HomeMy WebLinkAbout03/30/2009
/' "'0;:-..
( If 1 (ifiJJ1 () n
\ j }._ _. --'.~ . C), j _ J
f\Jwrgixiug UlDffll'io"'---'
,
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
DATE:
TIME:
PLACE:
March 30, 2009
9:30 A.M.
COUNCIL CHAMBERS
1. lVlEETING CALLED TO ORDER
2. DISCLOSURES OF PECUNIARY INTEREST
3. ANNOUNCEMENTS
4. MINUTES
(a)
Minutes of a Regular Meeting of March 9, 2009
401
5. PRESENTATIONS
(a) Paul Acquaah, Dillon Consulting Limited, Peer Review Comments
Regarding Report PSD-033-09 , Highway 407 East Environmental
Assessment
6.
DELEGATIONS (Draft List at Time of Publication - To be Replaced with Final List)
601
(a) Alice Grottoli, Community Connection, Regarding Consent for 211 Service
Delivery in Shared Telephone Exchange
(b) Kevin Anyan, Rotary Club Bowmanville, Regarding Report CSD-007-09,
Rotary Ribfest
(c) Victor Suppan, Chair, Heritage Committee, Regarding Report
PSD-033-09, Highway 407 East Environmental Assessment
(d) Libby Racansky, Regarding Report PSD-031-0B, Growth Plan
(e) Libby Racansky, Regarding Report PSD-033-0B, Highway 407 East
Environmental Assessment
(f) Lou Mastroianni, Regarding Report PSD-031-08, Growth Plan
(g) Rolf Fabricius, Regarding Report PSD-033-08, Highway 407 East
Environmental Assessment
CORPORATIOh' OF THE Mur,I~ClPAUTY OF C LAR,NGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARfO ,_1 C 3A6 T 905-623-3379
G.P. & A. Agenda
- 2 -
March 30, 2009
7. PUBLIC MEETINGS
(a) Amendment to Development Charges By-law 2005-108 701
Report: FND-007-09
8. PLANNING SERVICES DEPARTMENT
(a) PSD-031-09 Growth Plan Implementation - Proposed Amendment to
Regional Official Plan
(to be distributed under separate cover)
(b) PSD-032-09 Monitoring of the Decisions of the Committee of 801
Adjustment for the Meeting of March 12, 2009
(c) PSD-033-09 Highway 407 East Environmental Assessment 805
Municipality of Clarington Comments on the Preliminary
Design Plans for the Technically Preferred Route
(d) PSD-034-09 Selection of Members of the Clarington Task Force on 837
Attracting Higher Education Facilities to Clarington
(Attachment 2 [confidential] - distributed under separate
cover as it contains personal information about identifiable
individuals)
(e) PSD-035-09 Durham Region Sustainability Forum April 17, 2009 842
9. ENGINEERING SERVICES DEPARTMENT
(a) EGD-008-09 Nash Road Reconstruction - Public Information Centre 901
(b) EGD-011-09 Monthly Report on Building Permit Activity for February 906
2009
(c) EGD-012-09 Transfer of Part 7, Plan 1 OR-645 and Reciprocal Access 912
Easements for Silver Street/Home Hardware Parking
160 Church Street
(d) EGD-013-09 Old Scugog Road Reconstruction - Public Information 926
Centre
(e) EGD-014-09 Automall Subdivision, Bowmanville, Plan 40M-2171, 930
'Certificate of Acceptance' and 'Assumption By-law', Final
Works Including Roads and Other Related Works
G.P. & A. Agenda
- 3 -
March 30, 2009
1 O. OPERATIONS DEPARTMENT
(a) OPD-005-09 Clarington Pitch-in Canada
Clarington Clean and Green
1001
11. EMERGENCY AND FIRE SERVICES DEPARTMENT
(a) ESD-005-09 Monthly Response Report - February 2009
1101
12. COMMUNITY SERVICES DEPARTMENT
(a) CSD-007-09 2009 Rotary Ribfest
13. MUNICIPAL CLERK'S DEPARTMENT
1201
(a) CLD-005-09 Livestock Evaluation Status
1301
14. CORPORATE SERVICES DEPARTMENT
(a) COD-025-09 Tender CL2009-5, High Float Resurfacing 1401
(b) COD-026-09 CL2009-9, One (1) 60,000 G.v.W. Tandem Diesel Dump 1408
Truck c/w Plow Equipment
(c) COD-027-09 Co-operative Tender T257A-2008, Supply & Delivery of 1412
Domestic Furnace Oil
(d) COD-028-09 CL2009-10, One (1) 43,000 G.V.W. Single Axle Cab and 1415
Chassis c/w Snow Plow Equipment and U Dump Body
Spreader
15. FINANCE DEPARTMENT
(a) FND-007-09 Development Charges Amendment and By-law 1501
(b) FND-008-09 Mayor & Councillors' Remuneration & Expenses for 2008 1509
16. CHIEF ADMINISTRATIVE OFFICE
(a) Confidential Verbal Report of the Chief Administrative Officer Regarding
Energy-From-Waste Host Agreement Negotiations
17. UNFINISHED BUSINESS
(a) Addendum to Report COD-015-09 - Garnet B. Rickard Recreation
Complex Lease Space - Community Care Durham
1701
G.P. & A. Agenda
- 4 -
18. OTHER BUSINESS
(a) Confidential Verbal Report of the Solicitor Regarding Legal Advice
Pertaining to an Official Plan Amendment Application
19. COMMUNICATIONS
20. ADJOURNMENT
March 30, 2009
~~Mi!Jgron
General Purpose and Administration Committee
Minutes
March 9, 2009
Minutes of a meeting of the General Purpose and Administration Committee held on
Monday, March 9, 2009 at 9:30 a.m., in the Council Chambers.
ROLL CALL
Present Were:
Also Present:
Mayor J. Abernethy
Councillor A. Foster
Councillor R. Hooper
Councillor M. Novak
Councillor G. Robinson
Councillor C. Trim
Councillor W. Woo
Chief Administrative Officer, F. Wu
Director of Community Services, J. Caruana
Director of Engineering Services, 1. Cannella
Director of Planning Services, D. Crome
Parks Supervisor, Operations Department, B. Genosko
Director of Corporate Services, M. Marano
Director of Finance Department, N. Taylor
Fire Chief, Emergency Services, G. Weir
Deputy Clerk, A. Greentree
Clerk II, E. Atkinson
Mayor Abernethy chaired this portion of the meeting.
DISCLOSURES OF PECUNIARY INTEREST
There were no disclosures of pecuniary interest stated at this meeting.
ANNOUNCEMENTS
Councillor Hooper and Councillor Novak attended first annual Soups Cook-Off held at
the Kingsway Arms and hosted by the Clarington Older Adults Association and
Kingsway Arms. Councillor Hooper stated that next year this event may be held at 26
Beech Ave.
Councillor Novak advised the Committee the Public Meeting regarding the Growth Plan
will be held tonight, March 9, 2009, in Council Chambers between 7:00 p.m. and
9:00 p.m.
401
General Purpose and Administration Committee
Minutes
March 9, 2009
Councillor Foster advised that on Wednesday, March 4, 2009, he attended the Energy
From Waste Site Liaison meeting, and believed it to be very well attended.
Councillor Trim informed the Committee that the proper Regional meeting protocol will
be followed at the next EFW Site Liaison meeting which should allow for a more fair and
structured dialogue. He reminded the Committee of the Public Information Session on
the new waste collection schedule which is scheduled for tonight, March 9, 2009, at the
Garnet B. Rickard Recreation Complex. Other Public Information Sessions for the other
areas of Clarington are scheduled as follows: Newcastle Town Hall, Tuesday,
March 10th; Orono Town Hall, Monday, March 23rd; and Courtice Community Complex,
Thursday, March 26th. All of these Public Information Sessions are scheduled from
6:00 p.m. to 8:00 p.m. .
MINUTES
Resolution #GPA-165-09
Moved by Councillor Robinson, seconded by Councillor Woo
THAT the minutes of the regular meeting of the General Purpose and Administration
Committee held on February 23,2009, be approved.
CARRIED
PRESENTATIONS
There were no presentations scheduled for this meeting.
DELEGATIONS
Alice Grottoli was called but was not in attendance.
Jim Richards cancelled his delegations prior to the meeting.
Libby Racansky addressed the Committee regarding the reconstruction of Nash Road
and the construction of the Courtice Road bridge. Ms. Racansky expressed concerns
with the cost and the timing for the reconstruction of Nash Road. She informed the
Committee that Nash Road is the safest road for bikers, joggers and walkers to use and
she would like to see Nash Road remain as it is, being without curbs, gutters or the
widening. She stated that by having Nash Road resurfaced only, Council could then
use the money to repair the bridge on Hancock Road which has been eroded due to
new development in the area. Ms. Racansky feels the traffic, mainly trucks, that would
be required to be diverted onto Hancock Road as a result of the reconstruction and new
construction would have a detrimental affect on Hancock Road and the watershed. As
for the construction of the bridge on Courtice Road, Ms. Racansky would like to see the
new bridge higher so that the water runs off and does not erode the new roads. She
requested that the reconstruction and new construction be done in stages, after the
- 2 -
402
General Purpose and Administration Committee
Minutes
March 9, 2009
subdivisions are developed, so that the potential environmental damage will be
minimized. This will also allow the Region more time to assess the environmental
impact on the roads and the watershed after the subdivisions are completed.
Councillor Novak chaired this portion of the meeting.
PUBLIC MEETING
(a) Subject: General Amendment to Zoning By-law 84-63
Applicants: Municipality of Clarington
Report: PSD-026-09
Carlo Pellarin, Manager Development Review, Planning Services Department provided
a verbal report supported by a PowerPoint presentation pertaining to Report
PSD-026-09.
No one spoke in opposition to Report PSD-026-09.
Kerry Meydam spoke in support of the recommendations contained in Report
PSD-026-09. She sought and received clarification that section 3.2.3 pertaining to
permanent storage site for waste, addresses the burning of waste.
PLANNING SERVICES DEPARTMENT
GENERAL AMENDMENT TO ZONING BY-LAW 84-63 REGARDING
CLARIFICATION TO WASTE DISPOSAL USE PERMISSIONS
Resolution #GPA-166-09
Moved by Councillor Hooper, seconded by Councillor Foster
THAT Report PSD-026-09 be received;
THAT the draft Zoning By-law Amendment as contained in Attachment 1 to Report
PSD-026-09 continue to be processed; and
THAT the Region of Durham Planning Department and all interested parties listed in
Report PSD-026-09 and any delegations be advised of Council's decision.
CARRIED
- 3 -
403
General Purpose and Administration Committee
Minutes
March 9, 2009
MONITORING OF THE DECISIONS OF THE COMMITTEE OF ADJUSTMENT FOR
THE MEETING OF FEBRUARY 26, 2009
Resolution #GPA-167-09
Moved by Councillor Trim, seconded by Councillor Robinson
THAT Report PSD-027-09 be received; and
THAT Council concurs with the decisions of the Committee of Adjustment made on
February 26, 2009, for applications A2009-0001 and A2009-0002, and that Staff be
authorized to appear before the Ontario Municipal Board to defend the decisions of the
Committee of Adjustment.
CARRIED
PROVINCIAL GROWTH PLAN CONFORMITY EXTENSION REQUEST
Resolution #GPA-168-09
Moved by Councillor Woo, seconded by Mayor Abernethy
THAT Report PSD-028-09 be received;
THAT due to the anticipated timing for completion of the Region's Growth Plan
Conformity exercise and the subsequent approval process, the Council of the
Municipality of Clarington requests the Ministry of Energy and Infrastructure and the
Ministry of Municipal Affairs and Housing to grant an extension to the June 16, 2009
deadline for the Municipality to amend the Clarington Official Plan to conform with the
Growth Plan to an appropriate date following the approval, or resolution of any appeals,
of an amendment to the Durham Regional Official Plan that implements the provisions
of the Growth Plan;
THAT a copy of the Council resolution and the Municipality's Introductory Discussion
Paper on the Official Plan Review be forwarded to the Ministry of Energy and
Infrastructure and the Ministry of Municipal Affairs and Housing; and
THAT a copy of the Council resolution be forwarded to the Region of Durham and the
Durham Region area municipalities for information.
CARRIED
-4-
404
General Purpose and Administration Committee
Minutes
March 9, 2009
POTENTIAL SITES FOR COMMUTER PARKING LOTS
Resolution #G P A-169-09
Moved by Mayor Abernethy, seconded by Councillor Foster
THAT Report PSD-029-09 be received; and
THAT GO Transit be requested to investigate the possibility of a commuter parking lot in
Newcastle Village or at the interchange of Highway 115/35 with Durham Highway 2.
CARRIED AS AMENDED
(See following motions)
Resolution #GP A-170-09
Moved by Mayor Abernethy, seconded by Councillor Woo
THAT paragraph two of the foregoing resolution be amended to add "the Ministry of
Transportation".
CARRIED
Resolution # GPA-171-09
Moved by Mayor Abernethy, seconded by Councillor Robinson
THAT paragraph two of the foregoing resolution be amended to add "the Region of
Durham."
CARRIED
The foregoing Resolution #GPA-169-09 was then put to a vote and carried as amended.
TOOLEY AND ROBINSON CREEKS WATERSHED STUDY
Resolution #GPA-172-09
Moved by Councillor Foster, seconded by Councillor Robinson
THAT Report PSD-030-09 be received;
THAT the requirements of Purchasing By-law #2006-127 be waived for this transaction;
- 5 -
405
General Purpose and Administration Committee
Minutes
March 9, 2009
THAT staff be authorized to commence negotiations with AECOM, for the consulting
services required to complete the Watershed Study for Tooley and Robinson Creeks as
required by the Planning Services Department; and
THAT pending successful negotiations, staff be authorized to issue a purchase order for
the Tooley and Robinson Creeks Watershed Plan to AECOM.
CARRIED
Resolution # GPA-173-09
Moved by Councillor Robinson, seconded by Councillor Foster
THAT the Committee recess for ten minutes.
CARRIED
The meeting reconvened at 11 :10 a.m.
ENGINEERING SERVICES DEPARTMENT
There were no reports to be considered under this section of the Agenda.
OPERATIONS DEPARTMENT
There were no reports to be considered under this section of the Agenda.
EMERGENCY AND FIRE SERVICES DEPARTMENT
There were no reports to be considered under this section of the Agenda.
Councillor Robinson chaired this portion of the meeting.
COMMUNITY SERVICES DEPARTMENT
Sharon Meredith, Recreation Services Manager and Skip Crosby, Community Service
Coordinator were in attendance. They provided details regarding the grant applications
as required, including the on-going calculations of the grant allocation totals.
2009 COMMUNITY GRANTS
Resolution #GPA-174-09
Moved by Councillor Hooper, seconded by Councillor Novak
THAT Report CSD-004-09 be received;
- 6 -
406
General Purpose and Administration Committee
Minutes
March 9, 2009
THAT Council consider all submitted grant requests; and
THAT all applicants be advised of Council's decision.
CARRIED
(See following motions)
BOWMANVILLE ECOLOGY GARDEN
Resolution #GPA-175-09
Moved by Councillor Novak, seconded by Councillor Hooper
THAT the Bowmanville Ecology Garden be approved for a grant in the amount of
$500.00.
CARRIED
BOWMANVILLE HORTICULTURAL SOCIETY
Resolution #GPA-176-09
Moved by Councillor Hooper, seconded by Councillor Woo
THAT the Bowmanville Horticultural Society be approved for a grant in the amount of
$500.00.
CARRIED
COURTICE HORTICULTURAL SOCIETY
Resolution #GPA-177-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Courtice Horticultural Society be approved for a grant in the amount of
$500.00.
CARRIED
NEWCASTLE HORTICULTURAL SOCIETY
Resolution #GPA-178-09
Moved by Councillor Trim, seconded by Councillor Novak
THAT the Newcastle Horticultural Society be approved for a grant in the amount of
$900.00.
CARRIED
- 7 -
407
General Purpose and Administration Committee
Minutes
March 9, 2009
ORONO HORTICULTURAL SOCIETY
Resolution #GPA-179-09
Moved by Councillor Trim, seconded by Mayor Abernethy
THAT the Orono Horticultural Society be approved for a grant in the amount of $600.00
CARRIED
BOWMANVILLE SANTA CLAUS PARADE
Resolution #GPA-180-09
Moved by Councillor Hooper, seconded by Councillor Woo
THAT the Bowmanville Santa Claus Parade be approved for a grant in the amount of
$1,000.00.
MOTION LOST
Resolution #GPA-181-09
Moved by Mayor Abernethy, seconded by Councillor Novak
THAT the Bowmanville Santa Claus Parade be approved for a grant in the amount of
$2,000.00.
CARRIED
NEWCASTLE SANTA CLAUS PARADE
Resolution #GPA-182-09
Moved by Mayor Abernethy, seconded by Councillor Trim
THAT the Newcastle Santa Claus Parade be approved for a grant in the amount of
$2,000.00
CARRIED
CHRISTMAS IN CLARINGTON COUNTRY
Resolution #GPA-183-09
Moved by Councillor Trim, seconded by Councillor Foster
THAT the Christmas in Clarington Country request for a grant in the amount of
$5,000.00 be denied.
CARRIED
.8.
408
General Purpose and Administration Committee
Minutes
March 9, 2009
CLARINGTON FARMER'S MARKET
Resolution #G P A-184-09
Moved by Councillor Trim, seconded by Councillor Hooper
THAT the Clarington Farmer's Market be approved for a grant in the amount of
$1,000.00.
MOTION LOST
Resolution #GPA-185-09
Moved by Councillor Foster, seconded by Councillor Trim
THAT the Clarington Farmer's Market request for a grant in the amount of $2,000.00 be
denied.
CARRIED
CLARINGTON MARKETING MINDS
Resolution #GPA-186-09
Moved by Councillor Novak, seconded by Councillor Foster
THAT the Clarington Marketing Minds request for a grant in the amount of $5,000.00 be
denied.
CARRIED
NEWTONVILLE'S MUSIC NIGHT IN THE PARK
Resolution #GP A-187 -09
Moved by Councillor Trim, seconded by Councillor Hooper
THAT the Newtonville's Music Night in the Park be approved for a grant in the amount
of $750.00.
CARRIED
NEWCASTLE ART SHOW
Resolution #GPA-188-09
Moved by Councillor Trim, seconded by Mayor Abernethy
THAT the Newcastle Art Show be approved for a grant in the amount of $1 ,000.00.
CARRIED
.9.
409
General Purpose and Administration Committee
Minutes
March 9, 2009
NEWCASTLE VILLAGE & DISTRICT HISTORICAL SOCIETY
Resolution #GPA-189-09
Moved by Councillor Woo, seconded by Mayor Abernethy
THAT the Newcastle Village & District Historical Society be approved for a grant in the
amount of $1,500.00.
CARRIED
DURHAM CENTRAL AGRICULTURAL FAIR
Resolution #GPA-190-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Durham Central Agricultural Fair be approved for a grant in the amount of
$1,000.00.
CARRIED
ORONO TOWN HALL
Resolution #GPA-191-09
Moved by Councillor Foster, seconded by Mayor Abernethy
THAT the Orono Town Hall be approved for a grant in the amount of $3,250.00.
CARRIED
KENDAL COMMUNITY CENTRE
Resolution #GPA-192-09
Moved by Councillor Trim, seconded by Councillor Hooper
THAT the Kendal Community Centre be approved for a grant in the amount of
$2,500.00.
CARRIED
- 10 -
410
General Purpose and Administration Committee
Minutes
March 9, 2009
HAMPTON HALL
Resolution #GP A-193-09
Moved by Councillor Novak, seconded by Councillor Hooper
THAT the Hampton Hall be approved for a grant in the amount of $2,500.00.
CARRIED
SOLlNA COMMUNITY CENTRE
Resolution #GP A-194-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Solina Community Centre be approved for a grant in the amount of
$2,500.00.
CARRIED
NEWTONVILLE HALL
Resolution #GP A-195-09
Moved by Councillor Trim, seconded by Councillor Hooper
THAT the Newtonville Hall be approved for a grant in the amount of $2,500.00.
CARRIED
NEWCASTLE ARENA
Resolution #GPA-196-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Newcastle Arena be approved for a grant in the amount of $3,500.00.
CARRIED
TYRONE HALL
Resolution #GP A-197 -09
Moved by Councillor Woo, seconded by Councillor Novak
THAT the Tyrone Hall be approved for a grant in the amount of $2,500.00.
CARRIED
- 11 .
411
General Purpose and Administration Committee
Minutes
March 9, 2009
CLARINGTON NEW HORIZONS BAND
Resolution #GPA-198-09
Moved by Councillor Novak, seconded by Councillor Trim
THAT the Clarington New Horizons Band be approved for a grant in the amount of
$500.00.
CARRIED
CLARINGTON FIDDLE CLUB
Resolution #GPA-199-09
Moved by Councillor Hooper, seconded by Councillor Woo
THAT the Clarington Fiddle Club be approved for a grant in the amount of $750.00.
CARRIED
CLARINGTON CONCERT BAND
Resolution #GPA-200-09
Moved by Councillor Novak, seconded by Councillor Hooper
THAT the Clarington Concert Band be approved for a grant in the amount of $750.00.
CARRIED
CLARINGTON SWIM CLUB
Resolution #GPA-201-09
Moved by Councillor Foster, seconded by Councillor Hooper
THAT the Clarington Swim Club be approved for a grant in the amount of $1 ,000.00.
CARRIED
ORONO FIGURE SKATING CLUB
Resolution #GPA-202-09
Moved by Mayor Abernethy, seconded by Councillor Trim
THAT the Orono Figure Skating Club be approved for a grant in the amount of
$1,500.00.
CARRIED
-12 -
412
General Purpose and Administration Committee
Minutes
March 9, 2009
NEWCASTLE FIGURE SKATING CLUB
Resolution #GPA-203-09
Moved by Mayor Abernethy, seconded by Councillor Trim
THAT the Newcastle Figure Skating Club be approved for a grant in the amount of
$1,500.00.
CARRIED
COURTICE KIDS MUL TISPORT SERIES
Resolution #GPA-204-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Courtice Kids Multisport Series be approved for a grant in the amount of
$1,000.00.
CARRIED
CLARINGTON TIGERCATS FOOTBALL CLUB
Resolution #GPA-205-09
Moved by Councillor Novak, seconded by Councillor Trim
THAT the Clarington Tigercats Football Club request for a $5,000.00 grant be denied.
MOTION LOST
Resolution #GPA-206-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Clarington Tigercats Football Club be approved for a grant in the amount of
$1,500.00.
CARRIED
ORONO AMATEUR ATHLETIC ASSOCIATION
Resolution #GPA-207-09
Moved by Councillor Trim, seconded by Councillor Woo
THAT the Orono Amateur Athletic Association be approved for a grant in the amount of
$2,500.00.
CARRIED
- 13 -
413
General Purpose and Administration Committee
Minutes
March 9, 2009
CLARINGTON PROJECT
Resolution #GPA-208-09
Moved by Councillor Foster, seconded by Councillor Woo
THAT the Clarington Project be approved for a grant in the amount of $1 ,000.00.
CARRIED
TYRONE ORANGE COMMUNITY HALL BOARD
Resolution #GPA-209-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Tyrone Orange Community Hall Board grant request of $5,000.00 be denied.
CARRIED
OAK RIDGES TRAIL ASSOCIATION
Resolution #GPA-21 0-09
Moved by Councillor Novak, seconded by Councillor Trim
THAT the Oak Ridges Trail Association be approved for a grant in the amount of
$500.00.
CARRIED
MENTAL HEALTH DURHAM - MAKING CONNECTIONS CLARINGTON
Resolution #GPA-211-09
Moved by Councillor Woo, seconded by Councillor Hooper
THAT the Mental Health Durham - Making Connections Clarington be approved for a
grant in the amount of $1,000.00.
CARRIED
- 14 -
414
General Purpose and Administration Committee
Minutes
March 9, 2009
CLARINGTON EAST FOOD BANK
Resolution #GPA-212-09
Moved by Councillor Foster, seconded by Councillor Trim
THAT the Clarington East Food Bank be approved for a grant in the amount of
$5,000.00.
CARRIED
LEARNING DISABILITIES ASSOCIATION OF PETERBOROUGH
Resolution #GPA-213-09
Moved by Councillor Trim, seconded by Councillor Hooper
THAT the Learning Disabilities Association of Peterborough be approved for a grant in
the amount of $750.00.
CARRIED
DURHAM HOSPICE
Resolution #GPA-214-09
Moved by Councillor Foster, seconded by Councillor Novak
THAT the Durham Hospice request for a grant in the amount of $5,000.00 be denied.
CARRIED
CANADIAN RED CROSS - DISASTER MANAGEMENT PROGRAM
Resolution #GPA-215-09
Moved by Councillor Trim, seconded by Councillor Novak
THAT the Canadian Red Cross - Disaster Management Program request for a grant in
the amount of $5,000.00 be denied.
CARRIED
-15.
415
General Purpose and Administration Committee
Minutes
March 9, 2009
BIG BROTHERS AND SISTERS OF CLARINGTON
Resolution #GPA-216-09
Moved by Councillor Hooper, seconded by Councillor Novak
THAT the Big Brothers and Sisters of Clarington be approved for a grant in the amount
of $2,000.00.
CARRIED
PUBLIC ACCESS DEFIBRILLATOR PROGRAM - COLLABORATIVE STATEMENTS
Resolution #GPA-217-09
Moved by Councillor Foster, seconded by Councillor Woo
THAT Report CSD-005-09 be received;
THAT Council authorize the Mayor and Clerk to sign the Collaborative Statements
provided by Central East Pre hospital Care Program;
THAT Central East Prehospital Care program be advised of action taken; and
THAT the Orono Arena Board, Newcastle Arena Board and the Newcastle Community
Hall Board be advised of action taken.
CARRIED
CLARINGTON SPORTS HALL OF FAME
Resolution #GPA-218-09
Moved by Councillor Hooper, seconded by Councillor Trim
THAT Report CSD-006-09 be received;
THAT Council endorse the selection process for the appointment of committee
members for the Clarington Sports Hall of Fame; and
THAT the members of the Sports Hall of Fame Steering Committee be thanked by the
Mayor and Members of Council.for their contribution to the development of the
Clarington Sports Hall of Fame.
CARRIED
CLERK'S DEPARTMENT
There were no reports to be considered under this section of the Agenda.
-16 -
416
General Purpose and Administration Committee
Minutes
March 9, 2009
Mayor Abernethy chaired this portion of the meeting.
CORPORATE SERVICES DEPARTMENT
TENDER CL2008-5, MECHANICAL EQUIPMENT MAINTENANCE CONTRACT -
HVAC SERVICES - TERMINATION AND NEW CONTRACT AWARD
Resolution #GPA-219-09
Moved by Councillor Trim, seconded by Councillor Robinson
THAT Report COD-020-09 be received;
THAT the actions taken by the Purchasing Manager with respect to the termination of
contract CL2008-5 with Cynergy Mechanical Limited, Etobicoke and the award of a supply
and services contract to the next low bidder, Tri-Air Systems, Markham, be endorsed;
THAT pending satisfactory pricing and service the contract be extended for a second
and third year; and
THAT the funds expended be drawn from the Department of Operations and
Department of Community Services various operating accounts.
CARRIED
CO-OPERATIVE TENDER T257-2008, SUPPLY & DELIVERY OF GASOLINE AND
DIESEL FUEL
Resolution #GPA-220-09
Moved by Councillor Hooper, seconded by Councillor Foster
THAT Report COD-021-09 be received;
THAT Petro-Canada, Oakville, Ontario with an approximate annual value of
$353,122.40, being the lowest responsible bidder meeting all terms, conditions, and
specifications be awarded the Municipality of Clarington requirements for Co-operative
Tender T257-2008 Gasoline and Diesel Fuel for a three year term;
THAT pending satisfactory pricing and service the contract be extended for an
additional two years; and
THAT funding be provided from the current year's respective departments Operating
Fleet Budgets.
CARRIED
-17 -
417
General Purpose and Administration Committee
Minutes
March 9, 2009
Cl2009-1 COURTICE MillENNIUM TRAil BRIDGE CONSTRUCTION
Resolution #GPA-221-09
Moved by Councillor Trim, seconded by Councillor Novak
THAT Report COD-022-09 be received;
THAT Dig-Con International Ltd., Bolton, Ontario with a total revised bid in the amount
of $68,758.00 (Excluding G.S.T.), being the lowest responsible bidder meeting all terms,
conditions, and specifications of Tender CL2009-1, be awarded the contract for the
Courtice Millennium Trail Bridge Construction, Courtice, Ontario as required by the
Engineering Department;
THAT funds required in the amount of $79,263.00 (which includes $68,758.00
tendering, engineering, and contingencies) be drawn from Courtice Millennium Trail
Bridge Account #110-32-325-83400-7401; and
THAT the By-law marked Schedule "An attached to Report COD-022-09, authorizing the
Mayor and the Clerk to execute the necessary agreement be approved.
CARRIED
QUOTATION Q2008-32, BY- lAW SNOW CLEARING SERVICES TERMINATION
AND NEW CONTRACT AWARD
Resolution #GPA-222-09
Moved by Councillor Robinson, seconded by Councillor Woo
THAT Report COD-023-09 be received;
THAT the actions taken by the Purchasing Manager with respect to the termination of
contract Q2008-32 with 0 & F Snow Removal, Bowmanville, ON and the award of the
contract to the next low bidder, Pro-Lawn Landscaping, Orono, ON be endorsed;
THAT pending satisfactory pricing and service the contract be extended for a second
and third year; and
THAT the required funds be drawn from the respective year's operating budget for snow
clearing.
CARRIED
-18 -
418
General Purpose and Administration Committee
Minutes
March 9, 2009
TENDER CL2009-4, SUPPLY AND HAULING GRANULAR MATERIAL
Resolution # GPA-223-09
Moved by Councillor Woo, seconded by Councillor Hooper
THAT Report COD-024-09 be received;
THAT Dufferin Aggregates, Concord, ON with a total bid price of$212,057.17 (excluding
G.S.T.), being the lowest responsible bidder meeting all terms, conditions and
specifications of Tender CL2009-4, be awarded the contract for the Supply and Hauling of
Granular Material; and
THAT the funds expended be drawn from the Department of Operations, various 2009
Operations Road Maintenance and Construction accounts.
CARRIED
FINANCE DEPARTMENT
FINANCIAL UPDATE AS AT DECEMBER 31, 2008
Resolution # GPA-224-09
Moved by Councillor Robinson, seconded by Councillor Hooper
THAT Report FND-005-09 be received for information.
CARRIED
BUSINESS IMPROVEMENT AREAS 2009 BUDGETS
Resolution # GPA-225-09
Moved by Councillor Robinson, seconded by Councillor Woo
THAT Report FND-006-09 be received;
THAT the 2009 Budget submissions from the Boards of Management for Bowmanville
SIA, Newcastle BIA and Orono SIA be approved; and
THAT the Boards of Management for Bowmanville BIA, Newcastle SIA and Orono BIA
be advised of Council's decision.
CARRIED
-19 -
419
General Purpose and Administration Committee
Minutes
March 9, 2009
CHIEF ADMINISTRATIVE OFFICE
There were no reports to be considered under this section of the Agenda.
UNFINISHED BUSINESS
DELEGATION - LIBBY RACANSKY - REGARDING NASH ROAD
RECONSTRUCTION AND COURTICE ROAD BRIDGE CONSTRUCTION
Resolution # GPA-226-09
Moved by Councillor Novak, seconded by Councillor Foster
THAT the delegation of Libby Racansky be received with thanks.
CARRIED
OTHER BUSINESS
There were no items dealt with under this section of the agenda.
COMMUNICATIONS
APPOINTMENT TO THE CLARINGTON TRAFFIC MANAGEMENT ADVISORY
COMMITTEE
Resolution #GPA-227-09
Moved by Councillor Robinson, seconded by Councillor Hooper
THAT John Slater be appointed to the Clarington Traffic Management Advisory
Committee to fill the current vacancy for Ward 4.
CARRIED
APPOINTMENT TO THE CLARINGTON ACCESSIBILITY ADVISORY COMMITTEE
Resolution #GPA-228-09
Moved by Councillor Novak, seconded by Councillor Hooper
THAT Cornelia Goodwin be appointed to the Clarington Accessibility Advisory
Committee to fill the current vacant position.
CARRIED
- 20 -
420
General Purpose and Administration Committee
Minutes
March 9, 2009
CORRESPONDENCE - MICHAEL MCQUAID, WEIRFOULDS - REGARDING
REPORT PSD-026-09
Resolution #GPA-229-09
Moved by Councillor Foster, seconded by Councillor Hooper
THAT the correspondence from Micheal McQuaid, WeirFoulds LLP, Barristers &
Solictors for St. Marys Cement regarding Report PSD-026-09 be referred to the Director
of Planning Services.
CARRIED
ADJOURNMENT
Resolution #GPA-230-09
Moved by Councillor Robinson, seconded by Councillor Foster
THAT the meeting adjourn at 12:52 p.m.
CARRIED
MAYOR
DEPUTY CLERK
- 21 -
421
DRAFT LIST
OF DELEGATIONS
GPA Meeting: March 30, 2009
(a) Alice Grottoli, Community Connection, Regarding Consent for 211 Service
Delivery in Shared Telephone Exchange
(b) Kevin Anyan, Rotary Club Bowmanville, Regarding Report CSD-007-09,
Rotary Ribfest
(c) Victor Suppan, Chair, Heritage Committee, Regarding Report
PSD-033-09, Highway 407 East Environmental Assessment
(d) Libby Racansky, Regarding Report PSD-031-08, Growth Plan
(e) Libby Racansky, Regarding Report PSD-033-08, Highway 407 East
Environmental Assessment
(f) Lou Mastroianni, Regarding Report PSD-031-08, Growth Plan
(g) Rolf Fabricius, Regarding Report PSD-033-08, Highway 407 East
Environmental Assessment
601
PUBLIC MEETING
REPORT # FND-007-09
Notice of Public Meeting
Development Charges Act
The Council of the Municipality of Clarington will be considering an amendment
to the Development Charges By-law 2005-108. In accordance with section 12 of
the Development Charges Act, a public meeting to provide interested parties the
opportunity to make comments will be held on:
Date:
Time:
Place:
Monday, March 30, 2009
9:30 a.m.
Council Chambers, 2nd Floor, Municipal Administrative Centre,
40 Temperance Street, Bowmanville, Ontario
The proposed by-law and the background report will be available from the
Finance Department March 11, 2009. Any person may attend the public meeting
and make written or verbal representation either in support of or in opposition to
the amendment. The start time listed above reflects the time at which the
General Purpose and Administration Committee Meeting commences.
701
CJ.fJlpn
REPORT
PLANNING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION MEETING
Date:
Monday, March 30, 2009
Report #: PSD-032-09
File No: A2009-0003 By-law #:
Subject:
MONITORING OF THE DECISIONS OF THE COMMITTEE OF ADJUSTMENT
FOR THE MEETING OF MARCH 12, 2009
RECOMMENDA TIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report PSD-032-09 be received; and,
2. THAT Council concurs with the decision of the Committee of Adjustment made on
March 12, 2009, for application A2009-0003, and that Staff be authorized to appear
before the Ontario Municipal Board to defend the decisions of the Committee of
Adjustment.
~.
Submitted by'. .
~D a J. ro e, , RPP
Director of Planning Services
Reviewed by:
. }ll ranklin Wu,
-1f Chief Administrative Officer
CORPORATION OF THE MUNICIPALITY OF ClARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-0830
801
REPORT NO.: PSD-032-09
PAGE 2
1.0 APPLICATION DETAILS
1.1 All applications received by the Municipality for minor variance are scheduled for a
hearing within 30 days of being received by the Secretary-Treasurer. The purpose of
the minor variance applications and the Committee's decisions are detailed in
Attachment 1. The decisions of the Committee are summarized below.
DECISION OF COMMITTEE OF ADJUSTMENT FOR
. MARCH 12, 2009
A Iication Number
Staff Recommendation
Decision of Committee
A2009-0003
A rove with condition
A roved with condition
1.2 Application A2009-0003 was filed to permit an existing accessory building (gazebo) by
increasing the maximum permitted total lot coverage for all accessory buildings and
structures, from 10% to 11 %.
The subject property is located on the southeast. corner of Second Street and Lambs
Lane, with a lot size of 510m2. Currently there exists a single detached dwelling and
three accessory buildings; a detached garage, a garden shed and a gazebo. The
gazebo is built with a steel frame having a detachable cover that can be stored in the
winter months.
The Zoning By-law permits a total lot coverage for accessory buildings and structures of
10% of the lot area, up to a maximum 60 m2 in floor area. The total floor area of all three
existing structures is 55.1 m2 representing a total lot coverage of 11 %.
Staff recommended approval of the application as the existing accessory structures met
all other requirements of the Zoning By-law, and there would appear to be no
detrimental impact on surrounding properties with regards to drainage or maintenance
of structures.
Committee concurred with Staff's recommendations and approved the application
subject to the condition that no single accessory building or structure exceeds 51 m2 in
total floor area.
2.0 COMMENTS
2.1 Staff have reviewed the Committee's decision and are satisfied that application
A2009-0003 is in conformity with both Official Plan policies, consistent with the intent
of the Zoning By-law, is minor in nature and desirable.
802
REPORT NO.: PSD-032-09
PAGE 3
2.2 Council's concurrence with the decision of the Committee of Adjustment for application
A2009-0003 is required in order to afford Staff official status before the Ontario
Municipal Board in the event of an appeal of any decision of the Committee of
Adjustment.
Attachments:
Attachment 1 - Periodic Report for the Committee of Adjustment
803
Q!![.-!llgton
A TT ACHMENT 1
TO REPORT PSD-032-09
PERIODIC REPORT FOR THE COMMITTEE OF ADJUSTMENT
APPLICANT:
OWNER:
DOUG SELLERS
DOUG SELLERS
PROPERTY LOCATION: 23 SECOND STREET, BOWMANVILLE
PART LOT 12, CONCESSION 2
FORMER TOWN(SHIP) OF BOWMANVILLE
FILE NO.: A2009-0003
PURPOSE:
TO PERMIT THE CONSTRUCTION OF AN ACCESSORY BUILDING (GAZEBO) BY
INCREASING THE MAXIMUM PERMITTED TOTAL LOT COVERAGE FOR ALL
ACCESSORY BUILDINGS AND STRUCTURES FROM 10% TO 11%.
DECISION OF COMMITTEE:
TO APPROVE THE APPLICATION TO INCREASE THE MAXIMUM PERMITTED TOTAL
LOT COVERAGE FOR ALL ACCESSORY BUILDINGS AND STRUCTURES, FROM 10%
TO 11 %, SUBJECT TO THE FOLLOWING CONDITION: THAT NO SINGLE
ACCESSORY BUILDING OR STRUCTURE EXCEEDS 51 M2 IN TOTAL FLOOR AREA.
DATE OF DECISION: March 12,2009
LAST DAY OF APPEAL: April 1 , 2009
804
Cl~pn
REPORT
PLANNING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Report #:
PSD-033-09
File #: PLN 23.5.14
By-law #:
Subject:
HIGHWAY 407 EAST ENVIRONMENTAL ASSESSMENT
MUNICIPALITY OF CLARINGTON COMMENTS ON THE PRELIMINARY DESIGN
PLANS FOR THE TECHNICALLY PREFERRED ROUTE
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee recommend to
Council the following:
1. THAT Report PSD-033-09 be received;
2. THAT Report PSD-033-09 be APPROVED as the Municipality of Clarington's comments on the
Preliminary Design Plans for the Highway 407 East Technically Preferred Route;
3. THAT the Ministry of Transportation be requested:
a) To include the construction of Holt Road between Taunton Road (Regional Road 4) and
Concession Road 6 to a year round standard as part of the Highway 407 -related works;
b) To construct the Holt Road overpass as part of the initial Highway 407 works to maintain
access to agricultural fields;
c) To construct a full-movement interchange at Liberty Street and the 407 Mainline;
d) To incorporate into the EA a 4 lane cross-section for the Taunton Road overpass over
the East Durham Link and cost-share the construction costs for the additional 2 lanes
with the Region of Durham;
e) To improve a portion of Washington Road north of Taunton Road to a seasonal standard
to allow access to agricultural fields south of the 407 Mainline;
f) To provide a sidewalk and/or bicycle lane on Solina Road south of Solina to connect to
the future transitway south of the 407 Mainline;
g) To provide page-wire (farm) fencing, rather than chain-link fencing, along the rural
portions of the highway corridor in keeping with the rural character of the area;
805
REPORT NO.: PSD-033-09
PAGE 2
h) To acquire sufficient land to provide cul-de-sacs at the end of all roads terminated by the
407, and to transfer said lands to the Municipality of Clarington; and
i) To prepare preliminary designs for the stormwater pond and Courtice Road interchange
at the Clarington Energy Park that will be an enhancement to the business Park with
appropriate gateway treatments and quality landscaping features.
4. THAT the Ministry of Transportation be advised that the Municipality of Clarington supports the
creation of a working group to deal with the issue of remnant parcels outside the scope of the
Environmental Assessment, and that this be a specific recommendation in the EA Report
submitted to the Ministry of the Environment;
5. THAT the Region of Durham be requested:
a) To commence an Environmental Assessment and allocate funding for the construction of
the Courtice Road/Enfield Road (Regional Road 34) re-alignment so that the re-aligned
road is in place by the time the Highway 407 East Mainline is operational;
b) To agree to both the transfer of the Darlington/Clarke Townline Road north of Regional
Road 4 to the Region's jurisdiction and its improvement to a Type 'B' arterial standard so
that the improved road is in place by the time the new 407 interchange on this road is
operational;
c) To contribute funding to the Highway 407 project to construct a 4 lane cross-section for
the future East Durham Link grade separation at Taunton Road and thereby avoiding
future costly reconstruction costs.
6. THAT the Clarington Highway 407 Community Advisory Committee, the Clarington Agricultural
Advisory Committee, and the Clarington Heritage Committee be THANKED for their input and
assistance;
7. THAT a copy of this report and Council's decision be forwarded to the Ministry of
Transportation, the Regional Municipality of Durham, and all area municipalities in Durham
Region; and
8. THAT all interested parties listed in this report and any delegations be advised of Council's
decision.
806
REPORT NO.: PSD-033-09
PAGE 3
Submitted by:
David Crome, MCIP, RPP
Director of Planning Services
Reviewed bYO r-a-l?-Q~~
Franklin Wu
Chief Administrative Officer
JAS/LB/DJC/AC/df
24 March 2009
~~)
,1/..//)
'/~.
.' ./,/ /' //~ ~ ,. . ." ~
. / " //'}/1,-, 7 ! /
Reviewed by: ,/ <_ 1// I (, I' ;~_--
A. S. Cannella
Director of Engineering Services
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-0830
807
REPORT NO.: PSD-033-09
PAGE 4
1.0 BACKGROUND AND PURPOSE OF REPORT
1.1 The Technically Preferred Route (TPR) for the Highway 407 Mainline, including the
West Durham and East Durham Links, was presented at Public Information Centres in
June 2008. Council submitted its comments on the TPR through its consideration of
Report PSD-110-08 (November 3,2008 GPA meeting).
1.2 The Ministry of Transportation (MTO) responded to Clarington's comments on the TPR
by letter dated January 6, 2009. Attachment 2 to this Report summarizes MTO's
responses to the issues identified in Report PSD-11 0-08, and staffs comments. Those
issues that have been resolved to staffs satisfaction and are not discussed in the main
body of this report include:
· Access to the Orono Hunt and Fish Club
· Interchange configuration at Enfield Road
· Potential future extension of Pebblestone Road
· Access for Emergency Vehicles
· Emergency Closure and Detour Plan
· Compensation for Farm Business Losses During Appraisal
· Need for Co-ordinated Phasing/Staging Plan During Construction
1.3 Over the past several months, the 407 Project Team has been undertaking preliminary
design work and meeting with various stakeholders, including Clarington staff, to further
refine the TPR and the location and sizing of supporting infrastructure. The Project
Team has also undertaken additional analysis to determine potential impacts and
proposed mitigation measures and strategies.
1.4 The Preliminary Design Plans for Highway 407 were presented at the last round of
Public Information Centres which were held in late January/early February 2009.
Information on the proposed Community Value Plan for the Highway 407 corridor was
also presented at the Information Centres. The 407 Project Team has requested that
comments be submitted by Monday March 23, 2009; however, the Project Team has
been unable to present to Clarington Council until March 23, 2009.
1.5 The purpose of this report is to provide the Municipality of Clarington's comments on the
Preliminary Design Plan and the proposed Community Value Plan for the 407
Technically Preferred Route. These comments include both new issues and additional
comments on issues previously identified. Comments are indicated in bold italics. In
preparing this report, comments from the Clarington Highway 407 Community Advisory
Committee, the Clarington Agricultural Advisory Committee, and the Clarington Heritage
Committee were also considered.
1.6 Staff has provided a copy of this report to the Project Team as the Municipality's
preliminary comments, subject to Council approval, in order to meet the March 23, 2009
deadline.
808
REPORT NO.: PSD-033-09
PAGE 5
2.0 CLARINGTON ENERGY PARK
\
..._.i"".......
---
.
cj
II
! <
r '\
Figure 1: Proposed Highway 401/East Durham Link Configuration
2.1 South Service Road and EnerQV Park Drive
2.1.1 Currently the South Service Road runs adjacent and parallel to the 401. The freeway to
freeway (401/407) interchange and the Courtice Road interchange impinge on the
limited acreage of the Energy Park.
2.1.2 The realignment of South Service Road in whole or part is the topic of ongoing
discussions between staff and MTO. Options are available to mitigate the loss of
developable lands in the Energy Park providing that satisfactory arrangements
can be made for the short, medium and long term alignment of South Service
Road. Ultimately Energy Park Drive will assume the function of the South Service
Road and should be shown as such in the EA documents. The section of Energy
Drive near Solina Road needs to be shown as the Province's responsibility under
the EA to replace South Service Road.
2.2 Storm water ManaQement
2.2.1 MTO has depicted the southeast quadrant of Courtice Road and South Service Road as
a "potential site for stormwater management pond". This site is located within lands
currently designated Prestige Employment Node in the Clarington Energy Business
Park Secondary Plan.
2.2.2 The proposed location of the storm water management pond is compatible with
the recommendations of the recently completed Master Drainage Plan. The storm
water management pond will remove developable lands so it needs to incorporate
809
REPORT NO.: PSD-033-09
PAGE 6
an attractive entrance feature to the Business Park visible from Hwy 401 and
traffic entering from the Courtice Road interchange.
3.0 LOCAL AND REGIONAL ROAD NETWORK
3.1 Holt Road
3.1.1 The construction of the East Durham Link will result in a 2 km segment of Rundle Road
being lost. As a result, Rundle Road will become discontinuous between Taunton Road
and the Sixth Concession Road. Rundle Road will terminate at Taunton Road, while
that section north of the 407 will be truncated. Both northbound and southbound traffic
on Rundle Road will have to detour either onto Solina Road through the hamlet of
Solina (800 m to the west), or onto Old Scugog Road through the hamlet of Hampton
(2.5 km to the east).
3.1.2 Holt Road, which lies 800 m to the east of Rundle Road, is built to a year-round
standard between the South Service Road and the Seventh Concession Road, except
for that section between Taunton Road and the Sixth Concession.
3.1.3 Report PSD-11 0-08 included a specific
recommendation to advise MTO that it is the
Municipality's position that Holt Road
between Taunton Road and the Sixth
Concession Road should be improved to
year-round municipal road standards as part
of the 407 works to replace Rundle Road.
MTO responded in their January 6, 2009
letter that the 407 project team will not be
seeking EA approval to carry out
improvements to Holt Road, and that such
improvements, if justified, will be
Clarington's responsibility. However, they
have committed to constructing an overpass
for Holt Road at the 407 Mainline at such
time as Holt Road is improved.
Figure 2: Holt Road Reconstruction
3.1.4 The discontinuation of Rundle Road north of Taunton Road represents the loss
of an important north-south connection within the Municipality's road network,
and will create additional traffic impacts on Solina and Hampton. Given the loss
of this important connection, the request to MTO to replace the lost section of
Rundle Road with an approximately equivalent section on Holt Road is not
unreasonable.
810
REPORT NO.: PSD-033-09
PAGE 7
3.1.5 The reconstruction of the unimproved section of Holt Road to a year-round
standard would effectively mitigate the impact on the Municipality's road network
and the two hamlets created by the discontinuation of Rundle Road. The
Municipality's consultant has estimated that the cost to improve Holt Road would
be approximately $1.57 Million.
3.1.6 It continues to be the Municipality's position that the reconstruction of Holt Road
to a full municipal standard between Taunton Road and the Sixth Concession
should be included in the EA documentation for the 407 East as a project-related
work.
3.1.7 This unimproved section of Holt Road is used by farmers to access a number of
agricultural fields. It would be preferable from a traffic safety perspective for
farmers to use Concession Road 6 rather than Taunton Road to access these
fields. However, this will require that the Holt Road overpass be constructed as
part of the initial 407 works so that the farms south of the 407 can be accessed
from the north.
3.2 Taunton Road
3.2.1 The Preliminary Design Plans indicate that a two-lane cross-section (one lane in each
direction) has been proposed for Taunton Road where it will cross over the East
Durham Link. The widening of Taunton Road through Clarington has not been included
in the Region's Five Year Capital Budget. As a result, MTO will not take responsibility
for the cost of the additional 2 lanes on the overpass.
3.2.2 Regardless of the responsibility for the costs of this structure, the 4 lane cross-section
for the overpass should be incorporated into the EA to avoid a subsequent EA approval
and to ensure that proper long term planning is undertaken.
3.2.3 The Region is requested to contribute funds to the 407 project to provide for the
construction of a four lane cross-section on Taunton Road over the East Durham
Link to avoid significant reconstruction costs and delays in the future when the
Region would have to undertake the widening of Taunton Road.
3.3 Libertv Street interchanQe
3.3.1 The EA recommended design includes interchanges at Regional Road 57 and at the
Darlington-Clarke Townline only. Liberty Street would be a simple grade separation
with no direct connection to Highway 407. There is also an interchange on the Durham
East Link at Highway 2, and a partial interchange at Taunton Road (access to and from
the south only). Traffic generated in the Bowmanville area will predominantly be served
by the Regional Road 57 and Highway 2 interchanges, as opposed to either the
Taunton Road partial interchange or the Darlington-Clarke Townline interchange,
3.3.2 The results of the transportation model undertaken for the EA were reviewed by the
Municipality's consultant to determine whether an interchange at Liberty Street would be
necessary or beneficial from a road capacity perspective. The model results suggest
that the current EA-recommended design would result in a concentration of traffic on the
approach routes to the two interchanges serving Bowmanville traffic, particularly the
Regional Road 57 interchange.
811
REPORT NO.: PSD-033-09
PAGE 8
Detailed comments on the review of the transportation model are provided in
Attachment 3 to this report.
3.3.3 Based on a review of the Highway 407 transportation model and the future
planned land use and road network, the Municipality of Clarington requests MTO
to reconsider an interchange at Liberty Street. The interchange can be
accommodated while still maintaining appropriate interchange spacing, and is
important from a network connectivity perspective. It would help disperse
projected traffic volumes on the approach routes to Highway 407 in the
Bowmanville area, lead to lower traffic pressure on lower-order east-west
roadways, and alleviate high intersection turning movements along the Regional
Road 57 and Liberty Street corridors.
3.4 Hancock Road
3.4.1 The realignment of Hancock Road at Regional Road Highway 2 is currently proposed
by MTO as part of the work related to the East Durham Link. The realignment is meant
to accommodate a new ramp, the transitway and a transitway station. South of
Highway 2, the proposed realignment is achieved through the use of smooth horizontal
curves, thereby enabling relatively uninterrupted traffic flow. North of Highway 2, MTO
has proposed a T-intersection as a means of connecting the realigned section of
Hancock Road with the existing portion. The free flow of traffic will be inhibited with the
introduction of the 90 degree intersection.
Figure 3: Hancock Road: Proposed 90 degree intersection
3.4.2 The Municipality requests that the north leg of the realignment of Hancock Road
be redesigned with a smooth horizontal curve to facilitate traffic flow in this
location.
812
REPORT NO.: PSD-033-09
PAGE 9
3.5 Middle Road and Other Road re-aliqnments
3.5.1 MTO proposes to construct the Middle Road overpass west of the current road
alignment location to reduce impacts to properties and natural features on the east side.
The old remnant portions of Middle Road will be required to be terminated north and
south of H~ 40~. "~---~~..:f~
However, It IS stili r~'~f. '
unclear how MTO
plans to maintain
access to the
affected
properties.
---
Figure 4: Middle Road: Proposed Re-Alignment
3.5.2 The Municipality's preference is to have Middle Road and other similar situations
connect directly to the realigned road and to have private driveways extended to
the realigned road. This would avoid the need to maintain old remnant sections
of the former road. MTO will be required to ensure that all private driveway
entrances are extended to the re-aligned road, and that these entrances are
properly designed and constructed to address any potential grade and sightline
issues.
3.5.3 The Municipality also requests that MTO give the same consideration to all local
roads that will be re-aligned because of the 407 or East Durham Link.
3.6 Road Terminations (Cul-de-Sacs)
3.6.1 A number of local roads are indicated as being truncated at the 407 and East Durham
Link. The Municipality's snow-clearing and road maintenance equipment, as well as
emergency vehicles, will need to be able to turn around at these locations.
3.6.2 MTO is requested to provide cul-de-sacs on roads to be truncated by the 407 or
the East Durham Link consistent with the requirements of the Municipality of
Clarington to ensure proper access for both emergency services and
maintenance vehicles. All roads terminated with a cul-de-sac should have a
minimum radius of 15 metres to the edge of pavement. Sufficient property should
be acquired by the MTO and transferred to Clarington for these cul-de-sacs. At a
minimum, Clarington requires a radius of 24.5 metres to be provided to the
property limit.
3.7 Courtice Road/Enfield Road Connection
3.7.1 The construction of the interchange on Enfield Road (Regional Road 34) will result in
this road becoming a major access point to the 407. The resulting increase in traffic on
Enfield Road, Taunton Road and Trulls Road will have a significant negative effect on
the hamlet of Mitchells Corners. The Official Plan (Transportation Map B 1) indicates that
813
REPORT NO.: PSD-033-09
PAGE 10
Regional Road 34 is intended to be made continuous and by-pass Mitchells Corners
through connection of Courtice Road and Enfield Road.
3.7.2 The construction of the Regional Road 34 connection will be important to
minimizing traffic congestion and road safety issues in Mitchells Corners
resulting from the 407/Enfield Road interchange. As such, the Region of Durham
is requested to commence an Environmental Assessment and to allocate funding
for the construction of the north-south by-pass connecting the two portions of
Regional Road 34 (Courtice and Enfield Roads) by the time the Highway 407
mailine is operational.
3.8 DarlinQton/Clarke Townline Road
3.8.1 Similarly, the construction of the interchange at the Darlington/Clarke Townline will
result in additional traffic using the section north of Taunton Road (Regional Road 4).
The entire length of this road is identified in the Official Plan as a Type B arterial.
Although the section of the road south of Taunton Road is currently under the Region's
jurisdiction (Regional Road 42), the section to the north that will connect to the 407
remains as a local road.
3.8.2 The Region of Durham is requested to agree to the transfer of that portion of the
Darlington/Clarke Townline Road north of Taunton Road to the Region's
ownership prior to the 407 interchange at this location coming into operation.
4.0 WIDTH OF OVERPASSES AND UNDERPASSES
4.1 AQricultural equipment
4.1.1 Report PSD-110-08 included a specific recommendation that grade separations be
constructed to include the requirements for the movement of agricultural equipment and
pedestrians. MTO indicated in their January 6, 2009 letter that the current design of
overpasses and underpasses provides sufficient width for the safe passage of farm
equipment.
4.1.2 Staff have confirmed that the design standards being proposed by MTO for over
and underpasses would be sufficient to accommodate a standard combine with
standard tires. A full 2.5 m shoulder on each side of the road is being proposed.
This together with a typical 3.5 m lane width will provide 6 m of width for each
lane/shoulder combination on overpasses and underpasses, which is consistent
with the standard width of two-lane rural collectors. This issue has been resolved
to staff's satisfaction.
4.2 Sidewalks and Bicycle lanes
4.2.1 MTO has advised that they will only provide bicycle lanes and sidewalks on
underpasses and overpasses where they currently exist or where they are planned in
capital forecasts.
4.2.2 Rural roads typically do not have either bicycle lanes or sidewalks, although the
shoulders are frequently used for both purposes. The necessary width at grade
separations for pedestrians and bicyclists will be provided through
814
REPORT NO.: PSD-033-09
PAGE 11
accommodating the width of agricultural equipment as discussed in Section 4.1.
However, it would be appropriate for the construction of a sidewalk and/or bicycle
lane from Solina to the proposed future transitway facility to be included in the
EA as a 407 -related works.
5.0 REMNANT PARCELS
5.1 The Municipality has consistently expressed a concern that Highway 407 and the East
Durham Link will create a number of remnant parcels in the rural area that could
potentially become residential building lots. The creation of these lots would be contrary
to the intent of the Provincial Greenbelt Plan and the Regional and local Official Plans.
MTO has indicated that it supports Clarington's objectives in this regard and has
suggested a Working Group be established. It is MTO's position that the issue of
remnant parcels is outside the scope of the EA.
5.2 The Municipality supports the approach of creating a Working Group outside of
the Environmental Assessment process to address the issue of remnant parcels.
The Working Group should be established as soon as possible after the
submission of the EA Report, with MTO or another provincial agency being
responsible for establishing and supporting its work. The Ministry of Municipal
Affairs, the Region of Durham, the affected area municipalities, and the
Conservation Authorities should be invited to participate. The establishment of
the working group should be a specific recommendation in the 407 EA Report.
6.0 IMPACTS DURING CONSTRUCTION
6.1 There is the potential for significant impact on area roads during the period of
construction that will affect residential and business traffic (including the agricultural
community), as well as emergency and maintenance vehicles. It is essential that
specific consultation be carried out by the proponent and contractor(s) with the
Municipality, area businesses and the agricultural community, both prior to and during
the period of construction, to understand their specific requirements. This will be
essential in helping mitigate impacts to. the agricultural community, particularly during
the planting and harvesting seasons.
6.2 MTO is requested to establish a liaison committee comprised of the proponent,
the contractor and representatives from the Municipality, the business and
agricultural community, and that this be included as a specific recommendation
in the 407 EA report.
7.0 CULTURAL HERITAGE RESOURCES
7.1 The Municipality has previously recommended that MTO develop a comprehensive
strategy for the protection of cultural heritage resources in consultation with the Region
and the area municipalities, and that property owners and the relevant Municipality be
contacted to discuss specific mitigation measures for each affected heritage feature. In
response, MTO advised that more detailed work on cultural heritage resources would
be undertaken during preliminary design and that an Impact Assessment Report will be
815
REPORT NO.: PSD-033-09
PAGE 12
prepared that will document the mitigation and/or compensation techniques to be
employed in order to reduce impacts.
7.2 The Impact Assessment Report provided to the Clarington Heritage Committee in
March 2009 identified those cultural heritage resources that will be either displaced or
disrupted by the 407. General mitigation strategies were developed based on the
degree of impact and the nature of the resource. Landscape screening is proposed for
those heritage resources that will be disrupted, while a Cultural Heritage Evaluation
Report (CHER) is recommended in those situations where built heritage resources are
to be displaced. None of the properties to be displaced by the 407 and the East
Durham Link in Clarington were identified by the Impact Assessment Reports for
relocation.
7.3 The Clarington Heritage Committee has identified 27 built heritage resources included
in the Impact Assessment Report that have been recorded in the Committee's inventory
of heritage buildings. Of particular interest are the following eight built heritage
resources that will be displaced by the 407:
5531 Bethesda Road
5681 Acres Road
7500 Hi hwa 115
5658 Bethesda Road
This structure should be relocated.
This structure should be relocated.
This structure should be relocated.
4825 Rundle Road
2064 Taunton Road
H743
H747
The barn should be relocated.
Relocation of structure not necessa
7.4 The Cultural Heritage Evaluation Reports to be prepared for a number of the
properties should also include floor plans of the building, the footprint of the
building on the lot, and photographic records of the exterior and interior of the
building and of the vista from the building.
7.5 The impact assessment reports do not include any information on the
compensation techniques to be used to reduce the impact on heritage resources,
nor do they indicate if the owners of the identified properties have been
contacted in regards to the mitigation measures proposed. This information
should be provided to the Clarington Heritage Committee to allow for a more
816
REPORT NO.: PSD-033-09
PAGE 13
thorough review of the impact on the Municipality's built heritage resources, once
the negotiation with the owners is complete.
7.6 Attachment 4 provides the Municipality's comments on all of the heritage
resources identified by the impact assessment reports as being displaced or
disrupted by the 407 and the East Durham Link.
8.0 COMMUNITY VALUE PLAN
8.1 The Community Value Plan (CVP) process is intended to identify a range of measures
to mitigate the effects of Highway 407 that are sensitive to the cultural, social, historical
and environmental values of the communities in proximity to the Technically
Recommended Route. CVP measures are intended to be compatible with the natural
and built environments and aesthetically appropriate for the area, and will be
implemented within the 407 corridor. The Highway 407 Project Team should be
commended for undertaking the CVP process.
8.2 The 407 project team held a number of workshops in 2008 to identify key areas of
concern within communities affected by the highway corridor, and to discuss possible
strategies that will mitigate the impact of the highway while retaining or enhancing
community character. The proposed CVP was presented for comment at the last round
of Public Information Centres in late January 2009.
8.3 The CVP is intended to provide a range of potential mitigation and enhancement
measures that will be applicable at various locations throughout the 407 corridor.
Measures are grouped by themes, such as gateway locations, landscape screening,
local heritage, wildlife crossings, and wetland restoration. Comments on specific
aspects of the CVP are provided below.
8.4. Gatewav SiQnaQe
Figure 5: Proposed gateway signage
Community signs should be located on the 407 corridor at the eastbound
entrance to Clarington, as well as at the hamlets of Solina, Hampton and Leskard.
The design of the signs and graphics should be distinct and accurately represent
the history and character of the community - for example, the old water-powered
817
REPORT NO.: PSD-033-09
PAGE 14
mill in Hampton. Hamlet signs should also include a reference to the Municipality
of Clarington. Signs should be made of durable material to minimize maintenance
and to ensure that they remain attractive for a long time.
8.5 Bridqe Art
Figure 6: Proposed artwork on bridge structures and abutments
As with community signage, bridge artwork should be durable and accurately
reflect the history and character of nearby communities. For example, the grade
separation over Wilmot Creek should reflect the historical significance of the
fishery in this area.
8.6 Liqhtinq
Highway lighting located in proximity to homes and communities should be
visually screened to minimize the impact on residents. Where possible decorative
lighting (eg. heritage theme) should be installed. The Municipality has lighting
guidelines that recommend full cut-off, high efficiency luminaries.
8.7 Storm Water Manaqement Ponds
The many storm water
management ponds proposed
along the 407 corridor provide an
opportunity, with the use of
appropriate landscaping, to create
both visual assets and wildlife
habitat. However, when located
in proximity to communities,
fencing that is attractive and
compatible with the landscape
should be considered.
Figure 7: Storm water Management Ponds
818
REPORT NO.: PSD-033-09
PAGE 15
8.8 Wildlife Habitat and Wetland Restoration
Opportunities to provide wildlife
habitat within the 407 corridor and on
remnant parcels should be maximized
to mitigate the impact of the highway
on the landscape, in particular
connectivity within the Natural
Heritage System (eg. woodlots on
remnant parcels).
Figure 8: Wetland Boardwalk
The creation of trails, wetland boardwalks ands other public areas would be an
asset to the community; however, access to highly sensitive areas should not be
encouraged. Information on the ownership and maintenance of the facilities has
not yet been provided by the 407 project team and should be discussed with the
local municipalities.
8.9 EnerQV Business Park
The East Durham Link will have a significant impact on the plans of the
Clarington Energy Business Park. There should be additional details provided for
this area including preliminary design plans for the stormwater pond which
incorporates special landscape features and gateway treatment at the
interchange.
9.0 CONCLUSIONS
9.1 Many aspects of life in Clarington will be affected by the construction and operation of
the 407 Mainline and East Link. The impacts will be both positive and negative for the
natural heritage systems, social and community fabric, agricultural operations and many
businesses. The Ministry of Transportation and its consultants, through the preliminary
design of the Technically Preferred Route, have provided specific recommendations to
address the impacts and mitigate any negative outcomes. In many cases MTO and the
consultants have gone beyond mitigation and provided for enhancement opportunities,
which is greatly appreciated.
9.2 Staff will continue to work with the Project Team and provide input on the Functional
Design Study.
Attachments:
Attachment 1 - Glossary of Terms
Attachment 2 - MTO Response to Report PSD-110-08
Attachment 3 - Comments on Liberty Street Interchange
Attachment 4 - Comments on Impacted Built Heritage Resources
819
REPORT NO.: PSD-033-09
PAGE 16
List of interested parties to be advised of Council's decision:
Dan Remollino, P. Eng.
Doug Allingham, P. Eng.
John O'Toole, M.P.P.
Abe Afana
Ron Armstrong
Ann Ball
Jim Ballentine
Dorothy Barnett
Fred Biesenthal
Mark Bragg
Mark Canning
Jean-Maurice Cormier
Walenty & Maria Cyrganowicx
Yvonne Doorenspleet
Rolf & Tanya Fabricius
George Field
Linda Gasser
John Hammond
William J. Hasiuk
Mark Hawkins
Dave Horner
Karina Isert
Jennifer Knox
Jo-Anne McFarland
John and Barbara Montague
Denise Pickett
Libby Racansky
Hala Rawdah
David & Bev Rogers
Jim Slyfield
Bradford Soles
John Sturdy
John Waters
Ted Watson
820
GLOSSARY OF TERMS
CHER
Cultural Heritage Evaluation report
CVP
Community Value Plan
EA
Environmental Assessment
MTO
Ministry of Transportation
TPR
Technically Preferred Route
Attachment 1
To Report PSD-033-09
821
Response accepted. The
issue of remnant parcels wi
need to be addressed
outside of the 407 EA.
See Recommendation 4 and
Section 5.0 of Report.
MTO supports Clarington's objective to ensure no
additional residential remnant parcels are
created. Ultimately, Regional and Municipal
planning and policy decisions will dictate how
remnant parcels can be developed. MTO will
continue to work with other government agencies
to ensure the policies of the Greenbelt and local
Official Plan are addressed. A Working Group
approach may be considered outside the scope of
the EA.
MTO was requested to establish a working group,
to include the Ministry of Municipal Affairs, the
area municipalities, the Region of Durham, and
the Conservation Authorities, to develop a
comprehensive strategy for dealing with remnant
parcels created by the 407 Mainline and Links.
Response not accepted.
The Municipality's position
continues to be that this
section of Holt Road should
be included as part of the
407 works.
The 407 project team will not be seeking EA
approval to carry out improvements to Holt Road
between Taunton Road and 6th Concession Road
Such improvements, if justified, will be
Clarington's responsibility.
See Recommendation 3a)
and Section 3.1 of Report.
Holt Road
Holt Road between Taunton Road and the 6th
Concession Road is currently a seasonal road.
Its importance as an evacuation route from the
OPG Darlington site and as an alternate
emergency access for Solina is greatly enhanced
by the elimination of Rundle Road. Its
improvement to a year-round standard is required
to meet emergency services and should be part
of the 407 works.
-l
o
:::0
(l)
'0
o
~
"'O~
cn-
o~
I ::r
03
~(l)
, :J
0-
eo N
Response accepted
The 407 Project Team is recommending an
alternate access road be provided further to the
east in order to ensure continued access to both
the Orono Fish and Hunt Club as well as the
LaFarge pit.
Club
Access to Orono Hunt and Fish Club
The 407 will affect the seasonal road that
provides access to the Orono Hunt and Fish
and aggregate extraction area. An alternate
access through an access agreement or other
arranoement should be provided as part of the
co
I\)
I\)
Response accepted. Middle
Road is being re-aligned to
the west to minimize
property impacts. This has
created new issues that
need to be addressed.
MTO advised subsequent to their letter that a
grade separation will be constructed to allow
Middle Road to flyover Highway 407.
Middle Road
A grade separation should be constructed at
Middle Road.
See Recommendation 3 h)
and Section 3.5 of Report
Response accepted. The
2.5 m shoulder width plus
the 3.5 m lane width will be
sufficient to accommodate a
standard combine with
standard tires.
See Section 4.
The current design of overpasses and
underpasses provides sufficient width for the safe
passage of farm equipment.
Movement of Agricultural Equipment
The width of grade separations needs to address
the size of farm equipment as well as visibility
issues on overpasses.
Report.
of
Response accepted
1
The current design for the East Durham Link does
not preclude a future east-west grade separation
to accommodate a possible future extension of
Pebblestone Road east of Courtice Road.
Future Extension of Pebblestone Road
The functional design component of the EA Study
should ensure connectivity within the local road
network in the future by not precluding a future
east-west grade separation on the East Link to
accommodate a possible future extension of
Pebblestone Road east of Courtice Road.
See Recommendation 3c),
Section 3.3 and Attachment
The 407 project team will continue to meet with
Clarinaton staff over the next few months to
ton-
nterchan
Liberty Street
The location of the fu
ex>
I'\)
w
,l~~~1
fi6,21
confirm/refine the TPR. Traffic analysis will be
part of this review. At this time it is not envisioned
that an interchange will be included as part of the
EA, but its long-term potential to be constructed,
once a need has been identified, is not precluded.
Clarke Townline is more appropriate than at
Bethseda Road. However, over the long term,
traffic from Bowmanville will be restricted to
accessing the 407 at either Regional Road 57 or
Highway 2. The Municipality should have the
opportunity, prior to the finalization of the decision
about an interchange as Liberty Street, to review
the results of the updated traffic modelling to be
undertaken as Dart of the functional desian stud
Response accepted
The 407 Project Team isin the final stages of
developing the ultimate design, which includes
the review of a smaller interchange configuration
similar to Baldwin Street and Thickson Road in
Whitby. The interchange design is effective and
practical given the constraints in the area. The
smaller interchange configuration will still require
a connector road to allow for full movements to
Enfield Road and Concession 6; however, the
design will help minimize property impacts in the
area.
Enfield Road
The interchange at Enfield Road requires
additional property acquisitions due to grade
issues, proximity of the 407 on-ramps, 6th
Concession turning movements and significant
environmental constraints. It is recommended
that the Project Team collaborate with Regional
and Clarington staff to determine an effective and
practical design for this area that minimizes
property impacts.
Response accepted
See Recommendation 5a)
and Section 3.7 of Report.
This is a Clarington/Region of Durham issue and
is not part of the 407 East EA.
The Clarington Official Plan (Transportation Map
B 1) anticipates the future connection of Courtice
and Enfield Roads. Enfield Road will become the
major access point to the 407 for Courtice
residents. As such, the timing of the connection
of Enfield Road and Courtice Road should be
advanced to minimize congestion and road safety
issues through Mitchell's Corners
ex>
I\)
~
407 EAST ENVIRONMENTAL ASSESS.M
.' ~ESPONSr;'Tq REPORT. PSD-11 0..08> '.
>'
Response accepted
The 407 project team is aware of these concerns
and is working in co-operation with Clarington
staff and emergency service providers to ensure
reasonable access to the 407 is provided -
comparable to other 400 series highways
throughout the province. Reasonable access will
be provided via planned interchanges and, where
feasible, turnaround areas for emergency
services and maintenance activities will also be
rovided.
Access for Emergency Vehicles
Emergency Services has expressed concern with
being able to readily access certain portions of
Highway 407. Investigation of emergency access
via the vehicle inspection station located north of
Highway 407 Mainline near Acres Road should
be investigated as should having a northbound
entry for emergency vehicles to the East Durham
Link at Taunton Road.
Response accepted
A plan for emergency services and detour routes
will not be part of the EA documentation;
however, the ministry will consider including the
need to address emergency closures as an
implementation plan in the EA. The Ministry's
Traffic Office is currently undertaking a separate
study to review emergency detour routes.
Emergency Closure & Detour Plan
MTO has indicated that the scope of the 407 East
EA does not include a plan to address
development of a plan for emergency closure and
detour routes. Such a plan could include the
provision of appropriate detour signage, the
identification of emergency detour routes, and the
upgrading of the roads on the identified detour
routes by MTO. This should be included as an
imolementation recommendation in the EA stud
The Municipality may choose
to pursue this issue outside
the EA process.
be
not
the
The provision of emergency services is
responsibility of the regional and local
municipalities and as such, the Ministry wi
providing funding.
Funding for Emergency Services
The Municipality is concerned with potential cost
impacts related to the need for Emergency
Services to respond to accidents on the 407
Mainline and East Link. The Municipality could
incur additional costs for equipment, fire stations
and staff time and training. A recommendation to
address these concerns should be oart of the EA
Q)
l\)
U1
Response accepted
See Section 2.0 of Report.
The 407 project team continues to work with
Clarington and OPG staff in an effort to ensure
that the property requirements for the Highway
401 and East Durham Link interchange are kept
to a minimum.
Clarington Energy Park
Approximately 20 ha of developable land will be
removed form the Energy Park by the Courtice
Road interchange and reinstatement of the South
Service Road. The Municipality requests that
MTO work with Municipal staff in optimizing the
location of the South Service Road and its
stormwater management ponds to have as little
impact on the developable land within the Energy
Park as possible,
Response accepted
The 407 project team is aware of the need to
consider several issues unique to farm properties
during the appraisal process. Our Property
Section has been alerted to these requirements
Compensation For Farm Business Losses
During Appraisal
The fair market value property appraisals for
agricultural lands typically do not include
compensation for the farmers' business loss; this
aspect should be addressed. In addition, for all
agricultural owned and rented properties, farmers
are now planning up to 3 years in advance, The
timing of the implementation will play into
potential business losses that need to be
addressed as part of the overall compensation
package. -
ex>
I'\)
en
Response accepted
The ministry recognizes the need to develop an
implementation strategy, which includes details
such as timing, staging and construction scope.
The EA documentation will highlight possible
scenarios for implementation and phasing.
Need for Co-ordinated Phasing/Staging Plan
During Construction
The magnitude of constructing the 407 Mainline
and two highway links in a single stage and in a
compressed time frame will require a well -
coordinated phasing/staging approach to
minimize construction impacts on both he
Regional and local road network in Clarington.
MTO should develop a construction staging
committee with local and regional representatives
and technical advisers to ensure that construction
impacts are mitigated. This should be included
as an implementation recommendation in the EA
studv.
Report.
Response accepted
See Section 8.0 of
The ministry continues to work with regional and
municipal staff as well as various stakeholder
groups in an effort to mitigate impacts form the
highway. Enhancement opportunities for some
remnant parcels, where feasible, will be
considered. The ministry has recently completed
the Community Value Plan (CVP) Process, which
identified opportunities for enhancements.
Social and Environmental Impacts
The construction and operation of the 407
Mainline and the East Link will have a significant
effect on many aspects of life in the Clarington
community, including the integrity of its natural
heritage system, its social and community fabric,
and the viability of many businesses, including
agriculture. MTO is urged to identify and
implement initiatives to not only mitigate the
impact of the two highways on the community, but
also to investigate potential enhancement
opportunities related to the highways, such as the
use of remnant oarcels.
CD
I\)
--...]
MEMO
Attachment 3
To Report PSD-033-09
\,"''''~
DILLON
CONSULTING
TO:
Leslie Benson
Faye Langmaid
Janice Szwarz
Municipality of Clarington
Municipality of Clarington
Municipality of Clarington
FROM:
Brent Hooton
Dillon Consulting
CC:
Paul Acquaah
Dillon Consulting
DATE:
March 24, 2009
SUBJECT: Highway 407 East Extension EA - Liberty Street Interchange
OUR FILE: 08-1219
This memo has been prepared to document the findings of our review as to the need and feasibility of an
interchange on the Highway 407 East Extension at Liberty Street, in the Municipality of Clarington.
As part of our analysis, we have reviewed documentation and data used in the Highway 407 EA, as
provided by AECOM. This documentation includes:
· Design drawings of the preferred alignment
· Road link volumes generated for the 2031 horizon year using the EMME/2 transportation model
(including Highway 407 mainline and interchange volumes and projected traffic on other arterial
and collector roads in Clarington)
· Lane capacity and number of lanes assumed in modeling exercise
· 2031 land use assumptions (population; number of employees)
The EA recommended design includes interchanges at Regional Road 57 (RR 57) and at the Darlington-
Clarke Townline only. Liberty Street would be a simple grade separation with no direct connection to
Highway 407. There is also an interchange on the Durham East Link at Highway 2, and a partial
interchange at Taunton Road (access to and from the south only). Traffic generated in the Bowmanville
area will predominantly be served by the RR 57 and Highway 2 interchanges, as opposed to either the
Taunton Road partial interchange or the Darlington-Clarke Townline interchange. The Taunton Road
partial interchange only serves traffic bound to/from Highway 401, and Bowmanville traffic has other,
more direct routes to access Highway 401. The Darlington-Clark Townline interchange would be too
indirect to serve Bowmanville traffic in the predominant direction (i.e., traffic bound to/from the west).
Volume and Capacity Considerations
Major Approach Routes
The results of the transportation model undertaken for the EA were reviewed to determine whether an
interchange at Liberty Street would be necessary or beneficial from a road capacity perspective. The
model results suggest that the current EA-recommended design would result in a concentration of traffic
on the approach routes to the two interchanges serving Bowmanville traffic, particularly the RR 57
interchange.
235 Yorkland Boulevard, Suite 800, Toronto, Ontario, M2J 4Y8 - Phone (416) 229-4646 - Fax (416) 229-4692 828
Highway 407 East Extension EA - Liberty Street Interchange
March 24, 2009
Page 2
The 2031 horizon AM peak hour model projected significant traffic demand from the Bowmanville urban
area to westbound Highway 407:
· 1,025 trips via the RR 57 interchange; and
· 650 trips via the Highway 2 interchange on the East Link.
This traffic leads to capacity concerns on roads approaching those interchanges. Both RR 57 and
Highway 2 are modeled to be operating at or above capacity in the sections approaching Highway 407:
· RR 57 is projected to attract more than 1,050 vehicles (peak direction) on the section approaching
Highway 407, compared to a modeled capacity of 1,000 vehicles per direction. (As discussed
below, high volumes of turning traffic may have the effect of reducing the capacity of RR 57
below this level, which would further aggravate capacity issues.)
· Highway 2 is projected to attract 850 to 900 vehicles per hour per lane on the entire section from
the Bowmanville CBD to the East Link, compared to a modeled capacity of 900 vehicles per hour
per lane.
In addition, the loop on-ramp from RR 57 to Highway 407 is projected to operate at high volumes (more
than 1,000 vehicles per hour); the high volume of low-speed loop ramp traffic could lead to merging
issues on the mainline.
The EMME/2 transportation model is capacity constrained; when assigning traffic through the network, it
takes roadway capacity into account. It is possible that the actual demand approaching Highway 407 may
be higher, because the modeled demand is constrained by capacity limitations (i.e., both approach routes
are modeled to be at capacity, or at a planning LOS F).
Further, it is likely that demand on RR 57 would be higher, because the modeled volume does not appear
to include traffic generated by the proposed Highway 407 transitway. There is a station shown at RR 57,
with a park-and-ride lot. Although the number of spaces has not been specified, there is a large area (at
least 4.5 to 5.0 ha) allocated for parking, which would accommodate more than 1,000 spaces depending
on the ultimate configuration. If park-and-ride traffic is in addition to the modeled volumes, there is
potential for significantly higher traffic demands on RR 57.
It is noted that the model used in the EA traffic projections assumed that the Highway 407 extension
would be unto lied. The province announced in January 2009 that, although the province would maintain
control over the extension, tolls would still be applied (although the rates were not specified). Depending
on the ultimate toll rates, the volumes modeled on the highway may be overstated to some extent, which
in turn could overstate traffic on the approach routes.
Other East-West Routes
The attached exhibits illustrate the population and employment forecasts applied in the Highway 407 EA
traffic model. Exhibit 1 illustrates the projected growth between 2006 and 2031; Exhibit 2 illustrates the
ultimate forecasted 2031 population and employment levels. These exhibits illustrate that access to
Highway 407 from Bowmanville is unbalanced, in that both of the two interchanges that would serve
Bowmanville traffic (i.e., RR 57; Highway 2) are located in the west end ofthe Bowmanville urban area.
Since most of the Bowmanville urban area is situated east ofRR 57 (particularly in the north), most 407-
bound traffic will need to travel west to RR 57. The EMME model indicates significant volumes on east-
west arterial and collector roads bound for RR 57, including Taunton Road, the 3rd and 4th concessions,
829
Highway 407 East Extension EA - Liberty Street Interchange
March 24, 2009
Page 3
and Longworth Avenue / Scugog Lane. Some of these roads are less suited for this type of regional
traffic due to geometric conditions, road classification, or roadside environment (e.g. residential areas).
These east-west volumes will also lead to higher turning movement demands at intersections that would
decrease the capacity of RR 57 and lead to poorer intersection operations. This in turn could lead to
increased infiltration through residential neighbourhoods as motorists seek alternate routes to RR 57.
Liberty Street is more centrally located within Bowmanville, and therefore has potential to intercept a
significant proportion of trips that otherwise would need to be concentrated on RR 57 and the approach
routes to RR 57. If an interchange is provided at Liberty Street, there will be less east-west traffic
pressure and consequently lower turning movement requirements at intersections along the RR 57 and
Liberty Street corridors.
Network Considerations / Interchange Spacing
The EA-recommended design results in an interchange spacing of approximately 6.5 km between the RR
57 and Darlington-Clarke Townline interchanges. A Liberty Street interchange would be located
approximately 2.5 km east of the RR 57 interchange and 4.0 kIn west of the Darlington-Clarke Townline
interchange.
The MTO's Geometric Design Standards for Ontario Highways (GDSOH) recommends that, "as a
general guide in rural areas, interchanges are normally spaced at between 3 km and 8 km." With an
interchange at Liberty Street, the interchange spacing would be slightly below this level. However, the
GDSOH also notes that "the precise location depends on the particular needs of the community," and that
"interchanges should be located at arterial roads recognized as major components in the road system,
having good continuity and a capability for expansion if required." Liberty Street is identified as a Type
B Arterial in the Clarington Official Plan in which it has been planned to connect to Highway 407. In
addition, Liberty Street is a Regional Road, and is the only north-south Regional Road not to be afforded
an interchange with the Highway 407 East Extension (with the exception of Ritson Road, where there are
conflicts with the Simcoe Street interchange 1.3 km to the west).
Summary
Based on our review of the current Highway 407 transportation model and the future planned land use
and road network, we recommend that the Municipality of Clarington ask MTO to reconsider an
interchange at Liberty Street. The interchange can be accommodated while still maintaining appropriate
interchange spacing, and is important from a network connectivity perspective. It would help disperse
projected traffic volumes on the approach routes to Highway 407 in the Bowmanville area, lead to lower
traffic pressure on lower-order east-west roadways, and alleviate high intersection turning movements
along the RR 57 and Liberty Street corridors.
As stated earlier, our recommendation for the provision of an interchange at Liberty Street is based on the
most current data provided to us by the Highway 407 EA team which does not take into account the
tolling scenario. Whether the interchange is warranted under a tolling scenario would be entirely
dependant upon an analysis of an updated transportation model based on the most probable tolling
scenario, which at this point is unknown. No further modeling is expected to be carried out by the MTO
prior to the filing of the ESR.
830
"
."
." '"
'" il! il! il! i
, ' i I I
J l
! - .J
- ,
- il! "
il! , f ."
il! '"
t' il! z ." I il! s
! M il! '" J ;i
t J 8
,
~ - - - ,
, , 11 "
z , ,
* 'il! il! , , , il! Il
'" "j , il! i I , I J il! il!
, , , \ z , .. ,) , f
' ' , ' , ~ ,
,
t . . I " ,
:I, ~lonAd5
, il! il! "
e I , ,
il! ."
! il!' , I , '"
j I
~
am ,
ConcoooIon Ad ~
, " ,
~ ." .'
'"
, I
.
"
.. - -
I, j ..,
, '"
" , S
. ,
, , ,
, .. "
.. , , ._~.
L , ,
,
0.....: -.. : ... , -
~ ,;l~ -
'. , ,
,.
----.... . ..
". ~ -
- - - - - - - -
Exhibit 1 .'ProJected Population and Employment Growth Between 2006 and 2031 It~
Population and Employment Data Used In 407 EA Transportation Model 8
NO,OOO
Legend - -
0 _1.5 3 4.5
. R88klenUaI Growth' CJ TIS (Transportation Tomorrow Survey) Zones 1) 1 Dot"_"'10__
Employment Growth' Dota Source MTO 4111 EA PnI)1t<t roam
Urban Me Crootod By SFG
Proposed 407 Alignment ? CI1Icbd By: BH
WII8rbody CD c.._ 1.1_ 23. 200t
SecondIllY Roads 0.._:_25,2OOt
FlIo Polh: 1:\O/8\OlI121'-~'
- Highway DIU..oN MaPlJlftlfl'rojodod CIonrvm Population
CD ond EJllIlIoymonIGrawlhID 2031..-.<1
W
-'-
.'
.
.
.
.
_1.5
111 Dot ",preserca 10 Inslances
Dm _ MTO 407 fA Projoct Teem
C-ted By SFG
-& CI1oc:II2d By; BH
~ Dole ero..ct _ 23. 2llO9
Dale __. _ 25. 2llO9
Fie P8lIl: 1:\G1S\081219. CIalingtoII\
DIU..oN Moppong\PnlJo<lod CIoring!on 2031
. " PojUatIcn.,d Em~mJd
.
. " :..
. . . ,
~ 'j '. :. . !
I : J ._ ..... . .~.:.
. ':It' . .
- ~.~. ~ : - --:".
.,: ~ - . i" -; - rI'
.Vl:;: ..... '. i\! "
" I" . . .. . a:
;9" . .' . .' .1 II 11
., ". . . " . I lS
. . . . .
- ; . :~ . '.' .: :'.' ~ ~ ' . -: ,.
," I.. I.. "~., '. !
. : , . . .
., "'.. . j' .' 'i\! i. . i .
. .' I it. .. I I. z
. . '.. .. . :f~ . I I,
I. . I,' oil(
_ :. . ... '., . i .. I
, . ~ . .
...
J
~
:~
~
... .
.. I!
'-- . .'
- - "'-... - - .
Exhibit 2 . 2031 Total Population and Employment. Clarlngton
Population and Employment Data Used in 407 EA Transportation Model
Legend
· ResIdential' 0 TIS (TransportlltJon Tornonow SlI'Vey) Zones
Employment' Urban Area
Proposed 407 AJ1gnment WBlerbody
Secondlll}' Roads
- HIghway
CD
W
I\)
.
~
Ii! I
I . .
- ,.Ji!IlIIl
i\! .'
K Ii!
I.
.'
'..
.
.
Ii! 'i\! i\! ill.
'f .J I f
.
.
~Rd5 . .
. . .
Ii! <it Ii! .
f . i. . , I'. .
! '. .
.' . .
COncesslonJld4 .
Ii!
I
. :
~ --
. Ii! .
:. 8 .
.
. . ~
. .' '.
" . ..'
,
..
"
.
ill .'
j
.
'.
-;
o
:::0
<1>
-0
o
:::l-
"1J~
(J)-
o~
I :J'"
03
~<1>
I ::l
0-
(O~
Add a photographic documentation of the vista from the
residence, the barn and the two outbuildings to proposed
landscape screenin rior to construction of the hiahwa
Add a photographic documentation of the vista from the
residence, the barn and the two outbuildings to proposed
landscape screenin rior to construction of the hiahwa
Add a photographic documentation of the vista from the
residence, the barn and the outbuilding to the proposed
landscape screenin rior to construction of the hiahwa
history of
the property and add to
the
Add the incorporation of the residence into the
transitway station to CHER * option (as discussed with
MTO and AECOM at the Community Value Plan
workshops #2 & #3
Add a photographic documentation of the vista from
residence to proposed landscape screening prior to
construction of the hiahwa
Add a photographic documentation of the vista
residence and the barn to proposed landscape
screenin rior to construction of the hiahwa
Document the pioneer
CHER * option
CHER * not required
LARINGTON COMMENTS
Displacement
Displacement
Disruption
Disruption
Disruption
Disruption
Disruption
Primary List
Primary List
Secondary
List
Designated
Secondary
List
Secondary
List
Secondary
List
CHER Cultural Heritage Evaluation Report
H750
H079
H742
H113
H157
H752
H747
CM-34
CM-38
CM-39
CM-40
EM-06
EM-10
EM-03
EM-05
5415 Solina Road
2265 Concession
Road 6
1731 Concession
Road 6
1520 Concession
Road 6
2064 Taunton
Road
5649 Rundle
Road
5495 Enfield
Road
6325 Enfield
Road
*
CD
W
W
Add a photographic documentation of the vista from the
residence to proposed landscape screening prior to
construction of the hiahwa
Disruption
Secondary
List
H166
EM-18
5561 Liberty
Street N. (house)
the
to
the vista from
screening Prior
Add a photographic documentation of
barn to proposed landscape
construction of the hiahw,
Disruption
Secondary
List
H166
EM-19
5561 Liberty
Street N. (barn)
Add relocation of residence and disassembly and
relocation of barn to CHER * option
Displacement
Primary List
H068
EM-21
5658 Bethesda
Road
5531 Bethesda
Road
option
*
relocation of residence to CHER
Add
Displacement
Primary List
H043
EM-23
EM
5681 Acres
Road
Add relocation of residence to CHER * option
Add a photographic documentation of the vista from the
residence, barn 1, barn 2 and the two outbuildings to
proposed landscape screening prior to construction of
the hiahwa
Displacement
Disruption
Primary List
Primary List
H111
H034
-25
EM-28
3478 Darlington-
Clarke Townline
Road
the
Add a photographic documentation of the vista from
cemetery to proposed landscape screening prior to
construction of the hiahwa
EM-34
the
Add a photographic documentation of the vista from
residence and the barn to proposed landscape
screening prior to construction of the highway
Disruption
Secondary
List
H751
EM-36
3260
Concession
Road 7
Add a photographic documentation of the vista from the
residence, the three barns and the three outbuildings to
proposed landscape screening prior to construction of
the hiahwa
Disruption
Secondary
List
H741
EM-39
Road
Best
7421
Heritage Evaluation Report
CHER Cultura
*
ex>
w
+=-
Agree with CHER * option
Disruption
Heritage
Merit List
H740
H754
EM-40
EM-41
7420 Highway
35/115
7500 Highway
35/115
relocation of residence to CHER * option
Add
Displacement
Primary List
the
Disruption
Designated
H352
EM-42
7086 Kirby
Schoolhouse
the
Add a photographic documentation of the vista from
residence to proposed landscape screening prior to
construction of the hiohwa
Disruption
Heritage
Merit List
H746
EDL-02
2090 Taunton
Road
CHER * not required
Document the pioneer history of the property and add to
CHER * option. The residence should be investigated
as it may be a log home. The barn should be
disassembled and relocated.
Displacement
Secondary
List
H743
EDL-04
EDL-05
2021 Taunton
Road
4825 Rundle
Road/2070
Taunton Road
the
Add a photographic documentation of the vista from
residence and the barn to proposed landscape
screenin rior to construction of the hiohwa
Disruption
Secondary
List
H095
EDL-07
4573 Rundle
Road
option
*
Agree with CHER
Disruption
Heritage
Merit List
H744
EDL-08
4318 Rundle
Road
not reqUired
*
CHER
EDL-12
Lot 24,
Concession 3
(former farm
complex
* CHER Cultural Heritage Evaluation Report
en
w
(J1
the
Add a photographic documentation of the vista from
residence and the barn to proposed landscape
screenin rior to construction of the hiahwa
Disruption
Heritage
Merit List
H745
EDL-14
3242 Solina Road
not required
*
CHER
EDL-15
option
*
Agree with CHER
Disruption
Heritage
Merit List
H748
EDL-17
2799 Hancock
Road
not reqUIred
*
CHER
EDL-19
the
tion
Add a photographic documentation of the vista from
residence and the barn to proposed landscape
screenin rior to construction of the hiahwa
o
*
Add relocation of residence to CHER
Displacement
Disruption
nated
Secondary
List
Des
H116
H749
EDL-23
EDL-24
Street
1400 Solina Road
1909 Sloor
Add a photographic documentation of the vista from the
residence to proposed landscape screening prior to
construction of the hiahwa
Disruption
Primary List
H072
EDL-27
255 Osbourne
Road
Add to proposed landscape screening, a photographic
documentation of the vista from the residence and the
barn rior to construction of the hiahwa
Disruption
Primary List
Heritage Evaluation Report
H066
EDL-28
1719 Darlington
Park Road
CHER Cultura
*
CD
w
m
C[![mgtnn
REPORT
PLANNING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Report #: PSD-034-09
File #: PLN 19.3.2
By-law #:
Subject:
SELECTION OF MEMBERS OF THE CLARINGTON TASK FORCE ON
ATTRACTING HIGHER EDUCATION FACILITIES TO CLARINGTON
RECOMMENDA TIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report PSD-034-09 be received; and
2. THAT Council provide direction on the selection of candidates to sit on the Clarington
Task Force On Attracting Higher Education Facilities To Clarington.
Submitted by:
D i J. Crome, MCIP, RPP
Director of Planning Services
Reviewed by: (j~ ~
Franklin Wu,
Chief Administrative Officer
DJC/df/sc
24 March 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-0830
837
REPORT NO.: PSD-034-09
PAGE 2
1. On March 2, 2009, Council approved the establishment of a Task Force on Attracting
Higher Education Facilities to Clarington (Attachment 1). In accordance with the terms
of reference, the Task Force members are to be appointed by Council.
2. The attached potential list of members was consolidated from the following:
. Potential members identified by staff;
. Potential members identified by Members of Councilor the Board of Trade; and
. Candidates who responded to the notice in the Newspaper.
3. Most of the potential members have been identified by staff on the basis on some
knowledge of those persons who could significantly contribute to the Task Force's
mandate. They were not identified on the basis of an expression of interest. I do not
know if they would be willing to serve in this capacity.
4. Council can select up to 6 candidates to be invited to sit on the Task Force.
5. Information on the candidates is included in confidential Attachment 2. Given that the
list of candidates was compiled from various sources and not from applications, the
amount of information on some candidates is limited whereas other candidates have
more information available on the internet or through other sources.
Attachments:
Attachment 1 - Terms of Reference
Attachment 2 - Information on Candidates (Confidential)
838
ATTACHMENT 1
TO REPORT PSD-034-09
Terms of Reference
Clarington Task Force on Attracting
Higher Education Facilities to Clarington
MANDATE
To assist Council in attracting higher education facilities to the Municipality of Clarington
with particular attention to supporting the Energy and Science Park initiatives. The
potential candidate institutions are Durham College, the University of Ontario Institute of
Technology (UOIT), and Trent University; however there may be other institutions that
are either considering a satellite campus or have programs related to Clarington's
emerging training needs.
The work of the Task Force will also seek to support Clarington's objective to be
recognized as a Provincially Significant Employment Area. The Task Force will be
cognizant of recommendations to the Province to make Ontario a leader in the Creative
Age.
TASK FORCE MEMBERSHIP
The Task Force will be comprised of up to six (6) community members appointed by
Council with input from individual members of Council and the Clarington Board of
Trade. The community members will be sufficiently knowledgeable about the mission
and strategic objectives of higher education facilities, the training needs for existing and
anticipated businesses in Clarington, the changing Ontario economy and work being
done by groups such as the Institute for Competitiveness and Prosperity or the Martin
Prosperity Institute. Task Force members should be influential inside and outside of the
community. The composition of the Task Force should represent a variety of interests.
The Mayor will be an ex-officio member of the Task Force.
The Director of Planning Services is the municipal staff liaison for the Task Force.
PROCESS
The Task Force will look at the various options of attracting a satellite campus of a
higher education facility.
Clarington Task Force on Attracting Higher Education Facilities
3
839
The Task Force will:
. review the needs and requirements identified by the Durham College/ UOIT
Campus Planning Study and any similar studies or strategic plans available
from Trent University, etc.;
. undertake appropriate consultation with key stakeholders in Clarington
regarding their labour force and training needs, particularly Ontario Power
Generation, with a view towards identifying which education opportunities
could best be served from a satellite facility;
. review with executive members of the institutions their current plans and
the potential opportunities to meet their mission with satellite facilities or
private/institutional partnerships;
. identify opportunities within Clarington for satellite facilities and/or training
space in conjunction with business;
. advise the Mayor and Council on strategic actions that should be
considered;
· prepare an interim report to the Municipality within 6 months on their
findings that could be the basis for discussions with the higher education
institutions;
· undertake additional actions as determined by Council to influence the
investment decisions for higher education facilities and services; and
. deliver a final report within one year.
It is understood that in order to meet its mandate the Task Force will need to
be flexible and adjust to changing circumstances.
MEETINGS
The Task Force will meet at a convenient location and time for the members.
ROLES
The Chair
The Chair of the Task Force will be selected by members of the Task Force and
will:
. facilitate the meetings;
· be responsible to ensure that the task force meets its mandate;
· be responsible to author any report of the task force with the assistance of
other Task Force members;
· be responsible for arranging and leading key meetings with the institutions
and senior levels of government; and
· report to Council as appropriate and determined by the Task Force.
Clarington Task Force on Attracting Higher Education Facilities
4
840
Members
All Members of the Task Force will:
· report any conflict of interest issues prior to decision making;
· operate in a consensus mode, allowing members to discuss their
respective views and opinions and to listen to others;
· will review all documents, agendas and minutes presented to them to make
informed decisions;
· not release or use any confidential information obtained through
discussions or other information provided to the Task Force;
· participate in the writing of any report or other tasks as determined through
the meetings; and
· uphold the mandate of the Task Force.
Municipal Staff Liaison
The staff liaison will assist with any research and municipal planning information
that would be helpful to the Task Force.
Mayor's Office
The Mayor's Office will be responsible for all administrative arrangements and
meeting minutes.
Clarington Task Force on Attracting Higher Education Facilities
5
841
Cl~mgtDn
REPORT
PLANNING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Report #: PSD-035-09
File #: PLN 39.1
By-law #:
Subject:
DURHAM REGION SUSTAINABILlTY FORUM APRIL 17, 2009
RECOMMENDA TIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report PSD-035-09 be received for information.
SUbmitted~
. . avid J. . r e, M ,np.
Director of Planning Services
Reviewed bY:O~~
Franklin Wu,
Chief Administrative Officer
DJC/df
25 March 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-0830
842
REPORT NO.: PSD-035-09
PAGE 2
1.0 BACKGROUND
1.1 The Ontario Centre for Environmental Technology Advancement (OCETA) is a private,
not-for-profit corporation that supports the commercialization and market acceptance of
innovative technologies and environmentally sustainable solutions through stakeholder
consultation and the provision of business and technical services.
The Durham Sustainability Stewardship Program is being delivered by OCET A in
partnership with Durham Sustain Ability and the Canadian Centre for Pollution
Responsibility from 2008-2011, with funding support from the Ontario Trillium
Foundation. Among other outreach activities, the program includes delivery of eight
Stakeholders Sustainability Forums, one in each municipality in Durham Region. The
forums will aim to create awareness on Sustainable Production &
Consumption/Pollution Prevention principles and how these principles and tools can be
applied daily, both at work and home. The forums will also provide opportunities for
stakeholders to build partnerships, share local environmental initiatives, best practices,
and showcase achievements of local environmental stewards from all sectors in
Durham and other GTA communities. Local community members will also gain
knowledge on what local businesses are doing in efforts to optimize their manufacturing
processes to reduce pollution.
To date, Sustainability Forums have been held in Oshawa and Ajax. The Municipality of
Clarington has been asked to host the third forum. The Green Community Advisory
Committee will be hosting the third forum on April 17th.
The tentative outline for the program is attached.
Attachments:
Attachment 1 - Durham Region Stakeholders Sustainability Forum Tentative Program
843
.LJUlllaJ.ll ,",U1)Li:1111UUllH,Y .:nC;Wi1lU::S1UP r lUl:;lQJJ.l - rUJ.WIl~
Home Contact Us
Sustainauility
Forums
FOlUm Archive &
Prevflt,ltlollS
Environlllent<11
Education
Resources & Links
DSSP Advisory
Panel
~
Cont.'1ct OCETA
~
OCETA gratefully acknowledges the
financial support of the
Ontano Trillium Foundation
for the
Durllam Sustainability
Stewardship Program
~UCl\'III' lttlll I
To Report PSD-035-09
OCET A ~ www.oceta.on.ca
DtJ ,.
S~
.1 ~ I
..' I
Slr III II: II L
P. 6.oJf
Durham Region Stakeholders Sustainability Forum
OCETA, the Canadian Centre for Pollution Prevention (C2P2), and Dumam Sustain
Ability (DSA) are working together with local partners in the Municipality of Clarington to
present "Reducing Environmental Footprint In Durham Region" - the third
stakeholders Sustalnability Forum of the Durflam Sustalnability Stewardship Program
(DSSP).
Dat&: Friday, April 17th, 2009
Location: Municipality ofClarlngton Town Hall Council Chambers (tentative)
40 Temperance Street, Bowmanvllle, ON L 1C 3A6
( Google Map )
Draft Agenda coming soon...
While the Forum is complimentary, pre-registration Is required.
REGISTER ONLINE HERE
Clarington Mayor Jim Abemethy will provide welcoming remarks at the
Forum and an exciting program of speakers and presentations is being
finalized.
Tentative topics include:
. HIGHUGHTS OF ONTARIO'S RECENT CLEAN TECHNOLOGY REPORT
Kevin Jones. President & CEO, OCETA
· CUMA TE CHANGE AND ITS IMPACTS TO PLANNING & DEVELOPMENT IN
DURHAM REGION
Doug Undeblom. Economic Development, Regional Municipality of Durham
. CLARlNGTON"S VISION FOR ENERGY BUSINESS PARK
David Crome. Director of Planning Services, Municipality of C/arington
. UVING GREEN INmA nves - COMMUNITY ADVISORY COMMITTEE
Amy Burka, Living Green Community Advisory Committee
· REDUCING YOUR ENVIRONMENTAL FOOTPRINT - PRACTICAL INSIGHTS
http://www.oceta.on.ca/DSSP/forums.htm
844
3/25/200Y
Durham Sustainability Stewardship Program - Forums
Page 2 of2
THE ONTARIO
TRILLIUM
FOUNDATION
*
~
LA FONDATION
TRILLIUM
DE L'ONTARIO
Bruce Taylor. Enviro-Stewards
Who Should Attend?
Stakeholder groups from across Durham Region and surrounding Greater Toronto Area
Regions induding Business owners Qncluding SMEs), Regional and Municipal
government authorities, Institutions (school boards), Youth, Environmental Educators,
and Non-profit Organizations are Invited to attend this forum.
Forum Sponsor:
The purpose of the Forum Is to provide a venue for stakeholders to discuss and share
infonnation on opportunities and initiatives that support environmental sustainability
within the Region/and surrounding GT A convnunities while strengthening partnerships
across Durham Region Communities.
Clar1ngtDn
Municipality of Clarington
Participants will leave this Forum with new ideas, a means to address challenging
environmental issues through local partnerships and motivated to take action to help
protect the environment.
Contact us for more infonnation.
Background:
The Durham Sustainability Stewardship Program (DSSP) is being delivered by OCETA In
partnership with DSA and C2P2 from 2008-2011, with funding support from the Ontario
Trillium Foundation. Among other outreach activities, the program Includes delivery of
eight Stakeholders Sustain ability Forums, one in each municipality in Durham Region.
The forums will aim to create awareness on Sustainable Production &
ConsumptionIPollution Prevention principles and how these principles and tools can be
applied daily, both at worX and home. The forums will also provide opportunities for
stakeholders to build partnerships, share local environmental initiatives, best practices,
and showcase achievements of local environmental stewards from all sectors in Durham
and other GTA communities. Local community members will also gain knowledge on
what local businesses are doing in efforts to optimize their manufacturing processes to
reduce pollution.
This Durham Region Stakeholders Sustainability Forum has
been made possible by the financial contribution of the
Ontario Trillium Foundation.
OCET A gratefully acknowledges the support of the Munlclpellty of Clarlngton for their
sponsorship of the third DSSP Stakeholders Forum.
The Durham Sustainabllity Stewardship Program is a collaborative among
GCA_onc-
, '~.~,~~
OCETA~
Partnelill9 fOI d Su~tajnable I uture
~A
C 2009 aCETA
Disclaimer
http://www.oceta.on.ca/DSSP/forums.htm
845
3/25/2009
CliJ!.-ilJgtDn
REPORT
ENGINEERING SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday March 30, 2009
Report #: EGD-008-09
File #
By-law #
Subject:
NASH ROAD RECONSTRUCTION - PUBLIC INFORMATION CENTRE
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report EGD-008-09 be received;
2. THAT Staff is proceeding to finalize the detail design and tender based on the
information received at the Public Information Centre to meet the spring/summer 2009
construction start schedule; and
3. THAT all those who attended the Public Information Centre and who have contacted the
Municipality as interested parties be informed of this report.
Respectfully by,
//)
~/?uLL
(J ht~ e~DC
Reviewed by: Franklin Wu
Chief Administrative Officer
Submitted by: A. S. Cannella, C.E.T.
Director of Engineering Services
ASC/BMB/dv
March 12, 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
901
REPORT NO.: EGO-008-09
PAGE 2
1.0 BACKGROUND
Nash Road is classified as a Type B Arterial Road in the Clarington Official Plan and
is identified in the Municipalities development charge by-law. The section of
roadway between Courtice Road and Harry Gay Drive serves existing residents,
commuter traffic, and new development in the area. The Municipality of Clarington
will be urbanizing this section of road and the Region of Durham will be installing a
nominal amount of Regional infrastructure with the limits of the project. A portion of
the road has recently been excavated and reinstated due to the installation of
sewers to support the Hancock Neighbourhood. Through the proposed
reconstruction, attempts will be made to utilize the majority of the work previously
completed thereby taking advantage of earlier efforts by the developer. The
proposed reconstruction limits are shown in Attachment #1.
2.0 APPROACH
To assess suitable construction measures of the project and to obtain local residents
input to the design process, a joint Public Information Centre was held to present the
project proposal. The public was notified of the meeting by newspaper
advertisement, the Municipality's information board and website, and through
circulation notices to those who are directly affected by the proposed works.
3.0 INFORMATION CENTRE
A Public Information Centre (PIC) was held on February 24, 2009 at the Courtice
Community Centre. At the meeting the following documentation and plans were
presented for discussion:
· Existing road condition base plans, showing proposed road works with aerial
photography as a background for both Clarington and the Regional works;
· A typical road sections for the urban design;
· Photographs of existing pavement structure and residential entrances;
902
REPORT NO.: EGD-008-09
PAGE 3
.
The proposed landscape plans for Nash Road;
The future alignment for the extension of Nash Road from Harry Gay Drive to
Hancock Road;
The full set of preliminary engineering drawings;
An artist's rendition of the final product;
A Tree Assessment Report and Geotechnical Report was available for reading.
.
The register and comment sheets are on file with the Engineering Services
Department and available for review. Of the five residential properties on the north
side of Nash Road, three property owners appeared at the PIC. The Engineering
Department discussed the needs of the Church property at the Engineering counter
prior to the meeting and also had discussions with an interested resident in the area
following the PIC.
The design proposal presented was generally well received with concerns
expressed relating to drainage. Others were merely in attendance as interested
observers satisfied with the works proposed.
The concerns with respect to the drainage where generally associated to
connections of existing sump pumps and the overall grading and drainage of the
area. As such the design team is now proposing additional catch basins to resolve
the issues and comments made by the public. The Municipality had already allowed
for sump pump connection through the design process and will also be providing the
Church property with a storm sewer connection to property line should they decide
to re-grade and pave the parking area in the future.
903
REPORT NO.: EGO-008-09
PAGE 4
5.0 DISCUSSION
As a result of the Public Information Centre and counter discussions, detailed design
will be finalized and design drawings and tender documents will be prepared for the
project to target an early spring tender call. This will allow Council the opportunity to
consider the project for a construction in spring of 2009.
Attachments:
Attachment NO.1 - Site Map (Nash Road.)
Interested parties to be advised of Council's decision:
. Attendees of PIC
. Commenting members of the Public through correspondence
904
,-- ;)Klnner .ou
== I I in r---l
, 'f-
i--
~i ~l -~
'\-<1: _ 1-'12-
1---- Q) 0
I"'-~ --~-
1\ --2 --~
1--' ...J
-
reFtior ltre1et
II I I II
- -/-_./
- ....
-~ ;:::
z:-- .-
:.jf=
f-
~
~hT
_- ~ Nash-Roa-d ( i ~ I
f-- Reconlstructio'n --~ Tabo A'venue
11111 - ,-;~... -~ ~'_. ~-'fl
,~- J \ l ~ ~ 1N"hRo,'
~ /~l;"i
A/t: ~~=
/o~~~
.--' "S>> I I
----- ~rS ~ '--'--'- Re .
-:::-r'->' ~ U ~ I. g'on" Nigh",,, __
~ ~ /.-
,;f/----'~
../""
't:l
co
o
~
.ll:
-g
CJ
f--C
ri
n
1 _L
d
-
f----
::/./
-,/
L-
/ r:.F'--~
/----/ /..
r-
\
",.,.....'~...
,-----::.::-----
~---
I~ 1
llTI=1=~
WE ~~ I L-,---
lB. =~ ~~
== =1==
~
mrrm 1m I1II1
\ffiTIIT II ,1111111
i 11111111111111111 i
i' ,- ,'Ir---' : I Jl ~I I' II
'. .i:~jl . f---;- i----j-"C'- -~ir-L~,J""=-:-----li--'--
:,,,...~CC'-,,=.c..c-0:::'11..... 1--......-. ~+ . . I.' r -c I.. L~.__ -- ..1'
~~~,:,~~BI I ~~I=~~~:----" /ic "--~1 1~^~2:) --'1.r====
-.'.-~.'..~;1":11Jjt~.(!I1X,'0i\\.%,~.lli.t:. =.'.--.........-j....... r=-.. '~:':=. O:::--f=...-.. ..J..-l.,..~....,:L. '..' -.i._... ...'_....._....u,..]l.! li- rr, I
,":,:!EiW<<.Y c~i~!~'-'-rp~1 \__m_,__._ -::J'~-l .-' 0 I ,; '0
-<n;,r,~=I- L'}j~ i-----C) I .. ~Ul" , 0:::------"
.- . IJillI;~~f~c.1~~~~~:l.:-:~~~=-=-~~~c~\ I III -,'--
lC:~., III ~j~~~fr~~~,~bH~JI ' ~I
.....,S\ill..I\l1r;;;'j -. ~- '_'I~~~J:!1trc ,:::J , ::! l.lL."1 F.----ccl -....Il
~"I~~;~~~ ~N~~ti'~~R.:~j!~~r ~V:'.f~.!l{rlTlrdl r-I'". . [=:~~1
J '->_~llf18.!1lliili1''':''''I. as ~ ~1;i,~IDJ:illr:mt. ml .' ..... I R ."1i1: JUlj~L! l,~'~c=~-I.~----Jcc==
i...[..]u.'...'\\.I;.\\I.'ll.r....:..~.F.~.r.~.j.~-... _.[]')'"u , __n..'I. !J.. ...I-.~.'.I.ie.;I~. .... ~.- ..~~.,5.1 fill.'f.-ui [;11 L.. rrrr-rg:::].l..... '.-=:'....... ~.. ._..T---
...,."!~..'..r..',r';~'r.1T-...r'-,J -~.';~~. tJ .'. -.r.r-~. --~ -....~.~:...i\ffi~~v~.<.. ~.'.~.~...Oll 8' ....: ".'. .t,. . ci r. _:,1,. ,_._._m .1IL...:.1]l:"=:1.. r-.:-.,--'
~L,::,,-:;-_-. ~rJI9hl" .---~""p ""Liir1\'S .' FJ''[1 I f==- ----..--'l~_u
''''-:''=-'1 Tf b II - IU_:~::- ~alj., /J ,'~. ;'''c:::. -Ill! I ----~-----=-=.::;: Uf'-
1.111..l' 'JFth I -'-,7'1"~.Tc.<-~"-7iI~~'~~~"'" l . IL.l
'..L...u.-till.l~IHHB~".iini '.-.. ,.,.r ... ..I~IJSt ~~~'~] '. --~c..':'~><_~~ -~.T'-..'~ J
~!&l! . ...JI..~I~.l=i j l.' '.' .... .'. [1- /, I...!" ....' 'I ~~CDv1f ..1__
'3 ., I~~, ,/~!MlM ] I ~- ::
hg~~ii!!~~~C7/ '~t= I l~J KE~ MA~h II
q,
~,
\
//
_/
.-/'"
.'
~~--
-~
/.-/..-,.,.,.
lV
W~E
s
DRAWN BY: E.L.
I DATE: March 6, 2009
REPORT EGO-OOS-09
A TT A C H M ENT N ~~tt~chmentS\NaSh~~con.mxd
q~mgron
REPORT
ENGINEERING SERVICES DEPARTMEN1"
Meeti ng:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Resolution #:
Report #: EGD-011-09
File#:
By-law #:
Subject:
MONTHLY REPORT ON BUILDING PERMIT ACTIVITY FOR FEBRUARY, 20011
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report EGD-011-09 be received for information.
> /--)
/7 ~/ / )
Submitted by: ~/ilt~
A. S. Cannella, C.E.T.
Director of Engineering Services
U'~\
/ ! e
l /... ,
.... . - " /. \
Reviewed by: - "-J"Ll
Franklin Wu
Chief Administrative Officer
ASC*RP*bb
March 11, 2009
CORPORATION OF THE MUNICIPALITY OF CLARIN(
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623
906
REPORT NO.: EGD-011-09
PAGE 2
1. BACKGROUND
1.1 With respect to the Building Permit Activity for the month of FEBRUARY 2009, Staff wish to
highlight the following statistics for the information of Committee and Council.
MONTH OF FEBRUARY
2009 2008 .
BUILDING NUMBER OF VALUE OF NUMBER OF VALUE OF % CHANGE OF
CATEGORY PERMITS CONSTRUCTION PERMITS CONSTRUCTION VALUE 2009-2008
Residential 17 $4,555,280 31 $5,807,839 -21.6%
Industrial 0 $0 0 $0 N/A
Government 0 $0 0 $0 N/A
Commercial 2 $45,000 5 $297,000 -84.8%
Institutional 1 $20,000 1 $17,000 17.6%
Agricultural 1 $111 ,480 2 $218,440 -49.0%
Demolition 0 $0 2 $0 N/A
TOTAL 21 $4,731,760 41 $6,340,279 -25.4%
YEAR TO DATE
2009 2008
BUILDING NUMBER OF VALUE OF NUMBER OF VALUE OF % CHANGE OF
CATEGORY PERMITS CONSTRUCTION PERMITS CONSTRUCTION VALUE 2009-2008
Residential 33 . $6,419,083 84 $16,989,432 -62.2%
Industrial 1 $120,000 0 $0 N/A
Government 0 $0 0 $0 N/A
Commercial 4 $722,447 10 $654,500 10.4%
Institutional 3 $13,737,560 3 $375,000 3,563.3%
Agricultural 2 $151,480 2 $218,440 -30.7%
Demolition 6 $0 4 $0 N/A
TOTAL 49 $21,150,570 103 $18,237,372 16.0%
907
REPORT NO.: EGD-011-09
PAGE 3
1.2 With respect to building permit activities (over $250,000) and large residential building permit
activities, the details are provided as follows:
Owner I Applicant
Construction Type
Location
Value
908
REPORT NO.: EGD-011-09
PAGE 4
The following is a comparison of the types of dwelling units issued for the month of "FEBRUARY"
and "YEAR TO DATE".
D....elling Unit Type "FEBRUARY' 2009
o
Apartment
0%
o
Townhouse
0%
4
Semi-
Detached
29%
10
Single
Detached
71%
C Single Detached 10
. Semi-Detached 4
IiiilTownhouse 0
C Apartment 0
D....elling Unit Type ''YEAR TO DATE 2009"
o
T ownhous
e
0%
4
Semi-
Detached
22%
C Single Detached 14
. Semi-Detached 4
Iiiil Townhouse 0
C Apartment 0
The following is a historical comparison of the building permits issued for the month of
"FEBRUARY and "YEAR TO DATE" for a three year period.
HistoriCBI 0.1. for Monlh of
"FEBRUARY"
$12,000,000
$10,000,000
$8,000,000
$6,000,000
$4,000,000
$2,000,000
$0
2009
2007
2008
III Value $4,731,760 $6,340,279 $10,964,068
Historic.1 0.1. '"YEAR TO DATE"
$25,000,000
$20,000,000
$15,000,000
$1 0,000,000
$5,000,000
$0
2009
2007
2008
~alue $21,150,570 $18,237,372 $16,919,012
909
REPORT NO.: EGD-011-09
PAGE 5
PERMIT REVENUES
2009 2008
February Year to Date February Year to Date
I PERMIT FEES $ 31,591 $ 137,637 $ 45,376 $ 128,695
INSPECTION SERVICES
2009 2008
February Year to Date February Year to Date
Building Inspections 377 701 462 878
Plumbing & Heating Inspections 453 916 421 1,022
Pool Enclosure Inspections 1 4 0 0
TOTAL 831 1,621 883 1,900
NUMBER OF NEW RESIDENTIAL UNITS
2009 2008
February Year to Date February Year to Date
Single Detached 10 14 19 52
Semi-Detached 4 4 6 18
Townhouse 0 0 0 0
Apartments 0 0 0 0
TOTAL 14 18 25 70
910
REPORT NO.: EGD-011-09
PAGE 6
RESIDENTIAL UNITS HISTORICAL COMPARISON
YEAR: 2009
(to end of 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999
AREA February)
Bowmanville 2 340 451 609 307 5117 468 345 312 188 184
Courtice 13 134 82 126 241 1'13 180 133 129 231 296
Newcastle 0 60 77 84 202 1!l1 123 131 76 110 78
Wilmot Creek 0 30 16 15 15 :~5 29 38 24 19 21
Orono 0 2 1 1 1 2 0 1 0 0 1
Darlington 1 10 6 7 14 '15 13 17 47 102 31
Clarke 1 5 11 12 13 '10 16 15 9 17 17
Burketon 0 0 0 0 1 1 1 1 0 1 0
Enfield 0 0 0 0 0 0 0 0 0 0 0
Enniskillen 0 0 0 1 1 1 0 2 5 7 6
Hampton 0 0 1 1 0 0 0 1 1 1 2
Haydon 0 0 0 0 0 0 0 0 0 0 1
Kendal 0 0 1 0 0 1 0 3 2 0 1
Kirby 0 0 0 0 0 0 0 0 0 0 0
leskard 0 0 0 0 0 0 0 1 0 0 1
Maple Grove 0 0 0 0 0 0 1 0 0 0 0
Mitchell Corners 0 0 1 0 0 1 0 0 0 0 0
Newtonville 0 7 2 2 4 5 3 3 0 3 1
Solina 1 0 6 3 3 3 3 1 1 0 0
Tyrone 0 5 0 0 0 0 3 9 3 0 0
TOTALS 18 593 655 861 802 1,0'15 843 701 609 679 640
911
Cl!![.-!ngtnn
REPORT
ENGINEERING SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Resolution #:
Report #: EGD-012-09
File #:
By-law #:
Subject:
TRANSFER OF PART 7, PLAN 10R-645 AND RECIPROCAL ACCESS
EASEMENTS FOR SILVER STREET/HOME HARDWARE PARKING
160 CHURCH STREET
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report EGD-012-09 be received and APPROVED;
2. THAT the agreement in principle, as amended, contained in Attachment 1 be
RATIFIED and APPROVED by the Municipality of Clarington;
3. THAT the Municipality of Clarington accept the transfer of Part 7 on Plan 10R-
645 (673 sq. ft.) for a nominal consideration from Syvan Developments Limited;
4. THAT conditional on Syvan Developments Limited satisfying Recommendation 5,
the Municipality of Clarington grant Syvan Developments Limited an easement in
Easement Area #1 shown on the sketch contained in Attachment 3 to permit
vehicular and pedestrian access to Syvan Developments Limited, its lessees,
licensees, employees, contractors, and members of the public access to and
from Part 10 on Plan 10R-645 to and from Silver Street for a nominal
consideration, subject to the terms set out in section 1.10 of the Report;
5. THAT the Municipality of Clarington accept the transfer by Syvan Developments
Limited of an easement for a nominal consideration, in Easement Area #2 shown
on the sketch contained in Attachment 3 to permit vehicular and pedestrian
access by the Municipality, its employees, contractors, agents, licensees and
members of the public access to and from Parts 1, 2, 4, 5 and 9 on Plan 10R-645
to and from 160 Church Street, subject to the terms set out in section 1.11 of the
Report;
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-9282
912
REPORT NO.: EGD-012-09
PAGE 2
6. THAT Staff and the Municipal Solicitor be authorized to prepare all the necessary
documentation including a reference plan of survey to transfer the land and
easements referred to in this Report;
7. THAT the Mayor and Municipal Clerk be authorized to execute the necessary
documents on behalf of the Municipality of Clarington to permit implementation of
Recommendations 2 to 6, inclusive; and
8. THAT the draft By-law contained in Attachment 4 be PASSED.
Respectfully by,
/J// .~
~"'/C~</ / / .
Ll1;.I'~t"~
Submitted by: A.S. Cannella
Director of Engineering Services
() C-<k<....-iCQ ~ .eel;..
Reviewed by: Franklin Wu
Chief Administrative Officer
ASC/BMB/dv
March 11, 2009
913
REPORT NO.: EGD-012-09
PAGE 3
1.0 BACKGROUND
1.1 The Municipality as set out in the Land Acquisition Strategy of 2000 acquired
properties on the north side of Church Street and east side of Silver Street. The
Municipality has recently finalized a parking lot layout on these properties,
tendered the work and construction is substantially complete.
1.2 The Engineering Services Department made arrangements with the owner of the
Home Hardware site and associated lands (Parts 2, 3, 5, 6, 9 and 10 on Plan
10R-645), Syvan Developments Limited to carry out a coordinated parking lot
development. As part of those arrangements an agreement in principle was
reached to permit reciprocal access (Attachment 1) and payment was received
from Syvan Developments Limited for their portion of the works to implement the
agreement. Mr. Ed Vanhaverbeke is the authorized signing officer of Syvan
Developments Limited.
1.3 The parking lot plan referred to in paragraph 1.7 shows the Easement Areas
(Attachment 3) that would be the subject of the reciprocal exchange.
1.4 The agreement in principle stipulates that Syvan Developments Limited would
transfer to the Municipality of Clarington an easement over Parts 2, 5 and 9 on
Plan 10R-645 (Easement Area #2) for vehicular traffic and access to the
Municipal parking lot. In exchange the Municipality would transfer to Syvan
Development Limited an easement over portions of Parts 1 and 4 on Plan 10R-
645 for the delivery of goods. However, the parking areas shown on the plan
attached to the agreement in principle would not be affected by the exchange of
easements.
1.5 Easement Area #1 (Attachment 3) in which the Municipality would transfer an
access easement to Syvan Developments Limited to permit access to and from
Silver Street to and from Part 10 of Plan 10R-645, is located on portions of Parts
1 and 4 shown on Plan 10R-645.
1.6 Easement Area #2 (Attachment 3) in which Syvan Developments Limited would
transfer an easement to the Municipality to permit access to and from Church
Street to and from Parts 1, 4, 7 and 8 on Plan 10R-645, is located on portions of
Parts 2, 5 and 9 on Plan 10R-645. This easement would be transferred in
exchange for the transfer of the easement referred to in paragraph 1.5.
1.7 Attachment 3 also shows the parking lot layout with the easements referred to in
paragraphs 1.5 and 1.6. The easements will be transferred free and clear of all
encumbrances and for a nominal consideration.
1.8 In addition, Syvan Developments Limited has agreed to transfer Part 7 (673 sq.
ft) of Plan 10R-645 to the Municipality free and clear of all encumbrances for a
nominal consideration. This land forms part of the Municipality's parking lot.
914
REPORT NO.: EGD-012-09
PAGE 4
1.9 The Municipality will be responsible for the co~ts of reconstructing and improving
the municipal parking lot, the accesses referred to above and the cost of
preparation and execution of all legal and Burvey costs associated with the
transfer of Part 7 and the reciprocal easeme,nts. Each property owner will be
responsible for the maintenance of their property with the exception of winter
maintenance on parts 2, 5 and 9 to be completed by the municipality.
1.10 Also, by an amendment to the Agreement ill principle dated March 2, 2009,
(Attachment 1) the easement to be transferred by Syvan Developments Limited
to the Municipality in Easement Area #2 would be non-exclusive and perpetual in
duration. It would be subject to the qualification that Syvan Developments Limited
has the right to terminate the easement in Easement Area #2 if it decides to
redevelop the building located on Part 10. In this case, Syvan Developments
Limited would have the duty to relocate the easement to a new area on Part 9
and/or Part 10, provided that the replacement access driveway to Church Street
is constructed at Syvan Developments Limited's cost, has a width equal to or
greater than the width of the driveway that it replaces, provides access to Parts
1, 4, 7 and 8, and is constructed to the same qualitative standard as the driveway
that it replaces.
1.11 By an amendment to the agreement in principle dated March 2, 2009
(Attachment 1) the easement to be transferred by the Municipality to Syvan
Developments Limited in Easement Area ~t1 would be non-exclusive and
perpetual in duration. It would be subject to the qualification that the Municipality
has the right to terminate the easement in Ea~.ement Area #1 if it decided in the
future to develop Parts 7 and 8, and the portion of Parts 1 and 4 on which the
access driveway is to be located. In this case, the Municipality would have the
duty to relocate Easement Area #1 to a new area on Parts 7 and 8 and/or Parts 1
and 4, provided that the replacement access driveway to Silver Street which is to
be located thereon is constructed at the Municipality's cost, has a width equal to
or greater than the width of the driveway that it replaces, provides access to the
loading facility in Syvan Development Limited's building located on Part 10 via
lands owned by Syvan Developments Limited and is constructed to the same
qualitative standard as the driveway that it replaces.
2.0 CONCLUSION
2.1 The contract for the improvement of the Silver Street/Home Hardware Parking
Lot is now substantially complete and the arrangements made in principle with
Syvan Developments Limited (Ed Vanhaverbeke) should be finalized in
accordance with the recommendations made in this report.
2.2 The Director of Planning Services concurs with this report.
915
REPORT NO.: EGD-012-09
PAGE 5
Attachments:
Attachment 1 -
Attachment 2 -
Attachment 3 -
Attachment 4 -
Letters to Syvan Developments with sign back
Plan 10R-645
Easement Areas #1 and #2
Draft By-law
List of Interested Parties:
916
'-OJ
; \ r- '._"
Cl~-VJgron
March 2, 2009
Syvan Developments Limited
Mr. Edmond Vanhaverbeke
20 Robert St. West, Unit A
Newcastle, ON L 18 1 C6
Dear Mr. Vanhaverbeke:
Re: Shared Silver Street Parking Lot/Home Hardware Parking Lot, Bowmanville
CPR.2008.2
I am writing further to my letter to you dated July 17, 2008 and to confirm our recent
discussion regarding amendments to our agreement in principle expressed in my July
17,2008 letter.
Easement Area #1 is located on portions of Parts 1 and 4 on Plan 10R-645. The
Municipality would transfer an access easement in it to Syvan Developments Limited
("Syvan") to permit access to and from Part 3, 6, and 10 on Plan 1 OR-645 to Silver
Street.
Easement Area #2 is located on portions of Parts 2, 5 and 9 on Plan 10R-645. Syvan
would transfer an easement in it to the Municipality to permit access to and from Church
Street to Parts 1, 4, 7 and 8 on Plan 10R-645.
The easement to be transferred by the Municipality to Syvan in Easement Area #1 would
be non-exclusive and perpetual in duration. It would be subject to the qualification that
Syvan has the right to terminate the easement in Easement Area #2 if it decides to
redevelop the building located on Part 10. In this case, Syvan would have the duty to
relocate the easement to a new area on Part 2, 5, 9 and/or Part 10, provided that the
replacement access driveway to Church Street is constructed at Syvan's cost, has a
width equal to or greater than the width of the driveway that it replaces, provides access
to Parts 1, 4, 7 and 8, and is constructed to the same qualitative standard as the
driveway that it replaces.
The easement to be transferred by Syvan to the Municipality in Easement Area #2 would
be non-exclusive and perpetual in duration. It would be subject to the qualification that
the Municipality has the right to terminate the easement in Easement Area #1 if it
decided in the future to develop Part 7 and 8 and portions of Parts 1 and 4 on which the
access driveway is to be located. In this case, the Municipality would have the duty to
relocate the Easement Area #1 to a new area on Part 7, 8 and/or Part 1 and 4, provided
that the replacement access driveway to Silver Street which is to be located thereon is
constructed at the Municipality's cost, has a width equal to or greater than the width of
the driveway that it replaces, provides access to the loading facility in Syvan's building
located on Part 10 via lands owned by Syvan and is constructed to the same qualitative
standard as the driveway that it replaces.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T 9~lJ23-3379
2
Except as amended by this letter, our agreement in principle set out in my letter to dated
July 17, 2008 continues.
If you agree with this letter, please sign below where indicated and return three copies to
our office as soon as possible.
Should you have any questions or concerns, please contact the undersigned.
Yours truly,
~n~v;L)
AS. Cannella, C.E.T.
Director of Engineering Services
I the undersigned agree to the above based on the conditions and attachments
referenced and provided.
---;,
~{~ f 7/!tJ7
Date
~~
:::::=----
Edmond Vanhaverbeke
Syvan Developments
918
)
-)
- f\O
ClfJLi!lgton
July 17, 2008
REVISED-Please disregard previous
Letter also dated July 21,2008.
Syvan Developments Limited
Mr. Edmond Vanhaverbeke
20 Robert St West, Unit A
Newcastle ON LIB IC6
Dear Mr. Vanhaverbeke:
Re: Shared Silver Street Parking LotfHome Hardware Parking Lot-
Bowmanville
CPR.2008.2
Per our JWle 5th site meeting, I have summarized our discussion with respect to the reconstruction
of our shared Silver Street parking lot. Below are the details including the agreement reached in
principle and any subsequent discussions:
Meeting Summary
. The Municipality will be paving our portion of the Silver Street Parking lot;
. Curbs will be installed along the perimeter of the MWlicipa1ities portion of the parking
lot;
. The Silver Street entrance will be relocated north to provide an improved alignment for
your delivery trucks;
. A main concern of Syvan Developments was the loss, if any, of the parking stalls along
the west face of the Home Hardware building. It was agreed that your existing conditions
would remain;
. The entrance off Church Street will be slightly widened to the west not impacting your
parking on the east;
. Our parking area will be pay parking, Syvan Developments will provide signing for their
parking if patrons fmd it confusing.
Agreement Reached in Principle
. The MWlicipality will prepare a drawing for your approval (attached);
+ . Syvan Developments will grant the MWlicipality an easement over Parts 2, 5, and 9 of
Plan10R-645 (hereafter referenced 'the plan') for vehicular traffic and access to the
MWlicipal parking lot;
~ . The MWlicipality will provide Syvan Developments an easement over Part 1 and 4 of the
plan for the delivery of goods;
· Syvan Developments will transfer Part 7 of the plan to the MWlicipality free and clear of
all encumbrances;
· The MWlicipality will complete the pavement rehabilitation to Parts 2,5 and 9 of the plan
at our expense.
· The MWlicipality will do the winter maintenance of Parts 2,5, and 9 of the plan.
EtVS~ ~~15
PrI<~!/J) S ~
tJ~T To IAJr~~ t.O/rH PM;(~
S Hc~A.l C);J f'A~
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T ~1~23-3379
Sih l'r SlllT\ Sharl'd l'dll~il1:2 Illl
( PR.::'(liiS.~
.,
-: ~] ~illl:)
· The Municipality of Clarington will be responsible for all legal and survey costs
associated with the land transfer and easements;
· The Municipality will include additional surface rehabilitation in the contract for Parts 3,
6, and lOon Syvan Development's behalf and will provide the tendered pricing
(attached) to determine if Syvan Developments will proceed with the additional works as
shown on the drawing.
Attached for reference are the following; a drawing showing the works proposed (private and
public property), the landscape drawing, the tendered pricing for the works on Parts 3, 6, and 10
of the plan that are Syvan Developments responsibility if you wish to proceed, the area of
property to be exchanged, and the area of property requiring easements, as well as a copy of the
legal plan.
Upon agreement and consent by Syvan Developments, the Municipality will begin the
reconstruction of the Silver Street parking lot. Property matters pertaining to transfers and
easements will be finalized as agreed above when Municipal Council reconvenes in the fall of
2008.
I trust that you will find that this letter accurately reflects the discussions. Should you agree to
the principals herein and attached, please sign below in the appropriate location and return three
copies to our office. Your return to the undersigned of the duly signed consent by July 25th, 2008
would be appreciated.
Should you have any questions or concerns please contact the undersigned.
~
~.
f<ncAS. Cannella, .. .; - ~
Director of Engineering Services
ASC/BMB/cdldv
Attachments
I the undersigned agree to the works described above based on the conditions outlined herein and
attachments referenced and provided.
~'
~
-Edmond Vanhaverbeke
Syvan Developments
9~ .L 2;9JJtJ~
1.1-r1!Clill',Tin:,'-\,1111IT1i-;lr<lli'1I1 1.11'111\" 2011>< IUfI\ .11Ih.I-IIX":';1r1 pl"llpcTI:
I "11.lIc.tJ" I IcTSIl'arJ.dIl0!,'ill 'R 211f IX.2..\ "C.d,)(
920
, i i i
111111'
1111111
~I.ili ,! ,I i
l!l ~ i l : . 7 '
~ 1 I : i !
~
I
,
,
I
,
I
J
dll\
~
I
I
;
l:j g
!!l~ 1J
!lw 5
z '"
00: ill
ili<> '"
!l~ '"
d~ ;
w ~
o
~
'"
'" 0
~ ~
E :g8
~ Z~
l""I ~ ffi~""
g~ I -< Q.d~
i1\~ ~~ ~ ~~=..,
5Ul fi-< E 00( Z~>~
g:< <58 ~ D\",W-
t:: t:~., ~ ~<i::l:
~"' ~"':iO ~ <5~,"3;
e I-~J: ~.<I-
!'7 ~~~ i <l5!!~
fb~ I-<C . ~ib~
: E o~~ ~ a,"~
<8 ~~o 5 o~
Ill" uHr:~ !i ~~
<i: g:N
iO
IE
z
iii
i i
;}
~~,~
"'~
~~
i~
G~
-" .
! .
lillil I;;
IIIIII ('I
JlilIIJ;
'j/llr 'il
I~ ~illri' II!
"1.1 1111
i m 11111111
ll.!ljl !I hll
,flll!1 !I 11'1
I.... 11'1,"
iH jl;111
,~.! 1111:1/1
... I" .
r1;:1 II Ii Iii!
~ !.!!lli!
I
Ii
I'
"
,!
II
>-
~~
00
~ ~
o
~
o
w
'"
..
,.
o
'"
<
r
~
r
"
~
..
,. lj
~ l'J~ E~ <5 5
:50 ~Je ~~ ~~ ~ ~
i5~ w ~ 1= '"
~5 ~~ gg I '"
~1= U ..
~E ili~ ~5 ~~ '" ,.
w
~~:~ a~ c. ~
;Iii< '" 0
o wO .. "
f'! i01'l "',. '" il!
~ I~ ~~ a
~
g:
ilI~
~ ~~ ~
~ ~i ~ ~~
'" EO ~ 1J~ I
NO :500
~ ..:~ I!i fjOlffi
)(~ F= Gl:~a..
~ ~;. ~ ~~
o ~~ N ;~B
... 0 I!;
~!S
"'",,,,
~~
I
(!) ---
z '" 5l-
u~ ~~~a.."-
;t w ~ ~~.N'
IX: W i"~:> I ~
~::: ~ IX) a ~'" ~ I
w ~ (/) 8 j ~~ 'l' I I
IX::I: ~ '" I~ "'; 8. I' I II
f-Cl-o !lio ol'~'
-I _ ..J-' W
c( Q: CiiCl ~
,ii: ~ ~~ I'I:!
i (/) I ~ ~.. I'
c( .. .. I 'Ii
I-
W
W
0::::
l-
(/)
I
,.1 I; ()
"n, 'I' 0::::
IUi : I =:)
~II I
I' ()
"
I
><
o
'"
ti
~
z" g
~~~~
w<.~
~..~:
011< E
h~~
I!l
U
:>
t
Uw
Sill
5~
i5~
...'"
1'l~
wO
<5~
~~
i5~
~'"
u'"
..
I!:
ti
u
~
c.
'-'
~
:i! o::;~ ~
~ ",,,,= 0
~"i ~.;,",,~
~~ ~~ v;i
~~ ~~ ~
:;;< & ~
.<> IE ~
B~~ ~g ~
~c.J: E: ~
~lg ~~ ~
~~~ ~d a:
~~IE 8t! ~
~~ --,N "
~a::~. ~
",c.:5 -
IE ~
~
921
\ ~
I
Cost Breakdown of Vanhaverbeke Property Portion Printed 08/07/2008
of Silver Street Parking Lot Improvments
Lafarge Paving & Construction - Low Bid CONTRACT NO. CL2008-25
In accordance with the first paragraph of this Tender, the Contractor hereby offers to complete the work specified for
Contract No. CL2008-25 for the following unit prices.
Spec. No.
SP
(P)
RMDCS
MOC
The numbers in this column refer to the applicable
Refers to Special Provisions
Plan Quantity Payment Item
Regional Municipality of Durham Construction Specifications
Municipality of Clarington Design Guidelines and Standard Drawings
Item
No. Spec No. Description Unit Quantity Unit Price Total
SECTION 'A' - SILVER STREET A.1\'D CHURCH STREET PARKING LOT, BOWMANVILLE
A10 MOC,314, Provisional Item 2 50 85.14 4,257.00
m
SP Base Repair Incl. Sawcutting, Excavation,
Supply and Placement of 450 rom
Granular 'A' and H.L.-3 Base
A14 MOC,310, Provisional Item t 55 115.98 6,378.90
311 SP Hot Mix H.L.-3, (40 rom) Overlay
A15 MOC, 532 Pavement Markings - Durable
SP
c) 100 mm Width Yellow (Provisional) m 105 14.34 1,505.70
Total Section 'A' - Vanhaverbeke Portion 12,141.60
P:\Dept 12\12-29730\Specs\[CL2008-25.Low Bid.xls]Silver Vanhaverbeke Cost Swn.
a~0~1 L)- ~) ~ ~br1:
~~ Av6~
~v"",el.~~ u;J~ C1 . c&
/ iff' ilJ.-vpJ }J~ 0
V <;f~
;} rJ
Wk~
~~ ~~. t '. ~./
Page 1 ofl Pages ;\^- f-~ '1)iJ1 ~(I
~ t; I I I~
I -3 Ii!! _ ~ i ~I ~! l.t
~ i'
~ :.l . ~~ l!! ~ ~I ~I
~ .1 ~ ~ ~ jf el
:11 10 m"
~ $ cOlE z >- -1.3 ~l .1
Vi ..91 o II) ~ ~ ~ ~I ql
li' I u?1 .I~ ~ II) " ~I
l'j Q: ~ t;: EI ~
0 Q I ~~~ w ~ J!! I~
3 '" I~ ~ iti ~
~ Z ~ ~ I Iz
;;; ~ ~ tJ.l~ ::>
~
- '~) '>"'",~8~
~ N ~ ~ ~ v ~ ~ ~ ~
~..~ ..~.. ~~y)~N~
'" -
~
9 ~
~ 'J,
~~ Y>
2>- t.0
~(( ~i
:I:
~ ~. '..J
. I
~ - N ~ . ~ ~ ~ ~ ~
~
2
-J~ .
O-J.U)W :'Z ~
~~~j zg ~O
~<:{>O~ LU:I:z
>-12~ffi2 (j)2~ ...J Q:~
LU -C2c:t~ U):J2 .... a~
>~~~~ ~~WU)~~
Q:c:tF="">S1 O<l:~<( .
~~~~~~~~~~ ~:
S~~29~a~LU ~l \D
LA.. ~9~~9:~~~ Z ~~ ~
o ~~tsa::: ~f2I-..J l.L. => "
f?O~'~~U3~O ~~
~~~g~~~~~~~~
..JOOWO~W_;> QlLI
~li:ffi~5:O~EO fB~
~it~~~t5lI3.... a: VI
~
~
,....
_J
~-
.~
~ ;;;
9
...
'"
~
z
t-
{\j
t-::
.~ . ~ J'lt
~ ~ -.
W ~ i! ~ I t
I- ~~e ~
5 ; i i liP
G: 8 E '0 CD~
1= e ~ ~ Q"03
a: ~2 a I;:! 2
W <.9" ~
U ~t: ~16
o l! ~
(/) ~~%
o::;.;~gjl I
~t~~~ ~
>~~;~ '!!
a:~~l~ ....
~ flt t
~ . l' ~ l!
~~~~ &
! ~ :t ;:;
~v9/l
~.J
~
1.0
If)
1 11
0'
~
\0
(\'.
~i.
- 00 01:
-- ~nt :8 .
n - tJ--. _' .~Z.99I:;.
8
:;. J.33~lS
~
6N
''''VI
I
,I
~I }..~
::. 4-
v iAol'Q
lL vi...,l
,.,
O~
-;;
z
~
..
.
;:.
M
.
../"
':R
~
I
z
'!, ---,- ~ . -
JMI'. iO !
li: (-;. ~
~ ~
----"
I.
t':
<(
".
,010
01
!
1~'Vd
co
3 ~n 9/
00 Iii'
.tJ.; ~.(":
.~"''''
,.,
le
z u
i
.., N':'
~ i "J
. d
; -~-~-
.to
lXo
...1':
"'z
"-
li:
~
3 ..~. .EE o91N
~3^1'S
t-
W
lLJ
a::
t-
V)
it)
"ll:t
~
I:t:
o
~
:z:
u
a::
::>
J:
U
~
923
..... N
'*t: '*t:
<( <(
W w
0:: 0::
<( <(
f- f-
Z Z
W W
~ ~
W W
(/) (/)
<( <(
W W
w
u
z
W
LL
f-
W
:.::
u
0::
! ~
'I ::;
~ ~ M~
. ~tl ~
it ~u ::>
-'
8~
C9
z
~ ~
LL W
g;N~
UlWf-",
WC/)(J)O
~<{UlO
~I::>N
~Q.Q
<{ a:
il: ~
I ~
! Iii i
'dim!!
nd!!
IIII!!!
~IH!!Ul
~ I I IIII
.~
, >
!l111!i Iii
I!.~ I I~i
,fill .i!
Ii! II 'i~
'i'i! ,ti~
hill'i' II!
1l~1.I ill!
~ !ii iii ;111
B HI
! "i~ ! i
. O~i' ~
:~ i!;! ! !~h I ;
;1 :~~~ i ~~i!. I
.j ;~~;i Ii ~li j I
~! ;!.!i ~l ~i!g ~: ,_ i
:! il~!; I' ~~a! ,~ ~! !
;1 ~I;il il !;Ii I; i! I
l~
~ e
~ Rl~!
I q I~ili !
,II I ~i~i; !l ~
hi ~ I~! 1
i!H ~i ~
FI i ~l ~
l~; l~ ~i i
-'
<(
f-
W
o
o
w
CD
'-'
z
F
z
.0:
-'
Q.
(/)
::>
o
::>
z
F
z
0"
u;
~~
~
;~
:00
wO
00
~
o
o ~
a g
~
o
g
T---
, --,
--'--
I '
, -k
i \ \ \
w
~
~
~
~
w
~
!i'
\\\\\
~
MSO
~
w
~
o
z
~
000 + ~~
o
'" u
'"
"0
133~lS ~3A liS
924
i - f ~ (
i-~ - \. I'..~ \. ';
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW NO. 2009-
being a By-law to authorize the acceptance of the transfer of certain land from
Syvan Developments Limited to the Municipality of Clarington, the transfer of an
easement access to Syvan Developments Limited and acceptance of an easement
of access from Syvan Developments Limited in connection with the improvement
of the municipal parking lot at Church and Silver Streets, Bowmanville
WHEREAS at its meeting on
012-09;
, 2009, Council received and approved Report EGD-
NOW THEREFORE, the Council of The Corporation of the Municipality of Clarington enacts as
follows:
1. THAT the Municipality of Clarington hereby authorizes the acceptance by the
Municipality of the transfer from Syvan Developments Limited, for nominal
consideration, of the fee simple interest free and clear of encumbrances and restrictions
in the lands more particularly described as Part 7, Plan 10R-645.
2. THAT the Municipality of Clarington hereby authorizes the acceptance by the
Municipality of the transfer from Syvan Developments Limited for a nominal
consideration of an easement in Easement Area #1 shown on the sketch contained in
Attachment 3 for the purpose and on the terms set out in Report EGD-012-09.
3. THAT conditional on Syvan Developments Limited transferring the easement to the
Municipality as described in Section 2 hereof, the Municipality will transfer to Syvan
Developments Limited for a nominal consideration an easement in Easement Area #2
shown on the sketch contained in Attachment 3 for the purpose and on the terms set
out in Report EGD-012-09.
4. THAT the Mayor and Clerk are hereby authorized on behalf of the Municipality of
Clarington to execute the necessary documentation to permit the registration of the
transfer referred to in Section 1, the transfer of the easement in Easement Area #2 and
the acceptance of the transfer of the easement in Easement Area #1 referred to in
Sections 2 and 3 of this By-law.
BY-LAW read a first, second and third time and finally passed this _ day of
2009.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
925
CI!![il1gtDn
REPORT
ENGINEERING SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Report #: EGD-013-09
File #
By-law #
Subject:
OLD SCUGOG ROAD RECONSTRUCTION - PUBLIC INFORMATION
CENTRE
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report EGD-013-09 be received;
2. THAT Staff is proceeding to finalize the detail design and tender based on the
information received at the Public Information Centre to meet the spring/summer 2009
construction start schedule, and;
3. THAT all those who attended the Public Information Centre and who have contacted the
Municipality as interested parties be informed of this report.
Respectfully by,
aa~Q
Submitted by: A. S. Cannella, C.E.T.
Director of Engineering Services
/1~ [) r) jl
( ') ~~~~ ,,-L~'
Reviewed by: Franklin Wu
Chief Administrative Officer
ASC/BMB/dv
March 12, 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
926
REPORT NO.: EGD-013-09
PAGE 2
1.0 BACKGROUND
Old Scugog Road is classified as a Local Road in the Clarington Official Plan
although it operates more so as a collector road. This is due to vehicles attempting
to avoid Regional Road 57 and/or the roadway serving the Hamlet of Hampton. The
section of roadway between Millville Avenue and Ormiston Street has been the
subject of various drainage concerns by residents in the area. The reconstruction of
Old Scugog Road has been approved in the 2009 Capital Budget and the limits of
the project are shown in Attachment #1.
The municipality has completed pavement rehabilitation of the existing road north
and south of the subject site in previous years. This particular location will involve a
greater degree of work to address the drainage issues. The installation of storm
sewers will not only address some of drainage concerns, it also allows for an urban
cross section through a portion of the project.
2.0 APPROACH
To assess suitable construction measures of the project and to obtain local residents
input to the design process, a Public Information Centre was held to present the
project proposal. The public was notified of the meeting by newspaper
advertisement, the Municipality's information board and website, and through
circulation notices to those who are directly affected by the proposed works.
3.0 INFORMATION CENTRE
A Public Information Centre (PIC) was held on Feb 25,2009 at the Hampton
Community Hall. At the meeting the following documentation and plans were
presented for discussion:
· Existing road condition base plans, showing proposed road works with aerial
photography as a background for the works;
· A typical road sections for the urban design;
· Photographs of existing pavement structure and residential entrances;
· The full set of preliminary engineering drawings;
927
REPORT NO.: EGD-013-09
PAGE 3
.
An artist's rendition of the final product;
Eighteen residential frontages are abutting the road reconstruction. Nine residents
in the area appeared at the PIC and provided input. The register and comment
sheets are on file within the Engineering Services Department and available for
review.
The design proposal presented was well received and as expected the primary
concern expressed was related to drainage. These concerns where generally
associated to connections of existing sump pumps, external drainage
concentrations, and the overall grading and drainage of the area. The design team
was well prepared for the issues brought forward through site investigations and
preliminary designs. Some additional sump pump locations where identified as well
as an additional well in the area. Overall it was understood that the area is
susceptible to water problems and the reconstruction project will aid in some of
these issues.
5.0 DISCUSSION
As a result of the Public Information Centre, detailed design will be finalized and
design drawings and tender documents will be prepared for the project to target a
spring tender call. This will allow Council the opportunity to consider the project for a
construction in spring/summer of 2009.
Attachments:
Attachment NO.1 - Site Map (Old Scugog Rd.)
Interested parties to be advised of Council's decision:
Lisa Robinson Craig Holme
Andy & Amanda Townson Tami Twiddy
Sheryl Maran Geoff Waite
Marc Cummins Katy & Russ Gibson
928
I
..
I
..
I
..
,
..
,
[-'---'--"'P" """\'\ \
\\, ~ "
'------,---- \
". "--... " "', \
\
!
/
.
I
I
I
I
I
.
I
I
.
.
I
.
I
.
I
I
TinT Ii
~. 'Ir ' : '-.~} I I ~\ I J II I!J I
, HAMPTON I ~ 'I[-"! i
I I ---- I~\ I J I
I I, ,.-.6t~r -1 J \\. I ~I~.-:J J.
. II -- -':1 ~1 ." .~ '
'~ '.\-@?"t. 1\ -r~ ..--; I.n
I ~ I \\ \\~r\\L.-11 " i- - L III
! 0 I '1"r,J~ [, " ".__
I :r: I . . t?~~."%.\! I I ~
I I Kmg Ln. ."~ .~ . ;1~ ~. .,' ,'~' ___.
- ,L___-_.._I~~~~~, ~0')~\,.J--_...-- " .
! lr J j- 1--:", ,l?>\C;?;:; \\>2! I' ,
I 1 ./ f:: ....~J"' .. \ \ \
I I II, JI-! ( 0'1 ",.f\~."",y / ~'/'j
I L.- \ r~""/:I ~ /u~~ ,,\\'\V'/ ____
j .. \ I(?rt'x .,,~ ,~, u__ y
I 'I I~- ! ~"/'"~~ ~&%~ -{..u-r-'1' I
I j J' /\( "/~~~vC?^0\ I I..... I
?\(v' \ ,,/>,\...../ ? I Ll')
I c -- ----ic:: ~~~V/' r '0~~,.. .
I 'il t= ~i (5:'V'-:"<:;' l".
i ~u-E \ _~ (\ g::..J I
I I I I I ~- I \ =- '~,~I - - c,~'
I I I ~_. - \~- "" ~<' T \ II)
I \ I !a~~!on~~ci~l~ ! \'Fl (" '[),d J '!" II~
[ KEY MAP
"__-\1, I.~__.I
(
I
II
]V
W~E
s
DRAWN BY: E.L.
DATE: March 10,2009
REPORT EGD-013-09
ATTACHMENT NO.1 92q
G:\Attachments\OldScu 0 ~econ,mxd
Cl!J!.-iQgron
REPORT
ENGINEERING SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30,2009
Resolution #:
Report #: EGD-014-09
File #:
By-law #:
Subject:
AUTOMALL SUBDIVISION, BOWMANVILLE, PLAN 40M-2171,
'CERTIFICATE OF ACCEPTANCE' AND 'ASSUMPTION BY-LAW',
FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report EGD-014-09 be received;
2. THAT the Director of Engineering Services be authorized to issue a 'Certificate of
Acceptance' for the Final Works, which include final stage roads and other
related Works, constructed within Plan 40M-2171; and
3. THAT Council approve the by-law attached to Report EGD-014-09, assuming a
certain street within Plan 40M-2171 as public highway.
Respectfully by,
- 'l
4rf;hUV~
-
Submitted by: A.S. Cannella
Director of Engineering Services
ASC/NAC/dv
March 16, 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-9282
926
REPORT NO.: EGD-014-09
PAGE 2
1.0 BACKGROUND
1.1 The Corporation of the Municipality of Clarington entered into a Subdivision
Agreement, registered October 27,2003, with Waverly Road Properties Inc. to
develop lands by plan of subdivision, located in Bowmanville and described as
Plan 40M-2171 (Attachment 1). The agreement required the developer to
construct all roadworks, including hot-mix paving, sidewalks, curb and gutter,
street trees, a storm drainage system and streetlights, hereinafter referred to as
the 'Works'.
1.2 The Subdivision Agreement provides for the separation of the Works into four (4)
stages:
a) Initial Works;
b) Street Liqhtinq System;
c) Final Works; and
d) Stormwater Manaqement System
1.3 The Initial Works and Street Liqhtinq System were issued 'Certificates of
Completion' and subsequent 'Certificates of Acceptance' by the Director of
Engineering Services, as per the maintenance requirements set out in the
Subdivision Agreement.
1.4 The Stormwater Manaqement System was issued a 'Certificate of Completion'
dated November 16, 2007. This initiated a two (2) year maintenance period,
which will expire on November 16, 2009.
1.5 The Final Works were issued a 'Certificate of Completion' dated November 16,
2007. This initiated a one (1) year maintenance period, which expired on
November 16, 2008. The developer experienced delays in completing the repair
works, however, the works have been re-inspected, and all deficiencies have
now been rectified to the satisfaction of the Director of Engineering Services.
927
REPORT NO.: EGD-014-09
PAGE 3
1.6 It is now appropriate to issue a 'Certificate of Acceptance' for the Final Works.
The Subdivision Agreement requires Council approval prior to the issuance of the
'Certificate of Acceptance' for the Final Works.
1.7 Further to the issuance of a 'Certificate of Acceptance', a by-law is required to
permit the Municipality to assume a certain street within Plan 40M-2171 as public
highway (Attachment 2).
Attachments:
Attachment 1 - Key Map
Attachment 2 - Proposed By-Law
List of Interested Parties:
928
Automall Subdivision
Plan 40M-2171
Baseline Road
~
.....
u:'
"
q::
iii
c
,9
Cl
Q)
D::
"
C'll
o
D::
c
:e
C'll
~
Spicer Square
"
C'll
o
D::
>-
Q)
't:
Q)
>
C'll
3:
^'
W~E
s
'jJ7;
// tJ' DRAWN BY: E.L.
~-
~/~
~~
DATE: March 16, 2009
REPORT EGD-014-09
ATTACHMENT NO.1 q::>9
G:\AttachmentsWOM-2171.mxd
jJ," 1
I. [)C\[': i
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY -LAW 2009- XXX
Being a By-law to assume a certain street within the
Municipality of Clarington as public highway in the Municipality
of Clarington,
The Council of the Corporation of the Municipality of Clarington hereby enacts as follows:
1, THAT the street shown on Plan 40M-2171, and listed below in this section, being
in the Municipality of Clarington, in the Regional Municipality of Durham, is
hereby accepted by the Corporation of the Municipality of Clarington as public
highway, and assumed by the said Corporation for public use:
Spicer Square
BY-LAW read a first and second time this xxth day of xxxxx 2009,
BY-LAW read a third time and finally passed this xxth day of xxxxx 2009,
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
930
Cl!J!mgton
REPORT
OPERATIONS DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Report #: OPD-005 -09
File #:
By-Law #:
Subject:
CLARINGTON PITCH-IN CANADA
CLARINGTON CLEAN AND GREEN
Recommendations:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
1. THAT Report OPD-005-09 be received for information.
Submitted by:
Reviewed by: C) rzz~ -:;.~~
Franklin Wu,
Chief Administrative Officer
*sa
1001
REPORT NO. OPD-005-09
PAGE 2
BACKGROUND:
The 43rd Annual Pitch-In Canada Week across Canada takes place April 20th to
25th. The campaign theme was Operation Clean Sweep. Clarington's campaign'
theme is "Clarington Clean and Green". The objectives of the campaign include:
. Cleanup, restore and beautify the environment by cleaning up litter and
other garbage from urban, rural and wilderness areas and by initiating local
products such as habitat preservation and restoration and urban renewal
activities.
· Encourage voluntary action as a means of resolving environmental
problems.
· Encourage civic pride and develop long term working relationships for the
future.
The Clarington Pitch-In Canada Events in 2008 were a big success with 73
locations (compared to 49 in 2007 and 34 in 2006). There was 13.83 metric tonnes
of garbage collected versus 5.2 metric tonnes in 2007 and 4.5 in 2006. The
garbage was collected from our boulevards, parks, trails and open space areas. In
2008 it was the first year we asked residents to separate recycling. Not all
residents complied but we did manage to collect .0001 metric tonnes of bottles and
cans and 1.134 metric tonnes of tires. Our dry cell batteries drop off area collected
.363 metric tonnes of batteries.
For the week of April 20th a challenge is being issued to the schools across
Clarington to strive for 150,000 minutes of participation. Schools and other groups,
organizations or individuals must call the Operations Department so we can
include them in our event. We will provide garbage bags and gloves while
quantities last. Advertisements will be placed in the newspapers in April to promote
this event. Since April 22nd is Earth Day, school participation is significant as
teachers are promoting mother earth to our children.
2009 Clarington Clean and Green
1002
REPORT NO. OPD-OOS-09
PAGE 3
SPECIAL EVENT LOCATION:
This year the Region of Durham will be selling their blue boxes, green bins and
com posters at the free compost give away on Saturday April 2Sth which will be
located at the Operations Department 42 Yard at 178 Darlington/Clarke Townline
Rd., Bowmanville. The event will take place from 9 am to 12 noon which is the
same time as our cleanup events for Saturday. Residents are asked to bring a
shovel and container to collect their own compost and can take advantage of
bringing in their broken blue boxes and green bins and replace them for free.
Newcastle Food Bank will be on-site to collect non-perishable food items in
exchange for free compost and mulch. Residents can also drop off used cell
phones and dry cell batteries. Previously we have had this event at Animal
Services and have found at times the lineup would extend to Liberty St. causing
traffic jams. Since the response to this event is so overwhelming, moving the
event to 42 Yard will solve this problem.
CONCLUSION
"Pitch-In Wee'K' is an excellent Community based program that encourages
Community involvement and promotes volunteerism and instills Clarington pride.
Individuals, groups, organizations will be encourage to participate in programs that
will keep Clarington Clean and Green.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905) 263-2291 F (905) 263-4433
1003
" Clarmmon
Leading the Way b U
REPORT
EMERGENCY AND FIRE SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Resolution #:
Report #: ESD-005-09
File #
By-law #
Subject:
MONTHLY RESPONSE REPORT - FEBRUARY 2009
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report ESD-005-09 be received for information.
"
Cp'l /,/'
Submitted by: /I "C)~ i~
Gordon Weir, AMCT, CMM111
Director Emergency & Fire Services
Reviewed by: Q ~ -.:=C '
nklin Wu,
Chief Administrative Officer
GW*tw
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F 905)623-6506
1101
REPORT NO: ESD-005-09
PAGE 2
1.0 BACKGROUND
1.1 Our report covers the month February 2009. It is our intent to provide Committee with
information relevant to this Department, in a timely manner.
2.0 COMMENT
2.1 The Department responded to 315 calls during this period and recorded total fire
losses of $237,100.00 A breakdown of calls responded to follows in the attached table
(Attachment #1). Attachment #2 is an explanation of the different types of responses.
Attachment #1: Activity Report
Attachment #2: Description of Types of Responses
1102
Attachment #1 to ESD-005-09
CLARINGTON EMERGENCY & FIRE SERVICES MONTHLY ACTIVITY REPORT
REPORT PERIOD: FEBRUARY 1, 2009 OO:OO:OOhrs - FEBRUARY 28, 2009 23:59:59hrs
RESPONSE TYPE REPORT
FIRE STATIONS 2009 2008
RESPONSE STATION STATION STATION STATION STATION THIS TO TO DATE SAME TO
TYPE 1 2 3 4 5 PERIOD DATE % PERIOD DATE
FIRES / 2 3 1 1 1 8 19 3.1% 5 15
EXPLOSIONS
OVERPRESSURE
RUTURE 0 0 0 0 0 0 1 0,2% 0 0
EXPLOSIONS
PRE FIRE 2 0 0 0 0 2 7 1.1% 3 8
CONDITIONS
BURNING 0 0 0 0 0 0 0 0.0% 5 6
(controlled)
FALSE FIRE 12 8 0 15 0 35 74 12.1% 35 67
CALLS
CO FALSE CALLS 6 0 0 0 0 6 47 7.7% 21 60
PUBLIC HAZARD 6 1 0 3 0 10 24 3,9% 10 19
CALLS
RESCUE CALLS 13 5 5 4 6 33 94 15,4% 48 102
MEDICAL CALLS 87 18 7 37 0 149 315 51.6% 135 273
OTHER 11 1 3 3 1 19 30 4.9% 17 52
RESPONSES
TOTALS
THIS PERIOD 139 36 16 63 8 262 611 100.0% 279 602
TO DATE 323 81 45 142 20 611
THIS PERIOD 149 34 20 69 7 279
LAST YEAR
TO DATE LAST 310 75 38 159 20 602
YEAR
1103
. .
DOLLAR LOSS REPORT
THIS PERIOD $237,100
2009
TO DATE $294,800
THIS PERIOD $712,000
2008
TO DATE $1,077 ,600
APPARATUS RESPONSE REPORT FOR THIS PERIOD
STATION 1 PUMPER SCAT PUMPER TANKER UTILITY AERIAL RESCUE
1 1 11 1 1 1 1
THIS PERIOD 254 105 136 5 2 0 0 6
TO DATE 649 270 325 24 6 0 7 17
STATION 2 PUMPER TANKER
2 2
THIS PERIOD 49 39 10
TO DATE 108 82 26
STATION 3 PUMPER TANKER UTILITY ATV
3 3 3
THIS PERIOD 27 17 9 1 0
TO DATE 63 45 17 1 0
STATION 4 PUMPER PUMPER TANKER AERIAL
4 44 4 4
THIS PERIOD 100 90 8 2 0
TO DATE 238 209 20 7 2
STATION 5 PUMPER TANKER
5 5
THIS PERIOD 18 8 10
TO DATE 32 19 13
448 TOTAL VEHICLE MOVEMENTS FOR THIS PERIOD
1090 TOTAL VEHICLE MOVEMENTS TO DATE - 2009
1104
. .
Attachment #2 to ESD-005-09
DESCRIPTION OF RESPONSE TYPES
Fires and Explosions: Instance of destructive and uncontrolled burning involving
structures, vehicles and open area fires, including explosion of combustible solids, liquids or
gases which mayor may not have resulted in a dollar loss.
Overpressure Rupture/Explosion: An explosion or rupture as a result of pressure, no fire.
Pre Fire Conditions: Incidents with no fire that involve heat or potential pre fire conditions
e.g. pot on stove, cooking - smoke or steam, lightning, fireworks.
Burning (controlled): Complaint call related to outdoor controlled burning, authorized or
unauthorized. Fire Department did not take suppression action.
False Fire Calls: Alarm activation or fire call that when investigated, is determined to be as a
result of equipment failure, malicious/prank, perceived emergency, accidental activation of
alarm by person
CO (carbon monoxide) False Calls: A call where it is determined that the detection
equipment malfunctioned or there was a perceived emergency - no CO leak
Public Hazard Calls: Includes a response for spills and leaks of a hazardous product such
as natural Gas, Propane, Refrigerant, Miscellaneous/Unknown, Gasoline or Fuel, Toxic
Chemical, Radio-active Material, Power Lines Down, Arcing, Bomb, Explosive Removal,
Standby, CO (carbon monoxide) or Other Public Hazard.
Rescue Calls: A call for a person in danger due to their proximity to the occurrence and who
is unable to self evacuate and is assisted by Fire Department personnel i.e. Vehicle Accident,
Building Collapse, Commercial/Industrial Accident, Home/Residential Accident, Persons
Trapped in Elevator, Water Rescue, or Water/lce Rescue.
Medical/Resuscitator Call: Includes a response to a patient(s) suffering from Asphyxia,
Respiratory Condition, Convulsions, Epileptic, Diabetic Seizure, Electric Shock, Traumatic
Shock, Heart Attack, Stroke, Drug Related, Alcohol Related, Cuts, Abrasions, Fracture,
Burns, Person Fainted, Nausea and pre-hospital care such as administering oxygen, CPR,
defibrillation, or first aid
Other Response: Assistance to other Fire Departments, call cancelled on route, non fire
incidents where an illegal grow operation or drug operation was discovered
1105
Cl!J!.wgtnn
REPORT
COMMUNITY SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Resolution #:
Report #: CSD-007 -09
File #:
By-law #:
Subject:
2009 ROTARY RIBFEST
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recomme-nd to Council the following:
1. THAT Report CSD-007 -09 be received;
2. THAT Council provide direction to staff regarding the community use of the
municipal generator;
3. THAT Council provide staff with direction on associated costs related to the 2nd
Annual Rotary Ribfest;
4. THAT Council require the Bowmanville Rotary Club to provide, for the duration
of the event, general liability insurance in an amount of not less than five million
dollars (5,000,000) per occurrence. An original Certificate of Insurance shall be
submitted to the Municipality of Clarington and shall name the Municipality of
Clarington as an Additional Insured; and
5. THAT the Bowmanville Rotary Club be advised of Council's decision.
Submitted by: /
Jo eph P. Caruana
irector of Community Services
Reviewed bO~
Franklin Wu
Chief Administrative Officer
SM/SC/lw
CORPORATION OF T'HE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-5506
1201
REPORT NO.: CSD-007-09
PAGE 2
1.0 BACKGROUND
1.1 Council received correspondence from Wayne Routly, Sponsorship Chair,
Bowmanville Rotary Club, announcing that the Club would be hosting the 2nd
Annual Rotary Ribfest.event June 12 -14,2009, at the Garnet B. Rickard Playing
Fields. The Rotary Club further requested financial assistance with costs
associated with the rental of the parking lot and playing fields as well as costs
associated with advertising in Clarington tourism publications (Attachment # 1).
This correspondence was referred to staff.
1.2 The initial Rotary Ribfest was held June 27 to July 1, 2008, and attracted over
27,000 guests for five days of family friendly fun and entertainment, which
included local musicians, vendors and midway rides for the children.
2.0 COMMENTS
2.1 Staff representatives from Operations, Emergency Services, Communications &
Tourism and Community Services met with representatives of the Bowmanville
Rotary Club on February 1 ih to review their needs to facilitate the proposed 2nd
Annual Rotary Ribfest. Rotary Club representatives identified areas where the
Municipality could supply support and services to assist the Rotary Club.
2.2 Staff subsequently investigated and identified the associated costs with providing
the services/facilities requested.
2.3 The following are the facilities and services which the Municipality has been
requested to provide and the costs associated with providing these services.
Rental of East Ball
Diamond 0 erations)
Closure of West Ball
Diamond
o erations
Picnic tables and garbage
cans on site 0 erations)
Staffing
(Operations)
$840 June 12-15 (includes % day set up and full
da take down
$840 Although the west diamond is not required for
the event, the event would require this
diamond to be unavailable for rental .
N/C
$2,000 Staff to assist with the pick-up of litter and the
emptying of garbage containers. This event
is not a budgeted community event and would
require staff overtime for the Operations
De artment.
1202
REPORT NO.: CSD-007-09
PAGE 3
Waste Disposal The Rotary Club has been provided with
contact information for the waste disposal
contractor to explore possible event
sponsorship.
Parking Lot N/C For the 2008 event staff worked with the
(Community Services) Rotary Club to reconfigure the set up of ribber
vehicles to minimize the impact on the
parking lot. Ribbers vehicles are confined to
the north row of the parking lot and do not
negatively impact on other parking lot users.
Access to Water N/C The Ribbers require water at their food
(Community Services) stations to satisfy health regulations. There is
a hydrant adjacent to the site which could
accommodate this need. The Rotary Club
would be required to apply to the Region of
Durham for a permit to connect to the hydrant
and the Emergency Services Department
would provide the required hoses for the
duration of the event to carry the water to the
food stations.
Access to Electricity $2,790 In 2008, the Emergency Services Department
(Emergency Services) provided (at the last minute) the loan of a
generator when the organizers were not able
to access electrical power as they had
planned. This generator was purchased as
part of the Y2K contingency plans and
subsequently assigned as a back up power
source for the municipal emergency
evacuation centres. As the generator was
not originally intended to be loaned out to
community events, staff are requesting
direction from Council as to the suitability of
offering the use of the generator for this event
and if there should be a fee assigned to such
use.
Staff has determined the cost of renting a
similar generator from United Rental to be
$930.00 per day plus taxes. Ribfest would
require a three day rental.
Promotional Support $600 The organizers of Ribfest had requested
(Corporate Services) colour assistance with the promotion of the event
$480 b/w through the various Clarington tourism
publications.
Staff are able to provide at no cost (space
permitting)
1203
REPORT NO.: CSD-007 -09
PAGE 4
- June Clarington.net publication
- front page of the municipal website
- online events calendar on the municipal
website
-information screens located in various
facilities
- outdoor signs located at various facilities
In addition a ~ page ad in the Community
Services Summer Recreation & Leisure
Guide could be provided at a non-profit rate
of $600 for colour and $480 for black & white.
Disposal of Fryer Grease N/C The grease used in the on site fryers must be
(Community Services) replaced periodically throughout the
weekend. The organizers have requested
help in disposing of this grease.
The Garnet B. Rickard Recreation Complex
has capacity to store and recycle food grease
on site.
Staff would work with the organizers to
accommodate this request.
Certificate of Insurance Unknown In keeping with risk management best
(Finance) practices it is recommended that for the
duration of the event (including set up and
take down) the Bowmanville Rotary Club be
required to provide commercial general
liability insurance in an amount not less than
five million dollars (5,000,000) per occurrence
to protect the Rotary Club and the
Municipality of Clarington from any claims for
damages, personal injury including death,
and for claims from any property damage.
The insurance coverage shall include, but not
be limited to tenant's legal liability, non-
owned automobile coverage, cross liability
and severability of interest clause, third party
bodily injury including death, property
damage and personal injury~ An original
Certificate of Insurance shall be submitted to
the Municipality and shall name the
Municipality of Clarington as an Additional
Insured.
Total Costs of Services $7,070 Includes generator rental and colour 1/2
page in Community Guide
1204
REPORT NO.: CSD-007-09
PAGE 5
3,0 CONCLUSION
3.1 The 2008 Rotary Ribfest was a very successful event which included attractions
for the entire family. The event provided exposure for local talent with the
entertainment stage and to community groups and vendors through the booths
and displays.
3.2 It should be noted that the Bowmanville Rotary Club does not qualify for a
Community Grant as the program is not intended to provide funding to
organizations that make donations.
3.3 Queries with respect to departmental comments and estimates etc. should be
referred to the appropriate department.
Concurrence: Director of Corporate Services
Director of Operations
Director of Emergency Services
Director of Finance
Attachment #1: January 26, 2009 letter from Wayne Routly
1205
:::,'T'J)
( ,
').,~ vi, ,.,,:
""-'~' .' ... - '-
.J-' ,-
~ .,': ". '..
'.. J)''' "'';.
'c'~' ~.,
C50-007-09 Attachment #1
,---
: (~:' /'.,; ry-' ;":1 r~,
, ! I.:J 17 ('\ t.:; 1"\; R i }--J c ~ +l
.! \" '. '...; v... I i \,...~. '--, v
J
>( "f. ,''''' "",
.- .~ ,,'
" '. ',~
.,,-~ r
. . ~~J'ON
REVIEWED By/1-), c6
OIt~NA1. TO: I
e(" COUNCIL 1:1 COUNCIL 1:1 FILE
DIRfCTlOH INfORMATION
copy TO:
1:1 MAYOR 1:1 MfM8fRS 1:1 CAO
rL... ~IC.A Of COUNcil
09JAN21 pt "'~I:I :'~~TE CJ =r
CJ EfIG.EAIIIG 1:1 MUNlClm. 1:1 ()IIfRATIOfIS
SEAVlCfS CLERK'S
1:1 ~~rr CJ SOlICITOR CJ TREASURY
CJ OTHER
Rotary Ribfest June 12, 13, 142009
Garnet B. Rickard Playing Fields
Monday, January 26, 2009
Mayor Jim Abernethy
Municipality of Clarington
40 Temperance Street
Bowmanville Ontario L 1 C 3A6
Dear Mayor Abernethy: MlJNICIIW.CLEAIC'SFIU t11(J 9. ~b
110e
The Bowmanville Rotary Club will be hosting its 2nd Annual Ribfest June 12,
13, 14, 2009 at the Garnet B. Rickard Playing Fields.
As a non profit organization we would like to formally request that we
receive monetary relief on the parking lot and playing field rental costs
and as well associated costs with advertising in Clarington tourism
publications. As our budget for this event is estimated at $60,000 we are
hard at work to find donations, sponsorships and gifts in kind.
Ourfirst Ribfest last year was most successful and resulted in a turnout of
over 27,000 with great positive feedback. Rotary provided an event
which was family friendly, offering delicious food, exciting music,
interesting vendors and midway rides for children - Ribfest offered
something for everyone - we believe - making Rotary Ribfest a tourist
destination choice.
Rotary an International Service Organization has a motto to which all
Rotarians aspire - Service Above Self. With funds raised at this year's
event, we plan to continue serving both our local and international
communities, As proud supporters of all things community since 1924 the
Rotary Club of Bowmanville will continue to do so with monies raised from
this event.
o f '\ .r~~ '( ~ 2: :~: E= T r~2:~CS~j _
r'~ ,
'.' I
tf\jT t'-~ ;: .,/E:~)f :~:j';"E
'MNw.bcwmanviller!bfest .com
Attached is a list of some of our past and current funding initiatives. It
should be noted that the average annual amount the club spends on
funding initiatives is .$55,000 with a major portion being donated within
CI'](ington. Money is railed throlJgn the community "giving back" by
')upporting our ()nnual Christmas Tree Sales, the Rotary Dinner IJnd
1206
CSD-007-09 Attachment #1
Auction, the Rotary Hot Apple Cider Booth at Applefest and of course
Rotary Ribfest,
We know that Ribfest events are considered great drawing cards for
tourists and local citizens.... With Mosport hosting the Canadian Tire
weekend the same time as Ribfest we would hope tourists would combine
both events and with children also make a trip to the Bowmanville Zoo a
destination requirement,
Your support of Ribfest, Rotary and the important work that we do in the
community we believe makes us worthy recipients of this request from
Council.
For additional information on this Ribfest request, please contact the Chair
of Sponsorship as indicated below,
Sincerl!3
BD..{ ""v I ,
Wayne RO~
Sponsorship Chair
(905) 434-6212
eric 15)nexi~om.net
i~~f7f~';'~ ~~~-.._,..,
" .';.'.) fL.;.
/.. \ I ~ "1
';.\' 'I ,
))" _;,L.~;c.
/' I : l!li .'.
,,) "'; 1/ I.
1 [VI! :(\Ije), ,
. -!s'6';j7'~'~I. '
". :_~ '~J l'
i
f
. ,
i~...,/..J.f~:'I'."':~ T ~'.-:i l
.." -~.\I r,(..l.,',i(.,....I~r'.i;i!o--..;'ir.f~::..-::t t'i~.ir
1207
ROTARY FUNDING INITIATIVES
Local Community Initiatives
Donation of Visual Arts Property and Building
Visual Arts Garden
Dewey's Cafe
Fire Training Trailer
Restorative Justice
Adopt a Road
Special Needs Children's Programmes
Respite Programme for Parents of Special Needs Children
Disabled Persons
Seniors Programmes
Clarington Project
Partners In Service-Durham Region Disability Programme
GrandviewChildren's Centre & Campbell School for Disabilities
Community Care
Durham Region Disabled Riding Programme
Easter Seals Disabled Camo Programme
Doug Fluty Autistic Children's Programme
Ontario March of Dimes
Secondary School Bursaries
Junior Achievement
Secondary School Seasonal Symphony Tickets for Students
Firehouse
4-H-Club
Rotary Youth Leadership A wards
Rotary Adventure in Citizenship
Who is Nobody
First Nations Bursaries
Public School Dictionary Programme
Bowmanville Memorial Hospital Foundation
Rotary Park
Rotary Park Clock Tower
Clarington Older Adult Centre
Scugog Community Living Home
Library Renovations and Furnishings
Butterfly Garden
Newcastle Townhall
Good Samaritan Shoebox Xmas Project
Durham East Baseball
Special Requests
Donation of Silver Creek Parkland
Orono Rodeo and Bleachers
C50-007-09 Attachment #1
1208
CI!JlmglOn
REPORT
CLERK'S DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30,2009
Report #: CLD-005-09
File #:
By-law #:
Subject:
LIVESTOCK EVALUATION STATUS
RECOMMENDA TIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
THAT Report CLD-005-09 be received for information.
Submitted by:
d
Reviewed by: Franklin Wu,
Chief Administrative Officer
PLB*
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-6506
1301
REPORT NO.: CLD-005-09
PAGE 2
BACKGROUND AND COMMENT
At the General Purpose and Administration Committee meeting of January 19, 2009, direction
was provided for the Municipal Clerk's Department to provide an update of livestock evaluation
claims to date. Report CLD-27 -04, which is included as Attachment No. 1 to this report,
outlines the process for the filing of claims under the Livestock, Poultry and Honey Bee
Protection Act and the amount of compensation paid and reimbursed by the Province from
1998 to 2003. The following chart indicates the compensation for the years 2004 to 2008:
Total Compensation Paid by
Number of Municipality and Submitted to Compensation Reimbursed
Year Claims Province by Province
2004 61 $ 29,009.50 $ 29,009.50
(One claim for dog
damaQe)
2005 63 $ 33,974.75 $ 33,674.75
2006 61 $ 42,517.00 $ 42,467.00
(Two claims for
dOQ damaQe)
2007 87 $ 63,091.00 $ 62,191.00
2008 129 $108,214.00 $108,114.00
The differences in the amounts submitted to the Province and the amount paid to the
Municipality is due to the timing of the payments received around year end. In the vast
majority of cases, all claims submitted to the Province for coyote damage are reimbursed in
full.
This report is presented for information purposes.
Attachments
1. Report CLD-27 -04
1302
Attachment No.1 to
Report CLD-005-09
CI~gton
REPORT
CLERK'S DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: September 7, 2004
Report #: CLD-27-04
File #:
By-law #:
Subject:
LIVESTOCK, POULTRY AND HONEY BEE PROTECTION ACT
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
THAT Report CLD-27-04 be received for information.
, Submitted by:
Reviewed by: u,
f Chief Administrative Officer
, PlB*ct
1101
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE. ONTARIO l1C 3A6 T 905-623-3379 F 905-623-6506
1303
REPORT NO.:CLD-27-Q4
PAGE 2 OF 5
Backaround
At the Council meeting held on June 28, 2004, a resolution was passed
directing the Municipal Clerk to prepare a report regarding the Provincial
policy governing the livestock compensation process,
LeQislation
The livestock compensation process is governed by the Livestock, Poultry
and Honey Bee Protection Act (the Act). In accordance with the Act, local
municipalities are liable to the owner of livestock or poultry for the amount of
damage caused by dogs or wolves. For the purpose of the Act, local
municipalities must appoint one or more persons as valuers. When a fanner
determines that they have sustained damage to their livestock, they contact
a valuer who attends and completes a Livestock Valuers Report that is
submitted to the municipality.
OOQ Oamaoe
The Act states that any person may kill a dog that is found killing or injuring
livestock or poultry or that is found straying at any time and not under proper
control, upon premises where livestock or poultry are habitually kept. In the
case of damage caused by a dog, the municipality is entitled to recover the
amount paid from the owner of the dog. The council may conduct an inquiry
in order to ascertain the owner of a dog that has killed or injured livestock or
poultry. Once the owner of a dog has knowledge that his dog has killed or
injured livestock or poultry, he shall destroy the dog within forty-eight hours.
Wolf Oamaoe
In the case of damage caused by wolves, the municipality submits the
reports to the Ministry of Agriculture and Food and is reimbursed for the
amounts that have been paid to the owners of the livestock or poultry.
Other Wild Animals
The Act states that a local municipality may pass a by-law to provide that
where livestock or poultry are killed or injured by wild animals other than
wolves, the municipality will reimburse the owner for the damage and may
fix the maximum amount payable for any head of livestock so killed or
injured. In 1989, Council passed a resolution to deny reimbursement to
owners of livestock for damage caused by other wild animals.
1102
1304
REPORT NO.:CLD-27-04
PAGE 3 OF 5
Denial of Liabilitv
Where the valuer finds evidence to show:
a) that the livestock or poultry was not killed or injured by a dog or a
wolf;
b) that the killing or injuring was caused by a dog owned by or habitually
kept on the premises of the owner of the livestock; or
c) that the owner had not taken reasonable care to prevent the killing or
injuring of the livestock or poultry by dogs or wolves,
the council may deny liability in whole or in part,
Appeal
Should the owner of the livestock or the council be dissatisfied with the
report of the valuer, they may appeal to the director who is appointed by the
Minister. Upon appeal, the director will name a valuer who will make a
further investigation and report,
Limitation on Amount of Compensation
Part III of the Act states that where compensation is payable under the Act,
the amount shall not exceed the market value of the livestock, poultry,
honey bees or hive equipment at the time of death, injury or damage in
respect of which payment is made. If an owner received an amount under a
contract of insurance by reason of the death of or injury to livestock or
poultry, the market value of the livestock is to be reduced by that amount.
The regulations to the Act set out maximum amounts for compensation as
follows:
For a head of cattle, $1,000
For a fur-bearing animal, $100
For a goat, $200
For a horse, $500
For poultry of one owner killed or injured in any year, $1,000
For a rabbit, $20 and for all rabbits of one owner killed or injured in any
year, $1,000
For a head of sheep, $200
1103
1305
REPORT NO.:CLD-27-04
PAGE 4 OF 5
For a head of swine, $200
For honey bees, $35
For hive equipment, $75
In January 2004, with the appointment of new valuers, the amount of
compensation per claim being awarded to livestock owners decreased.
Although the market values had declined, the owners felt that the awards
had been decreased too dramatically to truly reflect the market.
In order to determine the method of calculating the compensation in past, a
long.time valuer was contacted. He advised that in many cases the lost
animal is a young calf or lamb. In those circumstances, an additional
amount of compensation has been awarded to offset the cost of feeding the
female animal until the next breeding. This compensates for the lost
potential revenue from the young animal.
To clarify this point, the Ministry was contacted, They have advised that
additional information may be factored into the value. Pedigree, genetics,
pertinent performance records, physical identification, invoices and/or sale
records and age should all be considered in determining the value. In
calculating market value, recognition should be given to breeding value that
an animal may have beyond what it is worth for slaugter purposes. The
value should, however, be based on the best estimate of the replacement
cost. The valuer should ask "What would the livestock owner have to pay to
'replace' that animal in the herd?"
Livestock Valuers Reoorts
In 2000, the Ministry amended the Report of the Livestock Valuer in order
for more information to be collected by the valuers. A copy of the form that
was used prior to the amendment is included as Attachment No.1. The new
form is included as Attachment No.2. Note that the new form has a column
on Page 3 to include an amount for "Additional Value Over Market".
In addition to the Report of the Livestock Valuer, each livestock owner must
complete an affidavit swearing to the details of the attack. This affidavit
must be signed in the presence of a Commissioner for Taking Affidavits;
Given the size of our municipality, we have applied and the Province has
appointed our valuers as Commissioners for Taking Affidavits. In this way,
the farmer can swear the affidavit at the time the valuer attends to
investigate the damage, saving them a trip into the Municipal Administrative
Centre. A copy of the Affidavit is attached hereto as Attachment No.3.
.., 1104
1306
REPORT NO.:CLD-27-o4
PAGE 5 OF 5
Claims of the Municipality
The resolution passed by Council on June 28 stated that the report being
prepared was to include the dollar value allowed per animal for each year
covering 1995 through to the end of 2003; in addition a list by year of the
claims submitted, money paid for each claim and the number of claims
rejected each year. In accordance with the municipality's record retention
by-law, the claims for the years 1995, 1996 and 1997 have been destroyed.
The total amounts for claims submitted to the Ministry for the years 1998 to
2003, inclusive, are as follows:
Compensation Paid
by Municipality and
Year Submitted to Compensation
Province Reimbursed bv Province
1998 47,655.00 47,655,00
1999 48,245,00 47,945.00
2000 25,410.75 23,210,75
2001 26,028.00 25,583,00
2002 25,732,50 25,732.50
2003 33,199.00 33,099.00
The details of each of these years are included as Attachment No.4 to this
report. Please note that these claims are only those that were submitted to
the Ministry for reimbursement.
Attachment No. 1 - Old Report of Livestock Valuer
Attachment No.2 - Revised Report of Livestock Valuer
Attachment No.3 - Affidavit
Attachment No.4 - Listing of Claims 199B to 2003
1105
1307
ClariniltDlJ
Leading the Way ~. t)
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Report #:
COD-025-09
File#_
By-law #
Subject:
TENDER CL2009-5, HIGH FLOAT RESURFACING
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-025-09 be received;
2. THAT Miller Paving Limited, Gormley, Ontario with a total revised bid in the amount of
$733,206.60 (excluding G.ST), being the lowest responsible bidder meeting all terms,
conditions and specifications of tender CL2009-5, be awarded the contract for the 2009
High Float Resurfacing as required by the Operations Department;
3. THAT funds required in the amount of $859,706.60 (which includes $733,206.60
tendering, engineering, administration and contingencies) be drawn from the Department
of Operations, 2009 Capital Budget Rural Road Resurfacing account # 110-36-330-
83680-7401; and
4.
THAT pending satisfactory pricing and service the contract is extended for an additional
one year.
Submitted by: ~~
rie Marano, H.B.Sc., C.M.O.,
Dire.9t9r'" of Corpor e Ser:vices
/ / .,
/ '/
Reviewed by: d ~...:::; ~
klinWu,
Chief Administrative Officer
MM\JDB\BH
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
1401
REPORT NO.: COD-025-09
PAGE 2
1, BACKGROUND AND COMMENT
1.1. Tender specifications were provided by AECOM for the 2009 High Float
Resurfacing as required by the Operations Department.
1.2. The tender makes provision for the extension of the agreement for a second year
provided the service is satisfactory and prices are acceptable.
1.3. Tenders were publicly advertised in the local paper as well as electronically.
Subsequently, two tenders were received and tabulated as per Schedule "A"
attached.
2, ANALYSIS
2.1. After review and analysis of the bids by the Operations Department, AECOM
Associates and Purchasing, it was mutually agreed that the low bidder, Miller
Paving Limited, Gormley, Ontario, be recommended for the contract for the 2009
High Float Resurfacing project. A copy of the recommendation memo from
AECOM, is attached as Schedule "B".
2.2. The recommended low bidder has previously performed satisfactory work for the
Municipality of Clarington.
2.3. For the information of Council, the average unit prices per tonne and cubic metre
quoted for this project represents an approximate 3% increase over the 2008 bid.
2.4. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Operations.
3. FINANCIAL IMPLICATIONS
3.1.
The low bid from Miller Paving Limited exceeds the project budget when costs for
administration, inspection, testing and contingencies are taken into consideration.
Therefore, the scope of work has been adjusted so that the project will fall within
the budget requirements.
3.2.
Details of the changes to the scope of work are outlined in the attached memo
from AECOM.
1402
REPORT NO.: COD-025-09
PAGE 3
3.3. The total project cost of $859,706.50 (which includes adjusted $733,206.60
tendering, engineering, administration and contingencies) will be drawn from the
2009 Operations Department Capital Budget Rural Road Resurfacing Account
#110-36-330-83680-7401.
3.4. The budget for the 2009 rural road resurfacing contract was approved at
$860,000.00.
4. CONCLUSION
4.1. That the low compliant bidder, Miller Paving Limited, Gormley, Ontario, be
recommended for the contract for the 2009 High Float Resurfacing project.
5. INPUT FROM OTHER SOURCES
5.1. This report has been reviewed for recommendation by the Purchasing Manager,
with the appropriate departments and circulated as follows:
Concurrence:
Director of Operations
Attachments:
Attachment 1 - Schedule "A", Bid Summary
Attachment 2 - Schedule "B", Recommendation Letter from AECOM
1403
Schedule "A"
Bid Summary
Tender CL2009-5
BIDDER TOTAL BID REVISED BID
(Excluding GST) (Excluding GST)
Miller Paving Limited $835,851.25 $733,206.60
Gormley, ON
*Royel Paving Limited $929,248.83 $821,205.89
Lindsay, ON
*mathematical correction required
1404
Schedule "B"
Recommendation Letter from AECOM
Tender CL2009-5
1405
AECOM
AECOM
300 Water Street, \lVhitby, ON, Canada L 1N 9J2
T 905,668,9363 F 905,668.0221 www.aecom.com
March 16, 2009
Mr. F. Horvath
Director of Operations
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE, ON L 1 C 3A6
Dear Sir:
Re: 2009 High Float Resurfacing Tender
Contract No. CL2009-5 (the "Contract")
Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Tuesday, February 24, 2009.
A list of the bids received is provided in the table below. All numbers are exclusive of GST.
BIDDER TOT AL BID
(GST Excluded)
Miller Paving Limited $835,851.25
Gormley, ON
Royel Paving Limited $929,248.83*
Lindsav, ON
* Mathematical Correction Required/Did not alter bid order
The Municipality of Clarington's Purchasing Department (the .Purchasing Department") reviewed all
bids. AECOM Canada Ltd. ("AECOM") has reviewed all bids accepted by the Purchasing Department
and confirmed the bid values noted above, Miller Paving Limited ("Miller") is the lowest bidder. Its
submitted tender has been reviewed and is compliant.
As requested by the Purchasing Department, references were checked only for the lowest bidder.
Miller has completed a number of similar scope projects including work for Carling Township, the
Town of East Gwillimbury, and the City of Pickering, and it has been providing this service to
Clarington for the past two years. The referenced clients were contacted and all responded
favourably.
The low bid from Miller Paving Limited exceeds the project budget when costs for administration.
inspection, testing, and contingencies are factored in. The tender documents allow the municipality to
adjust the tendered amount by up to 30% (Schedule A. Adjustment to Contract), and possible
revisions were reviewed with municipal staff to ensure budget compliance.
In order to meet the approved 2009 budget, the following actions are proposed:
1406
Page 2
Municipality of Clarington
March 16. 2009
a) After tendering this project, the municipality was informed it would be receiving Building
Canada Fund funding for paving Concession 7/8 from Highway 35/115 to the west boundary
(this is a separate project administered by the Clarington Engineering Department). This
project will therefore require the deletion of Part C, Item b), Concession 8 from this project
resulting in a saving of $50,281,
b) From the review with municipal staff, it is recommended that Part B, Item F (Concession 4
from Bragg Road westerly to the creek) be deleted resulting in a saving of $52,363.65.
Deleting the same items from Royel's bid using Royel's unit rates does not change the bid order,
The estimated costs for various project components, based on the low bid, are summarized in the
table below.
Miller Bid $835,851.25
Delete Part B, Item f) ($52,363.65)
Concession 4 (see below)
Delete Part C, Item b) ($50,281.00)
Concession 8 (see below)
II Net Value of Tender Award I $733,206.60 I
Project Costs:
Tender Prep/Administration/
Ins ection 7.5%
Materials Testing
Contingencies (7.5%)
Costs Total
oject Costs
$55,000.00
$16,500.00
$55,000.00
$126,500.00
$859,706.60
Budget
Budget Balance
$860,000.00
$293.40
Based on the references contacted regarding performance on their previous work, in our opinion, the
tender in the amount of $733,206.60 (exclusive of GST) could be awarded to Miller Paving Limited of
Gormley, Ontario, provided that all provisions of the Clarington Purchasing Bylaw have been met and
subject to allocation of funding by Council.
Should you have any questions regarding this matter, please contact the undersigned.
Sincerely,
AECOM Canada Ltd.
~b:g
ian.roger@aecom,com
IR
1407
Claringl<OlJ
Leading the Way
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Resolution #:
Report #:
COD-026-09
File #:
By-law #:
Subject:
CL2009-9, One (1) 60,000 G'v.W. Tandem Diesel Dump Truck c/w Plow Equipment
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend
to Council the following:
1. THAT Report COD-026-09 be received;
2. THAT Winslow Gerolamy Motors Limited, Peterborough, Ontario, with a total bid in the
amount of $190,352.16 (plus G.S.T.) after trade, being the lowest responsible bidder
meeting all terms, conditions and specifications of Tender CL2009-9, be awarded the
contract to supply one (1) 60,000 G.V.W. Tandem Diesel Dump Truck c/w Plow Equipment,
as required by the Municipality of Clarington, Operations Department; and
3. THAT the funds required in the amount of $190,352.16 (plus G.S.T.), be drawn from 2009
Capital Budget account number 110-36-388-83642-7401.
Submitted by: rie Marano, H.B.Sc., C.M.O.,
Direc~()r of Corpora.t ervices
/." //
~/ /.~', ,., -,-/ <(?' ----;
);/ "~'l 1'-
Nancy T lor, B. . :' ., C.A.,
Directorfof FinarfcelTreasurer
Reviewed by:
~
linWu,
Chief Administrative Officer
MM/JB/BH/km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-3330
1408
REPORT NO.: COD-026-09
PAGE 2
1, BACKGROUND AND COMMENT
1.1. Tender CL2009-9 covered the purchase of one (1) 60,000 GV.W. Tandem Diesel
Dump Truck c/w Plow Equipment. The tender was advertised and issued with bids
being received as per Schedule "A" attached.
1.2. The tender document made provision for bids with an option to trade in an existing
unit. Schedule "A" attached provides both an outright purchase price and an after
trade price.
2. ANALYSIS
2.1 Representatives from the Operations Department and Purchasing met to discuss the
bid submissions and specifications.
2.2 On review of the bids it was determined that the compliant low bidder Winslow
Gerolamy Motors Limited, Peterborough met the specifications, and offered an
acceptable trade value on the used unit. Therefore, the recommendation is to award
the contract to Winslow Gerolamy Motors Limited, Peterborough.
3. FINANCIAL IMPLICATIONS
3.1. The required funds for this acquisition total $190,352.16 (plus G.S.T.), fall within the
allocated 2009 Capital Budget for Operations.
3.2 The purchase of one (1) 60,000 G.V.W. Tandem Diesel Dump Truck c/w Plow
Equipment, is a replacement for a fleet vehicle. The Operations Department has
accepted the trade-in price for Unit # 98542.
4. CONCLUSION
4.1 To award the contract to Winslow Gerolamy Motors Limited, Peterborough, Ontario
for one (1) 60,000 G.V.W. Tandem Diesel Dump Truck c/w Plow Equipment, being
the low bid meeting all terms, conditions and specifications of Tender CL2009-9 as
required by the Operations Department.
1409
REPORT NO.: COD-026-09
PAGE 3
5, INPUT FROM OTHER SOURCES
5.1. This report has been reviewed for recommendation by the Purchasing Manager,
with the appropriate departments and circulated as follows:
Concurrence:
Director of Operations
Attachments:
Attachment 1 - Schedule "A", Bid Summary
1410
SCHEDULE "A"
BID SUMMARY
CL2009-9 ONE (1) 60,000 G,V,W. TANDEM DIESEL DUMP TRUCK CIW PLOW EQUIPMENT
BIDDER TOTAL BID (NO TRADE) TOTAL BID (AFTER TRADE)
Excluding GST Excludina GST
Winslow Gerolamy Motors Ltd. $209,900.16 $190,352.16**
Peterborough, ON
Performance Equipment Limited $218,272.30 $218,272.30
Mississauga, ON
Performance Equipment Limited $227,211.79 $227,211.79
Mississauga, ON
Durham Truck Equipment Sales & Service $216,431.36* $211, 131 .36*
Ajax, ON
*bid rejected, bid submission not signed
**trade-in accepted for Unit #98542
1411
rim. f. ;//1; 11f}...1...../0.)f1:
\JJL n-1.~ ,. .t1.
Leading the Way CJ
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30,2009
Report #:
COD-027 -09
File#_
By-law #
Subject:
Co-operative Tender T257A-2008, Supply & Delivery of Domestic Furnace Oil
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-027-09 be received;
2. THAT Ultramar Limited, Belleville, Ontario with an approximate annual value of
$32,493.75, being the lowest responsible bidder meeting all terms, conditions, and
specifications be awarded the Municipality of Clarington requirements for Co-operative
Tender T257 A-2008 Supply and Delivery of Domestic Furnace Oil for a three year term;
3. THAT pending satisfactory pricing and service the contract be extended for an additional
two years; and
4. THAT funding be provided from the current year's respective departments Operating
Budgets.
Submitted by:
Reviewed by:
ie Marano, H.B.Sc., C.M.O.,
Director of Corporate Services
Franklin Wu,
Chief Administrative Officer
MM\JDB\BH
1412
REPORT NO.: COD-027-09
PAGE 2
1. BACKGROUND AND COMMENT
1.1 A tender for the Supply and Delivery of Domestic Furnace Oil was issued on a
Co-operative basis with the Municipality of Clarington, City of Pickering, Town of
Whitby, Township of Uxbridge, Lakeridge Health Corporation, Durham District
School Board and the Region of Durham participating. The host agency for the
tender call was the Region of Durham.
1.2 The tender was publicly advertised and called for bids for the Supply and
Delivery of Domestic Furnace Oil as required by the co-operative agencies.
1.3 The contract resulting from this tender will cover the supply and delivery of
furnace oil on an as required basis for a three year term with the option to extend
for two additional years.
2. ANALYSIS
2.1 A total of four (4) bids were received, the bid submission from Lambert Oil was
disqualified as the bid was not authorized and the bid submission from Petro
Canada was disqualified as they submitted a qualified bid. The low compliant bid
was received from Ultramar Limited.
2.2 A bid for Clarington's requirements was received and tabulated as follows
Product
Ultramar Limited
Newarket, ON
Total Bid (Excludin GST)
Domestic Furnace Oil
Estimated Requirements
62,500 U ear $32,493.75
$34,625.00
2.3 Price adjustments throughout the contract are made in accordance with the
formula supplied in the tender document (i.e., based on daily rack pricing);
however the firm mark up price is fixed for the three (3) year term.
1413
REPORT NO.: COD-027-09
PAGE 3
3, FINANCIAL IMPLICATIONS
3.1 The annual consumption of domestic fuel oil from 2005 has decreased by
approximately 30% as municipal buildings are changed over from oil to gas
and/or propane. The prices are subject to the fluctuations in the marketplace.
3.2 The 2007/2008 expenditure for this contract was approximately $39,800.00 for
municipal facilities, The community halls located in Tyrone, Brownsdale and
Hayden represent an additional $13,400.00. The total expenditure was
$53,200.00.
3.3 Due to the volatility of the petroleum market, pricing is based on the daily rack
pricing (i.e., price fluctuations daily as per the market conditions) and is subject
to a fixed mark up price. A comparison of the unit cost provided with the tender
compared to the average price paid in 2008 reflects a 37% decrease, When the
market changes this unit price comparison will change significantly.
3.4 Funding will be provided from the current year's respective departments
Operating Budgets.
4. CONCLUSION
4.1 After review and analysis of the bids by Purchasing, the Operations Department
and the Durham Purchasing Co-operative, it is recommended that Ultramar
Limited be awarded the contract.
5. INPUT FROM OTHER SOURCES
5.1 This report has been reviewed for recommendation by the Purchasing Manager
with the appropriate departments and circulated as follows.
Concurrence: Director of Operations
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
1414
Clarin0f\11
Leading the Way b LV
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Resolution #:
Report #:
COD-028-09
File #:
By-law #:
Subject:
CL2009-10, One (1) 43,000 G.V.W. Single Axle Cab and Chassis c/w Snow Plow
Equipment and U Dump Body Spreader
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend
to Council the following:
1. THAT Report COD-028-09 be received;
2. THAT Winslow Gerolamy Motors Limited, Peterborough, Ontario, with a total bid in the
amount of $198,142.00 (plus G.S.T.), being the lowest responsible bidder meeting all terms,
conditions and specifications of Tender CL2009-10, be awarded the contract to supply one
(1) 43,000 G.v.W. Single Axle Chassis c/w Snow Plow Equipment and U Dump Body
Spreader, as required by the Municipality of Clarington, Operations Department; and
3. THAT the funds required in the amount of $198,142.00 (plus G.S.T.), be drawn from 2009
Capital Budget account number 110-36-388-83643-7401.
Submitted by:
Reviewed by:
~--C'~
anklin Wu,
Chief Administrative Officer
MM/JB/BH/km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-3330
1415
REPORT NO.: COD-028-09
PAGE 2
1. BACKGROUND AND COMMENT
1.1. Tender CL2009-10 covered the outright purchase of one (1) 43,000 G.V.W. Single
Axle Chassis Dump Truck comes with Snow Plow Equipment and U Dump Body
Spreader. The tender was advertised and issued with bids being received as per
Schedule "A" attached.
2. ANALYSIS
2.1 Representatives from Operations and Purchasing met to discuss the bid submission
and specifications.
2.2 The sole compliant bid was submitted by Winslow Gero/amy Motors Limited,
Peterborough. Based on previous purchases the pricing is competitive. Therefore,
the recommendation is to award the contract to Winslow Gerolamy Motors Limited,
Peterborough.
3. FINANCIAL IMPLICATIONS
3.1. The required funds for this acquisition total $198,142.20 (plus G.S.T.), fall within the
allocated 2009 Capital Budget for Operations.
3.2 The purchase of one (1) 43,000 GV.W. Single Axle Chassis Dump Truck complete
with Snow Plow Equipment and U Dump Body Spreader is a new addition to the
Operations fleet.
4. CONCLUSION
4.1 To award the contract to Winslow Gerolamy Motors Limited, Peterborough, Ontario
for one (1) 43,000 GV.W. Single Axle Chassis Dump Truck comes with Snow Plow
Equipment and U Dump Body Spreader, meeting all terms, conditions and
specifications of Tender CL2009-1 0 as required by the Operations Department.
1416
REPORT NO,: COD-028-09
PAGE 3
5. INPUT FROM OTHER SOURCES
5.1. This report has been reviewed for recommendation by the Purchasing Manager,
with the appropriate departments and circulated as follows:
Concurrence:
Director of Operations
Attachments:
Attachment 1 - Schedule "A", Bid Summary
1417
SCHEDULE "A"
BID SUMMARY
CL2009-10 ONE (1) 43,000 G,V.W. SINGLE AXLE CAB AND CHASSIS CIW SNOW PLOW
EQUIPMENT AND U DUMP BODY SPREADER
BIDDER TOTAL BID
Excluding GST
Winslow Gerolamy Motors Ltd. $198,142.00
Peterborough, ON
Performance Equipment Limited NO BID
Mississauga, ON
Durham Truck Equipment Sales & Service NO BID
Ajax, ON
1418
REPORT
FINANCE DEPARTMENT
PUBLIC MEETING
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
MONDAY MARCH 30TH, 2009
Resolution #:
Date:
Report #: FND-007-09
File #:
By-law #:
Subject:
DEVELOPMENT CHARGES AMENDMENT AND BY-LAW
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report FND-007-09 be received and approved;
2. THAT the phase-in component of the residential development charges on
Schedule "1" of the By-law No. 2005-108 be deferred from January 1,2009 to
July 1, 2009;
3. THAT the phase-in component of the non-residential (excluding Industrial)
development charges on Schedule "2" of the By-law No. 2005-108 be deferred
from January 1, 2009 to July 1, 2009;
4. THAT there is no need to alter or amend the Development Charges Amendment
Study, May 2008, prepared by Hemson Consulting Ltd.;
5. THAT the attached By-law to amend the Development Charges By-law 2005-108
as amended (Attachment #A), with any amendments recommended by the
General Purpose and Administrative Committee be recommended to Council for
approval and enactment; and
6. THAT the Region of Durham and recorded interested parties be provided a copy
of this report and be notified of Council's decision.
Reviewed by: AP.....
Franklin Wu,
Chief Administrative Officer.
NT/LG/hjl
1501
REPORT NO.: FND-007-09
PAGE 2
BACKGROUND:
1.0 At the Council meeting of December 8, 2008, the following Notice of Motion was
approved by Council Resolution #C-583-08.
WHEREAS the Municipality of Clarington's Development Charges By-Law No.
2005-108, as amended by By-Law No. 2008-104 and By-Law 2007-195 and By-
Law 2006-160, provides for annual indexing to next take place on January 1,
2009;
WHEREAS By-Law 2005-108 as amended, provides for a phasing schedule
whereby the final component of the phase-in schedule approved June 9, 2008 is
effective on January 1, 2009; and
WHEREAS Council is concerned over the combined impact of both the indexing
and the phase-in resulting in a 25 % increase in development charges quantum
during a time of economic uncertainty;
NOW THEREFORE BE IT RESOLVED that staff be directed to:
1. prepare a draft amendment to By-Law 2008-108 to defer the final component
of the phase-in increase from January 1, 2009 to July 1, 2009, and to hold the
necessary public meeting so that Council can consider the amendment as
early as possible in 2009; and
2. not increase the existing charge on January 1, 2009 for the phase-in
increase, but rather pending consideration by Council of the amendment to
the By-Law, just increase it on that date by the indexing component of By-Law
2008-108 as is standard practice in all municipalities.
2.0 DEVELOPMENT CHARGES BY-LAW AMENDMENT PROCESS:
2.1 The Development Charges Act, 1997, allows a municipality to amend an existing
development charges by-law. Section 19 of the Act sets out the requirements
related to this procedure:
19. (1) Sections 10 to 18 apply, with necessary modifications, to an
amendment to a development charges by-law other than an amendment
by, or pursuant to an order of, the Ontario Municipal Board. [emphasis
added}
19. (2) In an appeal of an amendment to a development charges by-law, the
Ontario Municipal Board may exercise its powers only in relation to the
amendment.
1502
REPORT NO.: FND-007-09
PAGE 3
2.2 To amend a development charges by-law a municipality must go through the
same public process associated with enacting a development charges by-law. It
needs to complete a background study outlining the purpose of the amendment
and the rationale for the amendment. This document serves as the background
study required under section 10 of the Act.
2.3 A municipality must hold a public meeting on the amendment, having provided
three weeks notice of the meeting, and has to make the background study and
proposed by-law amendment available two weeks prior to the meeting. The
public meeting is March 30, 2009 and was advertised commencing the week of
March 9th, 2009. The applicable documents were available at the Clerk's
Department commencing on March 11th, 2009.
2.4 Section 19(2) of the DCA is important because it allows for an amendment to an
existing by-law to be passed without exposing the unaltered portions of the by-
law to appeal. Only the amendment to the development charges by-law is
subject to appeal and consideration by the OMS.
3.0 BACKGROUND STUDY REQUIREMENTS:
3.1 Section 10(1) of the DCA, 1997, sets out the requirement for a municipality to
complete a development charge background study prior to the passage of a
development charge by-law or amendment. Subsection 10(2) identifies what is to
be included in the development charge background study. These legislative
requirements are summarized as follows:
s.1 0(2)(a) - estimate the amount, type and location of development
to which the development charge [amendment] is to apply;
s.1 0(2)(b) - establish the eligible growth-related costs and services (as
determine under paragraphs 2 to 8 of subsection 5(1) of the DCA, 1997) to
which the development charge by-law [amendment] would relate;
s.1 0(2)(c) - examine, for each service to which the development
charge by-law [amendment] relates, the long term capital and operating costs for
the capital infrastructure required.
3.2 The amendment proposed is not altering the amount, type and location of
development or growth-related capital costs that form the basis of the charge
determined in the Development Charges Amendment Study, so s.1 0(2)(a),(b)
and (c) are not relevant. The proposed amendment therefore does not require
an amendment to the 2008 Development Charges Amendment Study and this
document serves as the background study required under Section 10 of the Act.
1503
REPORT NO,: FND-007-09
PAGE 4
4.0 PROPOSED AMENDMENT:
4.1 The proposed amendment to defer the phase-in component increase from
January 1, 2009 to July 1, 2009 was done to lessen the financial burden on
residential and non-residential (excluding Industrial) construction or additions in
the first six months of 2009.
4.2 The Municipality is permitted through its Development Charges By-law to index
its municipal development charges on an annual basis effective January 1st each
year in accordance with the Statistics Canada Quarterly, Construction Price
Statistics, catalogue number 62-007 based on the 12 month period most recently
available.
4.3 The indexing percent based on the third quarter of 2008 per Statistics Canada
Quarterly, Construction Statistics catalogue number 62-007 was 11.6% which
was to be calculated on January 1, 2009 development charges.
4.4 Also effective on January 1, 2009 was the phase-in component on the residential
and non-residential (excluding Industrial) development charges so the combined
impact would be approximately a 25% increase on both types of development
charges.
4.5 Council was concerned with the high percentage increased during this time of
economic uncertainties so the January 1, 2009 phase in component on the
residential and non-residential (excluding Industrial) development charges has
been delayed to July 1, 2009.
4.6 In order to implement this proposed amendment to defer the phase-in increase
from January 1, 2009 to July 1, 2009, Schedule "1" - Residential Development
Charges and Schedule "2" - Non-Residential Development Charges of By-law
No. 2005-108 must be amended.
5.0 CONCLUSION:
5.1 Per DCA, 1997, the Development Charges By-law expires every 5 years which
necessitates that the Municipal By-law No. 2005-108 expires on June 30, 2010.
5.2 As staff will commence a full Development Charges Update Review this fall, it is
recommended that an amendment to the 2008 Development Charges
Amendment Study is not required and that this report fulfills the requirement for a
background study.
1504
REPORT NO,: FND-007-09
PAGE 5
Attachment:
Attachment "A" - By-law to amend By-law 2005-108
Interested Parties:
Region of Durham
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-4169
1505
Attachment "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LA W NO. 2009-XXX
Being a by-law to amend Municipality of Clarington
Development Charge By-law No. 2005-108, as amended by
By-law No. 2008-104, 2007-195 and By-law 2006-160.
WHEREAS Subsection 2(1) of the Development Charges Act, S,O. 1997, c.27 (the
"Act") provides that the council of a municipality may by by-law impose development charges
against land to pay for increased capital costs required because of increased needs for services
arising from the development of the area to which the by-law applies;
AND WHEREAS the Council of The Corporation of the Municipality of Cia ring ton
enacted By-law No, 2005-108 - Being a By-law to impose development charges against land in
The Municipality of Clarington pursuant to the Development Charges Act, 1997 for The
Corporation of the Municipality ofClarington. By-law No 2005-108 was amended by By-law
No, 2006-160, by By-law No. 2007-195 and by By-law 2008-104;
AND WHEREAS Council has before it the Background Study entitled "Development
Charges Amendment Study, Municipality ofClarington" dated May, 2008 and report FND-007,
09 (the "Study");
AND WHEREAS Section 19 of the Act provides for the process for an amendment to a
development charge by-law, including the requirement that a public meeting ("Public Meeting")
be held before an amendment is passed;
AND WHEREAS Council gave notice to the public of the Public Meeting and held the
Public Meeting pursuant to sections 12 and 19 of the Act on March 30, 2009, prior to which the
Study and the proposed amending by-law were made available to the public, and Council heard
comments and representation from all persons who applied to be heard and considered Report
FND-007,09 dated March 30, 2009 (the "Staff Report");
AND WHEREAS staff of the Municipality considered the public comments and
representations made at the Public Meeting and at the meeting of Council held on March 30,
2009 submitted to Council Addendum Report to Report FND-007-09 dated March 30, 2009;
AND WHEREAS at its meeting on March 30, 2009, by Resolution No. C-XXX-09
Council approved the recommendations contained in Report FND-007-09 and the Addendum
thereto;
NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE
MUNICIPALITY OF CLARINGTON ENACTS AS FOLLOWS:
I. THAT By-law No.2005-108, as amended, is further amended by deleting Schedule
"I" and "2" attached thereto and replacing it with a new Schedule "1" and "2" in the
form and with the content of Schedule "1" and "2" attached to and forming part of
this by-law.
2. This by-law comes into force and is effective on July 1,2009.
By-law read a first and second time this 6th day of April 2009.
By-Law read a third time and finally passed this 6th day of April 2009.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
1506
",~~
(
(
SCHEDULE "1"
RESIDENTIAL DEVElOPMENT CHARGES
SCHEDULE "1" TO BY-LAW NO. 2005-108, AS AMENDED
AND AS FURTHER AMENDED BY BY-LAW 2009-XXX
RESIDENTIAL DEVELOPMENT CHARGES PER UNIT
SCHEDULE BY EFFECTIVE DATE
Single and Semi-Detached
July 1, 2008
January 1, 2009
(11.6% Index Only)
July 1, 2009
(Index & Phase-In)
$13,012
$14,521
$16,224
Townhouse, Multiple and Row Units
Apartments
Large
Small
$11,353
$12,670
$14,131
$8,907
$9,940
$11,148
$5,651
$6,307
$7,065
1507
SCHEDULE "2"
NON.RESIDENTIAL DEVELOPMENT CHARGES
SCHEDULE "2" TO BY-LAW NO. 2005-108, AS AMENDED
AND AS FURTHER AMENDED BY BY-LAW 2009-XXX
NON-RESIDENTIAL DEVELOPMENT CHARGES PER
SQUARE METRE OF GROSS FLOOR AREA
SCHEDULE BY EFFECTIVE DATE
July 1, 2008 January 1, 2009 July 1, 2009 July 1, 2010
(11.6% Index Only) (Index & Phase-In) (Phase-In Only)*
Non-Residential (excluding Industrial)
$48.35
$53.96
$61.56
$69.16
Industrial
$26.89
$30.00
$34.55
$39.09
* Does not include January 1, 2010 indexing as information not yet available.
1508
REPORT
FINANCE DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
MONDAY MARCH 30TH, 2009
Resolution #:
Report #: FND-008-09
File #:
By-law #:
Subject:
MAYOR & COUNCILLOR'S REMUNERATION & EXPENSES FOR 2008
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report FND-008-09 be received;
Submitted by:
Reviewed byQ ~-2 ~
Franklin Wu,
Chief Administrative Officer.
NT/RB/AM/hjl
1509
REPORT NO,: FND-008-09
PAGE 2
BACKGROUND AND COMMENT:
Appended hereto, please find a schedule detailing the compensation paid to each Member of
Council during 2008 as required by the Municipal Act, S.O. 2001, c.25, Section 283. Also
attached is a schedule detailing compensation paid to Clarington's representatives on the
Veridian Board of Directors.
As per Resolution # GPA-445-95, passed by Council on July 15, 1995, attached is the Regional
Municipality of Durham Report # 2009-F-27 detailing the remuneration and expenses of the
Members of Council and Regional Council appointees to local boards.
Attachments:
Attachment # 1 - Remuneration & Expenses for Mayor & Councillors - January 1 to
December 31 , 2008
Attachment # 2 - Remuneration & Expenses for Members of Veridian Corporation -
January 1 to December 31, 2008
Attachment # 3 - Regional Report No. 2009-F-27
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T (905)623-3379 F (905)623-4169
1510
Expenses
exeludes G.S.T.
Other
neludes parking
nelude payment made by the Municipality for registration fee and/or
as well as direct reimbursement of expenses
meals. airfare. external kilometer reimbursement and miscellaneous charges
Conferences
Regional Councillor
+ Deputy Mayor- January to November
++Deputy Mayor- December
Notes
30,2008
to December 31,2008
accommodation
Name Basic Pay 1/3 Tax Free OMERS Municipal Gross Pay Travel Allowance Conferences Other Total
Allowance Equivalent Severance (per By-law 2008-020) (Note 1) (Note 2)
Mayor J. Abernethy $49,188.00 $24,594.00 $1,844.55 - $75,626.55 $10,536.01 $3,545.44 $1,782.33 $91,490.33
Councillor A. Foster 19.675,33 9,837.67 737.80 - 30,250.80 $6,984.00 1,055.56 - 38,290.36
Councillor R. Hooper 19,675.33 9,837.67 737.80 - 30,250,80 - 1,165.00 563.27 31,979.07
Councillor M. Novak**+ 19,675.33 9,837.67 737.80 - 30,250.80 $10,191.00 2,615.41 905.82 43,963.03
Councillor G. Robinson 19,675.33 9,837.67 737.80 30,250.80 $6,984,00 42.28 - 37,277.08
Councillor C. Trim**++ 19,675.33 9,837.67 737.80 - 30,250.80 $6,993.00 1,598.95 551.73 39,394.48
Councillor W. Woo 19.675.33 9,837.67 737.80 - 30,250.80 $6,984.00 2,126.18 1,309.83 40,670.81
Former Councillor J. Schell - - - 10,356.37 10,356.37 $0.00 - - 10,356.37
Total $167,239.98 $83,620.02 $6,271.35 10.356.37 $267,487.72 $48,672.01 $12,148.82 $5,112.98 $333,421.53
..--
'It
C
Q)
E
J::
()
.rg
;;:c
MAYOR & COUNCILLORS' REMUNERATION & EXPENSES
January 1 to December 31.2008
..-
..-
LO
..-
ncludes parking
nclude payments made by Veridian for registration
as well as direct reimbursement of expenses
Name Salary Kilometres Conferences Other Total
(Note 1) (Note 2)
J. Abernethy $ 19,000,04 $ 885.00 $19,885.04
H. Edmondson $ 15,000.04 $699,30 $262,90 $135.00 $16,097.24
A. Foster $ 16,500,04 $ 317,20 $ 135,00 $16,952.24
B. Mountford $ 17,000.04 $ 148,00 $ 1,181,53 $ 180,00 $18,509.57
Total $67,500,16 $1,164,50 $2,329,43 $450.00 $71,444,09
Notes
Conferences
Other
Expenses
excludes G,ST
meals. airfare and miscellaneous charges
fee and/or accommodation
REMUNERATION & EXPENSES OF
CLARINGTON DIRECTORS OF VERIDIAN CORPORATION
January 1 to December 31, 2008
N
"*
~
c
(])
E
.c
()
2
4:
C\J
T"""
10
T"""
Attachment #3
The Regional Municipality of Durham
Report to: The Finance and Administration Committee
From: R.J. Clapp, Commissioner of Finance
Report No.: 2009-F-27
Date: March 4, 2009
SUBJECT:
The Remuneration and Expenses in 2008 of Members of Regional Council and
Regional Council Appointees to Local Boards, as Required by Section 284(1) of the
Municipal Act, 2001, S.O. 2001, c25
RECOMMENDATION:
The Finance and Administration Committee recommend that this report be submitted to '--",
Regional Council for information.
REPORT:
As required by Section 284 (1) of the Municipal Act, 2001, I have prepared a statement
of the remuneration and expenses that were paid in 2008 to Regional Councillors and
Region~1 Council Appointees, (See attached Schedules 1 to 3 respectively).
The information concerning Regional Council appointees was obtained directly from the
Local Boards, with the exception of the Brock Township Landfill Public Liaison
Committee, Development Charges Complaint Committee, Durham Accessibility
Advisory Committee, Durham Agricultural Advisory Committee, Durham Environmental
Advisory Committee, Durham Regional Local Housing Corporation, Durham Region
Police Services Board, Durham Region Transit Commission, Energy from Waste Facility
Site Liaison Committee, Land Division Committee and the 9-1-1 Management Board,
whose accounting records are maintained by the Regional Finance Department.
~
R.J. Clapp, CA
Commissioner of Finance
Attach.
dlk\2009reports\remuneralion2008
1513
90
SCHEDULE 1
REGIONAL COUNCIL MEMBERS
2008 REMUNERATION AND EXPENSES
CONFERENCES.
REGIONAL COUNCIL CONVENTIONS
MEMBERS REMUNERATION MILEAGE & MEETINGS TOTAL
$ $ $ $
Abernethy, J, (6) 44.492,96 492,07 875,63 45.860,66
Crawford, S, 44.492,96 3,146.65 47,639,61
Cullen, A. (5) 50.472,18 565.4 7 4,460,84 55,498.49
Drumm, J. (6) 44.492,96 4,078,87 48,571,83
Emm, G. (6) 44.492,96 875.63 45,368.59
Grant. J. 44.492,96 1,357.35 1,931.30 47.781,61
Gray, J. (5) 50.4 72.18 50,472.18
Henry, J, 44.492.96 44,492.96
Herrema, H. (6) 44,492,96 748.35 640,00 45,881.31
Johnson, R 44,492.96 843,39 3,040.37 . 48,376.72
Jordan, C, 44.492.96 542.98 5,830.13 50,866.07
Kolodzie, J. 44.492.96 2,283.98 46,776,94
Littley, B. 44.492.96 986.36 2,930.56 48,409.88
Lutczyk, R 44,492,96 248.50 1,576.55 46.318.01
McLean, W. 44,492.96 548,81 2.211.47 47,253.24
McMillen, J, 44,492.96 2,702.04 1,102,55 48,297.55
Mitchell, D. (6) 44.492,96 84.98 2,127,52 46,705.46
Neal, J. 44,492.96 379.15 3,565.30 48,437.41
Nicholson, B. 44.492.96 192.85 44,685.81
Novak. M. (6) 44,492.96 1,215.84 2,576.52 48,285.32
O'Connor, L. 44,492.96 2,923.40 594.68 48,011.04
Parish, S, 44,492.96 159.47 4.348,57 49,001,00
Pearce, M, (5) 50,472.18 1,658.47 1,867.00 53,997.65
Perkins, P. (6) 44.492.96 1,645.23 46.138,19
Pidwerbecki, N, 44,492.96 394.46 1,326.23 46,213.65
Ryan, 0, 44.492.96 638,16 1,697.75 46,828.87
Shepherd, R (6) 44,492,96 1,399.09 4,869.64 50,761.69
Trim, C. (5) (6) 50,472.18 2,937.66 6,150.26 59,560.10
1,269,719.76 21,018,85 65,753,23 1,356,491.84
Pf~ 1 ~ 2
91
REGIONAL CHAIR
Anderson, R
WASTE TECHNOLOGY
TRIPS (71
Abernethy, J.
Anderson, R
Crawford. S.
Cullen, A.
Emm,G,
Johnson, R
KOlodzie, J.
Litlley. B.
Novak, M,
Pearce. M.
Perkins, P.
Pidwerbecki, N,
Trim,C.
REGIONAL COUNCIL MEMBERS
2008 REMUNERATION AND EXPENSES
REMUNERATION
$
CONFERENCES,
CONVENTIONS,
& MEETINGS
$
MILEAGE
$'
168,074,07
6,62563
24,853,04
REMUNERATION
$
TRAVEL
COSTS
$
MILEAGE
$
1,801.19
1,373.97
1,373.97
1,373.97
1.290.78
1,373.97
1,667.29
2,672.62
1,373.97
1,373.97
1,373.97
2.662.31
19,711,98
NOTES TO SCHEDULE OF REGIONAL COUNCIL MEMBERS 2008 REMUNERATION AND EXPENSES
SCHEDULE 1
(continued)
IQ!Ah
$
199,552.74
TOTAL
$
1,801.19
1,373.97
1,373,97
1,373.97
1.290.78
1,373.97
1,667.29
2,672.62
1.373,97
1,373.97
1,373,97
2,662,31
19.711,98
(1) Remuneration to the Regional Chair and Councillors is authorized by by-laws #16-2007, #01-2005. #08-2004.
#09-2007, #10-2004, #50-95, #61-93, and #142-92.
(2) The Regional Chair is provided with an automobile and is reimbursed for actual expenses incurred.
(3) Regional Councillors are reimbursed as follows:
Mileage - based on a rate per kilometre.
Conferences. Meetings. etc. - a rate of $75/day for meals. etc, without receipts; however, if the daily rate
is insufficient, actual expenses with receipts are reimbursed.
Accommodation. registration, etc. - reimbursed based on actual receipts.
(4) Expenses relating to Regional Council study and training sessions are not included in this statement.
(5) Denotes Regional Committee Chair.
(6) Remuneration is paid to Regional Councillor by the Area Municipality, and the Region reimburses the
Area Municipality.
(7) Expenses relating to the EFW Technology Trips to British Columbia and Nova Scotia,
92
PfliS f g 2
SCHEDULE 2
REGIONAL COUNCIL MEMBERS
2008 COMPENSATION PAID IN LIEU OF PENSION PLAN
REGIONAL COUNCIL
MEMBERS
IN LIEU OF PENSION
$
Crawford, S.
Cullen, A
Drumm, J.
Grant, J.
Gray, J.
Henry, J.
Johnson, R.
Jordan, C.
Kolodzie, J.
Littley, B.
Lutczyk, R.
McLean, W.
McMillen, J.
Neal, J.
Nicholson, B.
O'Connor, L.
Parish, S.
Pearce, M.
Pidwerbecki, N.
Ryan, D.
2,808.11
3,366.67
3,366.67
2,808.11
3,366.67
2,808.11
2,808.11
2,808.11
2,808.11
2,808.11
2,808.11
2,808.11
2,808.11
2,808.11
. 2,808.11
2,808.11
2,808.11
3,366.67
2,808.11
3,366.67
58,955.00
NOTES TO SCHEDULE OF REGIONAL COUNCIL MEMBERS 2008 COMPENSATION PAID
IN LIEU OF PENSION PLAN
1) Pursuant to by-law #08-2004, members of Regional Council, including the Chair, who are not enrolled in OMERS,
are entitled to compensation in lieu of a pension plan, Payment is made in the current year based on
prior year's eamings.
2) Pursuant to by-law #16-2007, the Regional Chair is enrolled in OMERS effective January 1, 2007,
93
F1aijjl1t ~ 1
REGIONAL COUNCIL
APPOINTEES
Central Lake Ontario
Conservation Authority
Crawford, S.
Cullen, A
Drumm, J,
Emm, G.
Foster, A,
Gray, J,
Hooper, R.
Johnson, R.
Mitchell, D.
Neal, J,
Nicholson, B,
Novak, M.
Pearce, M,
Perkins, p,
Ganaraska Region
Conservation Authority
Robinson, G.
Trim,C,
Kawartha Region
Conservation Authority
Hodgson, L
Hooper, R.
McMillen, J.
O'Connor, L
Lake Simcoe Region
Conservation Authority
Drew, B,
Grant, J,
Herrema, H.
Toronto & Region
Conservation Authority
Jordan, C.
Liltley, B,
O'Connor, G.
SCHEDULE 3
REGIONAL COUNCIL APPOINTEES TO LOCAL BOARDS
2008 REMUNERATION AND EXPENSES
REMUNERATION
$
CONFERENCES,
CONVENTIONS,
& MEETINGS
$
TOTAL
$
MILEAGE
$
250.00 88.40 338,40
300,00 300.00
350,00 72.80 422,80
2,850,00 145,SO 2,995,60
300.00 300.00
250.00 250,00
350.00 105.56 455.56
350,00 254.80 604.80
400.00 153,92 553.92
400,00 93.S0 493.60
350,00 350.00
350.00 94.64 444.64
400.00 232.96 632.96
400.00 116.48 516,48
7,300,00 1,358,76 8,S58,76
370.00
260.00
630,00
137.80
144.30
282, 10
507.80
404,30
912,10
700,00
550.00
700.00
1,900.00
3,850,00
676.20
596.40
210.00
1,224,30
2,706,90
1,376.20
1,146.40
910.00
3,124.30
6,556,90
5,600,00
1,200.00
1,200.00
8,00000
1,424.50
688.00
297,50
2,410,00
7,024.50
1,888.00
1,497,50
10,410,00
1,342,61
866.20
38,027,00
40,235.81
537,68
190.40
4,305,61
5,033.69
1,880.29
1,056.60
42,332.61
45,269,50
94
Pa~ 1 of4
1017
SCHEDULE 3
(continued)
REGIONAL COUNCIL APPOINTEES TO LOCAL BOARDS
2008 REMUNERATION AND EXPENSES
CONFERENCES,
CONVENTIONS.
& MEETINGS
$
REGIONAL COUNCIL
APPOINTEES
TOTAL
$
MILEAGE
$
REMUNERATION
$
Canadian National Exhibition
Agricultural Committee
3,950.44
3.95044
McMillen. J,
CTC Source Prptection
Committee
1,177.49
1,177.49
Presta. J,
Greater Toronto Transit
Authority (GO Transit)
Anderson, R
Ryan, D.
223.87
223.87
223.87
223,87
Durham Accessibility
Advisory Committee
Angus. A.
Atkinson, R
Bickle, V.
Cordahi. M,
Comeil, E.
Drumm, J.
Forsyth, E.
Heath. A.
McKenzie. 0,
Papp, A-
Roche, M,
Rundle, p,
Sutherland, M.
Wilson, D.
39.10
39.10
126.00
126,00
138.84
138.84
177. 94
126,00
303,94
Durham Agricultural
Advisory Committee
255,84 255.84
131.04 131.04
330.72 330.72
312.00 312.00
131.04 131,04
166,40 166.40
405,60 405.60
152.88 152.88
361,92 361.92
2,247.44 2,247.44
Beach, E.
Bowman, E.
Dejong, I.
Grant. J.
Gray, B.
Guthrie, N.
Kennedy, K.
Lea, R
McMillen, J,
O'Connor, K.
Pistritto, p,
Puterbaugh, F.
Risebrough, D.
Schillings. H.
Watson, T.
Westerbaan, R
Wolters, J.
Pa,ge 2 of 4
1~18
95
SCHEDULE 3
(continued)
REGIONAL COUNCIL APPOINTEES TO LOCAL BOARDS
2008 REMUNERATION AND EXPENSES
CONFERENCES.
REGIONAL COUNCIL CONVENTIONS,
APPOINTEES REMUNERATION MILEAGE & MEETINGS TOTAL
$ $ $ $
Durham Environmental
Advisory Committee
Barrington, A.
Burt,L.
Camenzuli, B.
Edwards, A, 25.00 25,00
Farmer, D, 25.00 25,00
Gillette, L. 25.00 25,00
Gray, J.
Grieve, S. 393.12 25.00 418.12
Kamey, B. 94.64 94.64
Klose, p,
Lasis, A, 25.00 25.00
Manchanda, S. "--.
Middleton, D. 25.00 25,00
Murray, K.
Pashley, J.
Shepherd. R.
Stitt, E.
White, R.
487,76 150,00 637.76
Durham Region Non-Profit
Housing Corporation
Anderson, R.
Cullen, A.
Gray, J,
O'Connor, L. 6,000.00 1,530,00 7,530.00
Pearce, M.
Perkins, P.
Trim,C.
6,000,00 1,53000 7,530,00
GTA Fare System Project
Executive Committee
Galinis, T, 184.00 184.00
Meagher, P.
184,00 184,00
GTA Fare System Project
Steering Committee
Gooding, D, 102.37 102.37
Meagher, P. 102,37
102,37
Local Diversity and
Immigration Partnership Council
Cullen, A.
Drouin, H. 3.97 48,24 52.21
3,97 48,24 52,21
96
1a~f~ 4
SCHEDULE 3
(continued)
REGIONAL COUNCIL APPOINTEES TO LOCAL BOARDS
2008 REMUNERATION AND EXPENSES
REMUNERATION
$
MilEAGE
$
CONFERENCES,
CONVENTIONS.
& MEETINGS
$
TOTAL
$
REGIONAl COUNCil
APPOINTEES
Social Housing Services
Corporation
O'Connor. L
4,850,00
835,00
2,448,99
8.133,99
land Division Committee
Collins, J.
Evans.L
Fisher. L
Graham. H.
Hedge. M.
Hurst, J.
Komamicki, J.M.
Kudla, W.
Patel, L
Sullivan, D,
Sutton. R
Taylor, W.
2,079.13 499.21 12.90 2.591.24
582.87 582.87
36.00 36.00
3,455.08 382.81 64,18 3.902.07
592.41 592.41
2.616.73 2,616.73
2,800.40 458.02 98.28 3.356.70
31.50 31.50
2.188.87 218.90 52.58 2,460.35
3,401.06 233.26 3,634.32
2,616.43 251.08 58.15 2,925.66
2,013.87 362.52 60.64 2,437,03
22.414,35 2,405,80 346,73 25.166,88
Durham Region Police
Services Board
Anderson, R
Boyle, B.
Drumm, J,
Ryan, D,
5.979,22
8.796.42
5,979.22
5,979.22
26.734,08
5.979.22
8.796.42
5,979.22
5,979.22
26,734,08
NOTE TO SCHEDULE OF REGIONAL COUNCil APPOINTEES TO lOCAL BOARDS 2008 REMUNERATION AND EXPENSES
1. No remuneration or expenses were paid to Regional Council appointees to the
- 9-1-1 Management Board,
- Association of Local Public Health Agencies,
o Association of Municipalities of Ontario,
- Brock Township Landfill Public Liaison Committee,
o Business Advisory Centre Durham.
- Development Charges Complaint Committee.
- Duffins Creek and Carruthers Creek Watershed Resource Group.
- Durham Advisory Committee on Homelessness,
- Durham Region Child and Youth Advocate,
- Durham Region Roundtable on Climate Change.
o Durham Regional Local Housing Corporation,
- Durham Trail COOrdinating Committee,
- Durham-Yorl< Residual Waste StUdy Joint Management Group,
o Energy from Waste Facility Site Liaison Committee,
. Glen Major Forest and Walker Woods Stewardship Committee.
o GTA Agricultural Action Plan Committee.
- Greater Toronto Marl<eting Alliance,
- Highway 407 East Environmental Assessment GrouP.
o Metrolinx,
. Rouge Parl< Alliance,
- South Georgian Bay-Lake Simcoe Source Protection Committee,
- Transit Advisory Committee, or the
- Trent Conservation Coalition Source Protection Committee.
97
P1~2 5 4
ClfJ!.#lgtDn
Unfinished Business
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
March 30, 2009
Report #: COD-015-09 (Addendum)
File#_
By-law #
Subject:
GARNET B. RICKARD RECREATION COMPLEX LEASE SPACE - COMMUNITY
CARE DURHAM
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend to
Council the following:
1. THAT Report COD-O 15-09 (Addendum) be received;
2. THAT Council provide staff direction with respect to the proposal from Community Care Durham to
lease the vacant space at the Garnet B. Rickard Recreation Complex;
3. THAT should Council approve the Community Care Durham proposal, the project be funded from
the General Municipal Purpose Reserve to an upset limit of $600,000.00;
4. THAT staff be authorized to proceed with a lease extension for the Beech Street Community Care
Offices on a month to month basis at the monthly rate of $1,404.48, plus GST;
5. THAT the attached By-law marked Schedule "F" authorizing the Mayor and Clerk to Execute a
lease extension agreement be approved; and
6.
THAT Community Car
decision.
Durham and the Clarington Older Adults Board be advised of Councils
Or rnAV€.Q-= Cu~
Reviewed by:
Franklin Wu,
Chief Administrative Officer
Submitted by:
Man Marano, H.B.Sc., C.M.O.,
Director of Corporate Services
~u\
trVl
Nanc Taylor, BBA, C.A.,
Director of Finance/Treasurer
MM\JDB\km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-4169
1701
REPORT COD-015-09 (Addendum)
PAGE 2 OF 6
1. BACKGROUND AND COMMENT
1.1. At the Council Meeting of March 2,2009, Report COO-015-09 (copy attached as Schedule "A") was
reviewed by Council and referred back to Corporate Services staff with the following directions:
1.1.1. THAT Community Care Durham continue to meet with Municipal Staff;
1.1.2. THAT a written report be prepared by staff and presented to the General purpose and
Administrative Services Committee as soon as possible:
1.1.3. THAT the report must include the needs, conditions and associated costs required to meet
Community Care Durham's (CCO) request;
1.1.4. THAT staff be authorized to spend up to $10,000.00; and
1.1.5. THAT LHIN's and the Ministry of Health and Long Term Care be advised of Council's decision.
1.2. As directed by Council, staff consisting of representatives from Corporate Services and Community
Services undertook the following:
1.2.1. Established an agreement with an architectural firm to provide professional services and advice
relating to the proposed renovations, prepare preliminary drawings and prepare cost estimates
of proposed lease hold improvements to the GBRRC lease space to accommodate CCO's
space requirements;
1.2.2. Met with representatives of CCO and the architectural firm's representative to determine CCO's
space requirements and the lease hold improvements needed to accommodate CCO's Home
Support and COPE Office (currently located at the Beech Centre) and the Adult Day Program
currently located in Newcastle.
1.3. Out of these meetings a workable space plan was developed that will accommodate CCO's current
needs and provide for expansion in the coming years. In addition, the review of the space
requirements and the establishment of the proposed layout afforded the architectural firm an
opportunity to review previous cost estimates as presented to Council in the attached report.
1702
REPORT COD-015-09 (Addendum)
PAGE 3 OF 6
2. ANALYSIS
2.1. Lease Hold Improvement and Professional Services Cost Estimates
2.1.1. In the initial report COD-015-09 on February 23, 2009 (copy attached as part of Schedule "A"), a cost of
$600,000.00 was provided as an estimate to cover the lease hold improvements, consulting fees and
contingencies. As directed, staff met with CCD and a representative from the architectural firm, and an
amended cost estimate for the lease hold improvements was provided, (copy attached as Schedule
"B"). This estimate amounts to $495,276.00 but did not include architectural fees or construction
contingency. These were subsequently estimated to be $55,000.00 to $60,000.00 plus disbursements
for architectural fees and $25,000.00 for construction contingency. The sum of the estimates totals
$580,276.00 and excludes the patio, however, after some discussion it was decided to increase the
contingency and include an allowance for disbursements by rounding the estimate to the original
$600,000.00. Given past experience in estimating projects of this nature and the uncertainty of the
market etc. It was deemed prudent to maintain a liberal estimate. All parties to the discussion
concurred with this approach.
2.1.2 Barring staff time, the costs to date associated with the design and estimating services provided by the
architect are approximately $2,000.00.
2.2. ANALYSIS - Community Care Durham Proposal
2.2.1. Following discussions with staff and review of the revised drawings and estimates Community Care
Durham prepared and submitted a revised lease proposal, Copy attached as Schedule "C". For
clarification, Schedule "c" references a ten year term. However, as noted in CCD's February 4th email,
the lease proposal provides for an option to renew the lease for a further ten year term.
2.2.2. Included in this proposal is consideration of the impact of inflation on utility costs. At CCD's request a
formula was developed that would provide for inflation using a 10 year average inflation applied to the
2008 utility costs attributable to the 5005 square feet of lease space and provide for a consistent
component in the gross lease rate. Actual lease payments will be on a gross lease basis with an uplift
cost included in first five years of the 10 year term to cover the cost of installing a kitchen and two
washrooms. As noted in the CCD's proposal the lease rate for the first five years would be set at
$17.00 per square foot with the rate dropping to $15.00 in the second five year period of the ten year
lease. Lease payments would be subject to GST.
1703
REPORT COD-015-09 (Addendum)
PAGE 4 OF 6
2.2.3. The lease rate for the second 10 year term would have to be negotiated in year nine of the first term to
establish a new rate or provide sufficient time for CCO to locate new facilities should negotiations fail or
CCO decides not to renew. Should CCO decide not to renew staff will require the time to source a new
tenant to minimize the time that the space sits vacant.
2.2.4. A tabulation of lease payments, lease hold improvement cost recovery and revenue is attached as
Schedule "0".
2.2.5. Assuming cost estimates are accurate, it is estimated that actual revenue will not be realized until the
last month of the ten year term. This estimate does not take into account any costs incurred to
maintain the facility throughout the lease; i.e. paint, carpet/flooring. Once year ten is reached the lease
payments less utility costs will be uncommitted revenue; barring some maintenance costs that may be
required to maintain standards and appearance.
2.2.6. For the information of Council and by way of comparison with the subject proposal, the following is a list
of some current lease rates in place at municipal facilities:
2.2.6.1. Courtice Community Complex - $14.94 per square foot, Net lease, no lease hold
improvement costs;
2.2.6.2. Courtice Community Complex - $11.75 per square foot, gross lease, no lease hold
improvement costs;
2.2.6.3. Trulls Road Fire Hall Lease Space - $20.53 square foot, gross lease, $430,000 Construction
cost, 10 year lease.
2.3. Analysis - Community Care Durham - Current Lease Arrangement @ COAA
2.3.1 The lease for the CCO space at the Clarington Older Adults facility on Beech Street expired in October
2008 and CCO is currently an over holding tenant on the same lease terms establish in 1998.
2.3.2 Regardless of the decision made with regard to the CCO proposal, they will continue as a tenant for
some time. In the event that the lease proposal is accepted CCO will continue to operate out of the
Beech Street location while the construction process is completed, and this could take upwards of one
year. In the event the proposal is not accepted and CCO is required to seek other accommodations,
time will be required to find an alternate site and have it configured to their requirements. This timing is
1704
REPORT COD-015-09 (Addendum)
PAGE 5 OF 6
an unknown at this point as, as according the CCO, suitable sites are not readily available in the
Bowmanville area.
2.3.1. Under the circumstances staff recommends that a lease extension be established to accommodate a
month to month lease under a new lease rate more reflective of the current economy. This would
necessitate a lease rate of $12.16 per square foot or $1,404.48 per month plus GST. This represents
an increase of approximately 12% over the rate established in 1998. A By-law authorizing the
execution of the proposed lease extension is attached as Schedule "F".
2.4. The extension of the lease for the Beech Street offices will increase revenue from the current $1,190.48
per month ($1,250.00 less GST) to $1,404.48 plus GST or $214.00 per month/$2,568.00 year.
3. FINANCIAL
3.1. Based on the proposal and the design requirements (see Schedule "E") put forward by CCO the
municipality's investment in lease hold improvements to accommodate the Bowmanville and Newcastle
office/program requirements will be $600,000.00. Based on the proposed lease rate the investment
would be recovered in the last month of the 9th year. Assuming the lease is extended for a further 10
years net revenue would be in the area of $55,055.00 per year plus any lease rate adjustment to reflect
inflation. Using today's figures the revenue over a 10 year period would be approximately $3,102.50
and over a 20 year period approximately $553,652.50. A more detailed revenue table is provided as
Schedule "0".
3.2. As noted in Report COO-015-09 (Schedule "A" attached) it is recommended that should Council
approve moving ahead with construction, an upset limit be established at $600,000.00 and that funding
be taken from the General Municipal Purpose Reserve Fund. On completion of the bidding process
Council will be presented with a report for approval to award the tender for construction.
4. CONCLUSION
4.1. Staff request direction on the CCO proposal. Alternatively, Council may wish to provide staff with direction
to cease discussions with CCO and issue a new RFP for the lease of the space to one or more proponents
(The municipality has been approached by at least three firms/individuals interested in leasing space at the
GBRRC since the original RFP).
4.2. In either option staff would provide a report and recommendation to award the construction tender and a
final lease for the GBRRC space, or the RFP process.
1705
REPORT COD-015-09 (Addendum)
PAGE 6 OF 6
4.3. This report has been reviewed for recommendation by the Purchasing Manager and the appropriate
department and circulated as follows:
Concurrence: Director of Community Services
Attachments:
Attachment 1-
Attachment 2-
Attachment 3-
Attachment 4-
Attachment 5-
Attachment 6-
Schedule "A", Report COD-015-09, February 23, 2009
Schedule "B", Consultant's Estimate of Construction Cost
Schedule "C", Community Care Durham Proposal dated March 17,2009
Schedule "0", Community Care Durham - Proposed Lease/Revenue Table
Schedule "E", Proposed Lease Space - Space Plan Designed by CCD
Schedule "F", By-law
1706
SCHEDULE "A"
ClWil1gron
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
General Purpose and Administration Committee
Resolution #:~ f /1-153-09
February 23, 2009
Date:
Report #: COD-015-09
File #:
By-law #:
SUBJECT: GARNET B. RICKARD RECREATION COMPLEX LEASE SPACE-
COMMUNITY CARE DURHAM
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-015-09 be received;
2. THAT Council provide staff direction with respect to the proposal from Community
Care Durham to lease the vacant space at the Garnet B. Rickard Recreation
Complex; and
3. THAT Community Care Durham and the Clarington Older Adults Board be
advised of Council~ decision.
Submitted by:
"&1~-
Marie Marano, H.B.Sc" C.M.a.,
Director of Corporate Services
Reviewed by:
6f~C~ ~
Franklin Wu,
Chief Administrative Officer
gai: ~k---
n A Nancy Taylor, B.SA, CA
~ \. Director of FinancerTreasurer
MM/JBli<m
CORRPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
1707
SCHEDULE "A"
REPORT NO.: COD-015-09
PAGE 2
1. BACKGROUND
1.1 At their meeting of November 10, 2009, Council provided staff with direction to proceed to
negotiations with Community Care Durham (CCD) for lease of space required to house
Community Care staff and operations currently located at the Clarington Beech Centre. This
was in response to a letter from Community Care Durham, dated October 14, 2008, indicating
that they were interested in pursuing this approach after determining that the cost to convert
the site at GBRRC to house both the Bowmanville office and the Newcastle Adult Day
Program in a single facility was cost prohibitive. A copy of the letter is attached as Schedule
"A",
1 .2 Discussions began with Community Care Durham in November 2008 and space requirements
were determined to be in the area of 2,000 square feet. Once the space requirements were
determined Durham Community Care staff went back to their space consultant to determine
office layout then to their contractor to establish an estimated to construct the office space
required to house staff from their Beech Street Offices.
1 ,3 By email dated February 4, 2009 Durham Community Care, (Schedule "B" attached) provided
notice that they had found the cost to construct the required offices to be prohibitive. They
also reiterated that their preference was to relocate both the Bowmanville office and the
Newcastle Adult Day Program to the same facility. With this in mind, CCD proposed that they
were interested in acquiring the complete GBRRC space of 5,005 square feet at a gross lease
of $13.00 per square foot. A gross lease includes all utilities, snow clearing and waste
removal. This proposal is contingent on the Municipality constructing the required space,
including offices, washrooms, kitchen facility, improved access, additional windows and use of
the patio.
1.4 The lease rate did not speak to the issue of G.S.T. (5%) which is normally extra to the lease
rate. In this case with the G.S.T extra it would amount to $0.65 per square foot. If CGD is
working on the assumption that the $13.00 rate includes G.S.T. the actual lease rate per
square foot would be $12.38 per square foot.
1.5 CCD and the Older Adult Board have been provided a copy of this report at the time of
signature to allow representatives to speak to the proposals at GP&A.
2. COMMENTS/OPTIONS
2.1 For comparison purposes the following schedule provides a comparison of the proposed
lease submitted by Community Care Durham against alternate options together with a
breakdown of the original proposal received in response to the RFP issued in 2008. 1708
SCHEDULE II A"
REPORT NO.: COD-015-09
PAGE 3
LEASE OPTIONS
Direction Requested: Option A Option B
Garnet B. Rickard Recreation Complex CCO Staff Proposal
Total Space Available - 5005 sq. ft. 2009
Proposal
Lease hold Improvement Costs
Municipality Cost - Maximum Approval $600,000.00 $600,000,00
Community Care Durham Cost NIL NIL
Lease Rate Proposed/Recommended $13.00/sq. ft. $20.00/sq. ft.
Utilities Included Extra
GST Not specified Extra
Annual Revenue
Assuming GST Extra or $65,065.00 $100,100.00
AssuminQ GST Included $61,961,90
Time required too recover municipal
investment.
Assuming GST Extra or 9.22 years(1) 5.99 years
Assuming GST Included 9.68 years(1)
Actual revenue earned in
5 years NIL NIL
10 years GST Extra or $50,750.70(2) $401,401.00
10 years GST Included $19,827.81 (2)
Escalation Clause Not included CPlor
reasonable
inflation rate
UTILITY OPTIONS
Community Care
Durham
2008 Proposal
$205,000.00
$250,000.00
$12.00/sq. ft.
Included
Extra
$60,060.00
3.41 years(1)
$95,300.00(2)
$395,600.00
Option 1 Option 2
Staff Proposal
Lease format for the selected Gross Lease including utilities, Net Lease, excluding utilities,
lease rate in Option A or B heat/AC, snow clearing, waste heat/AC, excluding GST
removal, excludinQ GST
Term - Recommended 10 year, with 10 year option to renew if conditions remain acceptable to
the Municipality.
Notes
(1) This does not consider the cost of utilities or the lost interest on funds used for lease hold
improvements
(2) Utility costs are not factored into this calculation. Estimated utility cost per year for the leased area
- $16,500.00, based on 2007 calendar year.
(3) FOR COMPARISON
$15.00 = Annual Revenue $75,075.00, Payback 8 year, GST and Utilities paid by CCO
$17.00 = Annual Revenue $85,085.00, Payback 7 years, GST paid by CCO; Net Lease
1709
SCHEDULE" A"
REPORT NO.: COD-015-09
PAGE 4
2.2 Lease Hold Cost 1 Recovery Now Proposed bv CCO at $13.00/so. ft. Lease Rate:
Based on a square footage of 5,005 square feet and the lease rate offered by CCO the annual
lease revenue would total $65,065.00 exclusive of 5% G.S.T. paid by CCO. It is estimated
that the construction and completion costs per CCO's proposal would be approximately
$600,000.00 estimated on Schedule "C"; therefore it would take approximately 9.22 years to
recover the costs with no revenue realized until after that time. CCO has also offered a 10
year extension which will provide total revenue of $701,300.00 total revenue over the 20 year
proposed life of the lease. These figures are based on the lease rate remaining constant
throughout the lease period. If the lease rate proposed is meant to include GST the payback
period increases slightly to 9.68 years. If an inflation factor is build into the arrangement, the
payback would improve as would the revenue over the lease period.
2.3 The 10 year recovery does not take into account the cost to heat, air condition and light the
facility. The estimated annual utilities cost would be $16,500.00, based on average 2007
Rickard Arena costs. When these elements are taken into consideration the payback period of
the construction cost increases.
2.4 Please note that this is a very rough estimate and would require confirmation of cost estimates
by an architect. This estimate does include architectural services including project
management at approximately $85,000.00.
2.5 Initial 2008 ProDosal bv CCO:
In the initial discussions with CCO in 2008 when the Municipality was providing approximately
$205,000.00 in leasehold improvements and CCO was covering the office construction
estimated at approximately $250,000.00, the pay-back period for municipal investment was
estimated to be approximately 3.41 years.
2,6 Given that the current proposal will require the municipality to invest $600,000.00 not
contemplated in the budget, the funds will have to be provided from reserve funds. The
proposals do not assess the lost opportunity cost (foregone interest) in the amount of
approximately $119,400.00 for 5 years (interest rate estimated at 3.98%) or approximately
$273,600.00 over 10 years (interest rate estimate - 4.56%), in determining payback and the
viability of this proposal. Also, this report does not speak to the matter of potential revenue
from tenants who may not require significant leasehold improvements,
1710
SCHEDULE "A"
REPORT NO,: COD-015-09
PAGE 5
2.7 Working on the assumption that a 5 year pay-back which was reasonably close to the
municipality's investment contemplated in the 2008 discussions was an acceptable
arrangement, the lease rate on the proposed arrangement put forward by CCO would require
a lease rate of approximately $20,00 per square foot.
2.8 One of the areas noted in the CCO e-mail of February 4th, Schedule B, is the requirement of
the patio with fencing. This requirement has been reviewed with Community Services and this
area has been traditionally used by Community Services programming staff and in
addition, various groups renting our Multi Purpose area of the facility, especially the many
weddings and banquets, where the adjoining patio has served quite useful. Under the
circumstances, unless a sharing arrangement could be made, this requirement could not be
met. Please note that the total construction cost estimate retains the value of the patio in the
event a sharing arrangement can be made otherwise it will be deleted from the construction
estimate.
3, FINANCIAL IMPLICATIONS
3.1 It is recommended that should Council approve moving ahead with construction, an upset limit
be established at $600,000.00. The funds are recommended to be funded from the General
Municipal Purpose Reserve Fund.
3.2 Council is facing a complex issue of accommodating the spatial requirements of the Older
Adults Association which is a municipal mandate. At the same time it may be advisable to
consider the potential ramifications for the request from CCO to set a precedent for other non-
municipal agencies who may wish to seek accommodations at a reasonable rate with no
investment from the requesting agency.
4, CONCLUSON
4.1 After reviewing the proposal from CCO it is expected that costs to complete the renovations
will be high and the requirement to provide a reasonable payback would make the lease rate
at $20.00 unmanageable for CCO.
4.2 Under the circumstances staff request direction. Alternatively, Council may wish to provide
staff with direction to cease discussions with CCO and issue a new RFP for the lease of the
space to one or more proponents (The municipality has been approached by at least three
firms/individuals interested in leasing space at the GBRRC since the original RFP).
1711
SCHEDULE "A"
REPORT NO,: COD-01S-09
PAGE6
4.3 In either option staff would provide a report and recommendation on the results of the
construction tender options and a final lease for the GBRRC space, or the RFP process.
4.4 Community Care Durham is currently an over-holding tenant at the Beech Street location as
their lease expired October 31, 2008. Staff will be providing a subsequent report on this
matter once this report is dealt with and staff has direction.
4.5 This report has been reviewed for recommendation by the Purchasing Manager and the
appropriate department and circulated as follows:
Concurrence: Director of Community Services
1712
COPE Mental Health
Program
Individual Support
Group Support
Education
Home Support
Program
Meals on Wheels
Transportation
Accessible Van
Friendly Visiting
Fool Care Clinics
Luncheon Out
Telephone Reassurance
Home Maintenance
Home Help
Respite Program
Adult Day Programs
In-Home Respite
Offices Serving
Ajax-Pickering
Brock
Clarington
Oshawa
Scugog
Uxbridge
Whitby
Charitable Reg.#
11888 Q9SS RROOO I
V o/unteer and
become an
everyday hero
.
A United Way
Member Agency
SCHEDULE" A"
SCHEDULE" A"
~
Community Care Durham
Clarington
October 14, 2008
26 Beech Avenue
Bowmanville I ON L 1 C 3A2
COPE Mental Health Program
Tel: 905-623-4123 · Fax: 905-623-2604
Home Support Program
Tel: 905-623-2261 . Fax: 905-623-2604
Respite Program
Adult Day Program
Tel: 1-888-255-6680. Fax: 905-837-6768
www.communitycaredurham.on.ca
Mr. Jerry Barber
The Corporation of the Municipality
of Clarington
Manager Purchasing Office
40 Temperance Street
Bowmanville, ON L I C 3A6
Dear Jerry:
Re:
Lease Agreement between Community Care Durham and the
Municipality of CIa ring ton for office space at 26 Beech Avenue
Further to recent correspondence with the Municipality of Clarington and the
determination that there are currently no suitable locations in the Clarington area in
which to expand our programs, Community Care Durham (CCD) is requesting a lease
renewal for office space at 26 Beech A venue. As you are aware we are also seeking
additional space at the Beech Centre.
On June 5,2008, Community Care Durham submitted a proposal to the Municipality
of Clarington to lease 5005 square feet of space at the Garnet B. Rickard Recreation
Complex, This new space would have allowed Community Care Durham to operate
all of their Clarington community support services from the one location. including the
Adult Day Program.
Due to the present dysfunctional layout for office space at the Rickard Centre, and
based on feasibility drawings and an estimate from a contractor, it was deemed that the
cost to improve this space would be far too substantial for Community Dare Durham
to absorb.
However, should the Municipality undertake to renovate this space for office use
(including windows) CeD would be agreeable to relocate their Home Support and
COPE programs presently serviced from the Beech A venue location. Converting this
space to office use would also allow for a variety of other office tenants to share in this
space, including perhaps a meeting room that could be rented.
Helping people live at home
1713
SCHEDULE" A"
SCHEDULE" A"
Mr, Jerry Barber
Municipality of Clarington
October 14. 2008
Page 2
Community Care Durham's references will attest to our stability, long term tenancy and timely
monthly payments,
Thank you for your assistance in this matter.
Sincerely,
I3MJr ~tk:J
pIA. ..4-6
Barbara Murcott
Director, Administration & Finance
cc: Mayor Jim Abernethy, Municipality of Clarington
Frank Wu, Municipality of Clarington
Brent Farr, Community Care Durham
Sally Barrie, Community Care Durham
1714
SCHEDULE" A"
Page 1 of2
SCHEDULE "B"
Barber, Jerry
From: Brent Farr [bfarr@communitycaredurham.on,caj
Sent: Wednesday, February 04,200910:35 AM
To: Barber, Jerry
Cc: MayorsExternalMailGroup
Subject: Garnet B. Rickard Recreation Complex
Hi Jerry,
In follow up to your email and telephone call to Barb Murcott last week, this will set out Community
Care Durham's position regarding our potential move to the Garnet B. Rickard Recreation Complex.
Subject to the satisfaction of the challenges presented in this correspondence, Community Care Durham
would be prepared to offer the Municipality of Clarington a ten year lease, with a ten year option to
renew, on the 5,100 square feet of space in the Rickard Complex to move both our Home Support and
COPE office (currently located in the Beech Centre) and our Adult Day Program (currently located in
Newcastle).
We would be prepared to offer $13.00 per square foot on a gross lease basis. As a result of an expansion
of the existing space for these programs and an increase in lease rate compared to the Beech Centre,
Community Care Durham would incur an additional $22,000 per year in rent costs based on this $13.00
per square foot.
Due to our organizational needs and new integration initiatives by the Central East Local Health
Integration Network (our primary funder), it is considered prudent that we collocate the Home Support,
COPE, and Adult Day Program together.
In order for this move to be viable for Community Care Durham, we are in a financial position to only
invest funds in our own interior furnishings and equipment. Therefore, the challenges we face in order
to make this new space in the Rickard Complex "office appropriate" are:
. Ample exterior windows (as feasible)
. Two private accessible washrooms in designated Adult Day Program
. Kitchenette with sink in designated Home Support / COPE area
. Roughed-in plumbing for a full kitchen in the Adult Day Program
. Approximately six completed offices in designated areas
. Tile or carpet floor coverings in designated areas
. Drop T -bar ceiling
. Patio with fencing
. Sprinkler system as required by code on finished space
. Soundproofing in areas where required (e.g. between gym and Community Care)
I recommend that we attend a meeting with the Mayor and the appropriate Municipal department heads
as soon as possible to move this opportunity forward as it has been some time since we commenced
negotiations.
Thank you,
Brent Farr
1715
SCHEDULE" A"
Page 2 of2
SCHEDULE" B"
Brent Farr
Executive Director
Community Care Durham
419 King Street West, Unit 605
Oshawa, Ontario L1J 2K5
Email: bfarr@communitycaredurham.on.ca
Tel: 905-404-2224 ext. 25
Web Site: www,,-c..Qmmunit\'.~Mgdl.lrllitm.on.CQ
Supporting People, Strengthening Community
Confidential: This email and any attachments transmitted with it are confidential and intended
solely for the use of the individual or entity to which they are addressed, If you have received this
email in error please notify the sender and delete the e-mail immediately, If you are not the
intended recipient you are notified that disclosing, copying, distributing or taking any action in
reliance on the contents of this information is strictly prohibited.
Le present courriel (email) et les documents qui y sont attaches sont confidentiels et proteges et
s'adressent exclusivement au destinataire mentionne ci-dessus. L'expediteur ne renonce pas aux
droits et obligations qui s'y rapportent. Toute prise de connaissance, diffusion, utilisation ou
reproduction de ce message ou des documents qui y sont attaches, ainsi que des renseignements
que chacun contient, par une personne autre que Ie destinataire designe est interdite. Si vous
recevez ce courriel par erreur, veuillez m'en aviser immediatement et veuillez Ie detruire avec les
documents qui y sont attaches.
No virus found in this outgoing message.
Checked by A VG.
Version: 7.5.552/ Virus Database: 270.10.17/1934 - Release Date: 2/4/2009 8:24 AM
1716
.... /1 ~ ,'" f\f\()
SCHEDULE" A"
SCHEDULE"C"
ESTIMATED CONSTRUCTION ELEMENTS AND COST
Estimated Cost of
Construction elements
Fire Rating $30,000.00
Addition of windows on south facing wall and east facing wall $35,000.00
Plumbing for Washrooms & Kitchen $40,000.00
Flooring $25,000.00
Ceiling $60,000.00
Offices, kitchenette and washrooms $250,000.00
Patio $25,000.00
New entrance from exterior of Building $25,000.00
Contingency $25,000.00
Design and inspection $85,000.00
Total Capital Cost (maximum limit of approval for project) $600,000.00*
* Estimates have been confirmed with an architect as being reasonable.
1717
SCHEDULE "B" CONSULTANT'S ESTIMATE OF CONSTRUCTION COST
88A P09-052
Cost Estimate No.1
Rickard: Communit Care Durham
A Shell
A3 Exterior Enclosures
A32 Walls Above Grade
A33 Windows and Entrances
A34 Roof Coverin
8 Interiors
81 Partitions & Doors
811 Partitions
812 Doors
82 Finishes
821 Flooring Finishes
822 Ceiling Finishes
B23 Wall Finishes
83 Fittings & Equi pment
B31 Fittings & Fixtures
B32 E ui ment: install
C Services
C1 Mechanical
C11 Plumbing & Drainage
C 12 Fire Protection
C13 HVAC
C14 Controls
C2 Electrical
C21 Service & Distribution
C22 Lighting, Devices, Heat'g
C23 S stems & Ancillaries
Net 8uildin Cost - Excludin Site
o Site & Ancilla Work
D1 Site Work
D11 Site Development
D13 Elect, Site Services
D2 Ancillary Work
D21 Demolition
022 Alterations
Net 8uildin Cost - Includin Site
21 General Requirements & Fee
211 General Req'ts 5% NBC
212 Fee 10% NBC
Total- Excludin Allowances
22 Allowances
221 Design Allowance 5% TEA
222 Escalation Allow: 2% TEA
Total - Includin Allowances
Goods & Services Tax 5%
Total Construction Estimate
~ ~j~~~j ~ ~H~;; H~~;~~H~;HH~~;~Hj~H
$160,500
$182,000
125,000
i:;:1:1:~ :i;~;i:~:i:l:1:i:1:ii~:~i~:~;?
incl.
incl.
incl.
incl.
incl.
~HHm~~;~nHWHHHmH~~mH~~
377 500
$25,000
o
1 ~~~ ~~~ ~ ~ ~~ n ~ ~.~~ ;HH~~ ~~1~~~~I ~~~i 1 ~.~
"'!illlliji
'm;:!\m'\'i":'~'~~~ :~~~
25,000
.111111111111
nm',,:::"'m"1m!~1!! ,:",,,,,,,,,,,,illi~i~:il
$462875
i~HiHniigH%iiiiii~ij1HiHiHii 32401
, ',','.' """""'2~:~~:' i!lillllllllllllllllllllllllfill!11111
$495,276
~HHHmnnmH!miHH1qmm 24,764
$520,040
1718
COPE Mental Health
Program
I ndividual Support
Group Support
Education
Home Support
Program
Meals on Wheels
Transportation
Accessible Van
Friendly Visiting
Foot Care Clinics
Luncheon Out
Telephone Reassurance
Home Maintenance
Homa Help
Respite Program
Adult Day Programs
In. Home Respite
OffIces Serving
Ajax-Pickering
Brock
Claringlon
Oshawa
Scugog
Uxbridge
Whitby
Charitable Reg.#
11888 9955 RROOO I
Volunteer and
become an
everyday hero
.
A United Way
Membar Agency
SCHEDULE "C" COMMUNITY CARE DURHAM PROPOSAL dated March 17 2009
,
~) Community Care Durham
March 17, 2009
Oshawa Centre
419 King Street West, Suite #605
Oshawa, ON L 1J 2K5
Tel: 905-404.2224. Fax: 905-404-2241
www.communitycaredurham.on.ca
Mr. Jerry Barber
Manager, Purchasing Services
The Corporation of the Municipality of Clarington
40 Temperance Street
Bowmanville, ON LIC 3A6
Dear Jerry:
Re: Gamet B. Rickard Recreation Complex (GBRRC)
Thank you for your email yesterday, The following sets out the financial terms of
Community Care Durham's offer to lease the available 5,005 square feet in the
GBRRC:
Annual Base Rent:
· $11.00 per square foot, plus GST, for the term of the ten year lease.
Annual Utilities:
. $3.90 per square foot, plus GST, for the first five years of the ten year lease,
and $4.00 per square foot, plus GST, for the next five years of the ten year
lease. This amount approximates the $19,564 for annual Municipal costs for
utilities (based on 10 year average inflation) as per your calculation.
Leasehold Improvements:
· $2.10 per square foot, plus GST, each year for the first five years of the ten
year lease. This amount equates a $50,000 (plus GST) contribution towards
the kitchen and two washrooms. This amount includes a 2% interest factor,
i.e. $2,552 for your financing costs over the five years.
In summary, the annual gross rental rate for the first five years would be $17.00 per
square foot, and the annual gross rental rate for the next five years would be $15.00
per square foot.
Please contact me if you require any additional information, otherwise I look forward
to Council's response.
?L
Brent Farr
Executive Director
Helping people live at home
1719
D
SCHEDULE
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
Estimated
Revenue over the
20 Year Lease
Term
Estimated
Revenue over the
10 Year Lease
Term
PROPOSED LEASE
Utilities Calculation
COMMUNITY CARE DURHAM
Annual
Proposed
Lease Rate
Garnet 8, Rickard Recreation Complex
600.000.00
600.000,00
5005
Estimate
Total Space Available - sq. ft,
Cost
mprovement
Lease Hold
GST Extra
$1,101.100.00
$52,552.50
$1,153,652.50
$553,652.50
$550,550.00
$52,552.50
$603,102.50
$3.102.50
$195,640.00
$97,597,50
$100,100.00
$197,697.50
$2.057.50
$55.055,00
$19,519,50
$20,020.00
$10.510.50
00
$3,90
$4.00
10
2
$11
Lease Rate Proposed Sq
Annual Base Rent
Estimated utility cost over 10 year period
Annual Utilities - 1 st 5 yrs (1)
Annual Utilities - 2nd 5 yrs (1)
Total Utility Payment
Estimated Utility Over Payment
Leasehold improvements! 5 years
Total Lease Payments
Ft
Actual Revenue
Time required to recover municipa
investment - Gross Lease
9.95 Years
9.95 Years
NOTE
(1) Util
10 year average Inflation factor.
year actual and extended to a 10 year term uSing a
to 5 Inclusive = $17.00 Sq, Ft Plus GST
to 10 inclusive = $15,00 Sq. Ft. Plus GST
1
ity costs are based on
years 1
years 6
rate for
rate for
lease
lease
Gross
Gross
-"
-....J
I'\)
o
SCHEDULE "E" PROPOSED LEASE SPACE - SPACE PLAN DESIGNED BY CCD
.
~
~
I \'::
'>
0 ~
I ~
~
~ ~
::z 0 0
() 0 :x.
0 0
0 ~
'2
0 t ~
3
!
~
~
~
p
00
0
l-~ ~
We i: 11.
~[t ~ u.
0
\II ~ .,., \rl
~ 3 ~ ~
<
~ ~
III or,
P V' "" 11\ III ~
~L 3 "3 3 3
:::. '2
Ij1 "5
lJ~ ~ If' c~ ~ V1 S
3 3: S :<; \J}
-Z
o 0'
DO C
:i to ~
i tOO
I' f Cl D
c. ~
& 0 L'
lJ C...J C
I D:J 0
jL?O _ ~.f1
~
~
.:J
':;>JEl', '>@ldCJ:l
:j
i:
I,.
"
~
\l.
"-
.::)
~
'"
I
i l-
I -
I ~
!
i
.----
I-
I
1721
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
Schedule "F"
BY-LAW 2009-
Being a By-law to authorize a contract between the Corporation of the
Municipality of Clarington and Community Care Durham, Bowmanville,
Ontario, to enter into agreement for the leased space at 26 Beech
Street, Bowmanville, ON.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of
the Municipality of Clarington and seal with the Corporation Seal, an agreement between
Community Care Durham, Bowmanville, Ontario, and said Corporation; and
2. THAT the agreement attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of.
,2009.
By-law read a third time and finally passed this
day of
,2009.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
1722
HANDOUTS/CIRCULA TIONS
COUNCIL
CWJ!Jgron
MEMO
CLERK'S DEPARTMENT
To:
From:
Date:
Subject:
Mayor Abernethy and Members of Council
Anne Greentree, Deputy Clerk
March 27, 2009
GENERAL PURPOSE & ADMINISTRATION COMMITTEE MEETING
AGENDA - MARCH 30, 2009 - UPDATE
Please be advised of the following amendments to the GPA agenda for the meeting to be
held on Monday, March 30, 2009:
6, DELEGATIONS
See attached Filial List.
8. PLANNING SERVICES
(a) Report PSD-031-09 - GROWTH PLAN IMPLEMENTATION - PROPOSED
AMENDMENT TO REGIONAL OFFICIAL PLAN
Your Agenda indicated that Report PSD-031 ,09 would be distributed under separate
cover. A hard copy of the report was delivered to you earlier today. For your
convenience, an electronic copy is attached to this email.
19. COMMUNICATIONS
Addition:
(a) Leiter from Wayne Clarke, Halloway Holdings Limited - Regarding Public
Meeting Respecting Report FND-007-09 - Amendment to Development Charges
-law 2005-108
tree, Deput lerk
Enc.
cc: F. Wu. Chief Administrative Officer
Department Heads
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-6506
FINAL LIST
OF DELEGATIONS
GPA Meeting: March 30, 2009
(a) Alice Grottoli, Community Connection, Regarding Consent for 211 Service
Delivery in Shared Telephone Exchange
(b) Kevin Anyan, Rotary Club Bowmanville, Regarding Report CSD-007-09,
Rotary Ribfest
(c) Victor Suppan, Chair, Heritage Committee, Regarding Report
PSD-033-09, Highway 407 East Environmental Assessment
(d) Libby Racansky, Regarding Report PSD-031-09, Growth Plan
(e) Libby Racansky, Regarding Report PSD-033,09, Highway 407 East
Environmental Assessment
(f) Richard Ward, Regarding Tax Situation
(g) Jim Richards, Regarding Council Resolutions Not Being Supported By
Regional Councillor(s) at the Regional Level
(h) Linda Gasser, Regarding Energy-From-Waste Host Community
Agreement
(i) Linda Gasser, Regarding Energy-From-Waste Monitoring
ll1'"\.LLV VV J-\. I nVLUll'l U~ LIlVlll v.,U
HALLOWAY HOLDINGS LIMITED
BUIl,DING FOR YOU SINCE 1922
March 27, 2009
Mayor Jim Abernathy.
Members of Clal'ington Council
40 Temperance Street
Bowmanville, Ontario
LlC 3A6
Be: Development Charge Amendment and By-Law for Proposed Non-Residential
Phase-ln Increases
Section 20 of By.Law 2005-18, a By-Law to impose development charges against land in
the Municipality of Clarington, lists ten public and other buildings that are exempt from
development charges. They are as follows;
I. Hospitals
2. MunicipaJ/& or Region owned buildings
3. Places of Worship
4, Board of Education owned buildings
5. Colleges of Applied Arts
6, Universities
7, Clarington Science park & Energy Park
8, Registered Charity Organizations
9. Conversion ofland or buildings within designated revitalization areas
10, Professional office of licensed Medical Practioners
i
Two additional By-Laws (2006-160 exempts Hotels) and (2007-108 allows for a 50%
discount for Major Office Buildings that are Leed Certified).
This places an added financial burden on retail/commercial and industrial Site Plan
Applications to cover the proposed Non-Residential increases found in Report FND-007-
09.
Ii
I'
As stated, in previous correspondence (May 29,2008) our current and future commercial
tenants could not afford to pay the proposed fees increases. At that time our Townline
and Clarington Centres currently had over 25,000 sq. ft, of vacant retail space, today that
total exceeds 29,600 sq. ft. How this current economic cycle has effected Clarington is
evident from a Planning Services Report (pSD-015-09 dated February 2, 2009) titled
"Annual Report on Site Plan Activities 2008",
"177 NonqG'o-nRoad, 20m Floor, '6sh-;;Y:a:C>i,;'~ioT1G'3S2'-"
Tel: 905.579,1()26
Fax: 905..579-9472
SS8-~ 200/r00d 8vS-l
2Lv6-6LS-S06
AEMOTTEH/dnoJ9 N~d-WO~~ sr:Vr 60,-L2-S0
-2-
Paragraph 2.2 states Commercial and Industrial land used applications accounted for only
17% each of all site plans received in 2008, However, in 2007 45% were Commercial
and 23% Industrial. Further more paragraph 3.1, states "Site plan activity in 2008 has
deviated from recent trends as growth in the commercial sector has slowed down in
comparison to previous years",
I respectfully request Clarington Council consider a freeze of indexing/increases of Non-
Residential Development Charges for the duration of DC By-Law #2005,108,
Yours truly,
e~
Property Manager
RH:kd
Co: Nancy Taylor (Treasurer)
Patti Barrie (Town Clerk)
;j
8S8-~ Z00!Z00d 8vS-l
ZLv6-6LS-S06
AEMOIIEH!dnOJ8 N~d-WOH~ 8t:vt 60,-LZ-80
ClYl-!lJgton
REPORT
PLANNING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
Monday, March 30, 2009
Report #: PSD-031-09
File #: PLN 1.1.12
By-law #:
Subject:
GROWTH PLAN IMPLEMENTATION - PROPOSED AMENDMENT TO THE
REGIONAL OFFICIAL PLAN
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee recommend to
Council the following:
1. THAT Report PSD-031-09 be received;
2. THAT the recommendations below and the comments noted throughout this Report in bold italics
be ENDORSED as the Municipality's comments on the Region's proposed Official Plan Amendment
to implement the Growth Plan for the Greater Golden Horseshoe;
3. THAT the Region of Durham be requested to:
a) Incorporate appropriate assumptions that Clarington will be a "complete community" as defined
by the Provincial Growth Plan and meets a minimum of 1 job for 3 residents within the
Municipality of Clarington, a target previously endorsed by the Region of Durham in approving
the Clarington Official Plan;
b) Provide for additional employment lands near the Courtice Road interchange and the Durham
East Link and, if necessary, make adjustments to employment areas lands in north-east
Pickering and Whitby to accommodate this;
c) Proceed with the resolution of Deferral Area #4 in Orono for industrial lands on municipal water
services;
d) That a Regional Corridor designation be applied to Courtice Road from Highway 401 to
Highway 2 connecting the future GO Train Station site to Highway 2 Transitway Station for the
Durham East Link;
REPORT NO.: PSD-031-09
PAGE 2
e) That Greenfield density standards be appropriate to each urban area in Clarington;
f) That local municipalities determine the intensification standards for historic downtowns areas in
designated Regional Centres in Clarington;
g) Refine phasing policies as the proposed approach will not work in Clarington and potentially
other municipalities, where secondary planning areas may not be adjacent to one another and
thus could all proceed simultaneously;
h) The intensification target for Clarington should be reduced to 5,000 units for the 15 year period
from 2015 to 2031;
i) The designation of future Employment Area and Living Area lands beyond 2031 be excluded
from the Region's Proposed Amendment by deleting Section 13.2.4, Special Policy Area D and
Schedule F;
4. THAT a copy of this report be forwarded to the Regional Municipality of Durham, the Ministry of
Municipal Affairs and Housing, the Ministry of Energy and Infrastructure and the local area
municipalities; and
5. THAT all interested parties listed in this report be advised of Council's decision.
Submitted by:
David J. Crome, MCIP, RPP
Director, Planning Services
Reviewed bU ~Q:"~
Franklin Wu .
Chief Administrative Officer
DJCIDJ/df/sn
26 March 2009
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-0830
REPORT NO.: PSD-031-09
PAGE 3
1.0 INTRODUCTION
1.1 On February 24, 2009 the Commissioner of Planning for Durham Region issued an early
release of a "public meeting report". It contained the proposed amendment to the
Durham Regional Official Plan (Regional Conformity Amendment) to bring it into
conformity with the Growth Plan for the Greater Golden Horseshoe (Provincial Growth
Plan).
1.2 The Region held public information sessions on the proposed Official Plan amendment
in each of the area municipalities. The session in Clarington was on March 9, 2009.
1.3 The statutory Public Open House and Public Meeting for the Regional Conformity
Amendment were held on March 23, and 24, 2009 respectively. The closing date for
comments is March 31, 2009.
1.4 Subsequent to the public consultation period, the Recommended Regional Conformity
Amendment will be released on May 6, 2009, 3 weeks prior to the Regional Planning
Committee's consideration and decision on May 19th. Regional Council is to consider the
Recommended Regional Conformity Amendment on June 3, 2009. The adopted
amendment will be forwarded to the Province for review and approval.
1.5 The purpose of this report is to provide the Municipality of Clarington's comments on the
proposed amendment to the Regional Official Plan.
2.0 BACKGROUND
2.1 In August 2007, the Region initiated a Growth Plan Implementation Study - "Growing
Durham", as the growth management component of the Regional Official Plan Review.
The study entailed an examination of the demographic, policy, and environmental
implications of growth within the Region of Durham, within the context of the Provincial
Growth Plan. The analyses formed the basis for the development of alternative growth
scenarios and a recommended preferred growth option for Durham.
2.2 In September 2008 the "Growing Durham" Study concluded with the consultants' release
of the Recommended Growth Management Option & Initial Policy Recommendations
Report. This report provided a recommended growth scenario for the Regional Planning
Committee's consideration.
2.3 Clarington's comments on the Region's Planning Report and Growing Durham Study
were adopted by Council on November 10, 2008.
2.4 On November 25, 2008 the Regional Planning Committee endorsed the Recommended .
Growth Scenario and Policy Directions. Regional Planning Committee did not amend the
recommended growth scenario to reflect Clarington's request to add employment lands
along the 407 link in Courtice and many other comments in PSD-115-08. The proposed
Regional Conformity Amendment is to implement the recommended growth scenario,
and to conform with the Provincial Growth Plan. The Region's documents are available
at www.durham.ca/arowthplan.
2.5 The report is formatted to set out a brief summary of the new and/or revised Regional
Official Plan policies followed by discussion of the issue and then a recommendation in
bold italics. Staff will forward detailed comments on key policies recommended by the
REPORT NO.: PSD-031-09
PAGE 4
Regional Conformity Amendment and Clarington Staff's response. It includes other
issues relating to detailed wording, definitions, certain use exclusions and interpretations
that are not addressed in the body of the report.
2.6 This report sets out Clarington's response to the proposed Regional Conformity
Amendment, being cognizant of the key points of concern and questions that have been
raised previously, with specific attention to the following key components:
o Population and employment forecasts;
o Economic Development;
o Urban Structure;
o Growth Management (Urban boundary expansion, Greenfield development and
Intensification, and Urban Densities);
o Regional Centres;
o Regional Corridors;
o Employment Areas;
o Potential Future Growth Areas;
o Food Security; and
o Plan Implementation and Monitoring.
Many areas of concern are implementation details surrounding the Provincial
Growth Plan. The Region has done an admirable job of advancing the
implementation process but there is a tendency to fall into the same approach as
provincial policy - "one size fits all". The Regional Conformity Amendment needs
to recognize that not all lakeshore municipalities have the same character or
opportunities, as evidenced by the lack of transit services planned for Clarington.
3.0 POPULATION AND EMPLOYMENT FORECASTS
3.1 The Population and Employment forecast in the Provincial Growth Plan is the basis for
managing growth in the GTAH and surrounding Regions. The Regional Plan is to
distribute Durham's share of growth among its constituent municipalities.
3.2 In Section 7.3.4 the Regional Conformity Amendment establishes population and
employment forecasts for the Region to 2031 to be 960,000 and 350,000 respectively.
This is consistent with the Provincial Growth Plan. However, there is a difference with
the interval periods which provide a lower growth rate for the earlier periods but is
accelerated for the later periods. For example, the Provincial Growth Plan targets a
population of 660,000 for Durham in 2011 whereas the Region is planning for 643,000.
The Region also provides for lower employment targets than the Province at 2011 and
2021.
3.3 The Regional Conformity Amendment designates the distribution of population,
household and employment forecasts to
REPORT NO.: PSD-031-09
PAGE 5
men
197,000 49,000 90,800 26,025
25,465 3,065 9,480 1,868
192,860 76,560 71,300 34,696
137,670 43,370 49,290 18,097
14,015 1,515 5,000 1,137
225,670 133,870 76,720 39,496
26,965 6,695 8,980 3,370
140,340 58,940 38,410 18,113
Durham 959,985 373,285 349,980 142,802
The population forecast would provide for an average of 1,000 new residential units per
year in Clarington.
3.4 The Regional Conformity Amendment includes an additional policy in 7.3.5 to state that
there "is a potential for the Region to accommodate up to an additional 25,000 jobs"
beyond the Provincial Growth Plan. This would improve the jobs to residents ratio
across the Region at 2031 from 1 :2.74 to 1 :2.56. It also includes how the additional
forecasted 25,000 jobs by 2031 would be distributed to the area municipalities as
follows:
Ajax 0 0.0%
Brock 550 2.2%
Clarington 2680 10.6%
Oshawa 6100 24.1%
Pickering 9090 36.0%
Scugog 540 2.1%
Uxbridge 500 2.0%
Whitby 5800 23.0%
Durham 25260 100.0%
Land areas for employment areas and regional centres have been based on the
assumption for the additional 25,000 jobs over the Provincial Growth Plan. If the
Province does not approve of this methodology, some lands may need to be
deleted from the urban expansion boundaries proposed.
Policy 7.3.5 and 3.2.2 state that the Region continues to support a target ratio of 1
job for every 2 residents, which is approximately 100,000 more jobs than provided
for in other portions of the Regional Conformity Amendment.
3.5 Clarington's share in the job growth in Durham between 2011 and 2031 averages
10.4%, which is the lowest of the lakeshore communities. Clarington's jobs to residents
improves to 2021 but is forecasted to drop afterwards.
REPORT NO.: PSD-031-09
PAGE 6
2006 81400 20,297 1 :4
2011 87,980 22,580 1 :3.9
2016 97,040 26,890 1:3.6
2021 108,095 32,139 1:3.3
2026 127,475 36,080 1:3.5
2031 140,340 38,410 1:3.6
3.6 The low job to population ratio for Clarington when compared to other area municipalities
in Durham is of great concern.
2.17
2.69
2.70
2.79
2.80
2.94
3.00
3.65
2.74
The Regional Official Plan should be based on Clarington achieving a minimum of
1 job for 3 residents by 2031. Stronger policies should be included to address the
job/resident ratio imbalance. The Provincial Growth Plan, the Growing Durham
Study and Region's Official Plan all call for each community to be a complete
community, which is only possible with a strong employment base.
4.0 ECONOMIC DEVELOPMENT
4.1 The Regional Conformity Amendment is seeking to strengthen the existing Economic
Section 3 in the Regional Official Plan through certain amendments.
4.2 The economic development section of the plan maintains a policy that the Region has a
target of 1 job for every 2 residents and adds a new policy that the Region will monitor
progress in achieving the employment forecasts (referenced above) and the target ratio
of 1 job for every 2 residents.
4.3 The Regional Conformity Amendment includes a new policy that recognizes the
importance of key economic drivers that will influence the future growth and
development of the Region, including UOITlDurham College, Highways 401 and 407,
Clarington Energy Park, the Darlington Nuclear Facility and future airport in Pickering.
4.4 The Community Adjustment and Sustainability Strategy for the City of Oshawa and the
Region of Durham, which was recently endorsed by Regional Council, emphasizes the
fact that the expansion of Darlington Nuclear Facility "will have an unprecedented impact
on the development and diversification of the Durham economy" and is "the biggest
opportunity on the horizon for Durham in terms of job and economic growth." It also
REPORT NO.: PSD-031-09
PAGE 7
represents the most immediately evident and potentially viable transition path for many
affected workers. Many construction jobs will be created if the project goes forward, but
the economic impact will extend well beyond the construction period.
4.5 Policy 3.3.10 should be revised to read as follows:
"This Plan recognizes the importance of a number of key economic drivers that
will influence the future growth and development of the Region. UOIT/Durham
College will provide an academic anchor for future growth in the Region. The
Darlington Nuclear Facility is the most significant opportunity for Durham in terms
of job and economic growth in the short term. The future Highway 407, combined
with the continued improvement to Highway 401 and extension/improvement of
GO rail service and the Oshawa Harbour and St. Mary's dock will provide critical
transportation infrastructure to attract new business. Over the longer term, it is
anticipated that there may be a future airport in Pickering, which could provide a
significant stimulus at that time. "
4.5 The timely servicing of industrial land has been an issue within Clarington and several
other municipalities. With the aggressive target of one job for every two residents, and
recognizing that 50% of the jobs are within Employment Areas, it is recommended that a
new policy be added to Section 3 to indicate that a higher priority for Regional spending
priorities to service industrial lands as follows:
"In order to implement the Region's employment targets, the Region will prioritize
the servicing of industrial lands. "
5.0 URBAN STRUCTURE
5.1 The current urban structure for the southerly portion of Durham Region is based on
strong central urban anchor (OshawalWhitby/Courtice) and a western urban anchor
(Pickering/Ajax) and an eastern anchor (Bowmanville/Newcastle). Although
Pickering/Ajax was larger than the Bowmanville and Newcastle, there was a recognition
that Bowmanville in particular would continue to grow.
5.2 Through the Grow Durham Study, three growth scenarios were developed as follows:
. A Dominant Western Anchor
. Focusing on a Central Hub (OshawalWhitby/Courtice)
. Reinforcing Existing Communities
The latter option was chosen but through a series of directions from the Regional
Planning committee, the "balanced growth" scenario ended up resembling the Dominant
Western Anchor Scenario. A new urban centre in north-west Seaton was added along
with extensive lands in Whitby. Only very minor expansions are proposed for Courtice
and Bowmanville.
REPORT NO.: PSD-031-09
PAGE 8
6.0 GROWTH MANAGEMENT
6.1 The Regional Conformity Amendment, is promoting an approach to managing urban
growth by proposing certain targets which could be considered aggressive, and new and
revised policies under the topics of urban boundary expansion, greenfield development,
intensification, and urban structure and densities. The primarily growth management
policies are:
· By 2015 and afterwards, 40% of residential development will occur through
intensification.
· Lakeshore municipalities will develop at a minimum gross density of 50 persons and
jobs per hectare.
· 50% of all employment will be accommodated in designated Employment Areas.
We concur with these overriding objectives.
6.2 Urban Boundary Expansions
6.2.1 As part of the Regional Conformity Amendment the expansion of certain urban area
boundaries in certain areas of Durham Region is recommended. In Clarington the
recommended Urban Area Boundary expansions are shown in Exhibit 5 (Attachment 3)
to the Regional Official Plan Amendment, as follows:
Bowmanville East Living Area
. The north-westward expansion of the Wilmot Creek Retirement Community of an
area measuring approximately 21.6 hectares, bounded by the 401, Bennett Road
and the CN Railway line; and re-designating it from "Prime Agricultural" to "Living
Area."
Orono Emplovment Area
. The eastward expansion of the Orono Urban Area Boundary on a parcel measuring
approximately 29.2 hectares east of Highway 35/115 (previously deferred) that is
designated "Employment Area" with a "partial municipal services" overlay.
Courtice East Living Area
. The eastward expansion of the Courtice Urban Area Boundary on a parcel of land
measuring approximately 109 hectares bounded by Courtice Road, Highway 2 and
Bloor Street, and re-designating it from "Prime Agricultural" to "Living Area".
This expansion to Wilmot Creek Phase 8 is an existing application to amend the
Regional Official Plan (ROPA2002-011) and Local Official Plan (COPA 2003-012) which
has been in progress since 2002/2003. Clarington Council has already, through a
previous resolution supported the inclusion of these subject lands in its comments on
Amendment 114 of the Durham Official Plan. The applicant is in the process of
compiling a revised master plan and planning rationale report in support of the official
plan amendment applications.
The eastward expansion of the Orono Urban Area boundary has been the topic of a
Deferral (D4 in the Regional Official Plan) since 1996 at the request of the Ministry of
Municipal Affairs and Housing. The deferral relates to the lack of available municipal
water and sewer to this area. Removal of the Deferral symbol would acknowledge the
potential of this area for dry industrial uses e.g. industrial warehousing, thus creating
REPORT NO.: PSD-031-09
PAGE 9
opportunity for local economic development and complementing the goal of creating
sustainable communities.
The eastward expansion of the Courtice Urban area boundary is based on the
population forecasts in the Growth Plan; the Region's subsequent analysis of the
housing supply needs in Clarington up to 2031 and proposed new intensification
policies. This area has significant natural features (branches of the Tooley Creek), and
will only yield a net developable area of approximately 32 hectares. In addition, the
proposed densities in greenfields for Clarington (see Section 6.4) may mean that this
area is not sufficient to meet the additional urban growth requirements to 2031.
6.2.2 The proposed urban residential expansions in Clarington are reasonable.
However if there are no additional industrial expansion lands, Council could
consider that there be no further residential lands be added to Clarington's urban
areas. Additional residential lands would only serve to reinforce Clarington's role
as a bedroom community and is contrary to Council's policy of achieving a target
of 1 job for 3 residents. By not including the above referenced residential
expansion areas, the jobs to population ratio would be improved.
6.3 Phasing of Development
6.3.1 The Region is proposing to phase residential lands primarily through local official plan
process and the secondary planning process, including expansions to urban boundaries,
under the provisions under Policy 7.3.13. This requires:
. A comprehensive official plan review;
. An analysis demonstrating the need for designating additional lands;
. Recognition of the phasing of development in accordance with the Region's 20 year
servicing plan;
. An analysis evaluating the achievement of targets in the Regional and area
municipal official plans;
. The preparation of a secondary plan;
. Phasing of secondary plan areas as discussed below;
. Area municipal services to support the expansion within the financial capability of the
area municipality; and .
. Potential of agricultural land-use conflicts.
Any future development area, including the Future Residential Areas currently
identified in our Official Plan requires the preparation of a secondary plan. We
concur with the approach and support the inclusion of a requirement to look at
land-use conflicts with agricultural activities.
6.3.2 The requirements for the preparation of a secondary plan for any new development
area.
"The preparation of a Secondary Plan based on the following:
. an approved watershed plan;
. the area is sufficiently large to create a new community, or to round out an existing
community;
. the area is contiguous to an existing Urban Area;
. sequential development;
REPORT NO.: PSD-031-09
PAGE 10
. the area is serviceable by full municipal water and sanitary sewerage systems;
. environmental impact studies, in accordance with Policy 2.3.42;
. the growth management objectives of Policy 7.3. 10;
. prescribed unit mixes and minimum and/or combined densities;"
The proposed requirement of a Secondary Plan sets an appropriate platform to develop
a planning framework for a particular area, which will provide a planning rationale for re-
designation of lands from "Future Urban Residential" to "Urban Residential" or to expand
an urban area boundary.
6.3.3 The Regional Conformity Amendment policies provide for the phasing of growth through
sequential preparation of secondary plans. Specifically it states that "Secondary Plan
areas shall be developed to 75% of their planned dwelling unit capacity, with a minimum
of 25% of the medium and high density units, prior to the approval of development in
adjacent secondary plan areas".
The intent is not only to sequence the planning areas but also to ensure the
development of the right housing mix within new residential subdivisions. Sometime the
medium density and high density sites are skipped over or redesignated to lower
densities because of the lack of a market for those types of units at a particular time.
This policy ensures that some medium and high density units are constructed but is not
too restrictive to make it very difficult to achieve.
6.3.4 While the policy direction is generally supported, there are some concerns:
. watershed plans are undertaken by the conservation authorities and subject to
funding constraints. The Region should be prepared to ensure that its funding
priorities of conservation authorities do not detrimentally impact a
municipality's ability to proceed at the appropriate time or the policy should
allow for sub watershed plans to be undertaken by area municipalities.
. It is not clear how this policy would be applied in Clarington with three distinct
urban areas with multiple directions for growth. As is the case at present,
there could be situations where 3, 4 or 5 secondary planning areas are under
development and none of them are "adjacent" as indicated in the proposed
policy. This phasing policy does not work for Clarington and needs to be
reconsidered.
6.4 Greenfield Development
6.4.1 Greenfield Development refers to all development (mostly residential development) on
land situated between the urban area boundary and the built-up area (built boundary).
The Region proposes the following policy: "Greenfield Living Areas in Lake Ontario
Shoreline Urban Areas, not subject to the higher density provisions of Section BA for
Centres and Corridors shall be planned to accommodate a minimum average density of
50 residential units per net hectare; and maximum 70% low density residential. "
While the intent of this policy is supported, there is concern about its applicability.
Although 70% of a Greenfield development area may be low density, the aggregate of
high and medium density units within the particular development area will have to be
quite high to meet an average minimum density of 50 units per net hectare on the whole
REPORT NO.: PSD-031-09
PAGE 11
parcel. Although it is not clear, the assumptions are that 20% medium density and 10%
high density will be built. Most apartments built in Clarington recently would be
considered medium density. The market for medium and high density residential,
particularly as you move further from Toronto, does not exist at present, particularly in
consideration that greater higher density housing forms are required in the Regional
Centres, Waterfront Places and through intensification. The minimum average density of
50 units per net hectare cannot be achieved without apartment units.
6.4.2 It is recommended that Section BB.2.3 for Greenfield Living Areas be amended
recognizing that not all Lake Ontario shoreline municipalities are the same. It
could be revised as follows:
"a) Lake Ontario Shoreline Urban Areas:
i) Minimum average density for:
Pickering, Ajax, Whitby, Oshawa, Courtice: 50 residential units / net hectare.
Bowmanville: 40 residential units / net hectare.
Newcastle: 30 residential units / net hectare.
b) Maximum 70% low density residential. "
It should be noted that the north urban areas are proposed to have a minimum average
density of 20 residential units per net hectare.
6.5 Waterfront Places
Waterfront Places are identified in several locations in Durham, including the Port of
Newcastle and Port Darlington area. The Regional Conformity Amendment proposes
quite high densities where appropriate of 135 residential units per net hectare, a
maximum of 20% low density residential and a maximum floor space index of 2.0.
Although these standards have quite high densities, the wording is sufficiently
flexible to allow the development areas to be tailored to reflect lithe characteristics
of each Waterfront Place". Staff have no objections to this change.
6.6 Intensification
6.6.1 Intensification refers to residential development or redevelopment of property at higher
density than what currently exists, including infill development and expansion or
conversion of existing buildings within the delineated built boundary (built-up area). The
Region proposes the following Intensification policy: "Urban areas shall be planned to
accommodate by 2015, and each year thereafter, a minimum 40% of all residential
development through intensification within built-up areas, in accordance with Schedule E
- Table 'E9'" as shown below:
REPORT NO.: PSD-031-09
PAGE 12
Intensification Allocations. 2015 - 2031
7,987 4,343 54% 9%
1,321 306 23% 1%
19,616 6,181 32% 13%
20,229 7,934 39% 17%
36,163 14,354 40% 31%
1,908 576 30% 1%
2,870 1,042 36% 2%
26,316 11,963 45% 26%
116,411 46,699 40% 100%
6.6.2 This policy is consistent with the Growth Plan directive. The intensification target for
Clarington is 6,181 units between 2015 and 2031, which represents 13% of the Region's
total. After 2015, this would require approximately 400 intensification units per year, in
additional to the higher densities required in the Greenfield areas. Through the
Clarington Official Plan review, this target will be refined to allocate intensification units
to Clarington's urban areas.
The target for Clarington is aggressive, particularly in comparison to the City of Oshawa,
which is required to provide 7,900 intensification units while Clarington is required to
provide 6,200 intensification units. There is a much greater opportunity for intensification
units in Oshawa whish is a designated Urban Growth Centre under the Provincial
Growth Plan and has many brownfield and greyfield opportunities. Furthermore in
reviewing the process for identifying intensification sites in Clarington, staff found a
number of areas that were incorrectly identified.
6.6.3 The intensification target for Clarington between 2015 and 2031should be reduced
to approximately 5,000 units.
6.6.4 The Regional Conformity Amendment needs to provide direction on
intensification for the immediate period after adoption up to 2015 so that
development can gradually transition to the mandated 40% regional intensification
target by 2015.
7.0 REGIONAL CENTRES
7.1 The Region proposes the following policy: "Regional Centres (Lake Ontario Shoreline
Urban Areas) shall be planned to accommodate a minimum average density of 170
residential units per net hectare; a minimum of 80% high density residential; and a
minimum floor space index of 2. 5 for non-residential uses. "
The historic nature of much of Newcastle Village Centre is not suitable for the
high densities and high non-residential floor space index sought through this new
Regional policy. It is recommended that policy BA.2.3 c) be amended to include
Newcastle Regional Centre in with the non-/akeshore Regional Centres.
7.2 There are major concerns regarding the ability of Historic Bowmanville's downtown to
meet these intensification requirements without being detrimental to its existing
character.
REPORT NO.: PSD-031-09
PAGE 13
The preferred approach would be to allow the local municipality to determine
these development standards for heritage downtowns through the review of their
local official plans.
7.3 "Regional Centres (Beaverton, Cannington, Sunderland, Uxbridge, Port Perry and
Orono) shall be planned to accommodate a minimum average density of 30 residential
units per net hectare; and a maximum of 50% low density residential."
Orono should be excluded. Due to its servicing constraints, it has not been
identified through the Growing Durham Study as a potential Regional Centre.
8.0 REGIONAL CORRIDORS
8.1 The Regional Conformity Amendment seeks to define the character of regional corridors
associated with Living Areas by setting out:
. minimum average density of 140 residential units per net hectare;
. minimum 60% high density residential;
. minimum floor space index of 2.5 for non-residential uses; and
. ultimate build-out, to demonstrate that higher density targets would not be precluded.
8.2 To illustrate what a dramatic shift this is for Clarington, at the present time our High
Density Residential designation is defined as 61-100 units per net hectares. The
proposed Regional Conformity Amendment requires a minimum average density of 140
units per net hectares.
8.3 Recognizing that there is a need to create a more transit-supportive urban environment
along arterial roads, it is recommended that the Municipality support these policies,
although there should be some flexibility to account for unique circumstances.
8.4 The Consultant's Recommended Growth Scenario proposed three new Regional
Corridor, in addition to Highway 2. They were:
. Bloor Street through Courtice
. Courtice Road through Courtice
. Regional Road 57 through Bowmanville
. Mill Street from Highway 401 to Highway 2 in Newcastle
. Regional staff have eliminated all the new Regional corridors from the proposed
Regional Conformity Amendment in Clarington with the exception of Bloor Street.
While staff agree with eliminating the Mill Street Regional Corridor in
Newcastle, and believe the Regional Road 57 area could be considered as a
Local Corridor, the Courtice Road Regional Corridor between the GO Rail
station and Highway 2 (and the nearby Durham East Link Transitway station)
should be maintained.
REPORT NO.: PSD-031-09
PAGE 14
9.0 EMPLOYMENT AREAS
9.1 Expansion Areas
9.1.1 Employment Areas forms an integral part of the Region's urban structure and economy
and plays an integral part in creating balanced growth across the Region. The proposed
Regional Conformity Amendment recognizes "the importance of key economic drivers
that will influence the future growth and development of the Region, including
UOIT/Durham College, Highways 401 and 407, Clarington Energy Park, the Darlington
Nuclear Facility and future airport in Pickering".
9.1.2 Given the strategic location of the lands bounded by Courtice Rd., the 401 and the future
407 link, there proximity to the new build at the Darlington Nuclear Facility, the
Clarington Energy Park and the relative ease of servicing, these lands are prime
employment areas.
Staff, have assessed the methodology the Region's consultants used in calculating the
employment land needs to 2031, certain anomalies in the calculation, where certain
sites, or portions thereof have mistakenly been counted as vacant developable lands
bring into question the resulting recommendations.
9.1.3 Regardless of the accounting exercise, there is a structural issue at hand. As noted
above, Clarington will have the lowest jobs to population ratio of any Municipality in
Durham Region, despite being the host of a provincial mega-project to expand
Darlington Nuclear Generating Station. Despite the Region calling this a "balanced
scenario" to "reinforce existing communities", the City of Pickering enjoys:
. almost 30% of all new jobs in Durham Region
. 35 % of all future industrial jobs in Durham
. 25% of all future retail commercial jobs in Durham
. 50% of all new employment lands
. Provincial support to push the servicing and development of the previously
designated employment lands in Seaton
This unbalanced growth in Durham Region was done on the basis that growth will move
from west to east. These market forces have been a reality since the Region's founding
but previous Regional Plans have tried to counterbalance this effect by developing a
strong centre and a significant population and employment growth in Clarington on the
east. It was anticipated that as land became more restricted on the western portion of
Durham, the eastern portion would be available. This has been abandoned through this
review.
This unbalanced growth in Durham was also done on the assumption that the Pickering
Airport would be built, despite the fact that there is no firm commitment on timing or
funding. It is no closer to reality than it was 25 years ago. If and when the Federal
Government makes a commitment to the Pickering Airport, the issue of additional
industrial lands in the vicinity of the airport could be considered in a future official plan
review.
REPORT NO.: PSD-031-09
PAGE 15
The Community Adjustment and Sustainability Strategy for the City of Oshawa and the
Region of Durham emphasizes the fact that the expansion of Darlington Nuclear Facility
"will have an unprecedented impact on the development and diversification of the
Durham economy" and is "the biggest opportunity on the horizon for Durham in terms of
job and economic growth." It also represents the most immediately evident and
potentially viable transition path for many affected workers. Many construction jobs will
be created if the project goes forward, but the economic impact will extend well beyond
the construction period. Many of those jobs will be in close proximity to the plant and
Energy Park.
The lands adjacent to the Courtice Road interchange should not be excluded from the
employment land base until 2031 merely on the basis that the accounting exercise
shows a "surplus" of employment lands in Clarington based on current trends. These
lands are surplus primarily due to the lack of regional servicing which did not occur over
the past 18 years.
9.1.4 In September 2008, the Tri-Committee of Planning, Works, and Finance recommended
to Regional Council to undertake an Infrastructure and Fiscal Impact Analysis of the
Preferred Growth Scenario, including Health and Social Services. The report indicated
that it would take up to 24 months to complete. It was to be undertaken on a Scenario
that may not change. As a result, the costs of implementation and the relative merits of
servicing industrial land in Courtice or servicing industrial land in the new North East
Pickering Urban Area or other areas will not be known until after the Regional
Conformity Amendment is adopted. Potentially serviceable industrial land near the
new Courtice Water Pollution Control plant could remain un utilized while trunk
sewers from that same plant are extended past those lands at great cost to the
north end of Oshawa and Whitby to service industrial lands. This is not a cost-
effective Regional investment.
9.1.5 The lands bounded by the Courtice Road, 401, 407 link and Bloor Street in South
Courtice (Attachment 5) should be designated as Employment Lands and included
in the Courtice urban area boundary expansion. This could be offset by the
reduction of employment lands in Pickering. Only after the Pickering Airport is
firm should the full extent of the employment lands in Pickering be designated.
9.2 Major Retail Uses Are Not Permitted In Employment Areas
Staff support the policy to prohibit major retail uses from employment areas
9.3 Employment Area Conversions
Policies have been added regarding the industrial land conversion as follows:
. to allow conversion only through a comprehensive municipal review and
. to recognize that decisions to refuse private applications or non-decisions on
applications for industrial land conversion shall not be subject to appeal to the
Ontario Municipal Board
Staff support the proposed policies on employment area conservation.
REPORT NO.: PSD-031-09
PAGE 16
9.4 Area Municipal Plans Required To Demonstrate Density Targets Will Be Met
Area municipal plans will have a new requirement to demonstrate how density targets
will be achieved. This is a process to ensure that higher density targets can be
achieved; any use that is lower will have to be compensated by another use that has a
higher employment density.
This is an appropriate mechanism to ensure that the Regional and Growth Plan
targets will be met but the policy requires further clarification as to how it will be
implemented.
10.0 POTENTIAL FUTURE GROWTH AREAS
10.1 The Growing Durham Study contained a map showing the long term growth structure
beyond 2031 (to 2056). This map has now been incorporated in the Regional
Conformity Amendment as Specific Policy Area D and shown on Schedule F: Potential
Future Growth Areas Map. The main reason for including these lands is apparently to
preserve the lands "for strategic long-term growth to 2056".
10.2 In Clarington, the lands identified as Future Growth Areas comprise 2068 hectares (6800
acres) and would consolidate Newcastle, Bowmanville and Courtice into one large urban
area.
10.3 The Regional Conformity Amendment proposes policy 13.2.4 which states that:
"Schedule 'F' - Specific Policy Area D, Potential Future Growth Areas, is a reflection of
the Region's long-range potential urban structure. It provides a context for growth and
infrastructure planning. It is not a land-use designation, nor an actual urban boundary
expansion. "
10.4 While the Potential Future Growth Areas are not intended as a land use designation nor
an urban boundary expansion, it has a similar impact. It provides a signal of future land
development which encourages premature land speculation and discourages investment
in farming. Including such a policy could lead to poor land stewardship, deterioration of
buildings and farm infrastructure. It also provides an assumption that the "whitebelt"
lands are all intended for future urbanization. It also creates reduced flexibility for future
Councils to respond to the issues of their day and assumes that growth issues will be
dealt with in a similar manner in 25 years time.
10.5 The Clarington Agricultural Committee on March 12, 2009 in response to the proposed
Food Security Policy that has been introduced as part of this Region Official Plan
Amendment, passed the following resolution:
"The Agricultural Advisory Committee of Clarington is supportive of the
proposed policies and direction of the Food Security Policy, Report No.
2009-P-17 for Durham Region.
In particular the proposed amendment to Section 9A.1 will add a new
Subsection as follows: "Prime Agricultural Areas shall be protected as a
significant element of the Region's economy and a secure source of food.
REPORT NO.: PSD-031-09
PAGE 17
In adding this section, the Region would be supporting the thought behind
the Clarington Agricultural Advisory Committee's Resolution of October
9th, 2008 which became part of the Municipalities comments on the
Growing Durham proposals.
Therefore Exhibit 10, Schedule F and Section 13.2.4 Specific Policy Area
D (Potential Future Growth Areas) of the Proposed Amendment do not
adhere to the principle of long term protection of prime agricultural areas
and Clarington Council should request that they be deleted from the
proposal."
Clarington Council, in Resolution #GPA-606-08 dated November 2008 advised the
Region of Durham that it does not support the designation of future growth areas beyond
2031.
10.6 Schedule F and Section 13.2.4 Specific Policy Area D (Potential Future Growth
Areas) should be removed from the Regional Conformity Amendment.
11.0 FOOD SECURITY POLICY
11.1 The Regional Conformity Amendment is seeking to strengthen the existing policies that
relate to food security and production in the Regional Official Plan through certain minor
amendments.
The Region's Report No. 2009-P-17 (Attachment 2-distributed under separate cover)
outlined the amendments supporting food security that have been included in the
Region's Growth Plan Implementation amendment. The Report examined the concept
of Food Security and the actions that the Region is already pursuing through its Health
Department and Economic Development Initiatives.
11.2 The current policies of the Region's Official Plan include the protection of prime
agricultural lands "to support a healthy and productive agricultural industry as an
important element of the Region's heritage, identity and economic base." The policy
changes enhance various objectives in the Regional Conformity Amendment to support
and recognize food security and the need for equal access to healthy and secure food.
Other policies discourage fragmentation of the agricultural land base to secure long term
viability. The ROP permits farm gate sales and retail stands for the sale of agricultural
products from a farm.
The agricultural industry in Clarington is the largest economic activity; Clarington's
Official Plan protects agricultural land as a prime resource and includes policies that limit
intrusion into the rural area by other uses. In addition, the public input carried out as part
of the Official Plan review continues to show the strong support for the protection of the
agricultural lands.
11.3 Policy 13.2.4, Specific Policy Area D and Schedule F do not implement "Prime
Agricultural Areas shall be protected as a significant element of the Region's
economy and a secure source of food", and it is recommended that it be deleted
as noted in Section 3.5.
REPORT NO.: PSD-031-09
PAGE 18
12.0 PLAN IMPLEMENTATION AND MONITORING
12.1 A plan is only as successful as its ability to be effectively implemented and evaluated.
The Region, through this Regional Conformity Amendment, are proposing plan review
and monitoring as follows:
"a) employment forecasts coincident with the release of relevant Census of Canada
information, and updates to the Growth Plan for the Greater Golden Horseshoe;
b) the achievement of the minimum intensification rates for each area municipality,
as detailed in Schedule E - Table 'E9' and the overall Regional target of 40%
intensification overall within the built-up area, including the following key growth
areas:
i)
ii)
iii)
Regional and Local Centres;
Regional and Local Corridors; and
Waterfront Places;
c) the achievement of the overall 50 people and jobs combined per gross hectare in
Greenfield areas, and..."
12.2 These requirements are above and beyond the legislative requirements imposed
by the Province in Places to Grow. Extra resources, both at the regional and local
level may be required to carry out this monitoring, especially given the details that
are required through the proposed new policies.
13.0 CONCLUSION
13.1 Staff have met with and provided comments to Regional staff throughout the Growing
Durham Study. Based on the policies recommended in the proposed amendment to the
Regional Official Plan there are critical pieces of information that are missing. This is
mostly due to the fact that the evaluation of the development scenarios have not
undergone a fiscal impact analysis.
13.2 Many of the detailed recommendations made within the Regional Conformity
Amendment policies that relate to how communities will look and feel are too prescriptive
and should be detailed in the local municipal official plans instead.
13.3 The Region's focus on northeast Pickering and the future 407 alignment for much of its
urban development and economic development lands does not represent a balanced
approach to development within the Region. There are other lands such as potential
employment lands in Courtice that would represent more cost effective sequential
growth.
13.4 The inclusion of Policy Area D - Schedule F is premature and not supported by a proper
analysis, it should be removed from the Regional Official Plan Amendment.
Attachments:
Attachment 1 - Regional Report No. 2009-P-24 Public Meeting Report (the proposed Regional
Official Plan Amendment previously distributed under separate cover)
REPORT NO.: PSD-031-09
PAGE 19
Attachment 2 - Regional Report No. 2009-P-17
Attachment 3 - Exhibit 5 to Regional Official Plan Amendment
Attachment 4 - Table summarizing urban structure elements proposed densities
Attachment 5 - Map Showing Employment Area Sought to 2031
Interested parties to be advised of Council's decision:
Linda Gasser
Tribute Communities
Agricultural Advisory Committee of Clarington
Andrew Marit
Sernas Associates
Libby and Stan Racansky
Luigi D. Mastroianni
Tom Van Camp
Delta Urban Inc.
D.G. Biddle & Associates Ltd.
Phip Limited
Kirkup Realty Corporation
Attachment 1
To Report PSD-031-09
,
The Regional Municipality of Durham
To: The Planning Committee
From: Commissioner of Planning
Report No.: 2009-P-24
Date: March 24, 2009
SUBJECT:
Public Meeting Report
Growth Plan Implementation "Growing Durham" Study - Proposed Amendment to the
Regional Official Plan, File: D12-05
RECOMMENDA TIONS:
a) THAT Commissioner's Report No. 2009-P-24 be received for information; and
b) THAT all submissions received be referred to the Planning Department for
consideration.
REPORT:
1. PURPOSE
1.1 The purpose of this report is to present the proposed amendment to the
Durham Regional Official Plan (ROP), to incorporate changes resulting from a
review of the ROP that was initiated in accordance with Section 26(1) of the
Planning Act (five-year review provision).
1.2 This amendment responds to "Directions" endorsed by Planning Committee
on November 25, 2008 presented in the Growing Durham, Recommended
Growth Scenario and Policy Directions Final Report (the Report), including
additions and modifications thereto, as the basis for proceeding with the
Durham Regional Official Plan Amendment (ROPA) process to implement the
Growth Plan. This is the subject of the public meeting (refer to Attachment 1).
1.3 For convenience, and to assist in the review of this material, the proposed
amendment has been consolidated into the relevant text of the ROP (refer to
Report No.: 2009-P-24
Page NO.2
Attachment 2). The consolidation illustrates the additions and deletions, and
details the basis for each change.
1.4 This Commissioner's Report and attachments were released to the public on
February 24, 2009. A "Notice of Public Meeting" regarding the proposed
amendment has been advertised in the appropriate newspapers. This report
was made available to the public prior to the meeting.
2. CONSULTATION
2.1 The public and agency consultation on the proposed amendment has
involved:
· Scheduling a series of Public Information Sessions, as follows:
- Pickering Council Chambers - March 3, 2009;
- Ajax Council Chambers - March 4, 2009;
- Uxbridge Council Chambers - March 5, 2009;
- Clarington Council Chambers - March 9, 2009;
- Whitby Council Chambers - March 11, 2009; and
- Oshawa Main Library Auditorium - March 12, 2009.
· Scheduling the statutory public open house for March 23, 2009 at
Regional Headquarters;
· Scheduling the statutory public meeting for the March 24, 2009 meeting of
Planning Committee;
· Meeting with area municipal and provincial staff;
· Placing notice of the consultation process, including Public Information
Sessions and Statutory Public Open House and Public Meeting in the
local newspapers and on the Regional web site;
· Giving direct notice to all of those who have made submissions or
requested notice through the Growing Durham Study; and
Report No.: 2009-P-24
Page NO.3
· Circulating copies of the proposed amendment to the Ministry of Municipal
Affairs and Housing, all area municipalities and conservation authorities,
School Boards and abutting municipalities and all those who request a
copy.
3. PROPOSED AMENDMENT TO THE ROP
3.1 The proposed amendment to the ROP (Attachment 1), as annotated in the
applicable ROP text (Attachment 2), implements the recommended policy
directions from the Growing Durham Study. The amendment also addresses
a number of "housekeeping" changes identified during the policy formulation
exercise.
3.2 Key amendments proposed include:
· Revising the planning horizon of the ROP from 2021 to 2031 ;
. Adding policies to promote the development of complete and healthy,
sustainable communities, that include a balance of jobs and population;
· Strengthening policies to support active transportation (e.g. walking and
cycling);
. Strengthening policies to protect Employment Areas from conversion to
other urban designations;
. Replacing the population and employment targets with forecasts
consistent with Schedule 3 of the Growth Plan for the Greater Golden
Horseshoe (960,000 people and 350,000 jobs), with the recognition that
the Region has the opportunity to achieve an additional 25,000 jobs;
. Adding a policy to clarify that population and employment forecasts
allocated to the Urban Areas in the Townships of Brock, Scugog and
Uxbridge will be held in reserve for the respective municipality;
Report No.: 2009-P-24
Page NO.4
· Adding growth management policy objectives consistent with the Growth
Plan for the Greater Golden Horseshoe, to accommodate intensification
within built-up areas and density of 50 persons and jobs per hectare in
greenfield areas;
· Adding policies to reinforce the Region's intent that employment growth be
balanced, with at least 50% of all forecast employment being within
designated Employment Areas;
· Adding criteria for consideration of Regional Urban Boundary Expansions
to include providing for a minimum 1 O-year housing and employment land
needs, with logical and sequential development patterns;
· Adding new criteria for the consideration of area municipal official plan
amendments to expand urban area boundaries, including:
- achieving the targets, forecasts and growth management objectives;
- preparing a secondary plan, with detailed criteria regarding content
and requirements for approved secondary plans, including watershed
plans;
- requiring secondary plans to be developed to 75% of their dwelling unit
capacity, with 25% of the medium and high density, prior to the
approval of development in adjacent secondary plan areas;
- ensuring area municipal services required to support the expansion are
within the financial capability of the area municipality; and
- taking potential conflicts between existing agricultural uses and new
Urban System uses into consideration and were possible alleviate
conflicts through buffering;
· Incorporating policies for Waterfront Places into the Urban System (moved
from the Greenlands System), including policies for density, housing form
and floor space index targets;
· Adding policies to introduce densities, housing form and floor space index
targets for Urban Growth Centres, Regional Centres, Local Centres,
Reflional Corridors and Local Corridors;
Report No.: 2009-P-24
Page NO.5
· Clarifying that Regional Corridors are an overlay of the main designation
(e.g. Living Areas or EmploymentAreas);
· Adding policies for Regional Corridors associated with Employment Areas,
to accommodate uses with the greatest potential for high employee
densities;
· Introducing density and housing form targets for new greenfield Living
Areas;
· Reinforcing policies to ensure that an adequate supply of vacant, serviced
employment land is maintained that provides sufficient market choice;
· Clarifying the suite of uses that are permitted within the Employment
Areas designation;
· Confirming the prohibition of residential uses in Employment Areas;
· Discouraging sensitive uses, such as community, cultural and health
facilities, from locating in Employment Areas, subject to applicable policies
in area municipal official plans;
· Clarifying policies that permit limited personal service and retail uses in
Employment Areas to ensure they are secondary to the permitted
employment uses;
· Permitting major retail uses (retail warehouses) in Employment Areas only
where currently designated as a permitted in an area municipal official
plan;
· Adding a policy for the consideration of conversions in Employment Areas
related to defined "downtown" or "regeneration" areas in accordance with
the relevant policies of the Growth Plan and the Provincial Policy
Statement;
Report No.: 2009-P-24
Page NO.6
· Clarifying that decisions of Regional Council to refuse applications or non-
decisions on applications for the conversion of Employment Areas will not
be subject to appeal to the Ontario Municipal Board in accordance with
new provisions of the Planning Act;
· Requiring area municipal official plans to include detailed phasing plans
for ultimate build-out of Employment Area lands, to demonstrate how
higher density targets will be achieved;
· Updating policies on the status of the Highway 407 East individual
Environmental Assessment;
· Adding policies to guide development adjacent to Transportation Hubs,
Commuter Stations and Transit Spines, to enhance opportunities for
intensification;
· Revising policies related to Schedule F, Potential Future Growth Areas to
indicate the intent to provide context for future long-range growth and
infrastructure planning;
· Add policies for the monitoring of key growth management objectives,
including:
- review of employment forecasts coincident with the release of Census
data;
- intensification rates;
- combined density target for greenfield Living Areas; and
- combined density target for Urban Growth Centres.
3.3 The proposed amendment also provides for expansions to the Urban Area
Boundaries to address the results of the land needs analysis, which
concluded that an additional 2,868 hectares 1 of land would be required to
accommodate forecasted growth to 2031.
1 The 2,868 hectares of "future growth lands" is a gross calculation that is net of Key Natural Heritage
Features and major infrastructure such as the Highway 407 right-of-way and hydro corridors.
Report No.: 2009-P-24
Page No. 7
3.4 The consultant's recommendation to include more broad permissions for
major retail uses in Employment Areas, in response to submissions from the
City of Oshawa, has not been included in the proposed amendment, based
upon feedback from area municipal staff, who expressed concern with the
implications of controlling such permissions in the area municipal official
plans.
4. PUBLIC PARTICIPATION
4.1 Anyone who attends the Region's public meeting may present an oral
submission, and/or provide a written submission, to Regional Planning
Committee on the proposed amendment. The deadline for consideration of
written submissions for the recommended Amendment is March 31, 2009.
However, any person may make a written submission at any time before
Regional Council makes a decision.
4.2 If a person who files an appeal to the Ontario Municipal Board of Regional
Council's decision on a proposed official plan amendment does not make oral
submissions at a public meeting, or does not make written submissions
before an amendment has been adopted by Regional Council, the Ontario
Municipal Board may dismiss all or part of the appeal.
4.3 Anyone wishing to be notified of Regional Council's decision on the subject
amendment must submit a written request to:
A.L. Georgieff, M.C.I.P., R.P.P.
Commissioner of Planning, Planning Department
Regional Municipality of Durham
PO Box 623, 605 Rossland Road East
Whitby, ON L 1 N 6A3
5. FUTURE REGIONAL COUNCIL DECISION
5.1 Planning Committee will consider the proposed amendment at a future
meeting, and make a recommendation to Regional Council. Upon Council's
Report No.: 2009-P-24
Page NO.8
adoption, the amendment will be forwarded to the Minister of Municipal Affairs
and Housing for approval.
5.2 All persons who made oral or written submissions, or have requested
notification in writing, will be given written notice of the future meetings of
Planning Committee and Regional Council at which the proposed amendment
will be considered.
A.L. Georgieff, M.C.I.P., R.P.P.
Commissioner of Planning
RECOMMENDED FOR PRESENTATION TO COMMITTEE
Garry H. Cubitt, M.S.W.
Chief Administrative Officer
Attachments:
1.
Proposed Regional Official Plan Amendment
(previously distributed under separate cover)
An Annotated Consolidation of the Proposed Regional
Official Plan Amendment (previously distributed under
separate cover)
2.
H:\1-2\agendas\Planning Committee & Joint Committee\2009\03-24-09\2009-P-23.doc
Attachment 2
To Report PSD-031-09
The Regional Municipality of Durham
To: The Planning Committee
From: Commissioner of Planning
Report No.: 2009-P-17
Date: February 24, 2009
SUBJECT:
Food Security Policy - Growing Durham Regional Official Plan Amendment,
File: 012-05
RECOMMENDA TIONS:
a) THAT Planning Committee authorize the consideration of the proposed policy
amendments supporting food security, outlined in Section 6 of
Commissioner's Report No. 2009-P-17, as part of the Growth Plan
Implementation amendment;
b) THAT Commissioner's Report No. 2009-P-17 be forwarded to the Health and
Social Services and Finance and Administration Committees for information;
and
c) THAT a copy of Commissioner's Report No. 2009-P-17 be forwarded to the
Durham Agricultural Advisory Committee, the Durham Federation of
Agriculture and the GT A Agricultural Action Committee.
REPORT:
1. PURPOSE
1.1 On December 10, 2008 Regional Council adopted the following
recommendation (as amended) of the Health and Social Services Committee:
"THAT the Planning Commissioner report back on how to consider
incorporating Food Security Principles into the "Growing Durham" growth
conformity plan including the following key actions recommended from the
Simcoe Muskoka District Health Unit's Food Security Strategy:
Report No.: 2009-P-17
Page NO.2
i) Support provincial and local advocacy efforts to reduce household
poverty;
ii) Increase the capacity of community service providers to build food skills in
'priority population' groups, including low-income individuals and families;
iii) Help build communities where healthy foods within easy reach of
everyone (e.g. focus on food security and the built environment);
iv) Support of community actions to help build a healthy local food-based
economy (includes helping to increase the demand for locally grown food,
and raising awareness/appreciation of our local food production system)."
1.2 This Purpose of this report is to respond to the above resolution by:
i) Examining the concept of Food Security and what Durham Region is
currently doing;
ii) Reviewing the Simcoe Muskoka District Health Unit Food Security
Strategy and outlining how current Official Plan policies align with the
principles;
jij) Examining the American Planning Association (APA) Policy Guide on
Community and Regional Food Planning; and
iv) Proposing policies on food security, for inclusion in the Durham Regional
Official Plan (ROP) Growth Plan implementation amendment.
2. DURHAM FOOD SECURITY INITIATIVES
2.1 Community Food Security is defined as a situation in which all community
residents obtain a safe, culturally acceptable, nutritionally adequate diet
through a sustainable food system that maximizes community self-reliance
and social justice. (Hamm and Bellows, Journal of Nutrition Education and
Behaviour. 2003; 35:27-43.)
2.2 Food Security is an important issue in the prevention of Chronic Diseases and
the promotion of overall health.
Report No.: 2009-P-17
Page NO.3
Health Initiatives
2.3 The Health Department annually assesses community food security in
Durham Region, by monitoring food affordability using the Nutritious Food
Basket Protocol. In addition, the Rapid Risk Factor Surveillance System
survey is used to determine the overall percentage of our population that is
considered to be food insecure. The survey identifies respondents as food
insecure, if they experienced one or more of the following:
. did not have enough food due to lack of money;
. ate poor quality or variety of foods due to lack of money;
. worried about not enough food due to lack of money; and
. did not have a place to go if they didn't actually have enough food.
Food security was last measured in Durham Region in 2006. The results
showed that 9.1 percent of Durham Region residents ages 18 and older were
food insecure.
2.4 The Health Department's approach to promoting food security includes
strategies under four main competency areas:
Health Communication:
The Health Department increases public awareness of food insecurity issues
by implementing local communication strategies. Each year, the cost of the
Nutritious Food Basket for Durham Region is publicized. The Food Resource
Directory is a listing of locations where food is available throughout Durham
Region and further support resources including pamphlets and educational
materials are made available at a variety of locations for populations
experiencing food insecurity.
Health Education:
Community Food Advisors are trained volunteers in the area of safe and
healthy food selection, handling, preparation and storage. These volunteers
provide opportunities for skill development in the areas of food preparation
Report No.: 2009-P-17
Page NO.4
and healthy eating practices around Durham Region for a variety of
populations. Key topics for vulnerable populations include food security and
healthy eating on a budget.
Capacity Building:
Durham Region Health Department works with community agencies and
groups to improve access to healthy foods on an ongoing basis. Examples of
this work include the Durham Lives! Food Charter working group, the Durham
Child Nutrition Project Advisory Committee and the Community Food Advisor
Advisory Committee.
Policy Development:
The Health Department works with municipalities to support healthy public
policies and the creation of supportive environments regarding access to
healthy foods. In addition, the Health Department has worked closely with
community partners in the development of the Durham Region Food Charter.
Durham Livesl
2.5 Food security for Durham Region is an initiative also being pursued by
Durham Lives!, a coalition of community agencies and individuals that
promote, among other matters, healthy eating. The Regional Health
Department is a member of the Food Charter Working Group of the Durham
Lives! coalition.
2.6 In 2006, Durham Lives! Food Wellness Group initiated developing a food
charter for Durham (refer to Attachment 1). The charter "presents a vision for
a food secure Durham Region with access to quality food for its residents
and protection of the whole food system as a foundation for population health.
A food secure Durham is a place where food production, processing and
distribution, is environmentally sustainable, socially just and financially
sound."
Report No.: 2009-P-17
Page NO.5
2.7 This vision is founded on three principles:
i) Planning food into our future - cultivate institutional supports through
education, research, laws, services and foster coordination of regional
efforts through key Regional strategic planning documents;
ii) Local agriculture, sustainability and self-reliance; and
iii) Food for all and human health.
2.8 Durham Lives! representatives presented the food charter to Regional
Council on February 18, 2009. A Symposium is also scheduled for March 26,
2009 in Durham Region Headquarters LL-C to "share the status of the
Durham Region Food Charter with key stakeholders, and develop a collective
vision for its future."
Economic Development Initiatives
2.9 The Economic Development and Tourism Department is involved in the
Durham Lives! Coalition Food Charter initiative with representation on the
Food Charter Working Group.
2.10 In support of food security, new programs are continually being developed for
the agriculture and agri-food sectors. The Rural Economic Development
Officer coordinates several initiatives and programs to assist the Region's
agricultural industry, for example:
i) Durham Farm Fresh Association; a non-profit Association with sixty two
member farms and orchards, two restaurants and 8 farmer's markets
across Durham;
ii) Farm Market Makeover Workshop: assisting to make farm markets more
customer friendly and better able to compete with larger retail operations;
iii) Agricultural Training Needs Survey: To assist in seeking and developing
training programs pertinent to the industry needs;
Report No.: 2009-P-17
Page NO.6
iv) Farm Connections: Annual three day event including livestock
demonstrations, targeting Grade 3 Elementary students to raise
awareness of where food comes from;
v) Gates Open - Savour Durham: Fall annual two day public self guided tour
of local farms, restaurants and bed and breakfast operations throughout
Durham, featuring local operations and local food;
vi) Apple/Berry Tracking Pilot Project: Research and tracking of apple and
berry operation approaches from growing stage to table; and
vii) Capturing Local Food Opportunities Research: Staff hired to implement
Local Food Opportunities initiatives for the next four years.
3. THE SIMCOE MUSKOKA PRINCIPLES
3.1 The Simcoe Muskoka District Health Unit (SMDHU) resolution considered by
Health and Social Services Committee, and adopted by Council urges the
Province to proceed with its poverty reduction strategy, taking the cost of a
nutritious basket, which is calculated annually by boards of health, into
account.
3.2 In developing this position, the SMDHU noted that the preparation of a Health
Unit Food Security Strategy was underway proposing the four "actions"
referenced in 1.1 of this report. Regional Council has asked how food security
principles and the four "actions" could be included in the ROP as part of the
Growing Durham amendment process.
4. PLANNING INITIATIVES
4.1 The SMDHU actions as well as the principles identified by Durham Lives!,
have been considered in the context of the current policies of the Regional
Official Plan (ROP).
4.2 One objective is to reduce household poverty. The ROP addresses this from
a land use perspective through policies that promote and facilitate the
Report No.: 2009-P-17
Page No. 7
development of the Region to its economic potential, providing complete
communities that include a balance of jobs and population. A long range
target is to provide 1 job for every 2 persons living in the Region to minimize
travel and maximize access to local jobs.
4.3 Another objective is to ensure that all residents have the knowledge
necessary to pursue food security. The ROP facilitates the pursuit of
knowledge by accommodating educational and social service facilities in our
communities. The Plan directs community facilities to locations that are visible
and accessible to residents, preferably in close proximity to existing and
future transit routes.
4.4 A third objective focuses on the need to build communities where healthy
foods are within easy reach of everyone; food security and built environment.
A direction of the ROP is to protect agricultural lands for future generations.
Over 80 percent of the Region's land base is protected by the Greenbelt Plan.
4.5 A goal for prime agricultural areas is "to support a healthy and productive
agricultural industry as an important element of the Region's heritage, identity
and economic base." Other policies discourage fragmentation of the
agricultural land base to secure long term viability. The ROP also permits
farm gate sales and retail stands for the sale of agricultural products from a
farm. These and other policies facilitate local food production and access to
food, locally.
4.6 The Growth Plan conformity amendment to the ROP will reinforce food
security, by maintaining a strong distinction between urban and rural areas.
The vast majority of growth is directed to urban centres in a form that is to be
transit supportive.
4.7 Overall, the ROP has many elements that support and facilitate the
comprehensive food security work of the Health Department, the Durham
Lives! Food Charter initiative and the SMDHU actions.
4.8 Reducing poverty, promoting knowledge on food security and making healthy
foods easily accessible, go well beyond the ambit of the Official Plan. Federal
Report No.: 2009-P-17
Page NO.8
and Provincial programs, producers and suppliers of food (the supply chain)
and the actions of individuals and families and many more factors, all playa
part in ensuring food security.
4.9 For example, through the efforts of the Durham Agricultural Advisory
Committee (DAAC) and the Planning, Works and Finance and Administration
Committees, the Region has taken action on such matters as farm land
assessment and farm vehicle safety to enhance the viability of the local
agricultural industry. DAAC has also held an annual farm tour to facilitate an
enhanced public knowledge of the agricultural industry in Durham.
4.10 The Region, through the efforts of Councillor Pearce and the Planning
Department, also supports the activities of the GT A Agricultural Action
Committee in implementing the GT A Agricultural Action Plan aimed at
keeping the GT A agricultural industry thriving and competitive. A key guiding
principle is recognition that GT A agriculture is distinct in its proximity to a
large market with beneficial climate and soils, advantages that are unique and
must be capitalized on and marketed.
5. THE APA POLICY GUIDE ON COMMUNITY AND REGIONAL FOOD
PLANNING
5.1 The APA, following an extensive consultative process, prepared a Policy
Guide for food planning. The Guide is very comprehensive, examining a
broad range of factors as a basis for the policy.
5.2 The APA Policy Guide seeks to strengthen the connections between
"traditional planning and the emerging field of community and regional food
planning". In doing so, the guide identifies activities that go well beyond the
scope of land use planning, recognizing other agencies and bodies necessary
to facilitate food security.
5.3 The Guide recognizes that to effectively address food security, all of the major
local planning functions, in the broadest sense, must be integrated. This
includes health and human services, public safety, land use, economic
development, transportation, environment, parks and recreation and
Report No.: 2009-P-17
Page NO.9
agricultural preservation. This will require collaboration between "groups
representing diverse interests such as anti-hunger, nutrition, farming, and
environmental issues; span many government agencies; and include multiple
levels of government in dialogues."
5.4 The scope of the Guide includes seven General Policies, under which 26
Specific Policies are identified. Under the Specific Policies, 90 possible
actions are presented. The actions include, for example:
i) Assessing food needs in the case of emergency - earthquake,
hurricane, terrorist attack;
ii) Planning for local and regional food reserves;
iii) Educating citizens on food related emergency preparedness;
iv) Preparing economic development plans for food production;
v) Analyzing factors that support or constrain the viability of agriculture;
vi) Protecting prime agricultural land;
vii) Supporting the development of community gardens, farm/garden stands,
and farmer's markets;
viii) Preparing regional food resource guides;
ix) Assisting farmers in diversifying their products to meet consumer
demand;
x) Supporting transit connections between low mobility neighborhoods and
food source locations;
xi) Limiting the development of fast food outlets near schools and other
youth centred facilities; and
xii) Supporting actions that prevent potential contamination of agriculture
and food products from animal operations.
5.5 Many of the initiatives suggested are, to the extent possible, addressed in the
ROP including the elements noted in 3.0 above. Many are within the purview
of other Regional and agency programs. However, as previously noted, the
APA Policy is very comprehensive and goes well beyond the scope of land
use planning and what can be achieved in an Official Plan.
5.6 The APA Policy Guide can be viewed on the APA web site at
www.plannino.oro/policv/ouides/adopted/food.htm .
Report No.: 2009-P-17
Page No. 10
6. REGIONAL OFFICIAL PLAN
6.1 Having examined the initiatives, it is felt that the ROP policies can be further
enhanced to more specifically recognize food security, the need for equal
access to healthy and secure food, as a policy objective.
6.2 To achieve this, the following ROP policy changes/amendments are
recommended, as part of the Growing Durham ROPA:
i) Amend Section 1 Basis, Goals and Directions, to add a new Direction as
follows:
"supporting food security for all residents of the Region;"
ii) Amend Section 8.1, Urban System Goals, to add a new Subsection as
follows:
"To provide convenient access to fresh locally grown produce and other
healthy food from sources such as farm markets, community gardens and
grocery stores;"
iii) Amend Section 9.1, Rural System Goals, to add a new Subsection as
follows:
"To support community food security";
iv) Amend Section 9A.1, Prime Agricultural Areas General Policies, to add a
new Subsection as follows:
"Prime Agricultural Areas shall be protected as a significant element of the
Region's economy and a secure source of food."
v) Amend Section 15A Definitions, to add a new definition:
"Food Security: a situation in which all community residents obtain a
safe, culturally acceptable, nutritionally adequate diet through a
Report No.: 2009-P-17
Page No. 11
sustainable food system that maximizes community self-reliance and
social justice."
6.3 These changes will introduce the concept of food security to the ROP. As
food security initiatives in Durham Region mature, consideration can be made
for further enhancements to the ROP.
7. CONCLUSION
7.1 The research undertaken in the preparation of this report clearly indicates that
food security is a very broad issue crossing the mandates of all levels of
government, a number of Regional Departments, many public agencies, food
producers and suppliers, and ultimately consumers. The Health Department
partnered with local community agencies in the Durham Lives! coalition, to
establish a Food Charter for Durham Region. The results of this initiative will
establish a framework for further action on the food security front.
7.2 It is recommended that Planning Committee authorize the consideration of
the proposed policy amendments supporting food security outlined in Section
5, as part of the Growth Plan Implementation amendment.
7.3 This report has been prepared in collaboration with the Health Department
and Economic Development Department.
A.L. Georgieff, M.C.I.P., R.P.P.
Commissioner of Planning
Report No.: 2009-P-17
Page No. 12
RECOMMENDED FOR PRESENTATION TO COMMITTEE
Garry H. Cubitt, M.S.W.
Chief Administrative Officer
Attachment
1.
Durham Region Food Charter
H:\ 1-2\agendas\Planning Committee\2009\02-24-09\Food Security.doc
Attachment 1
qDUrham Regiou Food ChartEr i. a vision for a fnod secure Durham Region with
~sh~I quality food for fu midenUi and protection of the whole food system as a
foundation for population health. A food secure Durham Region is a place where food
production, proc~sing and distribution, is environmentally sustainable, socially just and
financially sound.
1. Planning Food into OUr Future
Ensuring the future of a sustainable local food system will require coordination of
thinking for planning. To realize this we will cultivate insti1utianal supports 'through
appropriate educational programs, research, laws, services, etc. Fmther, we would foster
coordination of our regional. food security by inclusion of access to food and/or food
systems in key regional strategic planning docmnents:
· Regional Official Plan and municipal official plans
· Community Strategic Plan
· Master Plan for emergency preparedness
2. Local AgrimIture, Sustainabmty and Se~Reliance
Cultivation of local agriculture is important A sustainable local food system will
improve economic viability of Durham Region's fann industry, improve air and food
quality by decreasing food miles, and secure a regional food supply now and for future
generations .
Durham Region residents should expect the application of recognized principles to local
agriculture:
· Sustainable development
· Precaution
· Biodiversity
Enhance Access to Locally Produced Food
. Produce foods locally for regional. self-reliance and food security;
. Support convenient access to healthy and affordable, locally produced foods in
neighborhoods 'through alternate food retail channels such as local food markets, street
vendors, convenience stores, etc.;
. Encomage institutional food-service use of locally produced foods;
. Emphasize the sale of Locally produced foods in grocery stores and super centres.
22
Build Capacity through Local Food Production
. Develop local food processing capacity - e.g. communal canneries, freezing plants,
incubator kitchens;
. Support networks that provide information about local food choices and availability
- e.g. fanners' mwkets, urban agriculture mapping;
. Support agriculture initiatives - e.g. community gardens, 1raditianal agriculture,
community shared agriculture;
. Foster communication between food producers, community groups and other key
stakeholders in developing regional food system solutions;
. Regularly assess regional food security.
Environmental Stewardship
. Support strategies for sustainable food waste management;
. Protect agricultural land for production;
. Protect fish habitat;
. Ensure supply and quality ofwa:ter for local agriculture;
. Support training choices on ecological farming;
. Promote sustainable food production.
3. Food for All and Human Health
Affordable, nutritious, safe, personally acceptable food is a basic human right. Food is
also an experience that covers skill in selection, knowing what to do with it and ties to
our traditions and culture.
Accessibility and Social. Equity
. Advocate for social equity through increased social assistance benefits, jobs at living
wages, adequate translX'rtation and affordable housing to enable individuals and
families to afford Durham's Nutritious Food Basket;
. Support access to nourishing food to meet the nutrition needs of all Durham Region
residents - from as early as birth with breastfeeding and throughout all stages and
experiences of life.
Education
. Support nutrition communication for all that includes: food knowledge and selection
based on Eating Well with Canada's Food Guide, cooking skills, promotion offood.
safety and social marketing to raise awareness and encourage consmners to purchase
locally produced, seasonal foods;
. Support community food programs and planning that promotes health and prevents
disease.
Culture of Food
. Celebrate cultural diversity and food traditions;
. Enhance the dignity and joy of growing, preparing, and eating food.
23
1:1 OFFICIAL PLAN OF THE
. REGIONAL MUNICIPALITY
. OF DURHAM
~. SCHEDULE 'A' - MAP 'AS'
~?' REGIONAL STRUCTURE
~ LEGEND
URBAN SYSTEM
URBAN AREA BOUNDARY
EXHIBIT S TO REGIONAL
OFFICIAL PLAN AMENDMENT
NO._
I
I
I
I
I
I
-' ,\
I
~ 1______________________7____~-------------------------------
~ A 0 0 0 rf //. 9'% 1
~~ )5 fV I
ro I
I
I
I
I
I
I
~T~...."'0
," \
-
I
I
I
I-
I
I
I
I
I
I
'b
~D
~
--i
o
;0
Cl>
"0
o
~)>
""0-
(IJ-
o~
I :::T
03
~Cl>
I ::l
0-
cow
EMPlOYMENT AREAS
AREAS DEVELOPABlE ON
MUNICIPAl \/\lATER SYSTEMS
& PRIVATE WASTE DtSPOSAl
SYSTEMS
AREAS DEVELOPABLE ON
PRIVATE ',MOLLS & PRIVATE
WASTE DISPOSAl SYSTEMS
SPECIF)C Pettey AREA
APPEAlED TO C.M.B.
OAK RIDGES
MORAINE AREAS
fllI.l!B.O
.
GREEN BEl
CA..::!
CJ
-
%%;
............
A
LMNG AREAS
AREAS DEVELOPABLE ON
FULUPAATIAt. MUNICIPAl
SERVICES
AREAS DEVELOPABLE ON
PRIVATE 'wVElLS & MUNICIPAl
SEWER SYSTEMS
RURAL SYSTEM
[.==J PRINE AGRICULTURAL AREAS
A
o
AFlTERIAlROAD
FREEWAY
GO RAIL
GO STATION
GREENLANDS SYSTEM
MAJOR OPEN
SPACE AREAS
_ ~TERFRONT AREAS
_ OAt( RIOGESMORAINE
BOUNDARY
... RECREATIONAL !TOURIST
ACTMTY NODE
SPECIAL AREAS
'---1
L_~_J SPECIAL STUDY AREA
r[)2I DEFERRED BY MINISTER
~ OF MUNICIPAL AFFAIRS
o HAMl
G
@
-
REGIONAl NODE
==
-
.
a
-'
- .- . r'
,~~
......,.~'-~LE
,.....
'J --....uE
LAKE ONTARIO
'l::'':''~:~",,:,"0IM0__''_'''''''''''''''0I''''''''''''''_'.
II:,:",-:--,,:,.":'_""__-"'CT"'__"'''__ ......
..--_.~.-
q....-----"'--.-....---
"_'OIMOO_"'___'_.__-..:n>___
Attachment 4
To Report PSD-031-09
PROPOSED DENSITIES IN REGIONAL CONFORMITY"AMENDMENT
" Minimum Floor
Designation Net Density Unit Mix non-residential
Soace Index
Waterfront Places 135 units/nh Max 2.0
- Port of Newcastle 20% low density
- Port Darlington
Regional Centres 8A.2.3. b 170 uniUnh Min. 2.5
- Courtice Hwy.2 and Trulls Road 80% high density
- Bowmanville West Town Centre Area
- Bowmanville Historic Downtown
- Newcastle Historic Downtown
Regional centre - Orono 30 u/nh Max
(map does not show) 50% low density
LOCAL COMMUNITY AND NEIGHBORHOOD CENTERS
AS DETERMINED BY THE AREA MUNICIPAL PLANS
Regional Corridors 8A.2.12
- King Street - Courtice and
Bowmanville
- Bloor Street in Courtice
Regional Corridors associated with 140 u/nh Min. 2.5
Living Areas 60% high density
Regional Corridors associated with 40 employees per
Employment areas net hectare
Local Corridors - As determined by the area 65 u/nh Min 2.0
municipal plans 10% high density
Greenfield living areas (not part of regional Min average? Max
centres and corridors) 50 u/nh 70% low density
~
DIlLON
CONSULTINC
,
HIGHW A ~ 41
TRANSPORTATION PEER
FOR THE
MUNICIPALITY OF CLARINGTON
General Purpose & Administration
Committee Presentation
2009
,
March 30th
~
DIlLON
CONSULTINC
".
Liberty Street interchange
Rundle Road/Holt Road
Hancock Road intersection
Potential impact to agriculture during
construction
Key Outstanding
.
.
.
.
~
DILLON
CONSULTINC
Liberty Street
Current Highway 407 design provides for full interchanges at
Regional Road 57, Highway 2, Darlington-Clarke Townline
and a partial interchange at Taunton Road
.
Highway 407 EA team employed a transportation model
(EMMEI2) to determine future traffic volumes for 2031
horizon year
.
assumes no tolls on Highway 407 mainline or east link
Model
Peer review of the model results suggest concentration of
traffic on approach routes to Regional Road 57 and Hwy 2
interchanges
.
.
interchange at Lib~rry Street
.,.~. ._~'"-...;g;; '.>-1" ,,,=,-. ~:i_,.:'="'-" .,l" ,_.;v" f>
An additional
";..~ T ~
~
'"
~
..
~
GanaraslQ Rd
..
'"
.
J;
"
~
'"
t'
~
(J
~
'"
f
'"
"
~
~
01
~
.
i
(J
..
~ .
~.
~
Il
!
u
'"
.
"
(J
z
III
i
:i
01
.
'"
..
'" 01
~ ~ '" '"
.. . ~
~ '6- '~
to > l
COI'I08S'Sion Rd 5
.
'" '"
8 'Ii
! ~
CooceMion Rd 4
'"
t
,
'"
~
~
(J
;;
,to
..
.
..
""
*,
.
8
011
!!
-
..
~
~
l!-
.
i!
.!I
(J
~
!
'"
I
'.. .. ...... .f'..
'I..:::.::..... "! t/'''' .:
u
'"
~
l
z
.
>
<
E
~.
o
"
W
Ii
l\
?:
TaurCcn Rd
'~~.
:
<I
"
.;!
~
. '8
~
,.
v.~
70,000
40
-
Exhibit 1 - Projected Population and Employment Growth Between 2006 and 2031
Population and Employment Data Used in 407 EA Transportation Model
Ndes: 1.5 3
1) 1 Dot represents 10 Instances
Data Source: MTO 407 EA PrClled: Team
Crellled By: S~G
Checked By: BH
~.J": Date Created: March 23. 2009
~ ~ Date Modified: March 25. 2009
Fie Path: 1:'GI&.081219 - Clanngton\
DILLON Mapping\Projected C1aringtoo Population
and EmplO)m<<lt Growth 10 2031rnxd
45
D TIS (Transportation Tomorrow Survey) Zones
Urban Area
Waterbody
Residential Growthl
Employment GrCMIth'
Proposed 407 Alignment
Secondary Roads
H,ghway
Legend
.
.,
..
'"
~
..
~
:--Ganar.lSka Rd -
.
'"
6
~ .' .
-..
.
'" It ~ .
i ~ '"
" '"
~ Jl ~ !
.. ~
CVI-ce\'Sicn Rd 5 ..
. .
~, '"
8 . -ii.
i.
! ~ . .
. .
Concession,l{d ..
'"
~
"
.
,
..
.
..
..
..
~
'i
i
"
,.
z
~
E
I.
i"
.
z
I;S
i
~
..
:
Ii
~
- .
~.....J
""
..,
,
o.
~ ",.
~ 'II
~. :;,
. J:. g
f. . ~
,;AJ.hOOgh pop"""Uiation and emPloyment.
in these zooes are shown to be uniformly
distributed, they 'Ail be concentnlled in
the CBst sectioo inside the urban area
. (hjghli~ed)
..
.. '
:.. .'"
... :..
.
Taunta: R~'
..
.
.cancessKln Rd 6
~
.. t
'I.
-j ..
.. ,...
11
,.
Jj
~~
8
1:70,000
'.01~
.
..
1.5 4.5
Notes'
1)1 Dotrepresentsl0"stance5
Data Source: MTD 407 EA PrOtect Team
Created By: SFG
Checked By: BH
Date Created: March 23, 2009
Date Modi1i6d: March 25, 2009
F~e Pattel:\G15\081219 - Claringlon\
Mapping\Pfojectcd CllIrington 2031
Populatioo and EmplO')'menl.mxd
-?'
DILLON
I ..'...."1 II",
Exhibit 2 - 2031 Total Population and Employment - Clarington
Population and Employment Data Used in 407 EA Transportation Model
Legend
. Residential1 D TIS (Transportation Tomorrow Survey) Zones
Employment ' Urban Area
Proposed 407 Alignment Waterbody
Secordary Roads
HIghway
~
DILLON
CONSULTlNC
Rundle Road/Fio
The 2 km segment of Rundle Road between
Taunton Road and 6th Concession currently
provides year round service
Holt Road between the same
.
limits provides
.
only seasonal service
The construction of the East Link will eliminate
the 2 km segment of Rundle Road
.
It is recommended that Holt Road be
reconstructed by the MTO between Taunton
Road and 6th Concession to account for the lost
segment of Rundle Road
.
~
DIlLON
CONSULTING
Realignment of Hancock
Road required to
accommodate Highway 407
East Link, Transitway and
station
.
Ha'nco,ck Roa
- ""1
'_...~..~. .
~--' ,.:~ .
". .'}
. --':~ /)
""";. I'"
~.t~
. . ~ ;)
-
-
-
'"""'"'
i-.....
~ ....,
,~ ,.
"i'~'
'"
....
90 degree intersection will
reduce free flow of traffic
.
~
Recommend redesign of
north leg of Hancock Road
to improve traffic flow
.
~
DI1.LON
CONSULTINC
Impact to 4grlc
Con's truct-zo.n
· Construction staging plans have not been developed
· Potential for lengthy detours for area's farmers
· Affected farms need to be consulted by proponent and
contractor both prior to and during construction to understand
requirements
Recommend the formation of a liaison committee comprised of
the proponent, the contractor and representatives from the
affected agricultural communities
.
.
The recommendation needs to be specifically outlined as a
requirement in the Highway 407 EA Environmental Study
Report ~~ '.,
,~;.:i}._~<Lt;<.;'~-1~
THAN1( YOU
QUESTIONS?
~
DILLON
CONSULTlNC
g.... \~
~/~
-
~~ ,-
. -
"
P"
r:. '5""
~ ---.. -
t" '.:-: 'Ii.
;~ ~-
- -.
...
...-- ~- - .: p~
~ - r
.. 'l':: t"'" ..;- = ~-
., .
". ",
/
J'" '" "
- --
What is 211?
211 is a national abbreviated dialing code for access
to health and human services information and
referral. 211 is a free, confidential service with
universal social value, accessible to the entire
population and nationa in scope.
.lIr~
...-- ~ - 0.'" ... -<:.-
r - ... -.. . ';-
~ ~= .:6 --
':f-':: il~ . ...; ===-
" <, ~ /....
'r ~ .
~ --
N11 Dialing Codes
211 - public information & referra services
311 - non-emergency municipal government services
411 - directory assistance
511 - weather and traveler information
611 - telephone company repair service
711 message relay for telephone devices for the deaf
811 non-urgent health care triage services
911 .
emergency services
..-...'~
v/
/'
~
~ ~.~...J
1- .
t~ .." r . -
. ~ I
"""- ~ .;;;
~
!'
'1= iiii
-.--
~ -. '-
,;l:;3.. -- ":':
-.. ~
,
CRTC Guidelines for Nll's
must be a compelling need for three digit access that
cannot be satisfied by other dialing arrangements
must serve the broad public interest
must be for services of a universal social value
.
.
.
fi
. ...
~
- .
"l;:, \
=-
"-"" ""
-
6":
!!I =
..
...--- -
~ ~
~'"'~
,
ted States
.
I
n Un
.
I
211
United Way of America partnership with the Nationa
Information & Referral Association (AIRS)
- first service n Atlanta,
Georgia
(FCC)
ttee
Federal Communications Comm
approved 211 nationwide
1997
2000
.
.
.
2008 - 244 active 211 services in 48 states, serving
780/0 of the U.S. population (234 mi ion people)
.
..:".\1
__ ,oA'
0:... -~ /'
__ f ~. ~
~ ~~..
.....
,..
=
~
.c:~
"'"
r--' .-.
~=- .~
r
.
I
United Way of Canada/Centraide Canada partnership
with the National Information & Referral Association
(I nformCanada)
2001 - CRTC approval of 211
and referra
n Canada
211
public information
for
.
.
2002 - first service in Toronto,
2008 - 11 active 211 services, in 3 provinces, serving
280/0 of the Canadian population (9.3 million people)
in Ontario
Ontario
.
.
8 active 211 centres now operationa
serving 520/0 of the population
.
__II'~rfl
/" ......" .\.l
~ ~
~~
~-
=""1:. '...
-.
.
;0
"""-
,..
~.,.
-
.....
.---- -
L i!"
~:Ji~
,
Internet:
. 2110ntario.ca
. 211 SimcoeCounty.ca
. 211 Muskoka.ca
. 211 GreyCounty.ca
. 211 BruceCounty.ca
2.
Components of 211
1
.
.
Community Reporting
211 systematically tracks the reasons residents
call & the services they require, producing reports
which can be used to identify service gaps,
duplication & emerging trends in human services
free to ca
II
live answer
confidential
multilingua
Phone:
· 24/7
.
.
.
3.
-... "\1
_!.J'_/~
r
;;;;;;;;; ...
" ~
f,.
~
....
....
--
'"
'=- ~-
;~::''i'~~
"
.
.
to 211
Examples of calls
s
Can he do
m afraid she
My 85 year old mom lives alone & I'
not eating well enough.
Our landlord gave us an eviction notice.
that?
.
.
my
there
out for
s
II
fi
to
I'm afraid that my son is using drugs.
counselling for him?
I don't understand this form
income tax.
need
.
.
I'm new to town and need child care for my infant.
The stop sign on our street disappeared during the
night, do I report that to the police?
.
.
k
~i
~'" ,~. -
:".
...
..
::!i
....
-
:;! ~
"'"
r'
~.=
...
~
--
.lI _.w
l..,. ~
..c~ ~
'.
dialing
t
.
I
Three dig
North American Numbering Plan
NXX or exchange
705-645-2231
705 - numbering plan area code
645 - central office code or
2231 ne number
example
.
.
.
.
.
through public and
Telephone switches route calls
private telephone systems
.
Switches are programmed so when 211 s dialed
from an exchange, t routes the ca to a specific
telephone number
.
.~ll.:II.r~
.:,. ".,.,- ././'
~ ~ ~
- - - '.....---
~ .-
--
~"
&
........ ~
'= "
~.~ ~
.
L
'<!:<
~ -
ssues
I
Dialing
Potential 211
approval prior to
CRTC requires municipal council
211 implementation
.
Telephone exchanges cross multiple municipa
boundaries & multiple resolutions are required
.
to
Private phone systems are often programmed
deny access to 3-digit numbers except 911
.
fj ~ I'~--"~
-" t \ ~
::.
=-
.;:... "'"
...- - -
!~Ue' ~.."-
,",~..c-_ ~ 3
~ - =
ssues
I
Dialing
al211
Potenti
Multiple wire ne & wireless carriers
One company could miss routing one of the
multiple exchange numbers
Changes/upgrades to their systems can change
routing switches
Wireless carriers have gaps & overlaps in service
areas
.
.
.
.
:~~
/"
needed?
Why is 2'" ...
i>
.... ~
-k r
""~ -.'7 :;.;;__
~ -
r:-:. .-
L '"
~''ii ~r::_~
.
r--- .: .~
~ ~ l!' ..
,.c ~
- :; :iJiF" ~ i:: ii:: ....
"
...,.
I ,../
ror
1_-
- --
- -
The Human Services System
Services are funded by all levels of government
- Federal
- Ontario
- Municipal services (multiple tiers)
Services are provided by a variety of organizations
Non profit and charitable organizations
Formal and informal community networks
Business services
One time and seasonal programs
;;;"" is ~ ~ .. '~
' - - ~
...== ;;Jii. ~
.: /~
, ~. "
- -..
~
~'
How Do People Locate Services?
. Internet, telephone book...
· Federal - Service Canada
· Provincial - Service Ontario
· Regional - District of Muskoka
· Municipal - Town Hall
· Non profit and charitable organizations
· Formal and informal community networks
· Business services
· One time and seasonal programs
r---
l,. '" _
Ii ';:'.;:1 -
.,
"
--- ."11"
t ,.. "'"
7'" _a ~ ~c-._~ "".. . :.;
:" ~. , - '" - ~
, /' //
~ ~' ~
- ~
!l;..L.
Barriers in accessing services
· Access to a phone or Internet
· Out of date information
· Frustration or confusion with automated telephone
systems
· Frustration or confusion with the "Blue Pages"
· Language and culture
· Literacy and education
· Addiction and mental health
· Socia solation and poverty
..--- -.- aI- P\1
l, '" Ii - - ... ..
... ~ -~ ,.a. --1:; ~ =-
..
./ /-'
.. .~ ~
---
What are ?
.
· A highly visit that 3meml
· Single point access for community, health,
government, and social services.
· Simple for everyone, especially useful for vulnerable
populations.
. Reduces confusions, frustration, and unnecessary
delay in reaching services.
. Improved use of community resources by directing
people to appropriate services quickly.
....i.
V_"
./ /"
~ ,r
""'" -.
"
Community Connection's
experience since launching
2A A in 2005
.
r"" &
-.
t,
t- =' .,.. _ ==
"
I _
Coc::hrane
~~
Projected 211 Regions
D Toronto Region
c=J Central East Region
D Central West Region
D Central South Region
_ South West Region
I I Eastern Region
D Northern Region
L..-:..-.... ~.II-r\]
j,;>'ie~ ,,'" #:# a~ -.
/" ~
,,-
I ~ - I ~
I
-
~ -
Notes to 211 Map
- Peel Regional Centre added in 2007
- Huron and Perth Counties added to Central
East Region in 2008
-Nipissing District added to Northern Region
in 2008
...;:
.
::;
~
r--
(,
. -
1:
Our Experience
· 211 systematically tracks the reasons residents &
service providers call & the services they require,
producing reports which can be used to identify
service gaps, duplication & emerging trends in
human services
2008 service reports for South Georgian Bay
(Collingwood, Wasaga Beach, Clearview Township)
a population of about 48,000
.
-~~.
'i!:<
I'
,....
r-- ......-- .~
,~:; !,.-..
.-
· r."..
1.
2008 - South Georgian Bay
weekends
or
over night
15,497 calls received
330/0 during evenings,
.
.
me
youth
t
50/0
me; 60/0 part
callers
150/0 senior;
fu t
Caller profile
· 620/0 repeat
· 760/0 female
160/0
380/0
150/0
80/0 Ontario Works
130/0 no ncome
employed
.
pension
ODSP
.
.
.
.
.
-.I
CL._
2008 - South Georgian Bay
~~..
; ,
"/",' '
.~'I"
.
~>.
. ~ ,
,
;' ~ ia.
~
,= 0&
r---' -
~~
,.. ~.
. IF'" "
Services requested for
· 41 % services for children/youth
· 260/0 services for seniors
· 330/0 services for adults
Complexity:
· 20/0 (300 people) complex needs/s
Gaps and unmet needs:
· 530/0 requested services not available n community
· 240/0 could not afford requested services
· 140/0 experienced access issues
tuations
P\l
/" "
./
~. .
-.~
:-": ~
.. .
~
-;.,~
.
f.....
~
"'L.
r--
~ _:; III
'!II! ....._ __
'"
,
-
2008 - South Georgian Bay
Top 5 areas of referrals requested
1. Government (all levels)
2. Health services & Medical Doctors
3. Mental Health
4. Legal Assistance
5. Consumer/Community/Recreation
Top 3 service gaps identified
1. Transportation
2. Dental Services
3. Local Support Groups
-..- -.......~. ~\ll'...,....:,.
. .... .-<
. ~.'~.-
~ ..-fI'
./
~
~.~
. ~
, I
-~-
~
... ..:
".
r---
~
l
.
Expansion
Central East
phase launched in November 2005 to South
ingwood, Clearview Township &
Pilot
Georgian Bay (Co
Wasaga Beach)
.
to a
June 2008 expansion
November 2008 expansiol'l
to Parry Sound,
2010 expansion
.
.
.
.
J!\l
~..,- ~
.
...
.
-
." '"
,- ""' '"
--
Ii ""
~
~
- 't
A Few of the Benefits
Cost avoidance for organizations and governments
because of misdirected calls for services
.
th help
Time saved by individuals and organizations
Reduction in non-emergency calls to 911
Enhanced support for police, fire and paramedic
professionals
24/7 connection for employees and employers w
for issues that affect work
.
.
.
.
Planning information for communities
Sets high and reliable standards for nformation and
referrals for each community
.
.
~
g:lIIJ'~
.//~
-~ ~
~.~
I,
I
...... ...
0-'
~
.
'0
.---.. ............. -
f ..
I""' -
-'"i-
...
,
-
-
Community Connection
Non-profit charitable organization
40 years of information & referral service and
community helpline to local community
· searchable online databases
· print directories
· operate the Community Resource Centre, a
common roof initiative for 18 community
services and programs
Regional centre for SimcoefMuskoka
Information & Referral
.
.
.
~
-~. -
..
......
""
Thank you!
""'.. ~
6c
., -
r--
t..~ t::
~~~. :
..
Alice Grottoli, Communications Coordinator
Community Connection Collingwood
705.444.0040 ext 234
ag rottol i@communityconnection. net
Community Connection
------
~Uy O/ll,e-stop fNFOR../vlATfON sOUYC~
January 8, 2009
Ms. Patti Barrie, Clerk
Municipality of Clarington
40 Temperance Street
Bowmanville, ON
L 1 C 3A6
Dear Ms. Barrie;
Re: Consent of Council for 211 Service Delivery in Shared Telephone Exchanges
As you may be aware, in 2001, the Canadian Radio-television and Telecommunications Commission
(CRTC) approved the use of 211 dialling for telephone access to community information and referral
services. The current assignments for these N11 phone numbers are:
211 Public Information and Referral Services
311 Non-emergency Municipal Government Services
411 Directory Assistance
511 Weather, Traffic and Travel Information
611 Telco Repair Service
711 Message Relay Service (MRS)
811 Non-urgent Health Care Telephone Triage Service
911 Emergency Services.
The 211 system currently under development in Canada and the United States provides a three digit,
24/7 phone number to access free, confidential, multilingual information about community, social,
health and government services. This initiative is led by the United Way of America and the United Way
of Canada/Centraide Canada.
In Ontario, eight 211 call centres will serve the entire province. Northumberland County falls within the
Central East region, which will eventually be served by the Collingwood call centre, operated by
Community Connection. The 211 call centre, which has been operating since November 2005, currently
provides 211 phone service to Simcoe County and the District of Muskoka and is expanding services to
Northumberland County in 2009.
Through our planning process, we have identified telephone exchanges that are shared between
Northumberland County and the Municipality of Clarington. The following table outlines the information
that Bell Canada has provided to Community Connection regarding these telephone exchanges:
.../2
-.........,..,. .... ..,... ""'.J~.'~
Box 683, 275 First Street, Collingwood, Ontario L9Y 4E8
Helpline: dial 211 or 866.743.7818
admin: 705.444.0040 fax: 705.445.1516 tty: 705.445.1658
www.CommunityConnection.net www.2110ntario.ca
~Gjve Help.
@
~ommunjty
Resource Centre
2011/2012
0.14
59,109
17,980
4,236
8,059
11,856
5,729
9,149
12,938
2,261
10,439
10,486
18,631
11 ,335
182,206
2010/2011
0.16
67,553
20,549
4,841
9,210
13,550
6,547
10,456
14,786
2,584
11,930
11,984
21,293
12,954
208,235
2009/2010
0.16
67,553
20,549
4,841
9,210
MUnicipal Per Capita
2008/2009
0.19
80.219
10,456
14,786
2,584
11,930
11,984
21,293
12,954
188,138
80,219
U1ation
422,204
128,430
30,259
57,563
84,688
40,918
65,349
92,411
16,147
74,561
74,898
133,080
80,963
1,301,471
5 year Forecast
Ontario
Central East
211
Po
Cents per capita (Municipal)
Simcoe County
Barrie
Orillia
Muskoka
Nipissing
Parry Sound
Bruce
Grey
Haliburton
Kawartha Lakes
Peterborough City
Peterborough County
Northumberland
Tota
7/7/2008
- 2 -
Telephone Exchange Name Municipalities sharing this Number of Households
Exchange
Garden Hill (797) Northumberland County 1094
Municipality of Clarinqton 25
We are proposing to Bell Canada that the 797 Garden Hill exchange be routed to the Collingwood call
centre. A resolution by your municipal council is required as the boundary of this telephone exchange
boundary does not correspond with municipal boundaries.
Northumberland County and the Northumberland United Way are working with us as we expand the
211 service. Your timely response to this request would be sincerely appreciated. The proposed
wording for the resolution is as follows:
That the Municipality of Clarington does hereby consent to Community Connection providing
211 service to telephone subscribers in the shared Garden Hill telephone exchange (797), on the
basis that there is no financial obligation on the Municipality of Clarington.
Our work to date has required resolutions from the County of Northumberland, County of Peterborough,
City of Peterborough, City of Kawartha Lakes and Haliburton County.
Please feel free to contact me (705.444.0040 x 2222, agrottoli@communityconnection.net), if you have
any questions or require further information. I have also attached a 211 Fact Sheet and a document
"Who Benefits from 211" for your review and to distribute as you deem appropriate.
Sincerely,
Alice Grottoli
Communications Coordinator
cc:
Lynda Kay, Executive Director, Northumberland United Way
Bill Pyatt, CAO, County of Northumberland
P.M. Madill, Regional Clerk, Region of Durham