Loading...
HomeMy WebLinkAboutCOD-020-19Clarington Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: October 15, 2019 Report Number: COD-020-19 Submitted By: Marie Marano, Director of Corporate Services Reviewed By: Andrew C. Allison, CAO Resolution#: GG-474-19 File Number: CL2019-28 By-law Number: Report Subject: 2019 Facility Parking Lot Recommendations: 1. That Report COD-020-19 be received; 2. That C. Aurora Paving Ltd. with a total bid amount of $248,618.00 (Net HST Rebate, being the lowest compliant bidder meeting all terms, conditions and specifications of tender CL2019-28 be awarded the contract for the 2019 Facility Parking Lot, as required by the Engineering Services Department; 3. That the total funds required for this project in the amount of $277,498.74 (Net HST Rebate), which includes the construction cost of $248,618.00 (Net HST Rebate) and other costs including material testing, and contingencies in the amount of $28,880.74 (Net HST Rebate) is in the approved budget allocation as provided and will be funded from the following accounts; Description Account Number Amount Parking Lot Rehab (2019) 110-32-327-83614-7401 $255,043 Retaining Wall (2019) 110-36-330-83438-7401 22,456 4. That all interested parties listed in Report COD-020-19, and any delegations be advised of Council's decision. Municipality of Clarington Report COD-020-19 Report Overview Page 2 To request authorization from Council to award the contract for the work as required for the rehabilitation of the Church Street Parking. This work includes: asphalt paving, parking area operational improvements, pedestrian accommodation, drainage improvements, retaining wall removal, along with some planting. 1. Background 1.1. Tender specifications for reconstruction of the road alignment and road priority inclusive of road surface works, utility relocations, land exchange, railway signal replacement/ relocation, etc. were prepared by the Engineering Services Department and provided to the Purchasing Services Division. 1.2. Tender CL2019-28 was prepared and issued by the Purchasing Services Division and advertised electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyers Association's website. Nineteen (19) Companies downloaded the tender document. 1.3. The Tender closed August 7, 2019 2. Analysis 2.1. Six (6) bids were received in response to the tender call. 2.2. Of the thirteen (13) companies who downloaded the tender documents but chose not to submit pricing: • Two were construction associations; • One company was unable to meet the submission deadline; • Two companies were unable to meet our schedule due to their current workload; and • Eight companies did not respond to our request for information. 2.3. The bids were reviewed and tabulated by the Purchasing Services Division (see Attachment 1). All six submissions were deemed compliant. 2.4. The results were forwarded to the Engineering Services Department for their review and consideration. Municipality of Clarington Page 3 Report COD-020-19 2.5. After review and analysis of the submissions by the Engineering Services Department and the Purchasing Services Division, it was mutually agreed that the low bidder, C. Aurora Paving Ltd.be recommended for the award of tender CL2019-28 (see Attachment 2). 2.6. C. Aurora Paving Ltd. has successfully completed work for the Municipality in the past. 3. Financial 3.1. The total funds required for this project in the amount of $277,498.74 (Net HST Rebate), which includes the construction cost of $248,618.00 (Net HST Rebate) and other costs including material testing, and contingencies in the amount of $28,880.74 (Net HST Rebate) is in the approved budget allocation as provided and will be funded from the following accounts: Description Account Number Amount Parking Lot Rehab (2019) 110-32-327-83614-7401 $255,043 Retaining Wall (2019) 110-36-330-83438-7401 22,456 3.2. Queries with respect to the department needs, specifications, etc. should be referred to the Director of Engineering Services. 4. Concurrence This report has been reviewed by the Director of Engineering Services and the Director of Operations who concur with the recommendations. 5. Conclusion It is respectfully recommended that C. Aurora Paving Ltd. being the lowest compliant bid be awarded the contract for the 2019 Facility Parking Lot in accordance with all the terms, conditions specifications and drawings of tender CL2019-28. Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 Ext 2209 or dferguson@clarington.net. Attachments: Attachment 1 — Bid Summary Attachment 2 — Memo to Purchasing from Engineering Services Interested Parties: List of Interested Parties available from Department. Municipality of Clarington Report COD-020-19 Attachment 1 Page 4 Municipality of Clarington CL2019-28 2019 Facility Parking Lots Bid Summary BIDDER Total Bid (including HST) TOTAL BID (Net HST Rebate) C. Aurora Paving Ltd. $276.079.34 $248,618.00 Coco Paving Inc. $279,596.47 $251,785.28 Tri Son Contracting Inc. $286,191.71 $257,724.98 Ashland Paving Ltd. $308,817.01 $278,097.44 Dig -Con International Ltd. $326,869.11 $294,355.76 Springside Paving Ltd $361,157.49 $325,233.51 Clarftwn MEMO TO: David Ferguson, Purchasing Manager FROM: Ron Albright, P. Eng. Assistant Director - Engineering Services DATE: September 13, 2019 RE: 2019 Facility Parking Lots CL2019-28 The Engineering Services Department has reviewed the low bid by C. Aurora Paving Ltd. for CL2019-28 and offer the following comments. The work locations and a brief description is listed below. Item Limits Description Church Street 132 Church Street bounded by Parking lot rehabilitation Division Street to the East, Church including asphalt paving, Street to the South, and 47 parking area operational Temperance Street to the West. improvements, pedestrian accommodation, drainage improvements, retaining wall removal, planting The low bidder on this contract was C. Aurora Paving Ltd. Based on past experience with this contractor, we recommend the contract be awarded to C. Aurora Paving Ltd. in the amount of $276,079.34 inclusive of HST, or $248,618.00 net of HST rebate. A total contingency amount of approximately 10% of construction costs is required for this project, based on past experience. Therefore, including contingency, material testing and net HST costs, the Engineering Department advises of the following funding. Note that design, tendering, inspection, and contract administration will be done by municipal staff. 2019 Facility Parking Lots CL2019-28 2 September 13, 2019 Construction Cost, based on low bid (net of HST) $248,618.00 Other Costs (net of HST) $29,949.80 Total Project Cost $278,567.80 Allocated Financing Parking Lot Rehab (2019) 110-32-327-83614-7401 $278,567.80 Total Allocated Financing $278,567.80 * A more detailed breakdown is to be provided to Finance to provide necessary information for tracking of Tangible Capital Assets (TCA). As per the pricing low bid received there remains a shortfall in the Parking Lot Rehab - 110-32-327-83614-7401 account of $22,473.25. Funding from the Retaining Wall - 110- 36-330-83438-7401 (2019) account in the amount of $22,473.25 will be utilized to cover this shortfall as the current retaining wall in the existing lot will be removed in the scope of the work. The Engineering Services Department recommends that the Purchasing Department move forward with award of the contract based on the above apportionments. Should you have any further questions, please feel free to contact the undersigned. Regards, 'e, Ron Albright, P. Eng. Assistant Director - Engineering Services RA/RB/ra CC' Trevor Pinn, Director of Finance A.S. Cannella, Director of Engineering Services 2019 Facility Parking Lots CL2019-28 T September 13, 2019 K EYP LAN N.T.S.