Staff Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: October 22, 2019 Report Number: PSD-043-19
Submitted By: Faye Langmaid, Acting Director of Planning Services
Reviewed By:
File Number:
Report Subject:
Andrew C. Allison, CAO
ZBA2019-0016
Resolution#: PD-165-19
By-law Number:
Public Meeting - Proposed Rezoning to permit East Penn battery facility
located at 1840 Energy Drive, Courtice)
Recommendations:
1. That Report PSD-043-19 be received;
2. That the proposed application for Rezoning ZBA 2019-0016 continue to be processed
including the preparation of a subsequent report; and
3. That all interested parties listed in Report PSD-043-19 and any delegations be
advised of Council's decision.
Municipality of Clarington
Report PSD-043-19
Report Overview
Page 2
This is a public meeting report to provide background information regarding a rezoning
application to permit a significant industrial development in Clarington's Energy Business
Park in Courtice.
The lands are owned by East Penn Canada Power Battery Sales Ltd. The proposed
amendment to zoning regulations will facilitate the relocation of their warehouse, distribution
centre and national head office to Clarington. The first phase of development is for 15,330
square metres of industrial warehouse, 2,950 square metres of office space, with a future
second phase of warehouse space having an area of 13,935 square metres.
1. Application Details
1.1 Owner/Applicant
1.2 Agent:
1.3 Proposal:
1.4 Area:
1.5 Location:
1.6 Roll Number:
1.7 Within Built Boundary:
2. Background
East Penn Canada Power Battery Sales Ltd.
D.G. Biddle & Associates Limited
Proposed amendment to regulations in the Energy Park
Prestige Exception (M02-1) Zone
9.85 hectares (24.35 acres)
1840 Energy Drive, Courtice
Part of Lot 27, Broken Front Concession
Former Township of Darlington
1817 010 050 008900
Yes
2.1. On September 13, 2019, East Penn submitted an application to amend the Zoning By-
law. The purpose of the rezoning is to amend the setback regulations in the existing
Energy Park Prestige Exception (M02-1) Zone. The effect would be to allow for the
relocation of the East Penn battery warehouse and head office (currently located in
Ajax) to the Energy Drive site. (See Figure 1: Key Map).
Municipality of Clarington
Report PSD-043-19
Figure 1: Key Map
Page 3
2.2. The business involves battery post -production, distribution and recycling. The office
component will serve as the national headquarters of East Penn. The total building floor
space proposed for the site including all phases would total 32,215 square metres
(close to 350,000 square feet). The company has 17 warehouse facilities across
Canada.
Municipality of Clarington Page 4
Report PSD-043-19
2.3. The applicant has submitted the following studies and reports in support of the
development. These are reviewed under Section 7 of this report:
• Planning Opinion Letter
• Functional Servicing and Stormwater Management Report
• Traffic Impact Study
• Phase I and II Environmental Site Assessment
3. Land Characteristics and Surrounding Uses
3.1. The subject lands are currently vacant of buildings or structures. The lands were once
the location of Manheim's Auto Auction and used for parking and storage of off -lease
cars until approximately 2010.
3.2. The site is relatively flat and drains west to an existing watercourse and stormwater
pond at the western edge of the site. There is a berm located along the south end of
the site adjacent to Energy Drive.
Figure 2: View of Site towards Southeast
3.3. The surrounding uses are as follows:
North - Megawatt Drive, realigned Highway 401 and off -ramps
South - Existing Energy from Waste facility and OPG's Durham Energy Complex
East - Vacant Industrial Lands owned by Ontario Power Generation
West - Vacant Industrial Lands owned by the Region of Durham
Municipality of Clarington
Report PSD-043-19
4. Provincial Policy
Provincial Policy Statement
Page 5
4.1. Settlement areas are the focus of growth and development. Appropriate land uses are
based on efficient use of land, resources and infrastructure.
4.2. Economic development and competitiveness is supported by an appropriate mix and
range of employment uses. Municipalities are to provide opportunities for a diversified
economic base, including providing for a range and choice of suitable sites for
employment uses. The necessary infrastructure to support current and projected needs
shall be provided. Employment areas in proximity to major goods movement facilities
and corridors for employment uses that required those locations shall be protected.
4.3. Natural features shall be protected and appropriate stormwater management facilities
must be provided.
4.4. The proposed amendments are consistent with the Provincial Policy Statement.
Provincial Growth Plan
4.5. Forecasted growth is directed to settlement areas on full municipal services. Complete
communities offer and support opportunities for all people to access an appropriate mix
of jobs, local store and services, housing, transportation and public service facilities.
4.6. Economic development and competitiveness in the Greater Golden Horseshoe is
supported by making more efficient use of vacant and underutilized employment lands
and increasing employment densities. Transit connections should be planned to major
employment areas. Municipalities may identify and protect prime employment areas
along major goods movement facilities and corridors, including major highway
interchanges.
4.7. Transportation policies of the Growth Plan support planning for multimodal access to all
land uses including employment areas. Municipalities will provide for priority routes for
goods movement to facilitate the movement of goods into and out of employment areas,
and provide alternate routes connecting to the provincial network.
4.8. Detailed storm water management plans must be completed, and must be informed by
a subwatershed plan or equivalent, incorporate integrated treatment including low
impact development techniques and green infrastructure and establishing planning,
design and construction practices to minimize environmental impacts.
Municipality of Clarington Page 6
Report PSD-043-19
4.9. The proposed amendment conforms to the direction of the Growth Plan for the Greater
Golden Horseshoe and will contribute to employment generation in the designated Built-
up area.
5. Official Plans
Durham Regional Official Plan
5.1. The Durham Region Official Plan designates the lands as "Employment Area".
Employment Areas are intended accommodate uses that may require access to the
highway, rail and/or shipping facilities, separation from sensitive uses, or may benefit
from locating close to similar uses. Uses permitted in this area may include
manufacturing, assembly, and processing of goods, service industries, research and
development industries, and warehousing.
Clarington Official Plan
5.2. The Clarington Official Plan designates the subject lands Business Park.
5.3. A small area of land is identified as part of the natural heritage system. This area is
associated with a small tributary of Tooley Creek.
5.4. Business Parks have prime exposure along Highway 401 and major arterial roads.
Development within Business Parks is intended for employment uses exhibiting the
highest standard of building design and landscaping in order to provide an attractive
appearance that reflects or takes advantage of such high visibility. Goals, objectives
and policies applicable to Business Parks shall be set out in Secondary Plans.
5.5. A minimum density target of 30 jobs per gross hectare is required adjacent to the
Highway 401 Corridor.
Clarington Energy Business Park Secondary Plan
5.6. The Secondary Plan designates the subject lands a mix of Prestige Employment
Corridor and Light Industrial 1.
5.7. The intent of the Energy Business park policies is to promote growth in the energy and
environment sectors of the regional economy and to create an energy cluster.
5.8. The Prestige Employment Corridor designation permits business office; research and
development facilities; university and college facilities; manufacturing, assembling and
fabricating facilities; warehousing (ancillary to the uses listed above) and commercial or
technical schools.
Municipality of Clarington Page 7
Report PSD-043-19
5.9. The Light Industrial 1 designation permits business office; research and development
facilities; manufacturing, assembling and fabricating facilities; industrial processing of
waste materials, and warehousing (ancillary to the uses listed above).
5.10. The Secondary Plan provides urban design standards with respect to streetscaping, site
layout and design, landscaping and location of parking and loading areas.
5.11. The proposed amendment to zoning regulations continue to conform to the Secondary
Plan direction. The plan policies, including urban design directives, will be further
reviewed and implemented at the site plan stage.
6. Zoning By-law
6.1. Zoning By-law 84-63 zones the subject lands Energy Park Prestige Exception (MO2-1)
Zone. The MO2-1 Zone permits the proposed energy -related and office space however
the applicant proposes to amend the setback regulations to fit the development on the
site.
7. Summary of Background Studies
Planning Opinion Letter
7.1. The Planning Opinion letter reviews the development in the context of the Durham
Regional Official Plan, the Clarington Official Plan and the Clarington Energy Park
Secondary Plan.
7.2. The proposed uses for the site conform to the Secondary Plan. The orientation of the
building will be along Energy Drive, with loading areas to the north. Screening, berming
and landscaping will address views from Highway 401.
7.3. The report acknowledges that the Secondary Plan and existing Zoning may have
contemplated the development of several smaller parcels and buildings versus one
large development. The requested rezoning will tailor the zoning to the proposed
massing and scale of the development.
7.4. Building materials, urban design elements and landscaping are intended to reflect the
prestige designation as it relates to high visibility along Energy Drive and Highway 401,
appropriate screening of loading and service areas.
Municipality of Clarington Page 8
Report PSD-043-19
7.5. Due to the size and operation requirements of the proposed uses, the Zoning By-law
setbacks cannot be adhered to, triggering the need for amendments to setbacks. The
consultant provided a draft zoning by-law amendment for consideration.
Functional Servicing Report
7.6. The study and preliminary servicing drawing demonstrate the site can be serviced by
existing water and sanitary sewers and connections that exist at the south property limit
along Energy Drive.
7.7. Stormwater management will be addressed on -site in accordance with the Clarington
Energy Business Park Master Drainage Plan (AECOM, March 2011). Two private
stormwater management ponds are proposed — one to the north of the warehouse, and
one along the westerly edge of the property. The ponds will be designed to address
water quantity and water quality. An infiltration gallery is proposed along the east limit of
the building will be designed to accept all water collected on the roof top of the
development.
7.8. The report also provides recommendations on sediment and erosion controls to be
implemented during the construction phase.
Traffic Impact Study
7.9. The Traffic Impact Study finds that the road network and intersections proximate the site
will continue to operate within acceptable levels of service. However, the study does
identify left turning movements at Courtice Road ramps associated with Highway 401
that are forecasted to operate at a poor level of service. The turning movements would
be improved by signalization.
7.10. The report identifies that the area is in transition because of construction related to
Highway 418 and should be monitored as traffic patterns stabilize.
7.11. The report identifies that while the local road network of Energy Drive, Osborne Road
and Megawatt Drive can accommodate the proposed development that the broader
issue of turning movements at the Courtice Road ramps will require review and
recommendations as part of the overall Secondary Plan review and transportation
planning for the neighbourhood.
7.12. The study also recommends implementing strategies such as transit connections and
active transportation linkages as alternatives to vehicular access to the site.
Municipality of Clarington
Report PSD-043-19
Phase I and II Environmental Site Assessment
Page 9
7.13. Both a Phase I and a Phase II Environmental Site Assessment were completed in
accordance with the Ministry of Environment, Conservation and Parks guidelines, and
the Region of Durham's Site Contamination Protocol. From the soil and water sample
testing, no exceedances were noted from the Qualified Person. Since the proposed
development is not considered a sensitive use, no further study is required, and the site
is cleared for development from a soil and water contamination perspective.
8. Public Submissions
8.1. A notice of the Public Meeting was mailed on October 1, 2019. Three public meeting
signs were posted on the subject property. The Notice was posted on the municipal
website, in social media platforms and in the Clarington e-update.
8.2. At the time of writing this report, no area land owners or residents have contacted staff
regarding the proposal.
9. Agency Comments
Regional Municipality of Durham
9.1. Regional Planning provided informal comments advising they have no objections to the
rezoning subject to clearance of Regional interests such as: The Region's Site
Contamination Protocol, Archaeology and Regional Works requirements as part of a
Holding Provision on the site and/or as part of the future site plan approval process.
Central Lake Ontario Conservation Authority.
9.2. The Central Lake Ontario Conservation Authority has no objections to the zoning by-law
amendment. The Engineering drawing and functional servicing report are under review
and will be finalized as part of the site plan application.
Ministry of Transportation
9.3. The Ministry of Transportation has no objections to the rezoning. The functional
servicing report and traffic impact study are under review and will be finalized as part of
the site plan application.
Durham Regional Police Communications
9.4. The Communications Department of DRPS has no objections.
Municipality of Clarington Page 10
Report PSD-043-19
10. Departmental Comments
Engineering Services
10.1. Engineering Services has no objection to the rezoning. Functional servicing and grading
plans for the site are satisfactory and may be refined during the site plan approval
stage.
10.2. Standard comments with respect to financial requirements, boulevard works, entrance
construction, road occupancy and site alteration will be forwarded to the applicant and
to be address at the site plan stage.
10.3. A cash -in -lieu of parkland payment will be required as a condition of site plan approval.
Emergency and Fire Services
10.4. Emergency and Fire Services does not object to the rezoning and provided comments
relating to requirements for fire hydrant connections and is to be reflected on the site
plan submission.
Building Division
10.5. The Building Division has no comments or objections to the rezoning.
Accessibility Committee
10.6. The Committee does not object to the rezoning. The Committee provided guidance on
site design to provide for accessible parking; barrier -free path of travel throughout the
site; and accessible outdoor amenity space for employees. The Committee will continue
to be circulated during the site plan process.
11. Discussion
11.1. The proposed energy -related use is permitted by the Official Plan, the Clarington
Energy Park Secondary Plan and the Zoning By-law, as amended.
11.2. The existing Zoning By-law for the Energy Park was approved in 2006. At the time the
by-law was drafted to implement the Clarington Energy Park Secondary Plan. A site -
specific zone was created for this parcel to recognize the existing Manheim Auto
Auction facility.
Municipality of Clarington Page 11
Report PSD-043-19
11.3. The existing Secondary Plan appears to have contemplated the site being split into
southern parcels fronting Energy Drive, and northern parcels along Megawatt Drive
(former South Service Road).
11.4. The north half of the site is designated as a Prestige Employment Corridor, while the
southern half of the site is designated as Light Industrial 1 in the Secondary Plan. The
permitted employment uses in both designations are very similar and include office,
research and development, manufacturing, fabricated and assembly uses and
warehousing ancillary to office uses. The Prestige Employment Corridor differs slightly
in that additional uses such as post -secondary uses, and commercial/technical schools
are permitted. The Prestige Employment Corridor policies highlight the high degree of
visibility from Highway 401. Development should take advantage of these views,
however any service or loading areas should be appropriately screened.
11.5. Zoning regulations were drafted when the ultimate end -user of the site was not known.
They did not contemplated the entire property would redevelop with one large use, but
rather developed as multiple lots, buildings and uses.
11.6. The developable area of the parcel has also been impacted by construction along
Highway 401 and works related to the Highway 418 interchange. South Service Road
(now Megawatt Drive) has been relocated by the Ministry of Transportation. The road
has shifted south between 65 and 95 metres. Land previously owned by Manheim's was
acquired by the Ministry of Transportation to facilitate the road realignment.
11.7. The Secondary Plan and zoning for the Energy Park are currently being revisited.
Given the Secondary Plan policies, the proposed East Penn applications provide an
opportunity to revisit zone regulations and the relationship between the building and
Energy Drive and Osborne Road and its visibility to Highway 401 specifically for this
property.
11.8. During review of the preliminary site plan, it is apparent that adjustments to minimum
and maximum setbacks, and slight adjustments to landscape open space, and parking
area location on the lot will be necessary.
11.9. The Traffic Impact Study indicates that the ramps at Courtice Road and Highway 401
operate at a reduced level of service. However, transportation planning for the area
includes the future installation of 3 sets of signals at: the Courtice ramps on the north
side of the 401; the ramps on the south side of Highway 401, and again where Courtice
Road meets Energy Drive and Megawatt Drive. These improvements are to be
completed by the end of 2019.
Municipality of Clarington Page 12
Report PSD-043-19
11.10. To address the policies of the Secondary Plan, the following design considerations,
beyond zoning regulations, must be addressed by East Penn and their consulting team:
• Treatment at the corner of Energy Drive and Osborne Road — building must be
designed with emphasis at the intersection, including landscape design
elements. Applicant to considered incorporating public art into design.
• Building design and treatment along streets to ensure high quality architecture
and building materials within the public realm. Accessible entrances via the
public right-of-way.
• Sustainability and energy efficiency elements to be encouraged and highlighted
during site and building design.
• Active transportation pathways through the site with connections to the broader
neighbourhood.
• Treatment along Megawatt Drive to be sensitive to the site's high visibility along
Highway 401. Berming and landscaping to be installed to screen loading and
services areas up to the first storey. Structures and signage visible above the first
storey to be upgraded given the site's location along the Prestige Employment
Corridor. 3-D modelling of these views will be required at the site plan stage.
11.11. East Penn submitted a site plan application on October 8, 2019 which is in circulation. A
recommendation report regarding rezoning will be prepared once staff is satisfied that
the site design has undergone initial review by staff and agencies, to ensure all
necessary amendments to the Zoning By-law are considered.
12. Concurrence
Not Applicable.
13. Conclusion
It is recommended that the application continue to be processed. A recommendation
report and amending Zoning By-law will be drafted upon resolution of the above issues.
Staff Contact: Anne Taylor Scott, Senior Planner, 905-623-3379 ext. 2414 or
ataylorscott(a-clarington . net
The following is a list of the interested parties to be notified of Council's decision:
Jim Bouchard, East Penn Canada
Mike Bouchard, East Penn Canada
John Papanicolaou, East Penn Canada
Michael Fry, D.G. Biddle & Associates Ltd.
Michael Carswell, D.G. Biddle & Associates Ltd.