Loading...
HomeMy WebLinkAboutEGD-013-09Clarington Leading the Way REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE ,/~ q Jam-, Date: March 30, 2009 ~l"eSQ~~l~01~~~~"~ ~ /"~` ~ Report #: EGD-013-09 File # By-law #. Subject: OLD SCUGOG ROAD RECONSTRUCTION -PUBLIC INFORMATION CENTRE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-013-09 be received; 2. THAT Staff is proceeding to finalize the detail design and tender based on the information received at the Public Information Centre to meet the spring/summer 2009 construction start schedule, and; 3. THAT all those who attended the Public Information Centre and who have contacted the Municipality as interested parties be informed of this report. Respectfully by, Submitted by: A. S. Cannella, C.E.T. Director of Engineering Services ASC/BMB/dv March 12, 2009 ~ `l.~-' Reviewed by: Franklin Wu Chief Administrative Officer CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169 REPORT NO.: EGD-013-09 PAGE 2 1.0 BACKGROUND Old Scugog Road is classified as a Local Road in the Clarington Official Plan although it operates more so as a collector road. This is due to vehicles attempting to avoid Regional Road 57 and/or the roadway serving the Hamlet of Hampton. The section of roadway between Millville Avenue and Ormiston Street has been the subject of various drainage concerns by residents in the area. The reconstruction of Old Scugog Road has been approved in the 2009 Capital Budget and the limits of the project are shown in Attachment #1. The municipality has completed pavement rehabilitation of the existing road north and south of the subject site in previous years. This particular location will involve a greater degree of work to address the drainage issues. The installation of storm sewers will not only address some of drainage concerns, it also allows for an urban cross section through a portion of the project. 2.0 APPROACH To assess suitable construction measures of the project and to obtain local residents input to the design process, a Public Information Centre was held to present the project proposal. The public was notified of the meeting by newspaper advertisement, the Municipality's information board and website, and through circulation notices to those who are directly affected by the proposed works. 3.0 INFORMATION CENTRE A Public Information Centre (PIC) was held on Feb 25, 2009 at the Hampton Community Hall. At the meeting the following documentation and plans were presented for discussion: · Existing road condition base plans, showing proposed road works with aerial photography as a background for the works; · A typical road sections for the urban design; · Photographs of existing pavement structure and residential entrances; · The full set of preliminary engineering drawings; REPORT NO.: EGD-013-09 PAGE 3 · An artist's rendition of the final product; Eighteen residential frontages are abutting the road reconstruction. Nine residents in the area appeared at the PIC and provided input. The register and comment sheets are on file within the Engineering Services Department and available for review. The design proposal presented was well received and as expected the primary concern expressed was related to drainage. These concerns where generally associated to connections of existing sump pumps, external drainage concentrations, and the overall grading and drainage of the area. The design team was well prepared for the issues brought forward through site investigations and preliminary designs. Some additional sump pump locations where identified as well as an additional well in the area. Overall it was understood that the area is susceptible to water problems and the reconstruction project will aid in some of these issues. 5.0 DISCUSSION As a result of the Public Information Centre, detailed design will be finalized and design drawings and tender documents will be prepared for the project to target a spring tender call. This will allow Council the opportunity to consider the project for a construction in spring/summer of 2009. Attachments: Attachment NO.1 - Site Map (Old Scugog Rd.) Interested parties to be advised of Council's decision: Lisa Robinson Craig Holme Andy & Amanda Townson Tami Twiddy Sheryl Maran Geoff Waite Marc Cummins Katy & Russ Gibson / / / / I . I I . I I . I . I . ~r_ /"'"/ ~----- ,/ ~ . I . I I I !y W~E S DRAWN BY: E.L. DATE: March 10, 2009 REPORT EGD-013-09 ATTACHMENT NO.1 G:\Attachments\OldScu 0 Recon.mxd