Loading...
HomeMy WebLinkAboutCOD-054-09• Leadengt6e Way REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMIMITTEE /~ /7 Date: Monday, Sep~ember 28, 2009 I \~5~ I~On~ ~ C~ w~ ~`3~ 6 Report #: COD-054-09'~ File # By-law # Subject: TENDER CL2009-28, GUIDERAIL INSTALLATION Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: THAT Report COD-054-09 be received; 2. THAT Peninsula Construction Incorporated, Fonthill, Ontario, with a total bid price of $81,876.58 (excluding G.S.T.), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2009-28, be awarded the contract for the Guiderail Installation as required by the Operations Department; and 3. THAT the required fwnds in the amount of $129,076.58 ($81,876.58 tender plus consulting, contingencies, emergency work and administration) be drawn from the Department of Operations, 2009 Capital Budget for Guide Rail Installation Account #110-36-330-83639- 7401. Submitted by: bAe~ Margno, H.B.Sc., C.M.O Director of Corporate Services Reviewed by: /~ ~ ranklin Wu, JJ)D" Chief Administrative Officer . ~- Nancy Taylor, B.B.A., C.A., Director of Finance/Treasurer MMWDBI6H CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, OWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169 REPORT NO.: COD-054-09 PAGE2 1. BACKGROUND ANp COMMENT 1.1. Tender specifcations were provided by AECOM for the Guiderail Installation within the Municipality of Clarington, as required by the Operations Department. 1.2. Tenders were publicly advertised in the local paper as well as electronically. Subsequently, three tenders were received and tabulated as per Schedule "A" attached. 2. ANALYSIS 2.1. After further review and analysis of the bids by the Operations Department, AECOM Associates amd Purchasing, it was mutually agreed that the low bidder, Peninsula Construction Incorporated, Fonthill, Ontario, be recommended for the contract for the 2009 Guiderail Installation. A copy of the recommendation memo from AECOM, is attached as Schedule "B". 2.2. The recommended low bidder has previously performed satisfactory work for the Municipality of Clarington. 2.3. Queries with respect to the department needs, specifcations, etc. should be referred to the Director of Operations. 3. FINANCIAL IMPLICATIONS 3.1. The low bid from Peninsula Construction Incorporated is within the project budget allocation. As well, project costs for consulting, contingencies, emergency work and administration are within the budget allocation. 3.2. The allocated, budget is $190,000.00, the total project costs are $129,076.58 leaving a budget balance of $60,923.42. Details of the project costs are outlined in the attached merrao from AECOM. 3.3. The total project cost of $129,076.580 ($81,876.58 tender plus consulting, contingencies„ emergency work and administration) will be drawn from the Department of Operations, 2009 Capital Budget for Guide Rail Installation Account #110-36-330-83639-7401. REPORT NO.: COO-054-09 4. CONCLUSION PAGE3 4.1. That the low compliant bidder, Peninsula Construction Incorporated, Fonthill, Ontario, be recommended for the contract for the 2009 Guiderail Installation project. 5. INPUT FROM OTHER SOURCES 5.1. This report has been reviewed for recommendation by the Purchasing Manager, with the apprppriate departments and circulated. as follows: Concurrence: Operations Co-Ordinator Attachments: Attachment 1 -Schedule "A°; Bid Summary Attachment 2 -Schedule "B" Recommendation Letter from AECOM Schedule "A" Bid Summary Tender CL2009-28 DDER TOTAL B{D Excudin GS Peninsula Construction Inc. Fonthill, ON $81,876.58 All Services Inc. Oshawa, ON $116,855.00 Marbridge Construction Limited Mississauga,ON $186,390.00 AECOM AECOM 30D Water StreM, whltby, ON, Cartago LiN 9J2 T 808.868.8363 F 905.888.0221 www.aecom.can September 8, 2009 Ma F. Horvath Diredor of Operations The Municipality of Clarirugton 40 Temperance Street BOWMANVILLE, ON L1C3A6 Dear Sir: Re: 2009 Gulderail Installation Tender Contract No. CL2Q09-28 (the °Contract") Municipality of Clarington SCHEDULE "B" Tenders for the above project were opened at the Municipal Offices on Tuesday, September 1, 2009. A list of the bids received is,provided in the table below. All numbers are exclusive of GST. BIDDER TOTAL $ID GST Exduded Peninsula Construction inc. Fonthill, ON $81,876.58 All Services Inc. Oshawa, ON $~ 16,855.00 Marbridge Construction Limned Mississau a, ON $186,390.00 The Municipality of Clarington's Purchasing Department (the "Purchasing Department") reviewed all bids. AECOM Canada Ltd. {"AECOM") has reviewed all bids accepted by the Purchasing Department and confirmed the bid values noted above. Peninsula Construction Inc ("Peninsula") is the lowest bidder. Its submitted tender has been reviewed and is compliant. Peninsula has completed a number of similar scope projects, and it provided this service two years ago for Clarington's most regent guiderail installation tender. The estimated costs for various project components, based on the low bid, are summarized in the table below. For comparispn purposes, the engineer's estimate for this projed that was prepared following completion of the detailed design valued the construdion works at approximately $119,000. SCHEDULE "B" Page 2 Munlapality of Clarington September 8, 2009 Peninsula Bid $81,876.58 Net Value of Tender Award $81,876.58 Pro ect Costs: Tender PreparaticN AdministretioN2010Pce- En ineerin $19,000.00 6cis[ing Guiderail Repairs - Provisional $20,000.00 Contingencies $8,200.00 Costs Total $47,200.00 Total Project Costs $429,078.58 Budget Acc unt 110 36 330 83639 7401 $190,000.00 Budget Balance $60,923.42 The tender in the amount of $81,876.58 (exclusive of GST) could be awarded to Peninsula Construction Inc of Fonthill, Ontario, provided that all provisions of the Clarington Purchasing Bylaw have been met and subject to allocation of funding by Council. During the preparation of the 2009 tender, an inspeclion of existing guiderail installations was undertaken with municipal staff. There were a number of locations observed with varying degrees of damage/maintenance requirements due to collisions and/or winter maintenance activities. In order to ensure that the guiderails continue to function properly and provide the proper level of safety protection, the municipality should consider allocating additional funding to have Peninsula undertake repairs while it is in Clarington installing the new guiderail. Based on the observations of the damage to end treatments and guideraiUposts along with certain maintenance activities (cable tensioning), allocating an additional $20,000 would address many of the deficiencies. Should you have any questipns regarding this matter, please contact the undersigned. Sincerely, AECOM1I Canada Ltd. Ian Roger, P. Eng. tan.roger@aecom.com IR