD-003-10 PAGE 3 1.5 It is now appropriate to issue a 'Certificate of Acceptance' for the Final Works. The Subdivision Agreement requires Council approval prior to the issuance of the 'Certificate of Acceptance' for the Final Works. There are no road assumption by-laws associated with this phase of the subdivision. Attachments: Attachment 1 - Key Map 0 w 0) Robinson Ridge C Subdivision C 3: Phase 4 0 Plan 40M-2259 Gord Vinson Avenue (D > pw r .E C 4) LL. Kilgannon Avenue 0 t (-LT7 1 1 W Ar Gord Blo or [ DRAWN BY: E.L. DATE: December 15,2009 REPORT EGD-003-10 TTT- 0 c TICE c�j ATTACHMENT NO. 1 I � I KEY MAP GAttachments140M-2259.mxd