Report #: COD-049-09 File # By-law #,~00 ! ~~
Subject: CL2009-16, 2009 Structure Rehabilitation (Culvert Replacement)
Various Locations
Recommendations:
It is respectfully recommended to Council the following:
THAT Report COD-049-09 be received;
2. THAT All Services Incorporated, Oshawa, Ontario with a total bid in the amount.
of $141,570.00 (Plus GST), being the lowest responsible bidder meeting all
terms, conditions and specifications of Tender CL2009-16, be awarded the
contract for the 2009 Structure Rehabilitation (Culvert Replacements) Various
locations as required by the Engineering Department;
3. THAT funds required in the amount of $194,000.00 ($141,570.00 tender plus
design, contingencies, and contract administration) be drawn from the
Engineering 2009 Capital Budget Structure Rehabilitation Account # 110-32-330-
83275-7401.
4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the
Clerk to execute the necessary agreement be approved.
Submitted by: U` 6 ~~~~ Reviewed by: ~"~~ ~- "^~ "1,
Marie rano, H.B.Sc. C.M. Franklin Wu,
i Dirq~tof Corpora~erv~ ~ Chief Administrative Officer
Director
REPORT NO.: COD-049-09
BACKGROUND AND COMMENT
PAGE 2
Tender specifications were provided by AECOM Canada Ltd. for the 2009 Structure
Rehabilitation (Culvert Replacements) Various Locations, as required by the Engineering
Department.
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per the letter from AECOM Canada Ltd., Schedule "B" attached.
The total project cost, including tender price of $141,570.00, design, contract administration,
permit fees, utility relocations and contingencies amounts to $194,000.00. The funds required
for the project are outlined in the memo from Engineering Services and the letter from AECOM
Canada Ltd. marked Schedule "B".
Funding for this project will be drawn from the Engineering 2009 Structure Rehabilitation
Account #110-32-330-83275-7401 in the amount of $194,000.00 with the remaining funds being
utilized as intended.
After further review and analysis of the bids by the Engineering Department, AECOM Canada
Ltd. and Purchasing, it was mutually agreed that the low compliant bidder, All Services
Incorporated, Oshawa, Ontario be recommended for the contract for the 2009 Structure
Rehabilitation (Culvert Replacements) Various Locations, Ontario. The low bidder has
previously performed satisfactory work for the Municipality of Clarington. As noted in
correspondence from AECOM, Schedule "B", the bid submitted by Ambler & Co. Inc. is deemed
a non compliant bid as is the submission of Elirpa Construction & Materials Ltd.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation, queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
This report has been reviewed for recommendation by the Purchasing Manager, with the
appropriate departments-and circulated as follows:
Concurrence: Director of Engineering
Attachments:
Schedule "A" - By-law
Schedule "B" -Memo from Engineering Services & Letter from AECOM Canada Ltd.
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2009-
Being a By-law to authorize a contract between the Corporation of the
Municipality of Clarington and All Services Incorporated, Oshawa,
Ontario, to enter into agreement for the 2009 Structure Rehabilitation
(Culvert Replacements) Various Locations.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, All Services Incorporated, Oshawa, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of , 2009.
By-law read a third time and finally passed this day of , 2009.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
Schedule "B"
~lar~g~~o~
Leading the Way
MEMO
TO: Jerry Barber, Purchasing Manager
FROM: Bruno Bianco, P. Eng., Manager,: Infrastructure & Capital Works
DATE: June 24, 2009
SUBJECT: 2009 Structure Rehabilitation -Various Locations
CL2009-16, 5800-8310-09112
CSR.2009.1
The Engineering Services Department has reviewed the recommendation
provided by AECOM Canada Ltd. ("AECOM") and offers the following comments.
In 2009 the Municipality approved $400,000.00 respectively for the
reconstruction of various road crossing structures as well as further design for
the 2010 construction season and the annual structural appraisal report. We
concur with the recommendation to award the contract to All Services
Incorporated in the amount of $141,570.00 exclusive of G.S.T. for the structure
rehabilitation project.
Due to past experiences on similar projects, a contingency amount of
approximately 10.0% is carried forward. Therefore, including design and tender
fees as well as contract administration fees, utility relocation, and material
testing, the Engineering Department advises the following Municipal breakdown
for the above referenced project:
Pro~ect Breakdown
Total Project Value $194,000.00
Budget Amount
2009 Structures Rehabilitation
110 32 330 83275 7401 $400,000.00
Estimated Funds Remaining $206,000.00
Schedule "B"
We recommend the report to Council move forward .based on the above project
breakdown and the remaining funds continue be utilized as intended. Attached
for your files is the recommendation provided by AECOM. Should you have any
further question, please feel free to contact the undersigned.
Regards,
Bruno M. Bianco, P. Eng.
Manager, Infrastructure & Capital Works
BMB:cd
Attachment
cc Nancy Taylor, Director of Finance
ec William McCrae, P. Eng., AECOM
Anthony S.Cannella, Director of Engineering
L\EngAtlminNIEMOS 20081Sianco1CL2009.1 B.CSR.2009.i.doc
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379
Schedule "B"
rl `.~1~~
AECOM
513 Division Street, Cobourg, Ontario K9A 5G6
T 905.372.2121 F905.372.3621 www.aecom.com
June 23, 2009
Project Number: 111574
Mr. A. S. Cannella, C.E.T.
Director, Engineering Services
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE, ON L1C 3A6
Dear Sir:
Re: 2009 Structure Rehabilitation (Culvert Replacements) -Various Locations
Contract No. CL2009-16 (the "Contract")
Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Friday, June 5, 2009 at
2:15 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST.
BIDDER TOTALBID
All Services Incorporated
i
Oshawa ON $141,570.00
Cobourg Development Services Ltd.
Cobourg, ON $148,207.91
Ron Robinson Ltd.
Bowmanville, ON $156,520.62
Bry Ron Contracting Limited
A'ax, ON $209,086.00
Ampler 8 Co. Inc
Misslssau a, ON
$214,654.63 *
Boyle Excavating Ltd.
Bowmanville, ON $222,895.80
Peninsula Construction Inc.
Fonthill, ON $231,813.78 **
Montgomery MacEwen Contracting
Goodwood, ON $232,35D.45
Elirpa Construction & Materials Ltd.
Pickerin , ON $236,453.84'*"
*Non-Compliant
** Improper Bid Deposit
`**Did not acknowled a Addendum
The Municipality of Clarington's Purchasing Department (the °Purchasing Department") reviewed all
bids to confirm compliance with the Clarington Purchasing By-Law and rejected the bids from Ambler
(P:b2pl ]I]>\1115]~\COrresP~3]8I200fa
Page 2
Municipaltty of Clarington
June 23, 209
& Co. Inc. due to an imbalance in their statement of unit prices in their bid and Elirpa Construction &
Materials Ltd., as noted above. AECOM Canada Ltd. ("AECOM") has reviewed all bids deemed
compliant by the Purchasing Department and confirmed the bid values noted above. All Services
Incorporated ("All Services") is the lowest bidder. Its submitted tender has been reviewed and is
compliant.
All Services Incorporated has completed several projects for the Municipality of Clarington in recent
years in which AECOM has provided Contract Administration, including 02007-12 (Orono
Streetscape - 1), CL2006-45 (Orono Streetscape - 2) and CL2005-43 (Alexandra Boulevard
Retaining Wall and Soper Court Stair Repair). Quality of work and adherence to standards was
satisfactory for these projects. As requested by the Purchasing Department, references were
checked only for the lowest bidder. All Services has completed a number of similar swpe projects
including work for the Municipality of Marrnora and Lake, Township of Ramara and Municipality of
Maynooth. Staff contacted for the three references provided stated that All Services has completed
the work to specfication and to their satisfaction.
Estimated costs for various project components, based on All Services bid are summarized as
follows:
Low Bid (Excluding GST) $141,570.00
Preliminary & Detailed Design, Approvals, $ 17,704.27
Tendering, Contract Administration and
Material Testing $ 15,000.00
Contingencies $ 14,725.73
Utility Relocation (Rough Estimate) $ 5,000.00
Total Project Costs $194,000.00
2009 Budget Amount $400,000.00
Budget Surplus /Deficit $206,000.00
The low bid from All Services Incorporated is within the project budget and, in our opinion based on
the references contacted regarding performance on previous projects, the tender in the amount of
$141,570.00 (exclusive of GST) may be awarded to All Services Incorporated of Oshawa, Ontario,
subject to all provisions of the Clarington Purchasing Bylaw being met.
Bid Cheques or Bid Bonds shall be retained for All Services and Cobourg Development Servx;es Ltd.,
the second low bidder, until the Contract has been executed.
(P be{1 ]4t 3\11151d\COnay32eR.EOC
Schedule "B"
Page 3
Municipality of Ctarington
June 23, 2009
Should you have any questions regarding this matter, please contact the undersigned.
Best regards,
AECOM Canada Ltd.
Ron Albright, P. Eng.
Project Manager, C munity Infrastructure
ron.albrichtla~aeco .com
RA:pc
cc: Mr. Bruno Bianco, P. Eng., Manager, Infrastructure and Capital Works, Municipality of Clarington
ALt;OM