Loading...
HomeMy WebLinkAboutCOD-001-09a~ woy REPORT CORPORATE SERVICES DEPARTMENT Meeting: General Purpose and Administration Committee OO Date: January 5, 009 Resolution #: ~l pA -Oaf-~ Report #: COD-001-0~ File #: By-law #:0009 d ~p SUBJECT: CL2008-31 HIGHWAY 2 STREET LIGHTING AND STREETSCAPE IMPROVEMENTS, BOWMANVILLE. Recommendations: ~I It is respectfully recommehded that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD~001-09 be received; 2. THAT Rutherford ontracting Limited, Gormley, Ontario with a total bid in the amount of $1,047 296.93 (Plus G.S.T.), being the lowest responsible bidder meeting all terms conditions, and spec cations of Tender CL2008-31, be awarded the con ract for the Highway 2 Street Lighting and Streetscape Improvements, Bo manville. as required by the Engineering Department; 3. THAT $55,000.00 ~e reallocated from the 2008 Highway 2 Sidewalk account to the 2008 Highway Streetlight Installation account; 4. THAT funds $1,047,296.93 as follows: in the amount of $1,290,000.00 (which includes consulting and contingencies) be drawn from accounts Amount Engineering Depar • 2008 Street: Account #1' • 2008 Feder. of Streetscs • 2008 Sidew Account #1' • Street Light • 2007 Green Account #11 - Capital Budget Implementation, -32-338-83278-7401 ................................ ......$ 568,540.00 Gas Tax (Street Lighting) Component e Implementation ...................................... ......$ 81,460.00 k Construction, -32-331-83278-7401 ................................. ......$ 255,000.00 ~stallation, Account #110-32-324-83278-7401 $ 315,000.00 ;oad Reconstruction, -32-330-83276-7401 ................................. ..... $ 70.000.00 Total Funds Available 1.290.000.00 REPORT NO.: COD-001-09 5. THAT the attacf• Clerk to execute Submitted of PAGE2 By-law marked Schedule "A" authorizing the Mayor and the necessary agreement be approved. ~--- Reviewed by: H.B.Sc., C.M.O. Franklin Wu, ~o~ Ser~,es ~ Chief Administrative Officer Nancy T~jrl ~; Director of in MM/JB/km M.O. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE REPORT NO.: COD-001-09 PAGE 3 1.1. Tender specification$ were provided by Aecom (Totten Sims Hubicki Associates) for the Highway 2 Street Li hting and Streetscape Improvements, Bowmanville, as required by the Engineering De rtment. 1.2. Tenders were advertised in the local paper, The Daily Commercial News as well as electronically. Subsequently, tenders were received and tabulated as per the letter from Totten Sims Hubicki 'Associates, Schedule °B° attached. 2. ANALYSIS 2.1. On review of the bid it was noted that the bid from Sansar Contracting Limited, Maple, Ontario contained a extension error. This bid has been corrected and the bid summary provided as part of Schedule "B" reflects the corrected amount and does not affect the ranking of the bids s~bmitted. 2.2. The low bidder, Rutrerford Contracting Limited, has previously performed satisfactory work for the Municipality of Clarington. 3. 3.1. The total project colt, including tender price of $1,047.296.093, project administration; contingency is $1,29,000.00. 3.2. With respect to the streetscape implementation project, there is a funding shortfall of $81,460.00. It is re~Ommended that this be funded from remaining 2008 Federal Gas Tax Funds. There as also a reallocation of a funding shortfall and funding surplus for the sidewalk improvjements and street lighting improvements whereby $55,000.00 is transferred from one~component to the other component as detailed in the attached cost apportionment. REPORT NO.: COD-001-09 PAGE 4 3.3. Subject to Council approval funding for this project will be drawn from the 2008 Streetscape Imple entation Account 110-32-338-83278-7401 in the amount of $568,540.00 and th 2008 Federal Gas Tax (Street Lighting Component of Streetscape Implementation) Ac~ount in the amount of $81,460.00; 2008 Highway 2 Sidewalk Construction Accou t #110-32-331-83278-7401 in the amount of $255,000.00; 2008 Highway 2 Street Li ht Installation, Account #110-32-324-83278-7401 in the amount of $315,000.00 and 2 7 Green Road Reconstruction, Account #110-32-330-83276-7401 in the amount of $7 ,000.00. 3.4. After further review and analysis of the bids by the Engineering Department, Aecom and Purchasing, it as mutually agreed that the low bidder, Rutherford Contracting Limited, Gormley, tario be recommended for the contract for the Highway 2 Street Lighting and Streetsdape Improvements, Bowmanville. 3.5. Queries with respel'~t to specifications, etc. should be referred to the Director of Engineering. 3.6. This report has been reviewed for recommendation by the Purchasing Manager, with the appropriate department and circulated as follows: Concurrence: Director of Attachments: 'I Schedule "A" - By-law Schedule "B" -Memo from Engineering Services & Letter from Aecom (Totten Sims Hubicki) Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2008- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Rutherford Contracting Limited, Gormley, Ontario, to enter into agreement for the Beech Avenue Reconstruction, Bowmanville, Ontario. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Rutherford Contracting Limited, Gormley, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of , 2009. By-law read a third time and finally passed this day of , 2009. Jim Abernethy, Mayor Patti L. Barrie, Municipal Clerk Schedule "B" Clarington Leading tAe Way MEMO TO: Jerry Barber, Purchasing Manager FROM: Bruno Bianco, P. Eng., Design Engineer DATE: December 8, 2008 SUBJECT: Highway 2 Streetscape Implementation (Bowmanville) ProjectlD 5800-8310-08108,5800-8320-08100,5800-8390-08103 Green Rd Construction, Project ID 5800-8310-05120 CL 2008-31, Our File: CRC.Highway2.2 The Engineering Services Department has reviewed the recommendation provided by AECOM and offers the following comments: The total tendered project cost including design and tender fees as well as contract administration fees, utility relocations, and contingencies for the project is $1,290,000.00. Budget implications are as follows: Tender Summarv Project Budget Value/Source Tendered Surplus/(Deficit) Value Streetscape Implementation $568,540.00/Developer $650,000.00 ($81,460.00) (2008) Account # 110 32 338 83278 7401 Recover Collected Hwy 2 Sidewalk $310,000.00/Development $255,000.00 $55,000.00 (2008)A000UnI#110 32 331 83278 7401 Char eFund Hwy 2 Street Light Installation $260,000.OOIDevelopment $315,000.00 ($55,000.00) (2008)Accounl#110 32 324 83278 7401 Char eFund Green Rd $70,000.00/Development $70,000.00 $0.00 (2007) Account # 110 32 330 83276 7401 Char eFund Note. Costs including tlesign and tender fees as well as contract administration fees, utility relocations, and contingencies In order to proceed with these works, our department would like to utilize the following additional funds available: • The remaining 2008 Federal Gas Tax fund in the amount of $81,460.00 for the Street Lighting component of the Streetscape Implementation • The transfer of unspent funds from the 2008 Hwy 2 Sidewalk account (development charge funded) to the 2008 Hwy 2 Street Light Installation account (development charge funded) in the amount of $55,000.00 Should the funding sources detailed above be available, we concur with the recommendation by AECOM to award the contract to Rutherford Contracting Limited in the amount of $1,047,296.93 exclusive of G.S.T. The Engineering Department therefore proposes the following financial breakdown for the project: u~ , _ , ,~.. Project Fundin Project Breakdown Value Total Project Amount $1,290,000.00 Funding Streetscape Implementation (2008) Account # 110 32 338 83278 7401 $568,540.00 (2008) Federal Gas Tax (street Lighting> $81,460.00 Sidewalk Construction (budget less $55,000.00 transfer) (2008) Account # 11 D 32 331 83278 7401 $255,000.00 Street Light Installation (budget plus $55,000.00 transfer) (2008) Account # 110 32 324 83278 7401 $315,000.00 Green Road Streetscape (2007) Account # 110 32 330 83276 7401 $70,000.00 Total Project DeficiUSur lus $0.00 Schedule "B" Should the funding detailed above be acceptable, we recommend the report to Council move forward based on the above apportionments. Attached for your files is the recommendation provided by AECOM. Should you have any further questions, please feel free to contact the undersigned. Regards ~~~ _ Bruno' . Bi co, P. Eng. Design Engineer /dv Attachment cc Tony Cannella, Director of Engineering Nancy Taylor, Director of Finance David Crome, Director of Planning William McCrae, P. Eng., AECOM CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 Schedule "B" AECOM AECOM 513 Division Street, Cobaurp, ON, Canada K9A 6G6 T 905.372.2121 F 905.372.3621 vmw.aewm.com November 28, 2008 Mr. A. S. Cannella, CET FAX: 905-623-9282 Director Engineering Services The Municipality of Clartngton 40 Temperance Street BOWMANVILLE,Ontario L1C3A6 Dear Sir: Re: Highway 2 Streetscape and Street Lighting Improvements, Contract No. CL2008-31, Municipality of Clarington Project Number: 12-29701 Tenders for the above project were opened at the Municipal Offices on Thursday, November 20, 2008, at 2:15:00 p.m. local time. The bids received, exclusive of GST, are summarized as follows: BIDDER TOTAL BID AMOUNT (Excl. 6.S.T) Rutherford Contractin Limited, Gormle ON 1 047 296.93 Sansar Contractin Limited, Ma le, ON 1,110,811.10 Ron Robinson Limited, Bowmanville, ON 1,162,475.18 Alois Brothers Concrete Contractors Limited, Toronto, ON 1,261,080.20 Peninsula Construction Inc., Fonthill, ON 1,314,703.17 Extension error as noted by Clarington Purchasing Department. $0.50 extension error does not affect ranking of bids submitted. AECOM has reviewed all bids accepted by the Clarington Purchasing Department and have confirmed the bid values noted above. The bw bidder's submitted tender has been reviewed and is in order. References provided by the Contractor, which include the City of Orillia, the City of Brampton and Goodwood Properties Inc. have been contacted and comments received state that Rutherford Contracting Limited completed similar works satisfactorily. Rutherford Contracting Limited has also completed contracts CL2004-44 (Clarington Fields Baseball Facility), CL2006-08 (8owmanville) and CL2006-49 (Newcastle Waterfront Trail) for the Municipality of Clarington which AECOM was the contract administrator, and completed the work satisfactorily. The total project costs, excluding GST, are summarized on the attached Cost Apportionment. Should financing be available, based on past performance and their low bid we recommend that Rutherford Contracting Limited be awarded Contract CL2008-31 in the total amount of $1,047,296.93 (excluding GST). Schedule "B" Pape 2 The Municipality of Clarinpton November 28, 2008 Should you require any additional information, please contact the undersigned. Sincerely, Totten Sims Hubicki Associates (1987) Limited, doing business as AECOM /~` ~r C Ron Albright, P.Eng. ron. a I brig ht~aecom. com RA:ym Encl. cc: Mr. Norm Clark, C.E.T., Municipality of Clarinpton Mc Bruno Bianco, P. Enp., Municipality of Clarington P:',OryA il,13~]B)Of'Certefp~11153 tlac Schedule "B" ~~ ~~ B a x r V ~O+p (.? m e ~ m u e y i E b M d z S 2'n $~ &C UUSS E'c ;~~;gf ~'g£ ~ ~~ mg 5 ~s S~i% m ~ Iii R~°$ ~~ ~ ° g~~=~~ ma~a~$ ~~ ~ ~ ~Sg~E y: d N p m o O 0 0 O ~ S p Yf e Y I ~ N d ~ O ~ ~ N N N N M N N N N M O ~. ~ ~ O N O ~ V m ~ m N y Yl ~ M V sO Y] pA~ 10 S ~ S O O ^ pE$' O p~ y SV O ii ~ N $ A ~ 'C ~ N . Y ' N A Q ~! o x" (p E N N N N N N N N N N N N N M O N p O O p O O O Y ~ r^ ~ ~[~ g ~ ~ O ~ e m p~ p i(i N V Y N d $ O ~ C O O N { ~{ ? Ml MI Y 1 N ~ E N M /' l lV N M N N N N N N M N N N N ~~ ~ ~ r S O $ F O' N N OO N ~ p O ~ O ~ e O ~mm OO 1m` t0 P ~ pSQ n m N O ~R % n ~ ~6 I~ m fV ~ p tit N 1~ 1~ q O Y O ^ VI W ' C ~' E O M N N N N N M M N N M n {_~ tp o r N ry I WO n O b n n aO m S $ 0 ~ ~' N V S pO m "' ~ S pp O o yO Y l, b OO ~ ~ m O ~ qm m $ S r_ S S ~ N N 8 8 O t p t0 p ~ y1 ~ r r N p 6 y N ~ mp N ~ ~ O ~ G' n N N N N N N N N M N M M N N N N M O X y H ~ U ~i C r ~ ` ~ ~ ~ i O E < ~ ~ ggy g yp~ ry ~ S a~j .~ 8 3 a{~ (~ C ~ 8 j' e ~ $ ~ ~ ~j q ~ ~{ pF i E F E i F ~ Q a K { y 6• $ W ~ a r ~~ z N ~ Y 6 2 g a ~g ~ 8 g ~ ! ~ P~ ~8 ~F p j ~ E_ ttpp N ~ gy $ ; °a ~ L `o E Y ~ ; ~ i ; ~ ~ ~ r ~T~' P 8 ~ Ts ~~ - [y Nps ~ C p a ~ ~ yrypp $S V `p 2 ~ O E~ QQp° n` 8 ~C' F~ ° 2 e U ' 94 ~ ~ P~ 6 O~ ~ ~ ~ n £ ~ , L £~ E Na F v ~ N u C f. a Q i < C ~ Y 6 W Y g n u 5 G Y ~ 4 o L d U 6 1 F r y a c~ Q d