CORPORATE SERVICES DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: December 7, 2009 ~~5 b ~~~ ~ ~ ~~- ~ S 7-~
Report #: COD-071-09 File # By-law #
Subject: RFP2009-11 -Consulting Services for Garnet B. Rickard Recreation
Complex -Energy Retrofit
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
THAT Report COD-071-09 be received;
2. THAT the proposal received from Efficiency Engineering Incorporated, Cambridge,
Ontario being the most responsive bidder meeting all terms, conditions and
specifications of Request for Proposal RFP2009-11 be accepted for the provision of
Consulting Services for the Energy Retrofit project at Garnet B. Rickard Recreation
Complex, with a submission including disbursements of $ 89,100..00 (excluding GST);
and
3. THAT the funds required be drawn from Account # 110-42-421-84258-7401.
~i
Submitted by:
Marie Marano, H.B.Sc., C.M.O.,
Director of Corporate Services
Reviewed by: ~ t" ~~
Franklin Wu,
Chief Administrative Officer
MMUDB\SM1km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-4169
REPORT NO.: COD-071-09
BACKGROUND AND COMMENT
PAGE 2
1.1 Request for Proposal RFP2009-11 was issued for Consulting Services for the Energy
Retrofit project at Garnet B. Rickard Recreation Complex as required by the Municipality
of Clarington's Community Services Department. The RFP was advertised on the
Municipality's website as well as the Ontario Public Buyers' website. In addition, a
number of potential bidders were advised of the opportunity.
1.2 A total of nineteen (19) firms obtained a copy of this document. Seven (7) submissions
were received. Six (6) submissions were deemed to be compliant. The submission from
Building Innovations was deemed to be non-compliant due to a conflict established in a
previous agreement. See Appendix A for summary of bids received.
1.3 As per the Request for Proposal, these submissions were reviewed and evaluated
based on the predetermined criteria by staff of the Community Services Department as
well as Purchasing Services.
1.4 As a result of the evaluation committee's review and scoring of the submissions
received, three (3) firms, Efficiency Engineering Inc., Cambridge, Virtual Engineers ,
Richmond Hill and Kleinfeldt Consultants Ltd, Mississauga were short-listed based on
their overall scores. These three (3) firms were invited to provide a presentation of their
submissions to the Evaluation Committee to better illustrate their understanding of the
project, as well as their methodology and approach to completing the project.
1.5 The evaluation team proceeded to interview representatives from each of these three
firms as part of the presentation process in order to finalize the selection process.
2. ANALYSIS
2.1. Upon completion of the interviews/presentations for the three firms, Efficiency
Engineering Inc., Cambridge was the top ranked firm.
2.2. Staff were impressed with the coverage of the proposed services, proponents'
experience and enthusiasm for the project. Reference checks for the subject firm were
good.
REPORT NO.: COD-071-09
3. FINANCIAL
PAGE3
3.1. The Proposal submitted by Efficiency Engineering Inc., Cambridge was in the amount of
$89,100.00 (excluding GST). This fee includes disbursements.
3.2. The required funds are to be drawn from Account # 110-42-421-84258-7401 which is
within the 2009 budget allocation.
4. CONCLUSION
4.1. Staff are recommending that the proposal from Efficiency Engineering Inc., Cambridge,
Ontario be accepted.
4.2. Queries with respect to this project should be referred to the Director of Community
Services.
4.3. This report has been reviewed for recommendation by the Purchasing Manager and the
appropriate department and circulated as follows:
Concurrence: Director of Community Services
Attachments:
Attachment 1 -Schedule "A', Bid Summary
Schedule "A"
Clam n
Leading thehe WaJ~
Bid Summary for
RfP2009-11
Consulting Services for
Garnet B. Rickard Recreation Complex -Energy Retrofit
Pitta ~ Total includir+g Disbursement
Efficiency Engineering
$$9,100.00+GST
Cambridge, ON
Virtual Engineers
$72,500.00+GST
Richmond Hill, ON
Kleinfeldt Consultants Limited
$ 139,000.00+GST
Mississauga, ON
1. R. Freethy Architect
Bowmanville, ON
• See note below
Trow Associates Inc.
Brampton, ON • See note below
Durham Energy Specialist Limited
Whitby, ON
• See note below
Building Innovations Inc.
Toronto, ON Non Compliant
Note: This was a two envelope system for this RFP. Pricing was submitted in a
separate sealed envelope therefore only the firms who were short-listed had their pricing
envelopes opened. All other pricing envelopes remain sealed and confidential.