HomeMy WebLinkAboutCOD-068-09:lam y'1 ~~
Leading the Way
w~w~w~
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: November 16~', 2009
Report #: COD-068-09 File #:
Resolution #: G~~ J~~3~U
BY-law #: ~7- /~`~
SUBJECT: CL2009-20, HIGH STREET, FIRST STREET, THIRD & FOURTH
STREET RECONSTRUCTION
Recommendations:
It is respectfully recommended to Council the following
1. THAT Report COD-068-09 be received;
2. THAT Eagleson Construction, Millbrook, Ontario, with a total bid in the amount
of $1,602,296.33 (plus G.S.T.), being the lowest responsible bidder meeting all
terms, conditions, and specifications of Tender CL2009-20, be awarded the
contract for High Street, First Street, Third and Fourth Street, Reconstruction as
required by the Engineering Department;
3. THAT funds required in the amount of $2,165,790.57 (which includes
$1,602,296.33 for tendering, design contract administration and contingencies)
be drawn from the Accounts as follows:
Department and Account Number
Engineering Department -Capital Budget
2009 High Street Road Construction
Account # 110-32-330-83332-7401 $ 604,000.00
2008 Third Street Road Reconstruction
Account # 110-32-330-83331-7401 $ 13,000.00
2009 Asphalt Rehabilitation -First, Third, Fourth & High Street
Account # 110-32-330-83212-7401 $ 505,000.00
REPORT NO.: COD-068-09 PAGE 2
George Reynolds Drive Servicing
Account # 110-50-130-85002-7401 $ 87,000.00
Regional Municipality of Durham
Sanitary Sewer and Appurtenances $ 430,712.70
Watermain and Appurtenances $ 526.077.86
$2,165,790.57
4. THAT the tender award be subject to the approval of the Regional Municipality of
Durham for Regional Infrastructure; and
5. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the
Clerk to execute the necessary agreement be approved.
Submitted by: Reviewed by:~-/' `""""~~_ ~`-' ~"
Marie Marano, H.B.Sc., C.M.O. Franklin Wu,
Direc#~of Corporate Services Chief Administrative Officer
Director of
MM/JB/km
', B.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 EMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-4169
REPORT NO.: COD-068-09
1. BACKGROUND AND COMMENT
PAGE 3
1.1 Tender specifications were provided by AECOM Canada Ltd. for the High Street, First
Street, Third and Fourth Street Reconstruction as required by the Engineering
Department.
1.2 Tenders were advertised in the Daily Commercial News, as well as electronically.
Subsequently, tenders were received and tabulated as per the letter from AECOM
Canada Ltd., Schedule "B° attached.
2. ANALYSIS
2.2 A total of six (5) submissions were received in response to the tender call. One
submission was rejected for failing to provide the bid bond in the value stipulated in the
tender document. A second bid was rejected as the tender was unbalanced. Neither
rejected bids was low. Four submissions were deemed compliant and acceptable.
2.3 After further review and analysis of the compliant bids by the Engineering Department,
AECOM Canada Ltd. and Purchasing, it was mutually agreed that the low bidder,
Eagleson Construction, Millbrook, ON, be recommended for the contract for the High
Street, First Street, Third and Fourth Street Reconstruction. A copy of the
recommending memos from the Department of Engineering and the consultant AECOM
are attached as Schedule "B".
2.4 The low bidder has not provided services to the Municipality in the past. References
have been checked and Eagleson Construction has completed a number of projects for
the Region of Durham, City of Kawartha Lakes and the Municipality of Marmora Lake
for similar projects. All references were satisfied with work completed by Eagleson
Construction and would recommend them for similar projects.
2.5 Queries with respect to department needs, specifications, etc., should be referred to the
Director of Engineering.
REPORT NO.: COD-088-09
PAGE 4
3. FINANCIAL
3.1 The total project cost, including tender price of $1,602,296.33 design contract
administration, contingencies and utilities amounts to $2,165,790.57. The funding
required for the project is outlined in the memo from Engineering Services and the letter
from AECOM Canada Ltd., marked Schedule "B".
3.2 Funding for this project will be drawn from the following amounts:
Department and Account Number
Engineering Department -Capital Budget
2009 High Street Road Construction
Account # 110-32-330-83332-7401 $ 604,000.00
2008 Third Street Road Reconstruction
Account # 110-32-330-83331-7401 $ 13,000.00
2009 Asphalt Rehabilitation -First, Third, Fourth & High Street
Account # 110-32-330-83212-7401 $ 505,000.00
George Reynolds Drive Servicing
Account # 110-50-130-85002-7401 $ 87,000.00
Regional Municipality of Durham
Sanitary Sewer and Appurtenances $ 430,712.70
Watermain and Appurtenances $ 526.077.86
$2,165,790.57
4. INPUT FROM OTHER SOURCES
4.1 The Director of Finance has reviewed the funding requirements and concurs with the
recommendation.
4.2 This report has been reviewed for recommendation by the Purchasing Manager, with
the appropriate departments and circulated as follows:
Concurrence: Director of Engineering
Attachments:
Schedule "A" - By-law
Schedule "B" -Memo from Engineering Services & Letter from AECOM Canada Ltd.
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2009-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Eagleson
Construction, Millbrook, Ontario, to enter into agreement for
High Street, First Street, Third and Fourth Street
Reconstruction, Bowmanville, Ontario.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Eagleson Construction, Millbrook, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of , 2009.
By-law read a third time and finally passed this day of , 2009.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
SCHEDULE "B"
Clar1Il~0Il
Leading the Way
MEMO
TO: Jerry Barber, Purchasing Manager
FROM: Tony Cannella, CET., Director of Engineering
DATE: November 9, 2009
SUBJECT: High Street, First Street, Third Street and Fourth Street
Reconstruction and George Reynolds Drive Lot Servicing
CL2009-20
The Engineering Services Department has reviewed the recommendation provided by
AECOM Canada Ltd. ("AECOM") and offers the following comments.
Over the last 2 years the Municipality has approved various budget amounts to allow for
the reconstruction of High Street, First Street, Third Street and Fourth Street in an effort
to replace the aging infrastructure in this older area of Bowmanville.
As part of the design process a Public Information Centre was held on June 3, 2009 in
the Council Chambers of the Municipality of Clarington Administrative Centre which the
proposed improvements were presented to the public. At this meeting concems were
raised by area residents regarding provision and elimination of parking on the street,
improved sidewalks, storm water drainage and a number of other construction related
issues. As a result of the input received and assessment of this input, the final design
was updated to include works to the scope of the tender to address most of the
concerns raised.
During the tendering process the works required to service the four lots at the former
Courtice Fire Hall site off of George Reynolds Drive were added to the tender in order to
expedite the construction of the servicing this year. The price received for that work was
reasonable and consistent with estimated costs. Costs for this work have been budget
for in the Land Acquisition Account.
As Council is aware Fourth Street was originally approved in the 2009 Budget but due to
recent economic hardships it was removed from the budget as a cost saving measure
and was included in this tender as a provisional section as it was felt that by tendering
this now with the other streets in the area there was an opportunity to realize a savings
for the Municipality. Considering that the Fourth Street portion of the tender has come in
at a very good price roughly $85,000.00 under the estimated cost it is recommended
that the Fourth Street works be awarded this year and funded through the pavement
rehabilitation account. Work will not proceed on the High Street, First Street, Third
SCHEDULE "B"
Nov. 9, 2009
Street and Fourth Street Reconstruction until the Spring of 2010. Work on George
Reynolds Drive will proceed and be completed this year.
We concur with AECOM's recommendation to award the contract to Eagleson
Construction in the amount of $1,602,296.33 exclusive of G.S.T. for the reconstruction
of High Street, First Street, Third Street and Fourth Street and the servicing of the four
future lots on George Reynolds Drive in Courtice.
Due to past experiences on similar projects, a contingency amount of approximately 10% is
carried forward. Therefore, including design and tender fees as well as contract administration
fees, the Engineering Department advises the following breakdown for the above referenced
project:
Project Breakdown
Total Project Value $1,209,000.00
Budget Amount.
High Street Reconstruction $604,000.00
(2008 & 2009)
110-32-330-83352-7401
Third Street Reconstruction (2008) $14,000.00
110-32-330-83331-7401
First Street, Third Street, and High. $505,000.00
Street Pavement Rehabilitation
(2009). 110-32-330-83212-7401
George Reynolds Drive (2009) $87,000.00
110-50-130-85002-7401
Estimated Unexpended Budget $1,000.00
Additional Funding Required $0.00
We recommend the report to Council move forward based on the above apportionments.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379
SCHEDULE "B"
3
Nov?J;-200
Attached for your files is the recommendation provided by AECOM which includes a
more detailed breakdown of estimated project costs. Should you have any further
question, please feel free to contact the undersigned.
Regards,
~„~ '-
A. S. Cannella, CET.
Director Engineering Services
ASC:jb
Attachment
cc William McCrae, P. Eng., AECOM
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(906)623-3379
~ AECOM
a~.nwa, ~.L. ~
AECOM
AECOM
513 DNision Street, CoDOUrg, ON, Canada K9A 5G6
T 905.372.2121 F 905.372.3621 www.aecom.com
November 9, 2009
Project Number: 12-29738
Mr. A. S. Cannella, C.E.T.
Director, Engineering Services
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario L1C 3A6
Dear Sir:
Re: High Street, First Street, Third Street and Fourth Street Reconstruction
Contract No. CL2009-20 (the "Contract"), Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Tuesday, November 3, 2009
at 2:00 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of
G ST.
BIDDER TOTAL BID
Eagleson Construction, MILLBROOK, Ontario $1,602,296.33
Hard-Co Construction Ltd., WHITBY, Ontario $1,964,000.00 **
(Rejected)
Ron Robinson Limited, BOWMANVILLE, Ontario $2,1,47,633.84
Kapp Contracting Inc., VAUGHAN, Ontario $2,215,879.23
Tectonic Infrastructure, POTTAGEVILLE, Ontario $2,232,401.70
Elirpa Construction & Materials Ltd., PICKERING, Ontario $2,321,355.28 ***
(Rejected)
* Extension Error
** Improper Bid -Unbalanced Bid
*** Improper Bid -Insufficient Bid Deposit
The Municipality of Clarington's Purchasing Department (the "Purchasing Department") reviewed all
bids to confirm compliance with the Clarington Purchasing By-Law and all bids were deemed
compliant except for those submitted by Hard-Co construction Ltd. and Elirpa Construction &
Materials Ltd. as noted above. AECOM Canada Ltd. ("AECOM") has reviewed all bids and confirmed
(~ leep113111-29]30\COnpp1C t2 W 920 Te Mer gwa,O Letk r P aRd,c)
Pape 2
Page 2
Mr. A.S. Cannella, C.E.T.
November 9, 2009
the bid values noted above. Eagleson Construction is the lowest bidder. Its submitted tender has
been reviewed and is compliant.
As requested by the Purchasing Department, references were checked only for the lowest bidder.
Eagleson Construction has completed a number of projects of similar scope and value including work
for the Region of Durham, the City of Kawartha Lakes and the Municipality of Marmora Lake. Staff
contacted at the above references stated that Eagleson Construction has completed the work to
specification and to their satisfaction.
Estimated costs for various project components, based on Eagleson Construction's bid are
summarized on the attached Cost Apportionment.
With the low bid from Eagleson Construction and other associated project costs noted on the
attached Cost Apportionment, the project is within the allocated budget. Based on available funding
and the input provided by the references contacted regarding performance on previous projects, in
our opinion, the bid in the amount of $7,602,296.33 (exclusive of GST) may be awarded to Eagleson
Construction of Millbrook, Ontario subject to all provisions of the Clarington Purchasing Bylaw being
met and available financing.
Bid Cheques or Bid Bonds shall be retained for Eagleson Construction and Ron Robinson Ltd., the
second low bidder, until the Contract has been executed.
Should you have any questions regarding this matter, please contact the undersigned.
Sincerely,
AECOM Canada Ltd.
~- ~~
RonAlbnght, P.Eng.
Project Manager, Community Infrastructure
ron.albri ght@aewm.com
RA:ym
AECOM
(P IDep[ 12112-29I38lCOrtmpICl200S20 TenOer Martl Letter OraRtloc)
g~llll ~ I II I I II
SCH DULE "B"
x
N
K
CC~"C
U
O
~LL
6
Y C
F
_~
~~
N N
~ N•
~p
> Cl
Z
~~
~a
O
U
6
m
~~
s
qU
~5
~~
§~
Ett
r
~ ~ m ~ m g 8 8 r ~ ~
GG ~ N
N ~ ~ ~ N m ~ ~1 ~ ~ a ~
~ y
N ~
p y
a ~ m N S ~° N ~ m
M ~ y
y ~ s
a
L
N
p
0
V
N tl
M
~
`
$S
3
C
Y
~
~
"e~
~
~
~f
o
0o
n
~
$
q
d5
Q
25
Q
~X
5~
STS
~
y
E
w
5~
S
r
_ g g
g _ $
$
=Y
a ~
i ~ ~ ~ ~ ~ # ~ ~
~' ~ _ t
p
N
b
N y
~
f0
N q
N p
N
mO ~ a
yy~~
X
w
~
~
n
m
$
~ qq
E qS
25 gg
S 55~~
S
m yyyy
3 qq
E gg
25 g
g'
' i
w S ~ o b ^ ~ `~ w ~ g
:{ '~ $
~~ ~ w e
. .
~~
w
~ $ ~ `~
E
S e g
id
$ g
id , ¢
8 q
25 Q
2S
w N ~
E ~ w « .~
~ _ ~ ~ ~ 8
~ r ~ ~ Q
2
5 QQ
S '~ N 2
5 ~ o ~ q
S Q
S
~
j
» q
m N Q y
N V
N Yl p ss
a ~pp
N ~ yy
N
qq
O
N ~O y
]
ty y
fYf
y N N
~ N ~ N tgg+l
@ QQ
Z
~ ((~~~~{{ s
S
N ' N $$??
S
N
t q
q
a j
;
j
v
f pp r VV
( QI q
N y
O S ry
W ~ ~ ~ ~
m y
1L GG N
m pp
1
N N f ~ a
~ {~
W ry
M ~ N
F M
C
~
~
E$
J ~ ~
j ~ ~ ~ ~
C ~ ~ ~j$ QS
0
N
G
y C
y
6 E ~ y
~
g
U8
O
~ gG
8
$
$
~ ~ ~ E T rc § ~ ~ ~ ~ x ~ E
y L
{ R
?
L°
~ ~
O m
£
C e 5
g . j
O
z' ~ ~ r ` ~ H ~ ~ ~ ~ y
X ci a ~ ~ a
~~33?? ae
s
~ '~ ~ t
m ~ o
z w
z a
~ x
z A ~ ° ~ ~, S g g
a
s ~
a
a
n
n°
u
a°
$
a
,
3
d
~
e
~
a
~ ~
~`f
~
a5
3 i
y ~
F U ~ ~ U ~ ~ g u~
i
~ ~
a _
;
' F < ~ ~ ~ ~ ~ ~
w m o