Loading...
HomeMy WebLinkAboutCOD-046-09C~~~~;~on REPORT Lsadrng tke way CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE ,L Date: June 22, 2009 Resolution #: ~/9~7 /SD~~ Report #: COD-046-09 File #: By-law #:ip SUBJECT: CL2009-8, OLD SCUGOG ROAD RECONSTRUCTION AND DRAINAGE IMPROVEMENTS, MILLVILLE AVENUE TO ORMISTON LANE, HAMPTON Recommendations: It is respecttully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-046-09 be received; 2. THAT Cobourg Development Services, Cobourg, Ontario with a total bid in the amount of $370,417.97 (Plus G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2009-8, be awarded the contract for Old Scugog Road Reconstruction and Drainage Improvements, Millville Avenue To Ormiston Lane, Hampton, as required by the Engineering Department; 3. THAT funds required to cover the Municipality of Clarington's portion of this project, in the amount of $496,000.00 (which includes $370,417.97 tendering, design, contract administration, permit fees, utility relocations and contingencies) be drawn from the following accounts: Account# 110 32 330 83316 7401, 2007 & 2009 Old Scugog Road Reconstruction and Drainage Improvements: $330,000.00 Account# 110 32 330 83212 7401, 2009 Pavement Rehabilitation Program: $166,000.00 Total Funds Required: $496,000.00 REPORT NO.: COD-046-09 PAGE 2 4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk,to execute the necessary agreement be approved. Submitted t`~-`~---=~ Y' rie Marano, H.B.Sc., C.M.O. Direc of Corpor Ser ices .~ cy ayl' r, .B. , Director of Finance Reviewed b~r~--~.~ ,~ ranklin Wu, Chief Administrative Officer MM/JB/km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 623-3379 F (905) 623-4169 REPORT NO.: COD-046-09 BACKGROUND AND COMMENT PAGE 3 Tender specifications were provided by AECOM Canada Ltd. for the Old Scugog Road Reconstruction and Drainage Improvements, Hampton, as required by the Engineering Department. Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were received and tabulated as per the letter from AECOM Canada Ltd., Schedule "B" attached. The total project cost, including tender price of $370,417.97, design, contract administration, permit fees, utility relocations and contingencies amounts to $496,000.00 The funds required for the municipality's portion of the project cost is outlined in the memo from Engineering Services and the letter from AECOM Canada Ltd. marked Schedule "B". Funding for this project will be drawn from the Engineering 2007 and 2009 Old Scugog Road Reconstruction and Drainage Improvements Account #110-32-330-83316-7401 in the amount of $330,000.00 and the 2009 Rehabilitation Program, Account # 110 32 330 83212 7401 in the amount of $166,000.00. After further review and analysis of the bids by the Engineering Department, AECOM Canada Ltd. and Purchasing, it was mutually agreed that the low bidder, Cobourg development Services, Cobourg, Ontario be recommended for the contract for the Old Scugog Road Reconstruction and Drainage Improvements, Hampton, Ontario. The low bidder has previously performed satisfactory work for the Municipality of Clarington. The Director of Finance has reviewed the funding requirements and concurs with the recommendation, queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering. This report has been reviewed for recommendation by the Purchasing Manager, with the appropriate departments ahd circulated as follows: Concurrence: Director of Engineering Attachments: Schedule "A" - By-law Schedule "B" -Memo from Engineering Services & Letter from AECOM Canada Ltd. Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2009- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Cobourg Development Services Inc., Cobourg, Ontario, to enter into agreement for the Old Scugog Road Reconstruction and Drainage Improvements, Hampton THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS A5 FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Cobourg Development Services Inc., Cobourg, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of , 2009. By-law read a third time and finally passed this day of , 2009. Jim Abernethy, Mayor Patti L. Barrie, Municipal Clerk schedule "B" i AECOM AECOM 513 Division Streel, Cobourg, ON, Canada K9A SG6 T 905.372.2121 F 905.372.3621 www.aecom.com June 15, 2009 Mr. A. S. Cannella, C.E.T. Director, Engineering Services The Municipality of Clarington 40 Temperance Street BOWMANVILLE, ON L1C 3Aii Dear Sir: Project Number: 12-29693 Re: Old Scugog Road Reconstruction & Drainage Improvement, Hampton Contract No. CL2009-8 (the "Contract") Municipality of Clarington Tenders for the above project were opened at the Municipal Offices on Wednesday, June 10, 2009 at 2:15 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST. BIDDER TOTAL BID GST Excluded COBOURG DEVELOPMENT SERVICES LTD. $370,417.97 COBOURG,ON RON ROBINSON LIMITED $423,671.90 BOWMANVILLE, ON AMBLER & CO. INC. $432,816.87 MISSISSAUGA, ON DAGMAR CONSTRUCTION INC. $434,137.23 MARKHAM,ON MONTGOMERY MACEWEN CONTRACTING $466, 847.71 GOODWOOD,ON DAVE BOYLE EXCAVATING LTD. $503,856.70 BOWMANVILLE, ON ALOIA BROS. CONCRETE CONTRACTORS LTD. $51D,641.45 TORONTO, ON LAFARGE PAVING 8 CONSTRUCTION LIMITED $514,233.30 " OSHAWA,ON Extension Error M~!aeq tru-zsee~vormso~zeez.axl Schedule "B" Page 2 Municipally of Clarington June 15, 2009 The Municipality of Clarington's Purchasing Department (the "Purchasing Department") reviewed all bids to confirm compliance with the Clarington Purchasing By-Law, as noted above. AECOM Canada Ltd. ("AECOM") has reviewed all bids deemed compliant by the Purchasing Department and confirmed the bid values noted above. Cobourg Development Services Ltd. ("CDS") is the lowest bidder. Its submitted tender has been reviewed and is compliant. CDS has most recently completed Contract No. CL2008-12 for the Municipality of Clarington, which AECOM provided Contract Administration. Quality of work .and adherence to standards was satisfactory for this project. As requested by the Purchasing Department, references were checked only for the lowest bidder. CDS has completed a number of similar scope projects including work for the City of Belleville, Prince Edward County and the Municipality of Marmora and Lake. Staff contacted for the three references provided stated that CDS completed the work to specification and to their satisfaction. The estimated costs for various project components, based on the low bid, are summarized in the attached cost apportionment. The low bid from Cobourg Development Services Ltd. is within the project budget, and based on the refefences contacted regarding performance on previous projects in our opinion, the tender in the amount of $370,417.97 (exclusive of GST) may be awarded to Cobourg Development Services Ltd. of Cobourg, Ontario providing all other provisions of the Clarington purchasing by-law have been met. Bid cheques or bid bonds shall be retained for CDS and Ron Robinson Limited, the second low bidder, until the Contract has been executed. Should you have any questions regarding this matter, please contact the undersigned. Best regards, AECOM Canada Ltd. F- Ron Albright, P/E/ng. Project Manager; Community Infrastructure ron. a l brig h t@aeco m. co m RA:cs Encl. cc: Mr. Bruno Bianco, P. Eng., Manager, Infrastructure antl Capital Works, Municipality of Clarington (+encl.) AECOM (P ~Dep 1211 3~}B6WlCe,RSpul661.tlec) n D m O 3 D O m ti f] (n N m ~ v n ~ n ° ~ c c ~ ~ O m e e N C O 3 O O 6 0 ti % ~ . . m :: ro O ~ m N o_ ' 3 G 2 w % N 3 3 7 ~ ~ N 1=O N ~ ~ ~ r _ 0 C % 0 N S C r ~ n O ~ S N D m % ~ ~ O tf O > d % O f l O C. r 6 3 i ~ O > % Z ~ n O m m of v ~ m D ° n o o ~ o ~ c c ~ w .°. ~ v ~ ^ ~ N O 3 (A w ~ FA N ~ C ~ n O > d n O C c N O ~ o -n ~ ~ o °. ' Z > m a w 3 O C N w N N n ~- N O C ~ ~ ~ A O ~ 3 w C ; 00 ~ ~ ~ N ~;,~ . I % O % N H ~ ~{ O. O ~1 ? ~ N p % ? ~ ~ 3 J n % ~ ~ ~ C 2 ~ ~ w 3 m m m ~ ~ ~ ~ ° ~ N ~ ti ~ 3 O % °- N ~O o o n C 3 m sv w <» A A bi A {y {q W W "1 ~ N O _ N ~ 01 V~ O C Si ~ N N A i V ~" O O Ui ~ N O N O ~V ? Ol V fA O O Qi (T O N N QD O O O V N O O O O A V m O O O O + O] O O O O p~ ~ ~ 0 O O O ~] N O O O O N O m o a Efl b fA N m EA fA W N y l] W W W W EA W N t0 fA Eq N N , N fA N A W C O O N V (P (T ~ V N N A NN 0 0 O (( ~~ ~ W O O W ~ O N ' W O O O A (T O O O O W O O~ O V N W A O O O O O O OJ O N O O O O O r N fD W V ~ O O O N ( O O O Q O .~ N ~ ~ fA ~ ~ N W O N ~ fA W fA ffl N N ' ~I W A W C D 6l N A ~ V J ~ O -% O 8 O N V ~ ~ ~ m ' W ~ S O O O O W N N ~ O O N ~~ % < G ~ V W Q G < U~ O S O ~ N < < 3 m a ~ % % % m % % ~ S a 3 ~ ~ m a o 5. m m y n ° ~ ~ ~ ~ o^ w m (n ~ v o m n'o u +3 ~ me vn ~ c d n CO-. n°, N ~p O % m m ~ z ~ ~ ~ m O 3 ~ ` 3 3 a Qz~ ~ c n% n m ~ 3 ~~ N U Ol C 4 D ~ o ~ °~'o ] f N " 3 0 o p 7 p ~ N O m w o 0 j O N c N ~Sc~edule "B" 0 F m ~ .~ °' n r ~ N .%. O ~ ~ O N w W d % Q ° n O o- c° O _p G d (D ~ O n a C ~ ~ f0 ~ O ~. N rn C % ~' r p S- °f 3 a~ .'0 _3 A O. O 'O 3 41 w ~i~' n M n 3 p~ d ~. am ~ ~ Ot 3 3 L N A 7 D m n O 3 O n u O N W ~ ~ m N u N ~ ~ N ~ Q v (O Schedule "B" Leading the Way MEMO TO: Jerry Barber, Purchasing Manager FROM: Bruno Bianco, P. Eng., Manager, Infrastructure & Capital Works DATE: June 15, 2009 SUBJECT: Old Scugog Road Reconstruction CL2009-8, 5800-8310-07114 CRC.OIdScugogRd.1 The Engineering Services Department has reviewed the recommendation provided by AECOM Canada Ltd. ("AECOM") and offers the following comments. In 2007 and 2009 the Municipality approved $10,000.00 and $320,000.00 respectively for the reconstruction of Old Scugog Rd. as well as the 2009 Pavement Rehabilitation Program that allocates funds to various roads. We concur with the recommendation to award the contract to Cobourg Development Services Ltd. in the amount of $370,417.97 exclusive of G.S.T. for the road reconstruction project. Due to past experiences on a similar projects, a contingency amount of approximately 10% is carried forward. Therefore, including design and tender fees as well as contract administration fees, permit fees, and utility relocations, the Engineering Department advises the following Municipal breakdown for the above referenced project: Old Scugog Road 2009 Pavement Reconstruction and Rehabilitation Program Drainage Improvements (2007&2009) Account Account 110 32 330 83316 7401 110 32 330 83212 7401 Total Project Value $330,D00.00 $166,000.00 Budget Amount $330,000.00 $166,000.00 Estimated Budget $0.00 $0.00 Sur lus/Deficit Old Scugog Road Reconstruction scnedWe "B" CL-2009-8 2 June 15, 2009 We recommend the report to Council move forward based on the above apportionments. Attached for your files is the recommendation provided by AECOM. Should you have any further questions, please feel free to contact the undersigned. Regards, Bruno M. Bianco, P. Eng. Manager, Infrastructure & Capital Works BMB:cd Attachment cc William McCrae, P. Eng., AECOM Nancy Taylor, Director of Finance i lEngAdmfniNc~c1CS <~^~t[3ianc ,CIdScugoaRd CL2009.08 c!oc CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379