Loading...
HomeMy WebLinkAboutEGD-008-09~~ Win REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday March 30, 2009 ~e~tu~OVl ~-l~n-~I'''~' "' Report #: EGD-008-09 File # By-law # Subject: NASH ROAD RECONSTRUCTION -PUBLIC INFORMATION CENTRE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-008-09 be received; 2. THAT Staff is proceeding to finalize the detail design and tender based on the information received at the Public Information Centre to meet the spring/summer 2009 construction start schedule; and 3. THAT all those who attended the Public Information Centre and who have contacted the Municipality as interested parties be informed of this report. Respectfully by, Submitted by: A. S. Cannella, C.E.T. Reviewed by: Franklin Wu Director of Engineering Services Chief Administrative Officer ASC/BMB/dv March 12, 2009 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169 REPORT NO.: EGD-008-09 PAGE 2 1.0 BACKGROUND Nash Road is classified as a Type B Arterial Road in the Clarington Official Plan and is identified in the Municipalities development charge by-law. The section of roadway between Courtice Road and Harry Gay Drive serves existing residents, commuter traffic, and new development in the area. The Municipality of Clarington will be urbanizing this section of road and the Region of Durham will be installing a nominal amount of Regional infrastructure with the limits of the project. A portion of the road has recently been excavated and reinstated due to the installation of sewers to support the Hancock Neighbourhood. Through the proposed reconstruction, attempts will be made to utilize the majority of the work previously completed thereby taking advantage of earlier efforts by the developer. The proposed reconstruction limits are shown in Attachment #1. 2.0 APPROACH To assess suitable construction measures of the project and to obtain local residents input to the design process, a joint Public Information Centre was held to present the project proposal. The public was notified of the meeting by newspaper advertisement, the Municipality's information board and website, and through circulation notices to those who are directly affected by the proposed works. 3.0 INFORMATION CENTRE A Public Information Centre (PIC) was held on February 24, 2009 at the Courtice Community Centre. At the meeting the following documentation and plans were presented for discussion: · Existing road condition base plans, showing proposed road works with aerial photography as a background for both Clarington and the Regional works; · A typical road sections for the urban design; · Photographs of existing pavement structure and residential entrances; REPORT NO.: EGD-008-09 PAGE 3 · The proposed landscape plans for Nash Road; · The future alignment for the extension of Nash Road from Harry Gay Drive to Hancock Road; · The full set of preliminary engineering drawings; · An artist's rendition of the final product; · A Tree Assessment Report and Geotechnical Report was available for reading. The register and comment sheets are on file with the Engineering Services Department and available for review. Of the five residential properties on the north side of Nash Road, three property owners appeared at the PIC. The Engineering Department discussed the needs of the Church property at the Engineering counter prior to the meeting and also had discussions with an interested resident in the area following the PIC. The design proposal presented was generally well received with concerns expressed relating to drainage. Others were merely in attendance as interested observers satisfied with the works proposed. The concerns with respect to the drainage where generally associated to connections of existing sump pumps and the overall grading and drainage of the area. As such the design team is now proposing additional catchbasins to resolve the issues and comments made by the public. The Municipality had already allowed for sump pump connection through the design process and will also be providing the Church property with a storm sewer connection to property line should they decide to re-grade and pave the parking area in the future. REPORT NO.: EGD-008-09 PAGE 4 5.0 DISCUSSION As a result of the Public Information Centre and counter discussions, detailed design will be finalized and design drawings and tender documents will be prepared for the project to target an early spring tender call. This will allow Council the opportunity to consider the project for a construction in spring of 2009. Attachments: Attachment NO.1 - Site Map (Nash Road.) Interested parties to be advised of Council's decision: . Attendees of PIC . Commenting members of the Public through correspondence == t=: /./.. .....'E r" <:= ( ~ IT )1 ~ J f-=: f- --' D Nash-Roa-d \ T \ I /.;: f- Reconstruction. ~ 1/)'\ =- ~ PJ- \} l I @ tjfl Nas~ Road /1 1 II E , = / -<" JII /' .-<'\\\ \ -- .-<'1"IT~yseDrive / \\\\\\11111111 ~-~ "g/ \l l1/ ~/ ~ ~~ ~~ A ] ~\,"\(\c,) c,0 ..-->__7> i ~ CR~~!<" .r--c- 1/'-' ./ aLAC!<(', (,) 1\ 1,- ---- ,[, i'ol.,""J-")r- _--- i. J '--'-'-'-- ..~ __ J... ..j ~ \... _..-J___~ j ~--- 0 --'....,..... ...-..... ..;:!- ~ r~ ~ --=~~ Inl=1 "-:\ \\\1111/11 illS ~~ I '-,- DIB ~~ ~! Htj ~~ ~~ ,. ...., 1 ii' trio ..t;.. ~:: .... ...~..............~. [I ~li~l~'1 .", " ': '0 ,,!,1 ~~.... cc . l~!j .. 1.1,"!,;;; ....1' N~;d~:~i iil '! Illi ill'il,!;1:),!' ) '\\\','1;:,:;,(1;',,>:11;, ". r~q~~ ~lli~' ........ illl! ['iLIIT , )lHi~,.,. //L h;;'~C'<.'lT';; ... ".,'.} iT m """:~.~~c:rY '!""rL"""""';"-:''-'.<1 L :::i~ll~ "t~~il i",.dQLullrn..., 1'~COURT/~E~i~. /( - <-- 1-- . I-- I I-- ~- J]~_ :~ ~ --~- . ---< -->-1;1- ........ 4) 0 ,1--; e-->-~_ i---2 f--I-~ -' ...J I--- 1!!'flIl ~ -. - _ i--- f--- -f--- ~ rert"?Oie ~trelet I f----4 ill I -=:7l d - \ \, '...' l .<, 'Y!,1~ ns c:: '0 (J) ! .. -- '0 CII o ~ ~ f--g U _I: 'f [-'--'1 - '- __ , ~ I.' L_ .IP/ \,.~> --- l Reg' I lonal H.I. - Ighway 2 --..--------- --------- J "' ." / >~ '~0m ~~~ ---...........--- '[ ..f~'''''''/ lV W~8 s i ... DRAWN BY: E,L. DATE: March 6,2009 . I' REPORT EGD-008-09 I ATTACHMENT NO.1 G :\Attachments\NashRdRecon. mxd